1 – 10 of over 1000Sina Moradi and Kalle Kähkönen
The emergence of collaborative delivery models and working practices in construction industry has created a potential area for project success research. Previous studies have…
Abstract
Purpose
The emergence of collaborative delivery models and working practices in construction industry has created a potential area for project success research. Previous studies have addressed success factors of various collaborative delivery models (e.g. alliance and partnering). However, there is currently very limited research-based knowledge concerning core success factors for different collaborative delivery models, exploring the commonalities. Thus, this study aims to conceptualize a success model for collaborative construction projects by identifying and structuring their core success factors through the lens of project delivery elements.
Design/methodology/approach
A systematic literature review was conducted, and thematic as well as content analysis of the relevant studies led to the identification of mentioned success factors in the literature for different collaborative delivery models. Then, those common success factors were structured in a model based on factors' relation to project delivery elements.
Findings
The obtained results present eight core success factors (e.g. equality, mutual trust and commitment to win–win philosophy) for collaborative construction projects, structured in a model based on their contribution toward project organization, contractual relationships, and operational system in construction project delivery. Moreover, the differences between success factors for traditional and collaborative construction projects are discussed.
Originality/value
This study's findings provide insightful theoretical contributions on collaborative construction project success and providing a departure point for future studies based on the discussed differences between success factors of collaborative and traditional construction projects. The findings can be also practically insightful for the project professionals in collaborative construction projects to succeed in managing project organization, contractual relationships, and operational system.
Details
Keywords
Eloise Grove, Andrew Dainty, Derek Thomson and Tony Thorpe
The intra-organisational relationships of through-life support services providers are complex, especially given the multifaceted nature of the provision required. For example…
Abstract
Purpose
The intra-organisational relationships of through-life support services providers are complex, especially given the multifaceted nature of the provision required. For example, capabilities within the UK highways maintenance arena must support engineering design, routine maintenance and the on-going management of the network. While collaboration in construction projects has formed a major research focus in recent years, there is a paucity of work examining collaboration in-flight.
Design/methodology/approach
Through a micro-practices approach, two contracts delivering highway infrastructure maintenance and renewal services are examined to explore the intra-organisational relationships that determine the quality of service delivered.
Findings
Despite the rhetoric of collaboration and integrated working that pervades the contemporary project discourse, there was a clear focus on addressing immediate technical and commercial concerns, rather than on creating the conditions for integrated working to flourish. On the occasions where the collaborative environment was prioritised, a more integrated service was delivered.
Originality/value
In contrast to other accounts of the ways collaborative working shapes performance, this research reveals an acute need for a sustained collaborative effort; as soon as “collaborative working” was normalised, the level of integration and seamlessness of service was diminished. This questions normative notions of what defines collaborative working in projects and suggests a need for re-framing it as an on-going accomplishment of actors involved. Such a perspective resonates with notions of “organizational becoming”, particularly in that attempts to foster collaboration are themselves constitutive of the unfolding and shifting nature of intra-organisational relationships that emerge in complex contractual arrangements.
Details
Keywords
Rouzbeh Shabani, Tobias Onshuus Malvik, Agnar Johansen and Olav Torp
Uncertainty management (UM) in projects has been a point of attention for researchers for many years. Research on UM has mainly been aimed at uncertainty analyses in the front-end…
Abstract
Purpose
Uncertainty management (UM) in projects has been a point of attention for researchers for many years. Research on UM has mainly been aimed at uncertainty analyses in the front-end and managing uncertainty in the construction phase. In contrast, UM components in the design phase have received less attention. This research aims to improve knowledge about the key components of UM in the design phase of large road projects.
Design/methodology/approach
This study adopted a literature review and case study. The literature review was used to identify relevant criteria for UM. These criteria helped to design the interview guide. Multiple case study research was conducted, and data were collected through document study and interviews with project stakeholders in two road projects. Each case's owners, contractors and consultants were interviewed individually.
Findings
The data analysis obtained helpful information on the involved parties, process and exploit tools and techniques during the design phase. Johansen's (2015) framework [(a) human and organisation, (b) process and (c) tools and techniques)] was completed and developed by identifying relevant criteria (such as risk averse or risk-taker, culture and documentation level) for each component. These criteria help to measure UM performance. The authors found that owners and contractors are major formal UM actors, not consultants. Empirical data showed the effectiveness of Web-based tools in UM.
Research limitations/implications
The studied cases were Norwegian, and this study focussed on uncertainties in the project's design phase. Relevant criteria did not cover all the criteria for evaluating the performance of UM. Qualitative evaluation of criteria allows further quantitative analysis in the future.
Practical implications
This paper gave project owners and managers a better understanding of relevant criteria for measuring UM in the owners and managers' projects. The paper provides policy-makers with a deeper understanding of creating rigorous project criteria for UM during the design phase. This paper also provides a guideline for UM in road projects.
Originality/value
This research gives a holistic evaluation of UM by noticing relevant criteria and criteria's interconnection in the design phase.
