Search results
1 – 10 of 19Building Information Modelling (BIM) education promises new and exciting opportunities for more integrated learning experiences, multidisciplinary collaboration and greater…
Abstract
Purpose
Building Information Modelling (BIM) education promises new and exciting opportunities for more integrated learning experiences, multidisciplinary collaboration and greater synthesis between the learning environment and real-world projects. This paper aims to report the findings of a systematic review of the BIM education literature aimed at understanding the current state of the art of BIM-enabled education.
Design/Methodology/Approach
The systematic review methodology adopted borrows from the approach developed and widely deployed in evidence-based practice within the medical research field.
Findings
A total of 330 relevant articles were identified and analysed. Reported instances of BIM-enabled education were identified and analysed. It was found that these can be categorised into two groups: BIM as a learning tool and BIM as a learning environment.
Research Limitations/Implications
This review was limited to the academic literature published in English from 2007 until January 2018.
Practical Implications
BIM as a learning environment represents a new paradigm for AEC education, which emphasises integration, multidisciplinary collaboration, simulation, real life scenarios and application of learning concepts.
Originality/Value
The concept of BIM as a learning environment requires further elaboration, after which it can be used to enhance AEC education.
Details
Keywords
Creating a BIM-enabled learning space that spans both higher education and industry offers the possibility of immersive and integrated learning on the basis of real, up-to-date…
Abstract
Purpose
Creating a BIM-enabled learning space that spans both higher education and industry offers the possibility of immersive and integrated learning on the basis of real, up-to-date project data for a new generation of students who will be “BIM natives” and can “think in BIM”. This paper aims to elaborate the concept of BIM as a learning environment so that it can be produced for Architecture Engineering Construction (AEC) educational purposes.
Design/Methodology/Approach
The complementary theoretical lenses of Experiential Learning, Structuration Theory and Systems Theory are adopted for conceptualising a BIM-enabled Learning Environment (BLE).
Findings
The BLE is proposed in the form of a social system embedded within both the education system and the industry system. The BLE is described in terms of its structures and component subsystems, inputs, outputs and flows at different scales.
Research Limitations/Implications
In this initial paper, the BLE is merely outlined and its constituent structures alluded to. Further investigation is required to fully detail the BLE.
Practical Implications
By describing the identified structures in still more detail, the BLE can be understood to the extent that it can be reproduced in practice for actual learning. This is the goal and expectation going forward.
Originality/Value
The derived BLE is described in social terms and this reflects the centrality of social activity to both building and learning. Technology, processes and traditional industry roles are subordinated into supporting functions. This potentially offers opportunities for learners to reflect on all of these and to consider ways of improving them.
Details
Keywords
Theophilus O.O. Olowa, Emlyn Witt and Irene Lill
BIM education for construction professionals has tended to lag industry developments. This investigation initiates doctoral research into the use of BIM for construction education…
Abstract
Purpose
BIM education for construction professionals has tended to lag industry developments. This investigation initiates doctoral research into the use of BIM for construction education. The purpose of this study is to gain an understanding of existing examples of BIM education, their characteristics, the challenges faced in their implementation and any clear trends to focus the doctoral research effort.
Design/Methodology/Approach
A systematic search of peer-reviewed BIM education literature was carried out. From the articles captured, 51 specific cases of BIM education were identified and analysed.
Findings
Most cases are from the USA with a more global spread from 2013. A tendency towards interdisciplinary collaboration was apparent though single discipline courses remain important. BIM software in education is dominated by Autodesk products. Most cases were found to be BIM-focused with few examples of BIM-enabled education. This was consistent with the most significant BIM education challenges that were found to relate to the skill levels of students, time and the availability of technical support.
Research Limitations/Implications
This is an initial study. It is based on only 51 cases of BIM education, which were partially described in peer reviewed conference and journal papers available in international databases.
Practical Implications
The investigation has shed some light on existing examples of BIM education and these are useful in designing BIM education initiatives as well as directing further research efforts.
Originality/Value
The study offers an original perspective on global BIM education. It also represents the commencement of doctoral research.
