Search results

1 – 10 of 17
Article
Publication date: 31 January 2024

Chau Ngoc Dang, Warit Wipulanusat, Peem Nuaklong and Boonsap Witchayangkoon

This study aims to explore the relationships between knowledge management (KM) enablers, employee innovativeness (EI) and market development performance (MDP) in architecture…

Abstract

Purpose

This study aims to explore the relationships between knowledge management (KM) enablers, employee innovativeness (EI) and market development performance (MDP) in architecture, engineering and construction (A/E/C) firms.

Design/methodology/approach

A questionnaire survey is conducted to collect empirical data from A/E/C practitioners in Vietnam. First, factor analysis is used to identify KM enablers in A/E/C firms. Then, a framework which shows the links between KM enablers, EI and MDP is proposed. Structural equation modeling (SEM) is used to examine the proposed relationships.

Findings

This study identifies five constructs which can enable A/E/C firms to achieve effective KM implementation, including mutual trust and collaboration, organizational values and norms, information and communication systems, organizational policies and empowerment. Furthermore, the SEM results show that except for organizational policies, four remaining KM enablers significantly affect EI. It is also found that EI has a significant impact on MDP.

Practical implications

The findings could help A/E/C firms to know which KM enablers are critical to EI and provide a better understanding of the link between EI and MDP. Hence, they could make appropriate investments in KM practices to improve both EI and MDP.

Originality/value

The results of this study fill the gap in knowledge by empirically structuring the relationships between KM enablers, EI and MDP. Such results may provide A/E/C firms with useful information to enhance EI and MDP in today’s intensively competitive construction environments.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 4 October 2022

Shumank Deep, Thayaparan Gajendran, Marcus Jefferies, Venkata Suresh Uggina and Sanjay Patil

Research on strategic procurement was mostly focussed on the clients' and main contractors' perspectives, while limited work had been done from a subcontractor's perspective. The…

Abstract

Purpose

Research on strategic procurement was mostly focussed on the clients' and main contractors' perspectives, while limited work had been done from a subcontractor's perspective. The paper hypothesises that “strategic capability” influences the latent constructs of power, dependence and collaboration in the main contractor–subcontractor relationship. Therefore, the purpose of this study is to investigate the influence of a subcontractor's strategic capabilities on power, dependence and collaboration.

Design/methodology/approach

A survey questionnaire was developed and distributed amongst the subcontractors in Australia, and 212 complete responses were received. Then second order confirmatory factor analysis and partial least square structure equation modelling (PLS-SEM) analysis were performed to test the hypothesised relationships.

Findings

The findings support “strategic capabilities” as a construct expressive of a subcontractor's unique market position and good business reputation. The findings also suggest that strategically capable subcontractors enhance their potential for forming partnerships with main contractors through dependence (StratC. → Dep., β = 0.84; Effect Size (ES) = 0.713; p < 0.01), collaboration (StratC. → Collab., β = 0.84; ES = 0.697; p < 0.01) and bargaining power (StratC. → Pow., β = 0.83; ES = 0.672; p < 0.01).

Originality/value

The study is one of its kind to explore the impact of a subcontractor's strategic capability on their bargaining power, dependability and ability to form collaborations. Furthermore, results indicate that the “strategic capabilities” of subcontractors can strongly influence their ability to create “dependence”, foster “collaboration” and exert “power” over a main contractor. The findings can help improve the strategic procurement decision-making processes of both subcontractors and main contractors to build better business relationships.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 14 September 2022

Bingsheng Liu, Juankun Li, Dan Wang, Henry Liu, Guangdong Wu and Jingfeng Yuan

This study aims to develop a collaborative governance framework (CGF) to systematically investigate the impeding factors (IFs) in terms of the operational sustainability of PPPs…

Abstract

Purpose

This study aims to develop a collaborative governance framework (CGF) to systematically investigate the impeding factors (IFs) in terms of the operational sustainability of PPPs. It examines the transmission pattern (i.e. the way in which network members react to each other) of the IFs network.

Design/methodology/approach

Literature review and interview were adopted to identify the IFs. Then, with the data collected from the interview in China, the social network analysis and interpretive structure model were synergised to examine the chain reaction, driving and dependent powers, and hierarchical structure of the identified IFs.

Findings

The results reveal that the cognition, institutional, financial and participation aspects are key barriers confronted by PPP sustainability, and the government plays a leading role in controlling factors causing sustainability-related problems in PPPs. Weak government leadership and institutional environment were identified as the most fundamental reasons triggering a chain of IFs, while project governance and management activities act as bridge nodes that play an intermediary role in the IFs network.

