1 – 10 of 210
Article
Publication date: 8 March 2024

Md. Mohaimenul Islam Sourav, Mohammed Russedul Islam, Sheikh Mohibur Rahman and Md. Istiak Jahan

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of…

Abstract

Purpose

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of delays by taking responses from the stakeholders who are responsible for planning, design, funding, approval and implementation. There are few studies that have related infrastructure project delays to heterogeneity in stakeholders’ perceptions.

Design/methodology/approach

A structural equation (SE) model is developed with 350 normally distributed data points to understand the heterogeneity in stakeholders’ perceptions regarding delays in infrastructure projects in BD. Additionally, the relative importance index (RII) approach is used to assess the responses, validating the SE model.

Findings

The study finds that among the three latent variables, “Project itself related delay” has more influence on delays in infrastructure projects. Among the observed variables under the “project itself related delay” latent variable, “DPP approval process” has the most significance. From the heterogeneity analysis, the study found differences in responses among the stakeholders from “the Engineering Department,” “the Planning Office” and “the Construction Firm/Industry.” An important class of stakeholders believes that their stage is not being delayed and that other stages require attention.

Research limitations/implications

The data sample is 350. More data can improve the accuracy of the findings. Most of the respondents are civil engineers (74%) and represent the owner of the project. Sample data from more stakeholders’ will enhance the accuracy of the result.

Practical implications

This study addresses the requirements of Bangladeshi project stakeholders and how their interactions cause delays in projects. Furthermore, the opinions of other stakeholders are taken into consideration when determining the specific factors of individual stakeholders that are causing delays. Practically, the distance between stakeholders should be reduced. A project manager can play a role in this regard. Initiatives should be taken on how to complete the project quickly by eliminating the requirements discussed among the stakeholders and bureaucratic complications. Instead of placing blame on one another, stakeholders should take the initiative to figure out how to work together to finish the project on schedule. The Planning Commission’s approval of the Development Project Proposal (DPP) and Revised Development Project Proposal (RDPP) should be obtained as soon as possible by owner stakeholders. In order to avoid frequently changing the DPP, owners should also exercise greater caution when choosing contractors. Contractor stakeholders should use efficient and proper manpower and equipment so that unexpected delays are not created during the execution of work. Since the role of the contractor stakeholder is the most important among the three types of stakeholders, the contractor should raise awareness and urge the owners to get the RDPP approved quickly.

Originality/value

The findings from the study can help mitigate delays in infrastructure projects in BD, taking into account the perceptions of various stakeholders.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 7 August 2023

Christine Kousa, Barbara Lubelli and Uta Pottgiesser

Housing interventions carried out in accordance with current regulations in the Old City of Aleppo, both before and after the Syrian war, are minor in comparison to those carried…

Abstract

Purpose

Housing interventions carried out in accordance with current regulations in the Old City of Aleppo, both before and after the Syrian war, are minor in comparison to those carried out without a license and illegally. This suggests current policies are inadequate and needs upgrading.

Design/methodology/approach

This article critically reviews current Syrian policies and their implementation on residential heritage in the Old City of Aleppo with the aim to identify gaps and propose directions for modifications. Next to a review of the text of official policies and implementation documents, the archive of the Directorate of the Old City has been consulted and license applications, presented in the period 2018–2022, have been examined. Moreover, interviews with decision-makers from academics and practice were conducted.

Findings

Major limitations of these policies and relative application procedures have been identified: these involve: legal/administrative, economic and social aspects.

Originality/value

The specific needs have been highlighted and some proposals for improvement made.

Details

Journal of Cultural Heritage Management and Sustainable Development, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-1266

Keywords

Article
Publication date: 31 October 2023

Ruman Thapa, Niranjan Devkota, Krishna Dhakal, Vaibhav Puri, Surendra Mahato and Udaya Raj Paudel

Obtaining building permit certificate is an essential component of construction endeavors, but it can be cumbersome sometimes. The process is frequently beset with obstacles…

49

Abstract

Purpose

Obtaining building permit certificate is an essential component of construction endeavors, but it can be cumbersome sometimes. The process is frequently beset with obstacles, including bureaucratic impediments, red-tapism, prolonged authorization protocols and insufficient inter-agency collaboration which result in project timeline extension, cost escalation and applicant dissatisfaction. Therefore, this study aims to examine customer satisfaction with the assessment of building construction permit certificates in Lalitpur, Nepal.

