Search results

1 – 10 of over 9000
Article
Publication date: 13 September 2024

Alireza Arbabi, Roohollah Taherkhani and Ramin Ansari

With the advancement of technology and more attention to environmental issues, building information modeling (BIM) and green building have become two new and growing trends in the…

Abstract

Purpose

With the advancement of technology and more attention to environmental issues, building information modeling (BIM) and green building have become two new and growing trends in the construction industry. Therefore, this study proposes a new strategy that integrates BIM and green building rating assessments with an emphasis on Iran Green Building Rating System (IGBRS).

Design/methodology/approach

By creating a Revit-IGBRS project template that includes sheets related to all credits, the project compliance with the IGBRS credits and management of submittal documents for certification has been facilitated. Finally, a case study of the materials and resources category of the IGBRS system was performed to validate the BIM-IGBRS application model. All 8 criteria of this category were examined by using Dynamo programming for the Revit sample project.

Findings

A practical model for BIM and IGBRS integration is presented, which allows designers to be aware of the IGBRS scores obtained before the project’s construction phase and examine different scenarios for the highest scores. Overall, this study showed that integrating BIM and the Iranian rating system is possible with some constraints, and adding some features to BIM software can promote this integration.

Originality/value

Given that no study has been conducted on the integration of BIM with the Iran Green Building Rating System (IGBRS), the present research investigates utilizing building information modeling to meet the credits requirements of this rating system. The results of this research can be generalized and used in other green rating systems.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 17 May 2024

Sina Moradi, Janne Hirvonen and Piia Sormunen

The energy performance gap (EPG) in building construction has been one of the major barriers to the realization of environmental and economic sustainability in the built…

Abstract

Purpose

The energy performance gap (EPG) in building construction has been one of the major barriers to the realization of environmental and economic sustainability in the built environment. Although there have been a few studies addressing this issue, studying this topic with a special focus on the project delivery process has been almost overlooked. Hence, this study aims to address the EPG in building construction through the lens of collaborative and life cycle-based project delivery.

Design/methodology/approach

In order to realize the objective of this study, the development of a theoretical framework based on the literature review was followed by a qualitative study in which 21 semi-structured interviews were conducted with Finnish project professionals representing clients, design/planning experts, constructors and building operation/maintenance experts to explore their views on the topic under study.

Findings

The findings reveal the project delivery-related causes of EPG in building construction. Moreover, the obtained results present a collaborative and life cycle-based delivery model that integrates project and product (i.e. building) life cycles, and it is compatible with all types of contractual frameworks in building construction projects.

Research limitations/implications

Although the findings of this study significantly contribute to theory and practice in the field of collaborative and sustainable construction project delivery, it is acknowledged that these findings are based on Finnish professionals’ input, and expanding this research to other regions is a potential area for further studies. Moreover, the developed model, although validated in Finland, needs to be tested in a broader context as well to gain wider generalizability.

Originality/value

The obtained results reveal the significance and impact of collaborative and life cycle-based project development and delivery on the realization of environmentally sustainable building construction.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 25 April 2024

Abdul-Manan Sadick, Argaw Gurmu and Chathuri Gunarathna

Developing a reliable cost estimate at the early stage of construction projects is challenging due to inadequate project information. Most of the information during this stage is…

199

Abstract

Purpose

Developing a reliable cost estimate at the early stage of construction projects is challenging due to inadequate project information. Most of the information during this stage is qualitative, posing additional challenges to achieving accurate cost estimates. Additionally, there is a lack of tools that use qualitative project information and forecast the budgets required for project completion. This research, therefore, aims to develop a model for setting project budgets (excluding land) during the pre-conceptual stage of residential buildings, where project information is mainly qualitative.

Design/methodology/approach

Due to the qualitative nature of project information at the pre-conception stage, a natural language processing model, DistilBERT (Distilled Bidirectional Encoder Representations from Transformers), was trained to predict the cost range of residential buildings at the pre-conception stage. The training and evaluation data included 63,899 building permit activity records (2021–2022) from the Victorian State Building Authority, Australia. The input data comprised the project description of each record, which included project location and basic material types (floor, frame, roofing, and external wall).