Details
Keywords
Oluseye Olugboyega and Abimbola Windapo
BIM research to date has in general zeroed in on featuring the significance of BIM-enabled integration and collaboration (BIMIC) rather than giving exact proof of its occurrence…
Abstract
Purpose
BIM research to date has in general zeroed in on featuring the significance of BIM-enabled integration and collaboration (BIMIC) rather than giving exact proof of its occurrence. Accordingly, this research quantitatively explored the determinants of BIMIC in South Africa.
Design/methodology/approach
This research conceptualized a four-pillar model of BIM-enabled integration and collaboration. The speculations in the model were examined using SEM-MLE.
Findings
The aftereffects of the SEM-MLE demonstrated that network communication, knowledge sharing, and transfer, information sharing and exchange and trust-based relationships are critical determinants of BIMIC. The model's prescient power demonstrates an acceptable validity, and the boundary gauges showed that all the hypotheses were measurably huge.
Research limitations/implications
This research gives a hypothetical premise for further investigation of BIMIC by supporting the postulations on the occurrence of collaboration and integrations among the BIM-SCM.
Practical implications
The idea investigated involving SEM in this research gives a holistic view to the BIM managers in arranging BIM-based activities and overseeing BIM cycles and supply chain members. It likewise offers rules and structures for accomplishing and overseeing integration and collaboration among the BIM supply chain members.
Originality/value
Despite 20 years of exploration on the BIM concept and adoption, no idea has been given to clarify the determinants of integration and collaboration as a BIM cycle. The four-pillar model of BIMIC created and tested in this research clarified BIMIC and contributed a new model to the current literature on the BIM process.
Details
Keywords
Taha Karasu, Kirsi Aaltonen and Harri Haapasalo
Integrated project delivery (IPD) and building information modeling (BIM) have been discussed as prominent collaborative concepts in recent architecture, engineering and…
Abstract
Purpose
Integrated project delivery (IPD) and building information modeling (BIM) have been discussed as prominent collaborative concepts in recent architecture, engineering and construction (AEC) literature, thus recommended for more advanced value creation. However, they have been studied predominantly as discrete even though they are typically highly interrelated. This study aims to enhance collaboration in AEC projects by tracing recent trends in IPD and BIM literature by making sense of trends and by exploring how their interplay has been discussed and conceptualized.
Design/methodology/approach
This systematic literature review draws on Scopus and Web of Science as the primary databases. In total, 120 academic papers and review articles were sourced. Yet, the final sample includes 71 sources from the past decade (2011–2020), focusing on both IPD and BIM.
Findings
This study identifies 11 interrelated and overlapping themes that are indicative of trends in the recent IPD and BIM literature. This research found that among the identified themes, the clusters of sustainability, transformation and increasing the competence level of staff in the AEC industry, in addition to the concept of quality, require more extensive research in the context of IPD and BIM. Additionally, this study identifies four different approaches to the interplay of IPD and BIM, indicating an absence of scholarly consistency.
Originality/value
Based on the systematic analysis of the recent literature, this study indicates that IPD and BIM have several joint fundamental cornerstones. It is evident that both concepts support the implementation of each other. The success of implementing either one is strongly related to the other. Additionally, we have not found earlier systematic literature reviews that examine the interplay between IPD and BIM in the recent AEC literature.
Details
Keywords
Samuel Adeniyi Adekunle, Clinton Ohis Aigbavboa and Obuks Augustine Ejohwomu
The implementation of BIM in the construction industry requires the coevolution of the various aspects of the BIM ecosystem. The human dimension is a very important dimension of…
Abstract
Purpose
The implementation of BIM in the construction industry requires the coevolution of the various aspects of the BIM ecosystem. The human dimension is a very important dimension of the ecosystem necessary for BIM implementation. It is imperative to study this aspect of the BIM ecosystem both from the employer perspective and employee availability to provide insights for stakeholders (job seekers, employers, students, researchers, policymakers, higher education institutions, career advisors and curriculum developers) interested in the labour market dynamics.
Design/methodology/approach
To understand the BIM actor roles through the employer lens and the actual BIM actors in the construction industry, this study employed data mining of job adverts from LinkedIn and Mncjobs website. Content analysis was employed to gain insights into the data collected. Also, through a quantitative approach, the existing BIM actor roles were identified.
Findings
The study identified the employers' expectations of BIM actors; however, it is noted that the BIM actor recruitment space is still a loose one as recruiters put out open advertisements to get a large pool of applicants. From the data analysed, it is concluded that the BIM actor role is not an entirely new profession. However, it simply exists as construction industry professionals with BIM tool skills. Also, the professional development route is not well defined yet.
