Open Access
Article
Publication date: 2 August 2022

Sina Moradi and Kalle Kähkönen

The emergence of collaborative delivery models and working practices in construction industry has created a potential area for project success research. Previous studies have…

2969

Abstract

Purpose

The emergence of collaborative delivery models and working practices in construction industry has created a potential area for project success research. Previous studies have addressed success factors of various collaborative delivery models (e.g. alliance and partnering). However, there is currently very limited research-based knowledge concerning core success factors for different collaborative delivery models, exploring the commonalities. Thus, this study aims to conceptualize a success model for collaborative construction projects by identifying and structuring their core success factors through the lens of project delivery elements.

Design/methodology/approach

A systematic literature review was conducted, and thematic as well as content analysis of the relevant studies led to the identification of mentioned success factors in the literature for different collaborative delivery models. Then, those common success factors were structured in a model based on factors' relation to project delivery elements.

Findings

The obtained results present eight core success factors (e.g. equality, mutual trust and commitment to win–win philosophy) for collaborative construction projects, structured in a model based on their contribution toward project organization, contractual relationships, and operational system in construction project delivery. Moreover, the differences between success factors for traditional and collaborative construction projects are discussed.

Originality/value

This study's findings provide insightful theoretical contributions on collaborative construction project success and providing a departure point for future studies based on the discussed differences between success factors of collaborative and traditional construction projects. The findings can be also practically insightful for the project professionals in collaborative construction projects to succeed in managing project organization, contractual relationships, and operational system.

Details

Built Environment Project and Asset Management, vol. 12 no. 6
Type: Research Article
ISSN: 2044-124X

Keywords

Open Access
Article
Publication date: 17 May 2024

Sina Moradi, Janne Hirvonen and Piia Sormunen

The energy performance gap (EPG) in building construction has been one of the major barriers to the realization of environmental and economic sustainability in the built…

Abstract

Purpose

The energy performance gap (EPG) in building construction has been one of the major barriers to the realization of environmental and economic sustainability in the built environment. Although there have been a few studies addressing this issue, studying this topic with a special focus on the project delivery process has been almost overlooked. Hence, this study aims to address the EPG in building construction through the lens of collaborative and life cycle-based project delivery.

Design/methodology/approach

In order to realize the objective of this study, the development of a theoretical framework based on the literature review was followed by a qualitative study in which 21 semi-structured interviews were conducted with Finnish project professionals representing clients, design/planning experts, constructors and building operation/maintenance experts to explore their views on the topic under study.

Findings

The findings reveal the project delivery-related causes of EPG in building construction. Moreover, the obtained results present a collaborative and life cycle-based delivery model that integrates project and product (i.e. building) life cycles, and it is compatible with all types of contractual frameworks in building construction projects.

Research limitations/implications

Although the findings of this study significantly contribute to theory and practice in the field of collaborative and sustainable construction project delivery, it is acknowledged that these findings are based on Finnish professionals’ input, and expanding this research to other regions is a potential area for further studies. Moreover, the developed model, although validated in Finland, needs to be tested in a broader context as well to gain wider generalizability.

Originality/value

The obtained results reveal the significance and impact of collaborative and life cycle-based project development and delivery on the realization of environmentally sustainable building construction.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Open Access
Article
Publication date: 3 July 2024

Anna af Hällström

Managing megaprojects is challenging due to their inherent complexity and uncertainty. Collaborative project delivery models have been introduced as an alternative to traditional…

Abstract

Purpose

Managing megaprojects is challenging due to their inherent complexity and uncertainty. Collaborative project delivery models have been introduced as an alternative to traditional project management in public infrastructure megaprojects and are often realized through collaborative contracts. These project organizations act as institutional arenas for logic interaction as actors with differing institutional backgrounds interact within the project. This paper aims to study the delivery phase of three megaprojects through an institutional lens, investigating the institutional interaction and alignment of logics therein.

Design/methodology/approach

A multiple case study was employed to reach deep insight into the phenomenon. Sixty-one interviews were conducted over 3 cases with representatives from all levels of the project hierarchy. Respondents were selected through snowball sampling. In two cases, observations of the shared project office were conducted. Data analysis built on first-order codes and second-order themes, collected into a theoretical framework.

Findings

The empirical evidence demonstrates the dynamics shaping institutional logics and gives evidence for changing logics in projects with a well-applied collaborative contract. However, there is a risk of resistance and a return to traditional logics since institutional change is slow and an unsuitably applied collaborative contract can lead to adherence to the conventional way of work.