Findings

This research designed a novel tool for predicting the project budget based on preliminary project information. The model achieved 79% accuracy in classifying residential buildings into three cost_classes ($100,000-$300,000, $300,000-$500,000, $500,000-$1,200,000) and F1-scores of 0.85, 0.73, and 0.74, respectively. Additionally, the results show that the model learnt the contextual relationship between qualitative data like project location and cost.

Research limitations/implications

The current model was developed using data from Victoria state in Australia; hence, it would not return relevant outcomes for other contexts. However, future studies can adopt the methods to develop similar models for their context.

Originality/value

This research is the first to leverage a deep learning model, DistilBERT, for cost estimation at the pre-conception stage using basic project information like location and material types. Therefore, the model would contribute to overcoming data limitations for cost estimation at the pre-conception stage. Residential building stakeholders, like clients, designers, and estimators, can use the model to forecast the project budget at the pre-conception stage to facilitate decision-making.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 10 September 2024

Nazirah Zainul Abidin and Ayishathul Powmya

Oman commitment for Sustainable Development Goals 2030 pushes green building at the forefront of construction industry. However, its green building progress is slower than other…

Abstract

Purpose

Oman commitment for Sustainable Development Goals 2030 pushes green building at the forefront of construction industry. However, its green building progress is slower than other Gulf Cooperation Council countries, and only a handful of local contractors have been involved in green project development. Understanding the barriers to green project delivery will open avenues for better project planning and preparation. This research aims to identify the barriers experienced by the contractors when constructing green buildings in Oman.

Design/methodology/approach

Qualitative research, via a semi-structured interview process, explores the barriers experienced by 14 contractors when constructing Leadership in Energy and Environmental Design (LEED) green building projects in Oman. Using NVivo 12 software, thematic analysis was conducted through the generation of coding and themes which enable the identification of the relevant barriers.

Findings

The research uncovered 10 barriers and grouped them into five categories. The five categories are as follows: (1) insufficient skills development, (2) lack of government support and regulatory adjustment, (3) limitation in materials procurement, (4) documentation and coordination limitation and (5) difficulty in green rating compliance.

Originality/value

The research identified 10 barriers of constructing green buildings in Oman. These barriers gravitated on 4 issues: knowledge and competency, green rating requirements, government involvement and materials procurement. It streamlined clusters of the potential research area for more effective green building action plans in the future. Two barriers are deemed uniquely applied to Oman, namely “lack of needed regulatory adjustment” and “absence of local rating tools”. This insight can serve as a valuable steppingstone to push more green buildings for the country.

Details

Built Environment Project and Asset Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 5 January 2024

Madurachcharige Hasini Vidushima Fernando, Duleepa Dulshan Costa, Buddha Koralage Malsha Nadeetharu and Udayangani Kulatunga

A comprehensive literature review was conducted to identify the lean principles and the challenges of building refurbishment. To have an in-depth investigation of the application…

162

Abstract

Purpose

A comprehensive literature review was conducted to identify the lean principles and the challenges of building refurbishment. To have an in-depth investigation of the application of lean principles to address the challenges of refurbishment projects, ten expert interviews following a qualitative research approach were utilised in this research. Data were analysed using manual content analysis to derive the framework.

Design/methodology/approach

The refurbishment of buildings has attracted the attention of the present construction industry. However, uncertain project characteristics, information deficiency, limited space for construction activities and less stakeholder involvement make it complex. Since the lean concept effectively deals with complex and uncertain projects, this study focusses to investigate the application of lean principles to overcome the challenges of refurbishment projects in Sri Lanka by developing a framework.

