Search results

1 – 10 of 849
Article
Publication date: 11 October 2022

Onaopepo Adeniyi, Niraj Thurairajah and Feyisetan Leo-Olagbaye

Practitioners have reported a minimal and non-use of building information modelling (BIM), especially in small and medium-sized organisations and BIM infant construction…

Abstract

Purpose

Practitioners have reported a minimal and non-use of building information modelling (BIM), especially in small and medium-sized organisations and BIM infant construction industries. This development calls for a reappraisal of organisations’ strength in capabilities required for BIM uptake towards the target of global construction digitalisation. This study aims to assess the BIM Level 2 uptake capability of organisations in a BIM infant construction industry and identify the underlying interactions between the capability criteria.

Design/methodology/approach

The study used a multivariable analysis of fifteen descriptors identified from the people, process, policy, finance and technology domain. Data collection was done in the BIM infant construction industry in Nigeria. Verification of the descriptors and an evaluation of BIM uptake capability in organisations was done. Seventy-three responses were received within the selected context, and data analysis was done with mean weighting and exploratory factor analysis. Maximum Likelihood extraction and Direct Oblimin rotation were used.

Findings

Factor analysis revealed three factors that explained 53.28% of the total variance in the BIM Level 2 uptake capability of construction organisations. The factors are workforce capacity and continuous development, an affinity for innovation and strength in physical and operational facilities.

Research limitations/implications

This study provides an overarching and insightful discussion on BIM uptake capability and construction digitalisation with evidence from a BIM-infant construction industry.

Practical implications

The findings of this study are a piece of valuable empirical evidence on Level 2 BIM uptake capability. This empirical situation analysis will inform the advocacy for the advancement of BIM and enhanced utilisation of building information. Evidence on the capability performance of the BIM infant industry has been revealed.

Originality/value

The outcome is expected to stir debate on the preparedness of organisations to further exploit the benefits of BIM in the BIM infant construction industry. Examination of the capability for a particular phase of BIM is scanty in the literature.

Details

Construction Innovation , vol. 24 no. 2
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 30 March 2022

Oluseye Olugboyega, Godwin Ehis Oseghale and Clinton Aigbavboa

This study aims to undertake a contextual analysis of project-level building information modelling (BIM) adoption in Nigeria and demonstrate how BIM is applied across different…

Abstract

Purpose

This study aims to undertake a contextual analysis of project-level building information modelling (BIM) adoption in Nigeria and demonstrate how BIM is applied across different projects in Nigeria.

Design/methodology/approach

This research generates contextual and holistic understandings of multiple project-level cases of BIM adoption through an interpretive paradigm guided by relativist ontology and subjectivist epistemology. Two models of project-level BIM adoption (ten-factor theory of BIM adoption and strategic-contingent model of BIM adoption) were merged to formulate the BIM adoption assessment scale (BIM-AAS). A qualitative-oriented case study protocol was developed to extract valid and reliable data from external and internal project data based on BIM-AAS features. The extracted data were analysed using the pattern-matching technique and cross-case analysis.

Findings

The results indicate that there was substantial use of BIM tools and technologies in the projects. All the projects adopted collaborative procurement and team and developed integrated building information models. The use of BIM tools, technologies and processes in the projects was found to be above average. The complexities and expectations levels of the projects compliment the nature of BIM adoption in the projects.

Research limitations/implications

The BIM-AAS adopted in this research is an excellent example of a project-level BIM adoption analytical tool. It can be assumed in future research. Also, this research contributes to the theory that the level of project complexity and expectations must align with the level of BIM adoption in projects. The study’s findings ratify BIM tools, technologies and processes as the elements of project-level BIM adoption.

Practical implications

This research substantiates the actual nature and structure of BIM adoption in Nigeria, thereby simplifying the development of initiatives towards BIM adoption in projects and determining the appropriate strategies for BIM implementation and innovation in the Nigerian construction industry. The most important initiative that the Nigerian government can make to drive BIM implementation is the automating of code checking for building rules and regulations in Nigeria.

Originality/value

Previous studies have only reported cases of project-level BIM adoption using surveys and without a standardised project-level BIM adoption model to guide the analysis. This study is the first to formulate and use BIM adoption models for a uniform, critical and contextual analysis of project-level BIM adoption.

Article
Publication date: 28 June 2022

Andrew Thomas Hall, Serdar Durdyev, Kerim Koc, Omer Ekmekcioglu and Laura Tupenaite

Building information modeling (BIM) is a prominent concept to digitalize data collection and analysis processes. Small and medium-sized enterprises (SMEs) account for a…

1292

Abstract

Purpose

Building information modeling (BIM) is a prominent concept to digitalize data collection and analysis processes. Small and medium-sized enterprises (SMEs) account for a considerable percentage of the works performed in the construction industry. The adoption rate of BIM by SMEs is still, however, not at the desired level in the New Zealand construction industry. This study aims to evaluate barriers to BIM implementation for SMEs in the New Zealand construction industry.

