Search results
1 – 10 of over 5000A real-time production scheduling method for semiconductor back-end manufacturing process becomes increasingly important in industry 4.0. Semiconductor back-end manufacturing…
Abstract
Purpose
A real-time production scheduling method for semiconductor back-end manufacturing process becomes increasingly important in industry 4.0. Semiconductor back-end manufacturing process is always accompanied by order splitting and merging; besides, in each stage of the process, there are always multiple machine groups that have different production capabilities and capacities. This paper studies a multi-agent based scheduling architecture for the radio frequency identification (RFID)-enabled semiconductor back-end shopfloor, which integrates not only manufacturing resources but also human factors.
Design/methodology/approach
The architecture includes a task management (TM) agent, a staff instruction (SI) agent, a task scheduling (TS) agent, an information management center (IMC), machine group (MG) agent and a production monitoring (PM) agent. Then, based on the architecture, the authors developed a scheduling method consisting of capability & capacity planning and machine configuration modules in the TS agent.
Findings
The authors used greedy policy to assign each order to the appropriate machine groups based on the real-time utilization ration of each MG in the capability & capacity (C&C) planning module, and used a partial swarm optimization (PSO) algorithm to schedule each splitting job to the identified machine based on the C&C planning results. At last, we conducted a case study to demonstrate the proposed multi-agent based real-time production scheduling models and methods.
Originality/value
This paper proposes a multi-agent based real-time scheduling framework for semiconductor back-end industry. A C&C planning and a machine configuration algorithm are developed, respectively. The paper provides a feasible solution for semiconductor back-end manufacturing process to realize real-time scheduling.
Details
Keywords
This article analyzes the implementation of anti-corruption reforms in Taiwan by two former presidents, Chen Shui-bian (2000-2008) and Ma Ying-jeou (2008-2016).
Abstract
Purpose
This article analyzes the implementation of anti-corruption reforms in Taiwan by two former presidents, Chen Shui-bian (2000-2008) and Ma Ying-jeou (2008-2016).
Design/methodology/approach
A three-tier research approach, including in-depth interviews, questionnaire survey, and descriptive and inferential analysis, is adopted. In addition to Chen and Ma, 11 senior anti-corruption officials who served under both presidents were interviewed by the author. The survey questions cover 12 factors which are later grouped into the five dimensions of ethical leadership, considerate leadership, delegating leadership, participatory leadership, and performance to illustrate the causal relationship between these dimensions and performance.
Findings
Ma’s personal ethics are distinct from Chen’s in kind but Ma’s overall leadership and performance outshine Chen’s in degree rather than in kind. While the gap of ethical leadership between two Taiwan presidents is significantly wider than other dimensions of leadership, the outcome of the national integrity is not proportionate to the ethical leadership gap. In other words, personal ethics are not automatically transformed into political will for enhancing anti-corruption effectiveness. Three popular forms of corruption, red envelopes (bribing), influence-peddling, and vote-buying are analyzed in the context of changing political culture through national leadership. Unfortunately, both Chen and Ma produce insignificant contributions based on public surveys.
Originality/Value
Policy-makers and scholars can use these research findings to further explore how ethical leadership can enhance a country’s anti-corruption performance.
Details