Findings

It was found that the five main lean principles of customer value, value stream, value flow, pull and perfection are appropriate for building refurbishment projects in Sri Lanka. Precise identification of clients and end-users, value adding and non-value adding activities, interruptions and stakeholder communication chains, setting scope, examining the possible technologies and taking measures to deliver the exact product to ensure the successful application of lean principles for refurbishment projects. Further, 27 benefits of five lean principles were identified which can be used to address the 13 identified challenges of building refurbishment of projects. Finally, a framework has developed portraying the application of lean principles in building refurbishment.

Practical implications

The framework developed is beneficial for the building refurbishment project team to address the barriers of refurbishment projects by applying lean principles.

Originality/value

This framework can be used as a guideline for the implementation of building refurbishment projects by addressing their challenges with lean principles.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 26 January 2022

The-Quan Nguyen, Eric C.W. Lou and Bao Ngoc Nguyen

This paper aims to provide an integrated BIM-based approach for quantity take-off for progress payments in the context of high-rise buildings in Vietnam. It tries to find answers…

Abstract

Purpose

This paper aims to provide an integrated BIM-based approach for quantity take-off for progress payments in the context of high-rise buildings in Vietnam. It tries to find answers for the following questions: (1) When to start the QTO processes to facilitate the contract progress payments? (2) What information is required to measure the quantity of works to estimate contract progress payment (3) What are the challenges to manage (i.e. create, store, update and exploit)? What are the required information for this BIM use? and (4) How to process the information to deliver BIM-based QTO to facilitate contract progress payment?

Design/methodology/approach

The paper applied a deductive approach and expert consensus through a Delphi procedure to adapt to current innovation around BIM-based QTO. Starting with a literature review, it then discusses current practices in BIM-based QTO in general and high-rise building projects in particular. Challenges were compiled from the previous studies for references for BIM-based QTO to facilitate contract progress payment for high-rise building projects in Vietnam. A framework was developed considering a standard information management process throughout the construction lifecycle, when the BIM use of this study is delivered. The framework was validated with Delphi technique.

Findings

Four major challenges for BIM-based QTO discovered: new types of information required for the BIM model, changes and updates as projects progress, low interoperability between BIM model and estimation software, potentiality of low productivity and accuracy in data entry. Required information for QTO to facilitate progress payments in high-rise building projects include Object Geometric/Appearance Information, Structural Components' Definition and Contextual Information. Trade-offs between “Speed – Level of Detail–Applicable Breadth” and “Quality – Productivity” are proposed to consider the information amount to input at a time when creating/updating BIM objects. Interoperability check needed for creating, authoring/updating processing the BIM model's objects.

Research limitations/implications

This paper is not flawless. The first limitation lies in that the theoretical framework was established only based on desk research and small number of expert judgment. Further primary data collection would be needed to determine exactly how the framework underlies widespread practices. Secondly, this study only discussed the quantity take-off specifically for contract progress payment, but not for other purposes or broader BIM uses. Further research in this field would be of great help in developing a standard protocol for automatic quantity surveying system in Vietnam.

Originality/value

A new theoretical framework for BIM-based QTO validated with Delphi technique to facilitate progress payments for high-rise building projects, considering all information management stages and the phases of information development in the project lifecycle. The framework identified four types of information required for this QTO, detailed considerations for strategies (Library Objects Development, BIM Objects Information Declaration, BIM-based QTO) for better managing the information for this BIM use. Two trade-offs of “Speed – LOD–Applicable Breadth” and “Quality – Productivity” have been proposed for facilitating the strategies and also for enhancing the total efficiency and effectiveness of the QTO process.

Details

International Journal of Building Pathology and Adaptation, vol. 42 no. 4
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 29 March 2024

Esra Keskin, Eunhwa Yang, Harun Tanrıvermiş and Monsurat Ayojimi Salami

The facility management (FM) sector, which is developing rapidly, is making slower progress in Turkey compared to Europe and the USA. This paper aims to research the underlying…

Abstract

Purpose

The facility management (FM) sector, which is developing rapidly, is making slower progress in Turkey compared to Europe and the USA. This paper aims to research the underlying issues leading to FM practices and offer insights into the implications of FM-related policies, especially for large urban transformation projects.