Design/methodology/approach

This study adopted four-step methodology to evaluate barriers to BIM adoption for SMEs. First, a comprehensive literature review, followed by a focus group discussion was performed to identify barriers to BIM adoption. Then, analytical hierarchy process (AHP) was used to assess identified barriers. Finally, experts’ agreements (both internal and external) were ensured by consistency analysis and Kendall’s coefficient of concordance (Kendall’s W) tests.

Findings

The findings indicate that (1) interoperability between software platforms, (2) lack of government mandate on BIM usage at project level, (3) high cost of acquiring the software and licensing required to use BIM and (4) lack of client demand for adopting BIM were the most significant barriers in terms of technological, governmental, resource and cultural categories, respectively. Further investigation of the expert evaluation showed strong consistencies (each expert separately) and agreements (among experts) in each AHP matrix.

Practical implications

Primary focus should be training of local market (particularly SMEs) professionals as the shortage in qualified professionals makes the country-wide adoption challenging. The publicity in the local market can help SMEs understand how BIM is leveraged for further improvements in project performance.

Originality/value

Overall, this research not only provides a roadmap for the widespread adoption of BIM within SMEs in New Zealand through analysis of the barriers encountered but also highlights the power that policymakers hold over the mass adoption of BIM within SMEs.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 25 February 2022

Apeesada Sompolgrunk, Saeed Banihashemi, M. Reza Hosseini, Hamed Golzad and Aso Hajirasouli

The business benefits envisaged for BIM represent the main criteria for decision-making about BIM implementation – or shy away from BIM. Despite the significance, traditional…

Abstract

Purpose

The business benefits envisaged for BIM represent the main criteria for decision-making about BIM implementation – or shy away from BIM. Despite the significance, traditional evaluation techniques have difficulty to capture “the true value” of BIM from multiple levels and dimensions – as an effective evaluation method is supposed to. This study aims to identify the significant factors that affect BIM return on investment (ROI), develop an integrated model for companies and examine the influence of intangible returning factors of BIM on the rate of BIM implementation.

Design/methodology/approach

A cluster sampling technique was used; 92 questionnaires completed by Australian architecture, engineering and construction small- and medium-sized enterprises (SMEs) provided the basis to identify and analyse the key measurable returning factors, value drivers and strategic benefits associated with BIM ROI.

Findings

Applying the PLS-SEM technique, findings reveal that a lack of reliable quantification methods for the ROI factors associated with BIM significantly affects the organisation's commitments to implement BIM. In essence, the failure to adequately identify and assess these benefits could result in the system not being appropriately implemented and supported by executive sponsors, who give priority to hard and tangible ROI measurements.

Practical implications

The outcome of this study would be of direct appeal to policymakers, industry professionals and the academic community alike, in providing data-informed insight into the intersection between the implementation of BIM and the concept of ROI. Findings would provide a springboard for further research into using ROI factors to increase BIM implementation. Though the findings are directly applicable and contextualised for Australia, they provide lessons and offer a blueprint for similar studies in other countries and settings. That is, regardless of the context, findings raise awareness and provide a point of reference for the quantification of intangible returning factors rather than the tangible returning factors, as one of the first studies in its kind.

Originality/value

The study provides original insight in drawing attention to an untapped area for research in BIM implementation, namely BIM ROI. Apart from raising awareness around BIM ROI, the study is novel in providing a quantified model that establishes the links and level of impacts of various factors associated with BIM ROI. Findings of this study, particularly add value to the body of knowledge related to the business implications associated with BIM implementation in the context of Australian SMEs, while providing lessons for other countries and settings.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 28 February 2024

Thayla Zomer, Andy Neely and Paulo Savaget

How organisations interact with and respond to environmental pressures has been a long-term interest of organisational scholars. Still, it remains an under-theorised phenomenon…

Abstract

Purpose

How organisations interact with and respond to environmental pressures has been a long-term interest of organisational scholars. Still, it remains an under-theorised phenomenon from a project perspective. So far, there is limited understanding of how projects, which are composed by a constellation of organisations, “respond” to institutional pressures that are exerted on them. This research takes the perspective of projects as adopters/implementers of institutional pressures and analyses how they interact with, and respond to, such pressures. More specifically, this research explores how construction projects respond to the pressure of a Building Information Modelling (BIM) mandate.

Design/methodology/approach

Multiple in-depth case studies were conducted to explore the practical implementation of a BIM mandate in the UK and understand how the construction projects responded to the coercive pressures to implement a new policy mandate for process digitalisation. Multiple sources were employed for data collection and the data were analysed inductively. The findings identify a hybrid response comprising four distinct ways that projects might respond to an institutional pressure.