Originality/value

Current research has focused on the regulatory framework and procurement phase of such models, but little attention has been given to the delivery phase and the interaction of conflicting logics. This paper can serve as an exemplar of the different logics found within public infrastructure projects and their interaction and alignment. Contributions include a heightened emphasis on the start of the project as a meeting point for differing institutional logics and the role change necessary when using a collaborative contract.

Open Access
Article
Publication date: 21 July 2023

Kari-Pekka Tampio, Harri Haapasalo and Jere Lehtinen

The research problem in this study is how a client (as a project owner) should organise early stakeholder involvement and integration in the front-end phase of a project. This…

1410

Abstract

Purpose

The research problem in this study is how a client (as a project owner) should organise early stakeholder involvement and integration in the front-end phase of a project. This study aims to create normative managerial statements as propositions from the client's perspective and to combine them into a set of activities enabling efficient organisation in the front-end phase of a hospital construction project.

Design/methodology/approach

Action design research (ADR) was carried out in a large hospital construction project where the first author acted as an “involved researcher” and the other authors acted as “outside researchers”.

Findings

The authors created seven normative managerial propositions that were verified by the case project stakeholders and developed a managerial framework describing the client's essential stakeholder involvement and integration activities in the front-end phase of a hospital construction project based on these propositions. The authors have also depicted the subphases of the front-end phase: value definition phase in the client permanent organisation, value proposition phase in the client Programme Management Office (PMO) and finally development phase in the alliance organisation ending on the final investment decision.

Practical implications

The collaborative contract delivery model enables the early involvement and integration of stakeholders. It has been somewhat surprising to note the extent to which collaborative contracts change the client role in the project front-end. The results offer practical activities for how clients can manage front-end activities in collaborative contracts.

Originality/value

The case project offered a platform to analyse how the collaborative contract delivery model changes the emphasis of activities in the front-end of a project. One of the key benefits of collaborative contracts is that development, design and delivery occur partially in parallel, thereby enabling contributions from production to be included in the design and development. The benefit of having a real-life case under study provides the possibility to triangulate and analyse rich data, however limited by the qualitative case method.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 7 July 2022

Kirsi Aaltonen and Virpi Turkulainen

In this study, we develop further understanding of how institutional change is created within a mature and local industry. In this pursuit, we examine how a collaborative large…

2905

Abstract

Purpose

In this study, we develop further understanding of how institutional change is created within a mature and local industry. In this pursuit, we examine how a collaborative large project governance model was institutionalized at an industrial sector-level through both industry-level activities and “institutional projects”.

Design/methodology/approach

This study builds on the foundations of institutional fields and institutional change, suggesting that projects are not only shaped by their contexts but also produce institutional change themselves. We conducted extensive fieldwork on the institutionalization of a collaborative project governance model in Finland.

Findings

The findings illustrate how institutional change in governance of large and complex inter-organizational projects is created at the institutional field level. The institutionalized collaborative project governance model includes aspects of both relational and contractual governance. The change was facilitated by temporal links between the institutional projects as well as vertical links between the institutional projects and the field-level development programs.

Originality/value

This is one of the first studies to address how a collaborative large project governance model becomes the norm at the institutional field level beyond the boundaries of an individual project or organization.

Details

International Journal of Operations & Production Management, vol. 42 no. 8
Type: Research Article
ISSN: 0144-3577

Keywords

Book part
Publication date: 16 October 2014

Denise C. Tahara and Richard P. Green

This paper proposes an organizational change process to prepare physicians and other health professionals for their new roles in patient-centered medical homes (PCMHs). It…

Abstract

Purpose

This paper proposes an organizational change process to prepare physicians and other health professionals for their new roles in patient-centered medical homes (PCMHs). It provides physician-centered tools, models, concepts, and the language to implement transformational patient-centered medical care.

Design/methodology/approach

To improve care delivery, quality, and patient engagement, a systems approach to care is required. This paper examines a systems approach to patient care where all inputs that influence patient interactions and participation are considered in the design of health care delivery and follow-up treatment plans. Applying systems thinking, organizational change models, and team-building, we have examined the continuum of this change process from ideation through the diffusion of new methods and behaviors.

Findings

PCMHs make compelling business sense. Studies have shown that the PCMH improves patient satisfaction, clinical outcomes and reduces underuse and overuse of medical services. Patient-centered care necessitates transitioning from an adversarial to a collaborative culture. It is a transformation process predicated on strong leadership able to align an organization toward a vision of patient-centered care, creating a collaborative culture committed to health-goal achievement.