Design/methodology/approach

Following the notion of evaluation model theory, this study adopts an explanatory research design to determine the causal relationship between latent and observed variables. People who have recently completed the construction of their building and those people whose construction work is pending make up the population for the study. A total of 198 samples were collected by following the convenience sampling method from Lalitpur, Nepal. The primary data are collected by using the structured questionnaire with the interview process where the data are statistically evaluated using descriptive and inferential analysis using the KOBO toolbox, SPSS and AMOS. The connection between variables was examined using structural equation modeling (SEM).

Findings

Results indicate that the negligence of the employees, the attitude of the employees, the need for additional costs and the hiring of the agent are the most significant obstacles encountered by customers during the process of getting construction permit. Regarding the whole assessment system, the general population expresses displeasure. SEM results indicate that environment and quality are significantly related to customer satisfaction.

Originality/value

This paper's novelty lies in its Nepal-specific inquiry into the relationship between building permit acquisition procedures and customer contentment. The study provides a distinctive viewpoint on this context by combining evaluation model theory and SEM. The localized approach emphasizes the importance of customized strategies to improve customer satisfaction, adding to the current literature on the subject. The study's use of SEM as a quantitative analysis tool enhances its methodological rigor. This interdisciplinary research offers valuable insights for academics, practitioners and policymakers in Nepal and contributes to the wider field of construction and customer satisfaction.

Details

Journal of Economic and Administrative Sciences, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1026-4116

Keywords

Article
Publication date: 11 August 2023

Charles Frommweiler and Erik Poirier

The building commissioning (BCx) phase is a critical stage in a building's lifecycle. It is also a complex process that involves a large number of actors and activities. While the…

Abstract

Purpose

The building commissioning (BCx) phase is a critical stage in a building's lifecycle. It is also a complex process that involves a large number of actors and activities. While the use of building information modeling (BIM) in the commissioning phase of building equipment and systems could be beneficial, few studies have investigated the processes behind its implementation. The research presented in this paper aims to investigate the implementation of BIM for the commissioning phase within a general contracting company through action-research.

Design/methodology/approach

Through direct involvement with the research partner, a large general contractor, a diagnosis on the current limitations of the commissioning process was conducted. An action plan to implement BIM for commissioning was developed and implemented in two pilot projects. Evaluation was performed through on-site observations and informal discussions with field staff. Learning was specified through the development of a formal protocol for BIM-enabled BCx.

Findings

This action-research project helped the partner organization identify the challenges and a way forward to formalize its BIM-enabled BCx process. The action plan aimed at countering the lack of knowledge about the status of equipment and system commissioning as well as the lack of standardization. The research team co-developed and tested a formal protocol, including BIM-enabled processes and technologies to address these observed problems. A complete implementation ecosystem was structured and deployed. Preliminary feedback indicated that improvements were obtained using a BIM-enabled approach over a traditional approach.

Originality/value

While past studies have investigated the BCx process, this study identified current challenges considering recent advances in BIM and focused on a large general contractor. This work provides an in-depth account of a large general contractor attempting to streamline its BCx process. The results of the study could help guide practitioners in implementing more streamlined BIM-enabled BCx processes.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 12 August 2022

Muhammad Azeem Abbas, Saheed O. Ajayi, Adekunle Sabitu Oyegoke and Hafiz Alaka

Master information delivery plan (MIDP) is a key requirement for building information modelling (BIM) execution plan (BEP) that enlists all information deliverables in BIM-based…

2550

Abstract

Purpose

Master information delivery plan (MIDP) is a key requirement for building information modelling (BIM) execution plan (BEP) that enlists all information deliverables in BIM-based project, containing information about what would be prepared, when, by who, as well as the procedures and protocols to be used. In a well-conceived BEP, the MIDP facilitates collaboration among stakeholders. However, current approaches to generating MIDP are manual, making it tedious, error-prone and inconsistent, thereby limiting some expected benefits of BIM implementation. The purpose of this study is to automate the MIDP and demonstrate a collaborative BIM system that overcomes the problems associated with the traditional approach.

Design/methodology/approach

A BIM cloud-based system (named Auto-BIMApp) involving naming that automated MIDP generation is presented. A participatory action research methodology involving academia and industry stakeholders is followed to design and validate the Auto-BIMApp.