Originality/value
This study presents a realistic angle to BIM actor roles hence enhancing BIM implementation from the human perspective. The findings present an insight into the preferred against the actual.
Details
Keywords
Maria Saridaki and Kim Haugbølle
The architecture, engineering and construction industry faces several challenges when performing life-cycle cost calculations. On the basis of activity theory, this study aims at…
Abstract
Purpose
The architecture, engineering and construction industry faces several challenges when performing life-cycle cost calculations. On the basis of activity theory, this study aims at improving our understanding of the current cost calculation in design practices as an activity system with a number of built-in contradictions.
Design/Methodology/Approach
Drawing on one of the authors’ practical experience from a design office, the research design comprises a paradigmatic case study of a Danish architecture firm, in which data are gathered through documents, observations, interviews and physical artefacts. Moreover, this paper applies a literature review on barriers for adopting life-cycle costing.
Findings
The paper identifies a number of primary, secondary, tertiary and quaternary contradictions between practices of design, cost calculations and data management. Thus, hypotheses are formulated on how and to what extent these different contradictions shape cost calculations in design practices to obstruct or support the application of life cycle costing principles in design.
Research Limitations/Implications
This study is part of an ongoing research project. Thus, additional analysis is required before the authors may conclude on final results.
Practical Implications
This paper identifies a number of factors that obstruct or support the implementation of life cycle costing in current design practices.
Originality/Value
This paper provides new insights into the various contradictions that shape data management in architectural offices as a prerequisite for improving life cycle design practices.
Details
Keywords
Kim Haugbølle and Lau M. Raffnsøe
Sustainable building design suffers from a lack of reliable life cycle data. The purpose of this paper is to compare life cycle costs of sustainable building projects, examine the…
Abstract
Purpose
Sustainable building design suffers from a lack of reliable life cycle data. The purpose of this paper is to compare life cycle costs of sustainable building projects, examine the magnitude of various cost drivers and discuss the implications of an emerging shift in cost drivers.
Design/methodology/approach
This paper is based on data from 21 office buildings certified in Denmark according to the sustainable certification scheme DGNB.
Findings
The paper supports previous findings that construction costs and running costs each roughly make up half of the life cycle costs over a 50-year period. More surprising is the finding that the life cycle costs for cleaning are approximately twice as high as the supply costs for energy and water.
Research limitations/implications
The data set is based on actual construction costs of office buildings constructed in 2013-2017. Although all running costs are calculated rather than measured, they are based on a more detailed, specific and industry-supported set of calculation assumptions than is usual for life cycle costing studies because of extensive collaborative work in a number of concomitant national research and development projects.
Practical implications
Authorities, clients and building professionals heavily emphasise energy-saving measures in new Danish buildings. The paper suggests redirecting this effort towards other more prominent cost drivers like cleaning and technical installations.
Originality/value
This paper provides a notable contribution to the academic understanding of the significance of different cost drivers as well as the practical implementation of life cycle costing.
Details
Keywords
Lina Gharaibeh, Sandra Matarneh, Kristina Eriksson and Björn Lantz
This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on…
Abstract
Purpose
This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on examining the extent, maturity and actual practices of BIM in the Swedish wood construction industry, by analysing practitioners’ perspectives on the current state of BIM and its perceived benefits.
Design/methodology/approach
A qualitative approach was selected, given the study’s exploratory character. Initially, an extensive review was undertaken to examine the current state of BIM utilisation and its associated advantages within the construction industry. Subsequently, empirical data were acquired through semi-structured interviews featuring open-ended questions, aimed at comprehensively assessing the prevailing extent of BIM integration within the Swedish wood construction sector.
Findings
The research concluded that the wood construction industry in Sweden is shifting towards BIM on different levels, where in some cases, the level of implementation is still modest. It should be emphasised that the wood construction industry in Sweden is not realising the full potential of BIM. The industry is still using a combination of BIM and traditional methods, thus, limiting the benefits that full BIM implementation could offer the industry.
Originality/value
This study provided empirical evidence on the current perceptions and state of practice of the Swedish wood construction industry regarding BIM maturity.
Details