Design/methodology/approach

The study used a mixed-methods research design and collected qualitative data through semi-structured interviews with building/site managers and quantitative data through structured surveys with residents. Forty-nine building/site managers and 660 residents participated in the interview and survey from Turkey’s North Ankara and Dikmen Valley urban transformation projects.

Findings

The FM by residents, performed by the managers selected among homeowners, was preferred to the professional FM in Turkey. Education level, age, homeownership and duration of living in the region were associated with selecting FM practices. Cost also had an important place among the selection criteria, and the standard view from the residents was that professional FM would cause a cost increase. However, interviews with building/site managers in North Ankara and Dikmen Valley Urban Transformation areas revealed that a significant part of the problem resulted from insufficient knowledge and experience in FM.

Research limitations/implications

Within the scope of the research, two urban transformation projects in Ankara Province were selected, and the survey was limited to the North Ankara Entrance Urban Transformation Project and Dikmen Valley Urban Transformation Project areas. Although there is a need to improve the understanding of FM in all facilities, built environments and collective buildings, collective buildings in urban transformation areas due to several constraints, those other identified areas are postponed for future study. In addition, collective buildings located in transformation areas differ from others in discussing the social dimension and the impact of management.

Social implications

Within the scope of the research, two urban transformation projects in Ankara Province were selected, and the survey was limited to the North Ankara Entrance Urban Transformation Project and Dikmen Valley Urban Transformation Project areas. Although there is a need to improve the understanding of FM in all facilities, due to several constraints built environments and collective buildings in urban transformation areas, are postponed for future study. In addition, collective buildings located in transformation areas differ from others in discussing the social dimension and the impact of management.

Originality/value

This study evaluates two different FM approaches: FM by residents and professional FM, implemented in Turkey and identifies the criteria for choosing the FM practice. In addition, both building/site managers and residents evaluate different perspectives on FM. This study is unique because it compares different FM practices in Turkey and the criteria for residents to prefer different FM practices.

Details

Facilities , vol. 42 no. 7/8
Type: Research Article
ISSN: 0263-2772

Keywords

Open Access
Article
Publication date: 3 May 2023

Lars Stehn and Alexander Jimenez

The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels…

Abstract

Purpose

The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels. The take is that fragmentation of construction is one explanation for the lack of productivity growth, and that IHB could be an integrating method of overcoming horizontal and vertical fragmentation.

Design/methodology/approach

Singe-factor productivity measures are calculated based on data reported by IHB companies and compared to official produced and published research data. The survey covers the years 2013–2020 for IHB companies building multi-storey houses in timber. Generalization is sought through descriptive statistics by contrasting the data samples to the used means to control vertical and horizontal fragmentation formulated as three theoretical propositions.

Findings

According to the results, IHB in timber is on average more productive than conventional housebuilding at the company level, project level, in absolute and in growth terms over the eight-year period. On the company level, the labour productivity was on average 10% higher for IHB compared to general construction and positioned between general construction and general manufacturing. On the project level, IHB displayed an average cost productivity growth of 19% for an employed prefabrication degree of about 45%.

Originality/value

Empirical evidence is presented quantifying so far perceived advantages of IHB. By providing analysis of actual cost and project data derived from IHB companies, the article quantifies previous research that IHB is not only about prefabrication. The observed positive productivity growth in relation to the employed prefabrication degree indicates that off-site production is not a sufficient mean for reaching high productivity and productivity growth. Instead, the capabilities to integrate the operative logic of conventional housebuilding together with logic of IHB platform development and use is a probable explanation of the observed positive productivity growth.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 14 July 2022

Ayman Ahmed Ezzat Othman and Ahmed Ramadan Kamal

The aim of this paper is to develop a framework to enhance building maintainability through facilitating early suppliers’ involvement (ESI) in the design process.

Abstract

Purpose

The aim of this paper is to develop a framework to enhance building maintainability through facilitating early suppliers’ involvement (ESI) in the design process.