Findings

A mixed-method experiment is conducted to compare the proposed automated generation of MIDP using Auto-BIMApp with the traditional practice of using spreadsheets. The quantitative results show over 500% increased work efficiency, with improved and error-free collaboration among team members through Auto-BIMApp. Moreover, the responses from the participants using Auto-BIMApp during the experiment shows positive feedback in term of ease of use and automated functionalities of the Auto-BIMApp.

Originality/value

The replacement of traditional practices to a complete automated collaborative system for the generation of MIDP, with substantial productivity improvement, brings novelty to the present research. The Auto-BIMApp involve multidimensional information, multiple platforms, multiple types and levels of users, and generates three different representations of MIDP.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 12 July 2023

Meryem Melis Cihan Yavuzcan and Elmira Ayşe Gür

This study aims to draw a general framework for recreating water-related urban places. It discusses design criteria and processes that will strengthen people's and the city's…

Abstract

Purpose

This study aims to draw a general framework for recreating water-related urban places. It discusses design criteria and processes that will strengthen people's and the city's relationship with the waterfront. It also explores the functional requirements of a participatory process to incorporate social and functional relations into place making.

Design/methodology/approach

The study is based on a comprehensive case study of the Kabataş project process. Data collection methods include archive searches, questionnaires, interviews and analysis. The study analyses the architectural decisions, the role and perspectives of the key actors and the current dynamics that shape the process. It points out shortcomings and needs of communication and collaboration with different stakeholders, especially with the users.

Findings

The results show that political and power dynamics play an important role in shaping the process. Non-transparent processes increase the gap between the aspects of community and decision makers in current practices. Establishing holistic, waterfront-specific and collaborative approaches is a necessity. The results also show that the success of participation depends on procedural dynamics such as scope, method, timing, representativeness of the community, institutionalisation level, transparency and deliberation.

Originality/value

Despite the intense interest in waterfront regeneration, few studies have focused on the potential of the participatory process. The study examines the intersections of waterfront design decisions and collaborative participation at various scales and emphasises the importance of local actors in the social production of space.

Details

Archnet-IJAR: International Journal of Architectural Research, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2631-6862

Keywords

Article
Publication date: 8 April 2024

Malik Lakshan Hasantha, Anuradha Samarajeewa Waidyasekara and Hasith Chathuranga Victar

Insufficient time allocation for the bidding period occurs, causing drawbacks to both parties, the client and the bidder. Hence, this study aims to evaluate the time allocated for…

Abstract

Purpose

Insufficient time allocation for the bidding period occurs, causing drawbacks to both parties, the client and the bidder. Hence, this study aims to evaluate the time allocated for preparing a bid proposal as per the National Competitive Bidding (NCB) in the Sri Lankan context.

Design/methodology/approach

The study has adopted a mixed method approach and expert interviews and document review to detect, analyse and validate the issues, and solutions based on NCB along with the adequacy of the allocated bidding period used as main data collection tools. Both qualitative and quantitative data were analysed through manual content analysis and inferential analysis respectively.

Findings

Overall, 24 local issues with the existing competitive bidding process and solutions for each were identified. Among the 24 local issues, it was unanimously agreed by all interviewees that three specific issues require attention and improvement. These issues are related to the standard and incompleteness of bidding documents, inaccurate BOQ quantities measured by the consultant or the main contractor, and the excessive number of bidding document amendments by the consultant. It was revealed that a maximum of 42 calendar days (6 weeks) is sufficient for the bidding process while a minimum of 21 calendar days (3 weeks) is insufficient.

Originality/value

The findings of this study would be recommended that Information and Communication Technology Agency (ICTA) understand the necessity of revising the NCB reference to the time allocated for the preparation of bids. By recognising the importance of sufficient time allocation for bid preparation, this research serves as a practical guide for authorities involved in policy formulation, aiding them in implementing revisions that align with the dynamic requirements of bidding procedures.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 31 October 2023

Nadin Augustiniok, Claudine Houbart, Bie Plevoets and Koenraad Van Cleempoel

Adaptive reuse processes aim to preserve heritage values while creating new values through the architectural interventions that have become necessary. This claim provokes a…

Abstract

Purpose

Adaptive reuse processes aim to preserve heritage values while creating new values through the architectural interventions that have become necessary. This claim provokes a discussion about the meaning of values, how we can preserve them in practice and how we can translate them into architectural qualities that users experience. Riegl's understanding of the different perspectives of heritage values in the past and present opens up the possibility of identifying present values as a reflection of current social, material and political conditions in the architectural discourse.