Research limitations/implications

This research contributes to the literature on PPP governance by (1) bridging the literature gap through the development of CGF for explaining the governance of PPP sustainability with a holistic view that considers both macro environment and operational project processes; and (2) identifying the transmission pattern of IFs network which uncovers the underlying dynamics causing the unsustainable operation of PPPs.

Practical implications

This research provides practitioners with a list of key checkpoints for preventing failure escalation, enables decision-makers to prioritise obstacle-mitigation efforts and develop a feasible process to control PPP operation, and offers management countermeasures to remove the key barriers impeding PPP sustainability.

Originality/value

This study is novel for adopting network-oriented techniques to quantify the relative importance of the IFs and examine the transmission pattern of the IFs system. Therefore, it visualises the complex underlying dynamics causing unsustainable PPP operation, identifies root and direct causes of PPP failures, and provides decision-makers with insights into sustaining PPP sustainability from a network-oriented perspective.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 27 August 2021

Dan Wang, Xueqing Wang, Lu Wang, Henry Liu, Michael Sing and Bingsheng Liu

This study aims to develop a Stackelberg Game Model for seeking the optimal subsidy plans with varying levels of government financial capability (GFC). Furthermore, the…

Abstract

Purpose

This study aims to develop a Stackelberg Game Model for seeking the optimal subsidy plans with varying levels of government financial capability (GFC). Furthermore, the scenario-based analysis is conducted and will enable governments to identify a comprehensive subsidy plan as follows: improve project performance and optimise social welfare.

Design/methodology/approach

A Stackelberg Game Model is developed to optimise the effectiveness of subsidies on the performance of public-private partnerships (PPPs).

Findings

According to the scenarios that are generated from the model, governments that are confronting with limited public budgets could reduce the intensity of performance incentives and increase the participation-oriented subsidy. Whilst a participation-oriented subsidy can stimulate private organisations’ willingness to participate in infrastructure PPPs, a performance-oriented subsidy is capable of facilitating the projects’ performances. Intuitively, the performance-oriented subsidy enables the private entities of PPPs to improve their efforts on the projects to realise higher profits. However, the participation-oriented subsidy is unable to affect the level of their effort spent on the projects. To satisfy both parties’ expectations in a PPP, the performance-oriented subsidy needs to be prioritised for a purpose of enabling higher quality outputs.

Practical implications

The game model developed in this study contributes to the literature by offering new insight into the underlying mechanism of governments and private entities, in terms of their decision-making for subsidy planning and contributions (i.e. resource allocation and spending) during the life-cycle of PPPs. This research enriches the government subsidy model by revealing the effects of the GFC and clarifies the impacts of two different schemes of subsidy on the performance of PPPs.

Originality/value

The government has been conventionally viewed as being omnipotent to provide PPPs with a wide range of subsidies. However, the subsidies are not unlimited, due to GFC. In addressing this void, this study has modelled the impacts of government subsidy plans with a consideration of GFC-related constraints. The combined effects of the participation- and performance-oriented subsidies on the project performance of PPPs have been examined.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 5
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 12 September 2023

Pramod Malaka Silva, Niluka Domingo and Noushad Ali Naseem Ameer Ali

The construction industry is complex, human-intensive and driven by monetary values. Hence, disputes are widespread. Initial conflicts among parties may develop into a disastrous…

Abstract

Purpose

The construction industry is complex, human-intensive and driven by monetary values. Hence, disputes are widespread. Initial conflicts among parties may develop into a disastrous dispute that costs the project success and good relationships and affects stakeholders' expectations. There has been a focus on causes of construction-related disputes, and studies over the past three decades have attempted to identify a more comprehensive list of reasons for disputes. Some of these studies' limitations were geographical, project delivery methods and project types. The purpose of this study is to identify the most recent and conclusive list of causes of disputes based on current literature by undertaking a systematic literature review (SLR).

Design/methodology/approach

Considering the large number of studies that focused on causes of disputes, this study aims to develop a comprehensive list of causes, using a SLR, as it ensures that all previous articles in multiple databases are reviewed to produce a comprehensive outcome. A six-stage SLR was followed from background study to analysis and reporting.

Findings

Not surprisingly, the number of publications has increased over time, most from the Middle East region. The interconnected nature of the causes was widely emphasised. The SLR has produced eight common core causes of disputes. They are: poor contractual arrangements, employer-initiated scope changes, unforeseen site changes, poor contract understanding and administration, contractor’s quality of works, the inability of the contractor to achieve time targets, non- or delayed payments and poor quality of design. The majority of previous authors realised that disputes could be avoided by parties’ involvement during the early stages, avoiding being opportunistic and acting collaboratively.