Originality/value

This paper proposes that the PCMH is a rigorous team-building transformational organizational change, a radical departure from the current hierarchical, silo-oriented, medical practice model. It requires that participants within and across health care organizations learn new skills and behaviors to achieve the anticipated quality and efficiency improvements. It is an innovative health care organization model of the future whose success is premised on teams supplanting the individual as the building block and unit of health care performance.

Details

Population Health Management in Health Care Organizations
Type: Book
ISBN: 978-1-78441-197-8

Keywords

Article
Publication date: 15 June 2023

Ahmed Nouh, Elsayed Elkasaby and Omnia Wageh

Innovative design and execution approaches are employed in infrastructure sectors and planning to enhance the integrated project delivery system, assure the sustainability of…

Abstract

Purpose

Innovative design and execution approaches are employed in infrastructure sectors and planning to enhance the integrated project delivery system, assure the sustainability of infrastructure projects, and meet the demands of the dynamic, changing environment. Delivery methods must incorporate new technologies. By combining digital technology, teamwork, and mass manufacturing, a greater degree of exceptional quality, sustainability, and resilience in the environment will be generated. As a result, a new approach does not rely on the reaction policy, but instead considers alternative scenarios and employs a simulation model to determine the best course of action.

Design/methodology/approach

In the paper, the system dynamics approach to construction management is validated in light of pertinent research. Additionally, it describes the difficulties facing the infrastructure projects' delivery system. Additionally, the strategy for system dynamics creation is described. This strategy includes a causal loop diagram, generates a stock-flow diagram, and simulates forecasts of model behavior over time. Next, the optimization model's validation process is used to create a system dynamics model for choosing the best infrastructure project delivery system project and controlling it to maximize sustainability, mass production, digital integration, and team integration. The dynamic complexity of project management is growing.

Findings

The primary goal is to present a system dynamics (SD) simulation to look at how well infrastructure projects perform in terms of choosing the best method for delivering infrastructure projects. One of the most ideal methods for delivering projects is integrated project delivery. An effective methodology for making strategic decisions on the choice of the best project delivery method. In order to enhance certain infrastructure project delivery system metrics for sustainability, mass production, digital integration, and team integration, the model included building strategy and sophisticated system dynamics simulation. According to the construction strategy, the outcomes have been satisfactory.

Originality/value

System dynamics research has been done to replicate the idea of contemporary construction in order to determine the best approach for delivering infrastructure. The government and decision-makers would benefit from understanding this research as they decide on the best delivery method for boosting the sustainability and productivity of infrastructure projects in Egypt.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 25 October 2018

Teemu Mikael Lappi, Kirsi Aaltonen and Jaakko Kujala

ICT projects, especially in the public sector, can have a substantial impact on society but are challenging due to organizational and technological complexities and uncertainties…

Abstract

Purpose

ICT projects, especially in the public sector, can have a substantial impact on society but are challenging due to organizational and technological complexities and uncertainties. Collaborative and cooperative project delivery models, namely, the project alliance method, can mitigate such challenges, but, thus far, have not been utilized in information and communication technology (ICT) projects. The purpose of this paper is to explore and understand the cross-field transfer process through which the project alliance model was applied to the ICT field from the construction sector.

Design/methodology/approach

An inductive case study of the ICT project alliance early stages was performed. Data were collected from the first known ICT alliance project, conducted in the context of the Finnish public sector digitalization.

Findings

The findings show how the activities of institutional entrepreneurs impact the cross-field transfer process during the ICT project alliance’s early stages. Furthermore, the results illustrate the characteristics of an ICT project alliance and compare those with more traditional project alliances.

Originality/value

The topic and results of the study are original and contribute to institutional research by identifying and studying the micro-level processes associated with the cross-field transfer process. The study also builds an initial understanding of a new method of organizing ICT projects and contributes to the project alliance literature. The managerial implications of the findings allow project practitioners to understand the emerging characteristics of an ICT project alliance, and enable managers in the ICT field to adjust and prepare their own organizations and processes for the application of the project alliance model.

Details

International Journal of Managing Projects in Business, vol. 12 no. 2
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 8 July 2024

Abraham Kuol, Koorosh Gharehbaghi, Ken Farnes, Kong Fah Tee and Kerry McManus

While efficient design in engineering projects is crucial, this paper aims to examine the integration of Building Information Modeling (BIM) into railway Intelligent…

79

Abstract

Purpose

While efficient design in engineering projects is crucial, this paper aims to examine the integration of Building Information Modeling (BIM) into railway Intelligent Transportation Systems (ITS). The paper provides some key understanding of integrating BIM and ITS to improve the efficiency of railway infrastructure projects.