Design/methodology/approach

A research methodology consisting of literature review, case studies and survey questionnaire was designed to achieve the above-mentioned aim. Firstly, literature review was used to examine the concepts of building maintenance, maintainability, the design process and ESI. Secondly, three case studies were presented and analysed to investigate the role of ESI towards enhancing building maintainability during the design process. Thirdly, a survey questionnaire was carried out with a representative sample of architectural design firms (ADFs) in Egypt to investigate their perception and application of ESI towards enhancing building maintainability during the design process. Finally, the research developed a framework to facilitate ESI in the design process in ADFs in Egypt.

Findings

Through literature review, the research highlighted the relationship between ESI and enhancing building maintainability and identified the roles, benefits, challenges and that encounter ESI in ADFs, factors for suppliers selection and levels of involvement. Results of the data analysis showed that “Difficulty of trusting external parties and sharing information with transparency” was ranked the highest challenge of ESI in ADFs in Egypt, followed by “Legal competitive advantage restrictions”. Moreover, “Better estimation for operation and maintenance costs” was ranked the highest contributions of ESI towards enhancing building maintainability, followed by “Reduce the number of operation and maintenance problems or reworks”. Finally, respondents stated that “Innovation, technical expertise, and competence” was ranked the highest supplier’s selection criteria, while “paying consultation fees for offering advice and recommendations to the design team” was ranked the highest form of supplier’s remuneration.

Research limitations/implications

The proposed framework contributes to the body of knowledge through proposing five functions that aimed to facilitate ESI in the design process, a research area that received scant attention in construction research. In addition, because of the conceptual nature of the framework, it has to be validated to ensure its capability to overcome the challenges of ESI as an approach for enhancing building maintainability during the design process.

Practical implications

This research presents a practical solution that bridges the gap between theory and practice through overcoming the challenges that obstruct suppliers from being involved in the design process as an approach for enhancing building maintainability.

Originality/value

This research discussed the relationship between ESI and enhancing building maintainability as well as the roles, benefits and challenges that encounter ESI in ADFs. In addition, the research investigated the levels of suppliers’ involvement, selection criteria and forms of payment. Moreover, it investigated the perception and application of ESI in ADFs in Egypt towards improving building maintainability. The research proposed a framework to facilitate the integration of suppliers in the early stages of the project life cycle. It represents a synthesis that is novel and creative in thought and adds value to the knowledge in a manner that has not previously occurred.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 4
Type: Research Article
ISSN: 1726-0531

Keywords

Open Access
Article
Publication date: 28 May 2024

Chijioke Emmanuel Emere, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala and Opeoluwa Israel Akinradewo

Successful project delivery for sustainable building construction (SBC) has been linked to certain features. Previous studies have emphasised the need to improve SBC practice in…

Abstract

Purpose

Successful project delivery for sustainable building construction (SBC) has been linked to certain features. Previous studies have emphasised the need to improve SBC practice in South Africa. The purpose of this study is to explore the SBC features for project delivery in South Africa.

Design/methodology/approach

A structured questionnaire elicited the primary data from 281 built environment professionals, mainly in South Africa’s Gauteng province. Descriptive and inferential statistics were used for the data analysis. This study used the principal component analysis technique to ascertain the principal SBC features.

Findings

Three components of SBC features, namely, sustainable resource use and compliance, sustainable waste minimisation and recycling and sustainable designs and materials, were developed from the principal component analysis. The factor loadings of the constituent variables ranged from 0.570 to 0.836. The reliability of each component was evaluated, and the results were 0.966, 0.931 and 0.913.

Practical implications

The revelations from this study will aid the decision-making of the relevant stakeholders towards establishing improvement initiatives and mitigating the reluctance to shift from conventional building methods and poor knowledge sharing of SBC benefits.

Originality/value

This is one of the most recent South African studies that sheds light on the components of a successful SBC deployment. The findings of this study added to knowledge by confirming three fundamental features of SBC. This study recommends adequately considering the principal features for successful SBC project delivery in South Africa.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

1 – 10 of over 9000