Findings

We find that projects decouple both from the content and from the intended purpose of a policy, i.e. there are two variance of a policy-practice decoupling phenomenon in projects. The findings also reveal the underlying conditions leading to decoupling.

Originality/value

We advance decoupling literature so that it better applies to the temporary, distributed and interdependent work conducted via projects. Second, we define decoupling in projects as a provisional and fragmented process of wayfinding through heterogeneous institutional spaces, and discuss the potential policy-practice assemblages in projects, influenced by how, if and when project members' activities decouple from the many and often contradicting institutional pressures they face. Third, we discuss how the qualitatively different forms of decoupling that we identified in our work may act as part of a legitimation process in ambiguous situations whereby projects might share a resemblance of conformity with institutional pressures when they are de facto only partially conforming to them.

Details

International Journal of Managing Projects in Business, vol. 17 no. 2
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 12 October 2022

Thi-Thao-Nguyen Nguyen, Sy Tien Do, Viet Thanh Nguyen and Thu Anh Nguyen

This study aims to identify the enabling factors for Building Information Modeling (BIM) adoption in Vietnamese construction enterprises and uncover their interrelationships. This…

600

Abstract

Purpose

This study aims to identify the enabling factors for Building Information Modeling (BIM) adoption in Vietnamese construction enterprises and uncover their interrelationships. This will help stakeholders focus on controlling and allocating resources (time, personnel, and costs) appropriately to adopt BIM and differentiate themselves from fierce competition in the architectural, engineering, construction and operations (AECO) industry.

Design/methodology/approach

This study first identifies and evaluates 32 enabling factors for applying BIM in the Vietnamese construction industry according to the TOE extended framework. Afterwards, a hybrid questionnaire survey using a convenient sampling method is conducted to capture stakeholders' views. The exploratory factor analysis (EFA) and the partial least squares structural equation modelling (PLS-SEM) technique are then applied to identify the constructs of the enabling factors and their interrelationships.

Findings

The study extracts six constructs that could have a significant impact on the adoption of BIM in construction enterprises, namely: technical feasibility (TF), human resources and management (HRM), company business vision (CBV), political environment (PE), economic viability (EV), and legal aspects (LA). Based on eleven proposed hypotheses, the analysis results confirm nine hypotheses and show that the HRM, TF, and CBV have the strongest effects on managers in evaluating the factors for BIM.

Originality/value

The results of the study fill the gap in knowledge by discovering the interrelationships among the enabling factors for BIM adoption in construction enterprises. The results might support the construction enterprises and their stakeholders in increasing the application of BIM, and digital transformation in construction industry.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 19 January 2024

Kenneth Lawani, Farhad Sadeghineko, Michael Tong and Mehmethan Bayraktar

The purpose of this study is to explore the suggestions that construction processes could be considerably improved by integrating building information modelling (BIM) with 3D…

74

Abstract

Purpose

The purpose of this study is to explore the suggestions that construction processes could be considerably improved by integrating building information modelling (BIM) with 3D laser scanning technologies. This case study integrated 3D laser point cloud scans with BIM to explore the effects of BIM adoption on ongoing construction project, whilst evaluating the utility of 3D laser scanning technology for producing structural 3D models by converting point cloud data (PCD) into BIM.

Design/methodology/approach

The primary data acquisition adopted the use of Trimble X7 laser scanning process, which is a set of data points in the scanned space that represent the scanned structure. The implementation of BIM with the 3D PCD to explore the precision and effectiveness of the construction processes as well as the as-built condition of a structure was precisely captured using the 3D laser scanning technology to recreate accurate and exact 3D models capable of being used to find and fix problems during construction.

Findings

The findings indicate that the integration of BIM and 3D laser scanning technology has the tendency to mitigate issues such as building rework, improved project completion times, reduced project cost, enhanced interdisciplinary communication, cooperation and collaboration amongst the project duty holders, which ultimately enhances the overall efficiency of the construction project.

Research limitations/implications

The acquisition of data using 3D laser scanner is usually conducted from the ground. Therefore, certain aspects of the building could potentially disturb data acquisition; for example, the gable and sections of eaves (fascia and soffit) could be left in a blind spot. Data acquisition using 3D laser scanner technology takes time, and the processing of the vast amount of data acquired is laborious, and if not carefully analysed, could result in errors in generated models. Furthermore, because this was an ongoing construction project, material stockpiling and planned construction works obstructed and delayed the seamless capture of scanned data points.