Design/methodology/approach

An in-depth qualitative analysis of three ITS case studies was conducted to understand BIM’s global impact and benefits in railway infrastructure projects. While case study one investigated the Crossrail (UK), the other two case studies were TUC Rail (Belgium) and the Intercity railway network (Norway).

Findings

The findings include the specific benefits of BIM, regarding the railway infrastructure. The result indicated that BIM benefits were consistently the same across all case studies. Although Case study 1 was the only one that boasts a high reduction in waste and reworks, all of the case studies showed less rework and delays due to BIM. The results indicated that the advantages of BIM for such projects are cost optimization, reduction in waste, rework and lessening delays. Subsequently, this leads to the ease and efficiency with which structures and railways can be built. The outcomes can ultimately assist transportation planners in better planning and managing railway projects.

Practical implications

This study proposes the integration of BIM into railway projects as a part of their ITS. The BIM integration into railway projects as a part of their ITS fits within the overall planning to handover phases. Specifically, the BIM integration improves the design process of typical railway projects. Thus, the most significant advantage of BIM for railway projects is to further improve their design process leading to a higher degree of constructability.

Originality/value

Railway infrastructure performs a major role in economic and regional development. The complexity of railway projects continues to increase as the need for more railway infrastructure is on the rise globally. BIM is proving to be an effective tool for improving the efficiency of railway infrastructure projects. As the utilization of BIM is intensifying, the railway industry can further exploit BIM to improve project delivery adeptness by offering greater collaboration leading to efficient design processes. As a result, the understanding of BIM for horizontal projects such as railway infrastructure on a global scale is a substantial exercise that this research aims to respond to.

Details

Technological Sustainability, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2754-1312

Keywords

Article
Publication date: 27 April 2012

Patricia McLaughlin and Julie Faulkner

Educational facilities and their design have considerable impact on how students learn. Recent research indicates that modern university students are spending less time on campus…

3601

Abstract

Purpose

Educational facilities and their design have considerable impact on how students learn. Recent research indicates that modern university students are spending less time on campus and more time interacting with their peers through technology. This paper aims to examine the responses of a small number of first year university students, at RMIT University, Melbourne, to questions about the type of learning facilities they want on campus.

Design/methodology/approach

First year undergraduate students were interviewed about their engagement with university and in particular their learning styles in the physical environment. Although a small volunteer sample (n=12), they were all first‐time users of the university and its facilities. The average age of the sample was 19.8 years. The case studies were interviewed regularly (n=8) over a 12‐month period and their responses to learning needs and styles and university facilities recorded. The gender mix (m=8, f=4) reflected the enrolment patterns in the university school. The students were given a range of discussion triggers in semi‐structured interviews to promote discussion about their own learning styles and where and when they felt they learnt best at university.

Findings

The responses of these students indicate a number of features about their interpretation of the relationship between university learning and teaching expectations and facilities. These are: learning for these students occurred in both formal and informal settings; there was evidence that the timetabled facility dictated the teaching style used and the opportunities for collaborative learning; active learning occurred more often for these students away from the classroom, often in informal, ad hoc spaces; these students placed an important emphasis on the technology available throughout the university; and the students favoured collaborative, social spaces for learning and technology exchange. The conclusions drawn from their responses indicate that these university students want flexible learning spaces that can adapt to both individual and collaborative work with a strong emphasis on social learning and advanced technology. The responses also indicate a mismatch between existing lecture theatres and tutorial rooms and the third space learning that these students want. The results have implications for the design and construct of future teaching and learning spaces in universities and other learning institutions.

Practical implications

Fisher notes the importance of safety, security, natural ventilation, lighting and other physical features as conducive to effective learning. Students in this study also indicated a need for multi‐use spaces for intense work and learning opportunities. These spaces also need to allow for students to interact with the global environment through technology.

Originality/value

The changes in learning and teaching have been significant in the past 25 years and the role of features such as technology, collaborative spaces and third space learning have created pressure on universities and staff to meet the demands of a modern community of scholars. There is now a far greater emphasis on the learning needs of tertiary students and the relationship between learning and facilities. The responses of this small sample of first time university users indicate that this relationship is critical.

Details

Journal of Facilities Management, vol. 10 no. 2
Type: Research Article
ISSN: 1472-5967

Keywords

1 – 10 of over 25000