Originality/value

Even though numerous studies have been carried out to identify the causes of disputes in the construction industry, none did a SLR. This study aggregates all the previous studies that focused on construction-related disputes systematically. Categorising causes based on the party primarily responsible help various stakeholders by providing a distinct list of factors to avoid that contribute to disputes.

Details

Journal of Financial Management of Property and Construction , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 10 November 2023

Bamidele Temitope Arijeloye

This paper aims to help understand how adopting risk allocation criteria impacts the delivery of public–private partnership (PPP) mass housing in Nigeria with the view of…

Abstract

Purpose

This paper aims to help understand how adopting risk allocation criteria impacts the delivery of public–private partnership (PPP) mass housing in Nigeria with the view of promoting the adoption of PPP housing scheme in Nigeria.

Design/methodology/approach

The research design adopts the census sampling approach by using well-structured questionnaires distributed to stakeholders involved in PPP-procured mass housing projects, i.e. consultants, in-house professionals, contractors and the organized private sector, registered with PPP departments in the Federal Capital Territory Development Authority, Abuja, Nigeria. Sixty-three risk factors, nine risk allocation criteria and nine project delivery indices were submitted for the respondents to rank on a Likert scale of 7. Two hypotheses were formulated to test whether the risk allocation criteria impacted PPP mass housing delivery or otherwise. The study adopts partial least square-structural equation modeling to model the effect of risk on risk allocation criteria on project delivery indices and risk severity.

Findings

The finding shows that project risk allocation criteria have less effect on project delivery indices than on risk severity. The study concludes that risk allocation principles do not directly affect the delivery of PPP-procured mass housing projects. This is evident by the path coefficient of 0.724 values, which is not statistically significant at a 5% alpha protection value. The study concludes that allocating critical risk factors influences the performance of PPP-procured mass housing projects, as the path coefficient of 0.360 is also not significantly far from 0 and at a 5% alpha protection value.

Originality/value

The study is one of the recent studies conducted in PPP-procured mass housing projects in Nigeria owing to the novelty of procurement option in the sector. It highlights the risk factors that can jeopardize the PPP-procured mass housing project objectives. The study is of immense value to PPP actors in the sector by providing the necessary information required to formulate risk response methods to minimize the impact of the risk factors in PPP mass housing projects.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 24 November 2023

Abdulkader Zairbani and Senthil Kumar Jaya Prakash

The purpose of this paper is to provide an organizing lens for viewing the distinct contributions to knowledge production from those research communities addressing the impact of…

Abstract

Purpose

The purpose of this paper is to provide an organizing lens for viewing the distinct contributions to knowledge production from those research communities addressing the impact of competitive strategy on company performance in general, and the influence of cost leadership and differentiation strategy on organizational performance in detail.

Design/methodology/approach

The research methodology was based on the PRISMA review, and thematic analysis based on an iterative process of open coding was analyzed and then the sample was analyzed by illustrating the research title, objectives, method, data analysis, sample size, variables and country.

Findings

The main factor that influenced the competitive strategy is strategic growth; strategic growth has a significant influence on competitive strategy. Furthermore, competitive strategy will boost firm network, performance measurement and organization behavior. In the same way, the internal goal factor will enhance organizational effectiveness. Also, a differentiation strategy will support management practice factors, strategic positions, product price, product characteristics and company performance.

Originality/value

This study contributes to the literature by identifying a framework of competitive strategy factors, company performance factors, cost leadership strategy factors, differentiation strategy factors and competitive strategy with global market factors. This study provides a complete picture and description of the resulting body knowledge in competitive strategy and organizational performance.

Details

Benchmarking: An International Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 20 September 2022

Hasan Yousef Aljuhmani, Bashar Ababneh, Lawrence Emeagwali and Hamzah Elrehail

Although prior researchers have consistently established a significant relationship between different strategic stances and organizational performances across different research…

Abstract

Purpose

Although prior researchers have consistently established a significant relationship between different strategic stances and organizational performances across different research contexts, the mechanisms underlying this link remain unclear. This study attempts to fill this gap in the literature by testing the mediating effect of the use of strategic performance measurement systems (SPMS) on the relationship between strategic stances (prospector, defender, and reactor) and organizational performance in the public sector.

Design/methodology/approach

This research is based on data collected by surveying 224 managers at public organizations in the Turkish Republic of Northern Cyprus (TRNC) and conducts an analysis using structural equation modeling (SEM).