Details
Keywords
Kari-Pekka Tampio, Harri Haapasalo and Farooq Ali
This study primarily aims to analyse stakeholder management challenges and how these emerge in the stakeholder landscape in a large hospital project. From this analysis, the…
Abstract
Purpose
This study primarily aims to analyse stakeholder management challenges and how these emerge in the stakeholder landscape in a large hospital project. From this analysis, the authors aim to identify the implications that stakeholder management has on value creation in a hospital project.
Design/methodology/approach
The research method is qualitative. Empirical data were collected in three cycles: project internal documentation, thematic interviews and survey. The literature related to hospital projects, stakeholder analysis and management, stakeholder salience and landscape is summarised, informing the qualitative design of the study.
Findings
The authors noted the importance of project-specific stakeholder identification, salience analysis and landscape description. The regulatory, formal and contractual stakeholders give an over-simplistic picture on stakeholder map. The operative stakeholder map and landscape describe the complexity, uncertainty, dynamism and institutional context inducing the challenges for the stakeholder management. There is an evident potential of utilising the stakeholder landscape and its elements in the resulting collaborative value creation in hospital projects. Multiple and changing stakeholders with differing expectations are an important opportunity to improve the value creation process.
Originality/value
Stakeholder management has recently attracted much attention in the industrial project setting. This research attempts to identify the operative stakeholder landscape in a large hospital project, not to mention its impact on value creation. This study offers a framework that can help academics and project management practitioners tackle the challenges amongst project stakeholders.
Details
Keywords
Kirsi Aaltonen and Virpi Turkulainen
In this study, we develop further understanding of how institutional change is created within a mature and local industry. In this pursuit, we examine how a collaborative large…
Abstract
Purpose
In this study, we develop further understanding of how institutional change is created within a mature and local industry. In this pursuit, we examine how a collaborative large project governance model was institutionalized at an industrial sector-level through both industry-level activities and “institutional projects”.
Design/methodology/approach
This study builds on the foundations of institutional fields and institutional change, suggesting that projects are not only shaped by their contexts but also produce institutional change themselves. We conducted extensive fieldwork on the institutionalization of a collaborative project governance model in Finland.
Findings
The findings illustrate how institutional change in governance of large and complex inter-organizational projects is created at the institutional field level. The institutionalized collaborative project governance model includes aspects of both relational and contractual governance. The change was facilitated by temporal links between the institutional projects as well as vertical links between the institutional projects and the field-level development programs.
Originality/value
This is one of the first studies to address how a collaborative large project governance model becomes the norm at the institutional field level beyond the boundaries of an individual project or organization.
Details
Keywords
The purpose of this study is to investigate how procurement strategies may be designed to facilitate exploration and exploitation in construction projects.
Abstract
Purpose
The purpose of this study is to investigate how procurement strategies may be designed to facilitate exploration and exploitation in construction projects.
Design/methodology/approach
This paper is based on a literature review of organizational research and construction management literature together with a brief interview study of Swedish clients and contractors.
Findings
The theoretical and empirical findings propose that small and simple projects with low uncertainty and scarce resources may focus on exploitation to enhance short-term efficiency through traditional procurement strategies including delivery systems that separate the actors and their activities (i.e. pure design-build- or design-bid-build-contracts), fixed price payment and price focus in bid evaluation. Large complex projects with high uncertainty and customization benefit from combining exploration and exploitation to enhance sustainable performance. This requires collaborative procurement strategies including joint specification through early contractor involvement, cost reimbursement coupled with incentive-based payment, bid evaluation based on multiple criteria and collaborative tools and activities in partnering arrangements.
Research limitations/implications
This paper contributes to organizational learning literature by pinpointing the need for integrating procurement strategies that enhance combination of exploration and exploitation. The main contribution to the construction management literature involves the investigation of how procurement strategies may affect exploration and exploitation, as identified and articulated in the propositions developed in this paper.
Practical implications
From a practical perspective, the findings highlight the importance of tailoring procurement strategies to project characteristics to enhance a suitable balance between exploration and exploitation in construction projects.
Originality/value
The explicit focus on the operational project-level is uncommon but relevant in organizational learning literature.
Details
Keywords
Kari-Pekka Tampio, Harri Haapasalo and Jere Lehtinen
The research problem in this study is how a client (as a project owner) should organise early stakeholder involvement and integration in the front-end phase of a project. This…
Abstract
Purpose
The research problem in this study is how a client (as a project owner) should organise early stakeholder involvement and integration in the front-end phase of a project. This study aims to create normative managerial statements as propositions from the client's perspective and to combine them into a set of activities enabling efficient organisation in the front-end phase of a hospital construction project.
Design/methodology/approach
Action design research (ADR) was carried out in a large hospital construction project where the first author acted as an “involved researcher” and the other authors acted as “outside researchers”.