Design/methodology/approach

This qualitative and practical study compares two Belgian projects to trace the use of values in adaptive reuse projects from an architectural design perspective. The Predikherenklooster, a 17th-century monastery in Mechelen that now houses the public library, and the C-Mine cultural centre in Genk, a former 20th-century coal mine, are compared. The starting point is Flemish legislation, which defines significance through values, distinguishing between 13 heritage values.

Findings

The study demonstrates the opportunities that axiological questions offer during the design process of an adaptive reuse project. They provide an overarching framework for tangible and intangible aspects that need to be discussed, particularly in terms of the link between what exists, the design strategy and their effect.

Originality/value

Adaptive reuse can draw on approaches from both heritage conservation and contemporary architecture and explore values as a tool for “re-designing” built heritage.

Details

Journal of Cultural Heritage Management and Sustainable Development, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-1266

Keywords

Article
Publication date: 17 July 2023

Valerio Brescia, Paolo Esposito, Stefano Amelio and Paolo Pietro Biancone

The COVID-19 pandemic has generated a crisis that has hit the European economy and the currently existing systems. To cope with the crisis, Europe has started an investment aiming…

Abstract

Purpose

The COVID-19 pandemic has generated a crisis that has hit the European economy and the currently existing systems. To cope with the crisis, Europe has started an investment aiming the energy transition and crisis. Portugal, Spain and Greece have received the approval of their National Recovery Plans from the European Commission, with a definition of spending up to 2026 through the European Union (EU) Next Generation Found. The study investigates whether the Green Deal policies are relaunched by the plans financed and whether the pandemic has changed and conditioned the priorities of the energy transaction. The study uses the lens of corporate social responsability (CSR) and relapse measurable across the Sustainable Development Goals (SDGs).

Design/methodology/approach

The Green Deal policies supported by new European investments in the three countries were analyzed through a content analysis (CA) technique to investigate the associated practical and theoretical elements.

Findings

The energy theme has a relevance compared to other issues in the investment plans envisaged in Greece, Portugal and Spain. The analysis highlights energy efficiency, sustainable energy and reduction of consumption among the main themes. Energetically, sustainable building plays a central role. The study highlights the relationship between Green Deal policies, CSR, SDGs and management tools adopted.

Originality/value

The study strengthens the relationship between the Green Deal, CSR and SDGs by identifying policies that have already been implemented and theoretical and practical gaps on which politicians and scholars will have to investigate and support in the process of development and continuity of the identified pillars.

Details

EuroMed Journal of Business, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1450-2194

Keywords

Article
Publication date: 11 January 2024

Denis Scott, Ling Ma and Tim Broyd

Poor cash flow management and lack of profitability have plagued the construction industry for decades. In response, the UK Government published the project bank account (PBA…

Abstract

Purpose

Poor cash flow management and lack of profitability have plagued the construction industry for decades. In response, the UK Government published the project bank account (PBA) payment strategy in 2012 to mitigate main contractors unfairly withholding liabilities. However, PBAs suffer from adoption challenges, such as systems fragmentation and a lack of incentives for main contractors to adopt them effectively. This study aims to investigate how to reduce systems fragmentation in construction by integrating PBA procedures with existing management workflows to increase payment automation, resulting in improved cash liquidity and better incentives for using PBAs.

Design/methodology/approach

A PBA blockchain decentralised application is developed, presented and critically evaluated. Blockchain is the technology used because of its permissionless, license-free, open-source and immutability properties. It is a suitable general-purpose technology layer for building and testing applications without the limitations associated with centralised technologies, such as high proprietary fees, vendor lock and intellectual property restrictions.

Findings

The research demonstrates how a blockchain application can integrate siloed construction workflows such as cash flow scheduling, supply chain management and payment executions, reducing the management workload for implementing PBAs in construction projects. Furthermore, the proposed application is open-source and replicable, and its user interface is available for external testing here: https://console.atra.io/app/bf26f846-7f16-4f80-90a0-c5488ab6edd3.

Originality/value

PBA is a suitable test case because it enforces an auditable, transparent and neutral account, which are inbuilt properties of blockchains; thus, both systems are harmonious to integrate. PBA is mandated in UK public sector construction projects; therefore, the research has a solid practical foundation.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

1 – 10 of 210