Findings

The study findings show that prospector strategy is positively associated with organizational performance through the use of SPMS. The reactor strategy was negatively related to organizational performance through the use of SPMS. The defender strategy shows mixed results in terms of its effect on the use of SPMS and organizational performance.

Research limitations/implications

The results obtained here provide strong evidence of the vitality of the use of SPMS for efficiency and effectiveness as a mediator between prospector strategy and organizational performance. To extend this position, future researchers could incorporate other contingent variables, such as structural autonomy, or use experimental design methods during economic austerity in the aftermath of the coronavirus disease 2019 (COVID-19) global pandemic.

Originality/value

This study represents an attempt to address public administration literature' general calls for grounded research that spells out to practitioners how different strategic stances are likely to affect the use of SPMS to achieve organizational performance levels in the public sector. The present study extends the public administration literature by examining the unexplored linkage of the use of SPMS through which strategic stances influence organizational performance in major public sector organizations.

Details

Asia-Pacific Journal of Business Administration, vol. 16 no. 2
Type: Research Article
ISSN: 1757-4323

Keywords

Article
Publication date: 25 March 2024

Francis Nuako, Frank Ato Ghansah and Thomas Adusei

It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been…

Abstract

Purpose

It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been advancements in the management of building projects throughout time but cost overruns remain a key concern in the construction sector internationally, particularly in emerging economies such as Ghana. This study aims to answer the question, “What are the critical success factors (CSFs) that can assist reduce cost overruns in public sector infrastructure projects in the Ghanaian construction industry?”

Design/methodology/approach

This study used a quantitative survey method. The questionnaire was pre-tested by interviewing 15 contractors to ascertain the validity of the content. Factor analysis and multiple regression were adopted to analyze the data.

Findings

This study discovered that the critical factors that can reduce cost overruns in construction projects in Ghana are directly linked to five themes: early contractor involvement in the project planning stage, adequate funding, good project team relations, competent managers/supervisors and project participant incentives/bonuses. This study identifies indestructible, empirically measurable important success criteria for reducing cost overruns in public building projects in Ghana.

Practical implications

When well thought through from the project initiation stage to completion, these critical successes can also be used to deal with damaging economic effects such as allocative inefficiency of scarce resources, further delays, contractual disputes, claims and litigation, project failure and total abandonment.

Originality/value

The uniqueness of this research resides in the fact that it is, to the best of the authors’ knowledge, a first-of-its-kind investigation of the CSFs for reducing cost overruns in public building projects in developing countries.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 16 August 2022

Jin Cai, Zhongfu Li, Yudan Dou, Yue Teng and Mengqi Yuan

Contractor selection is critical in green buildings (GBs) since the preferred contractor has the responsibility to achieve construction sustainability as well as relationship…

Abstract

Purpose

Contractor selection is critical in green buildings (GBs) since the preferred contractor has the responsibility to achieve construction sustainability as well as relationship sustainability. The developer satisfaction reflecting requirements can boost the cooperative relationship among stakeholders and act as an evaluation scale for the success of GB projects, which needs to be emphasized in the selection process but little involved in the existing research. This study explores improving GB contractor (GBC) selection by integrating developer satisfaction into selection procedures.

Design/methodology/approach

A systematic framework of GBC selection including twenty-five criteria from literature review and experts survey is firstly constructed. Both tactical and strategic criteria are further classified into Kano categories (must-be, one-dimensional, and attractive categories) using the fuzzy Kano model (FKM), and weighted by the developer satisfaction index. The model proposed by this study combining FKM and TOPSIS divides the selection process into the filtration phase and selection phase by Kano categories. The proposed model is finally verified through performance comparison among multiple methods in a case.

Findings

Selection criteria are measured linearly and nonlinearly, showing criteria having nonlinear satisfaction change accounts for two-thirds of all. Criteria at tactical level tend to be must-be or one-dimensional categories for the developer, and most strategic criteria are classed as the attractive category, indicating that adding strategic criteria is necessary for long-term cooperation. The proposed model, using developer satisfaction to improve the selection process, ensures the selected GBC to be the most satisfactory with requirements of the developer and makes the performance of GBCs easily distinguishable.

Originality/value

This study contributes to the existing body of knowledge for promoting relationship sustainability by supplementing an integrated model with emphasis on developer satisfaction in GBC selection, so as to establish a good initial foundation due to the match between performances of GBCs and needs of developers. It not only helps maximize developer satisfaction in GBC selection by applying satisfaction to pre-construction management, but also instructs GBCs to prioritize performance improvements. The framework is also conducive for developers to classify selection criteria and select other participants (like green suppliers) from the satisfaction perspective in GBs.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of 17