Findings
The authors created seven normative managerial propositions that were verified by the case project stakeholders and developed a managerial framework describing the client's essential stakeholder involvement and integration activities in the front-end phase of a hospital construction project based on these propositions. The authors have also depicted the subphases of the front-end phase: value definition phase in the client permanent organisation, value proposition phase in the client Programme Management Office (PMO) and finally development phase in the alliance organisation ending on the final investment decision.
Practical implications
The collaborative contract delivery model enables the early involvement and integration of stakeholders. It has been somewhat surprising to note the extent to which collaborative contracts change the client role in the project front-end. The results offer practical activities for how clients can manage front-end activities in collaborative contracts.
Originality/value
The case project offered a platform to analyse how the collaborative contract delivery model changes the emphasis of activities in the front-end of a project. One of the key benefits of collaborative contracts is that development, design and delivery occur partially in parallel, thereby enabling contributions from production to be included in the design and development. The benefit of having a real-life case under study provides the possibility to triangulate and analyse rich data, however limited by the qualitative case method.
Details
Keywords
Siraj Ahmed, Jukka Majava and Kirsi Aaltonen
The purpose of this study is to investigate the benefits and challenges of implementing circular economy (CE), as well as shed light on the influence of procurement strategy in CE…
Abstract
Purpose
The purpose of this study is to investigate the benefits and challenges of implementing circular economy (CE), as well as shed light on the influence of procurement strategy in CE implementation in construction projects.
Design/methodology/approach
A qualitative research approach with abductive reasoning was adopted. The empirical data were collected from the construction industry in the United Arab Emirates (UAE).
Findings
The results reveal that clients, consultants and contractors have limited awareness, knowledge and motivation to implement CE in construction projects. The absence of incentives to design projects following CE principles, lack of involvement of contractors and suppliers, non-use of materials that use CE principles and current procurement strategies are the main challenges for the implementation of CE in the UAE.
Originality/value
Previous research offers limited knowledge on CE and its implementation in construction projects particularly from a procurement strategy perspective. The findings of the study provide new knowledge of the benefits, challenges and role of procurement strategy for implementing CE. It is suggested that collaborative and partnering-based procurement methods are needed to facilitate the effective implementation of CE.
Details
Keywords
Jeroen van Strien, Cees Johannes Gelderman and Janjaap Semeijn
Performance-based contracting (PBC) plays an increasingly important role in the defense industry. This paper aims to investigate factors that influence service provider’s…
Abstract
Purpose
Performance-based contracting (PBC) plays an increasingly important role in the defense industry. This paper aims to investigate factors that influence service provider’s willingness to accept PBC-induced risks. It also shows how these risks could be managed in a military service supply chain.
Design/methodology/approach
The case study focused on the relationship between a service provider and a customer that acted on behalf of other users in the defense sector. The contract involved the sustainment of a military engine in a complex supply chain.
Findings
The service provider’s performance attributability appeared to have a strong impact on its willingness to take PBC-induced risks. For the parts where the service provider did not have full control over the service performance, exclusions and Service Level Agreements (SLAs) were used to manage and mitigate the risks associated with uncontrolled performance. The service provider’s willingness to accept PBC-induced risks was also affected by its ability to make accurate forecasts, the applied growth path and the length of the contract.
Research limitations/implications
This case has specific characteristics, unique by time (maturity of the technical system and supply chain) and place (market). It is recommended that results are tested in other research settings.
Practical implications
Organizations should be aware of the factors that influence a service provider’s willingness to bear PBC-induced risks. Customers should limit PBC to those parts of a contract where risks are of an acceptable level. Also, it is recommended to follow a phased growth path when it is not possible to make accurate forecasts in a PBC context.
Originality/value
This study is the first to address critical issues concerning the identification and management of risks under PBC in the defense industry.
Details
Keywords
Kari-Pekka Tampio and Harri Haapasalo
The purpose of this paper is to identify the areas and logic of integration of different stakeholders using different methods and to analyse their applicability and challenges in…
Abstract
Purpose
The purpose of this paper is to identify the areas and logic of integration of different stakeholders using different methods and to analyse their applicability and challenges in practical projects. The main aim is to describe how these different methods impact value creation.
Design/methodology/approach
Action design research was carried out in a large hospital construction project where the first author acted as an “involved researcher” and the second author acted as an “outside researcher”. Two workshops were organised to evaluate the direct and indirect challenges and benefits of the applied four methods and to explain how different methods enable value creation.
Findings
All the studied methods provide good results in terms of usability and commitment to the aims of the project, thus delivering the direct benefits expected. Process, people and tools logic works well in this case project when applying the methods properly. Significant evidence was provided on secondary deliverables of the methods, and all analysed methods had a significant impact in the area of leading people, clarifying what “focus on people” means and how it is enabled.
Practical implications
Focus on people can be achieved through different operative methods if applied in the right way. It is necessary to select the most suitable methods based on all the direct and indirect deliverables.
Originality/value
This case project offered a platform to analyse integration methods in a real-life project using the collaborative contract method. The authors were able to participate in the analysis by taking action from the very beginning of the project in terms of training, learning, continuous development and coaching of these methods and evaluating the applicability.
Details