Originality/value

These findings highlight the significance of integrating BIM and 3D laser scanning technology in the construction process and emphasise the value of advanced data collection methods for effectively managing construction projects and streamlined workflows.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 3 January 2023

Syahrul Nizam Kamaruzzaman, Sarah Nabiha Suznan and Nik Elyna Myeda

This study aims to leverage the implementation of building information modelling (BIM) in facilities management (FM), and thus the integration of BIM and FM are explored. It looks…

Abstract

Purpose

This study aims to leverage the implementation of building information modelling (BIM) in facilities management (FM), and thus the integration of BIM and FM are explored. It looks at identifying the information needed to implement BIM application in FM, to determine the level of implementation of BIMFM as well as to recommend BIMFM application mapping for building life cycle.

Design/methodology/approach

This study applied qualitative methodology, upon which a purposive sampling to 16 interviewees were conducted among professionals involved in any BIM, FM, BIMFM projects. Final analysis was conducted using thematical analysis by ATLAS.ti software.

Findings

The types of information required to implement BIMFM range from managerial information, commercial information, technical information and all full life cycle data. The implementation of BIMFM is agreed as beneficial, as it builds up efficiency of building performance, able to close gap of loses information, helps to improve FM in terms of data management, mitigates the problems, identifies priority defects and to enhance the FM processes. Respondents also believed that the causes where there is no implementation of BIMFM is in the situations where things are in order and when it becomes very expensive.

Originality/value

This paper has managed to gather the essential elements toward leveraging the implementation of BIMFM in digital construction project which are in the means of information types, the needs of BIMFM implementation and towards the end drawing the BIMFM implementation plan framework that could be used as a reference for the practitioners and industry.

Details

Journal of Facilities Management , vol. 21 no. 4
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 31 October 2023

Chukwuka Christian Ohueri, San Chuin Liew, Jibril Adewale Bamgbade and Wallace Imoudu Enegbuma

The efficient application of building information modeling (BIM) methodology in the sustainable building design process, known as green BIM, provides ideal leverage to…

Abstract

Purpose

The efficient application of building information modeling (BIM) methodology in the sustainable building design process, known as green BIM, provides ideal leverage to significantly enhance multidiscipline team collaboration. However, the practical execution of green BIM is characterized by issues such as duplication of work, information silos and poor cross-party coordination. Besides, there are limited studies on the specific components that are critical to driving green BIM collaborative design. This study aims to establish the critical components of green BIM collaborative design to enable the multidiscipline team to effectively use diverse software to collaboratively exchange accurate information, thus ensuring informed decision-making in the sustainable building design process.

Design/methodology/approach

Data were obtained by using a questionnaire to survey 360 respondents comprising mainly architects and engineers (civil, mechanical and electrical) in Malaysia. Subsequently, data were analyzed via confirmatory factor analysis. Afterward, a measurement model was established and used to test the 11 hypotheses of this study.

Findings

A covariance-based structural equation model of the critical components for successful BIM-based sustainable building design collaboration was established.

Practical implications

The research findings will guide the multidisciplinary team to collaboratively exchange accurate information in green BIM practices.

Originality/value

To the best of the authors’ knowledge, this research is the first attempt in the literature to provide a pragmatic approach for practitioners to combine the established critical components of green BIM to collaboratively exchange heterogeneous sustainability criteria and efficiently design buildings with high sustainability performance, particularly in emerging countries like Malaysia.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 22 November 2022

Praveena Munianday, Rahimi A. Rahman and Muneera Esa

There is a dearth of studies conducted by local academics on actual building information modelling (BIM) projects to analyse the actual hurdles of BIM adoption. The majority of…

Abstract

Purpose

There is a dearth of studies conducted by local academics on actual building information modelling (BIM) projects to analyse the actual hurdles of BIM adoption. The majority of BIM research focuses on the technology’s general advantages, disadvantages, issues and limitations. In addition, research on actual BIM projects that have integrated BIM throughout the project is necessary to increase the current low number of BIM users in Malaysia. Consequently, the purpose of this study is to examine the challenges BIM adopters experience while implementing BIM in their projects and how they overcome them.

Design/methodology/approach

An in-depth interview session was used to collect data based on a case-study methodology. In Malaysia, three BIM projects were chosen, given the available resources. To evaluate the data in this qualitative study, NVivo was used.

Findings

According to the findings, the most important elements influencing the adoption of new technology and innovation were people and capital. The most significant impediments to BIM adoption are the appraisal of time and finances, as well as the tolerance of changes in approach.

Originality/value

Collaborative training and BIM education have been the most explored solutions for reducing BIM difficulties. As a result, these concerns and solutions should be investigated and implemented to ensure project success and fully use technological innovation.

Details

Journal of Facilities Management , vol. 21 no. 4
Type: Research Article
ISSN: 1472-5967

Keywords

1 – 10 of 849