Search results

1 – 10 of over 1000
Article
Publication date: 7 September 2015

Jehan Zeb, Thomas Froese and Dana Vanier

The purpose of this paper is to develop and apply an ontology-supported asset information integrator system (AIIS) in the domain of infrastructure management. The two objectives…

Abstract

Purpose

The purpose of this paper is to develop and apply an ontology-supported asset information integrator system (AIIS) in the domain of infrastructure management. The two objectives are: first, to describe how different ontologies developed as part of this research support the design of message templates (MTs) that were implemented in the AIIS; and second, to explain the development and application of the prototype system for tangible capital asset (TCA) reporting.

Design/methodology/approach

The proposed system was developed in the MS SharePoint platform using a four-step methodology: create a web site and library; review and modify MTs; design and configure workflows; and add functionalities.

Findings

First, the architecture, methodology, and evaluation of the two ontologies: Transaction Domain Ontology and Tangible Capital Asset Ontology, developed as part of this research work were briefly introduced to describe how both the ontologies supported the design of MTs that were implemented in the AIIS. Second, the AIIS was successfully developed and applied in the domain of infrastructure management for the Asset Inventory and Condition Assessment Reporting.

Practical implications

The development of the AIIS would enable industry experts to exchange the tangible capital information. The built-in search engine and history services would help the experts to search a transaction and track the transaction history. The real-time visualisation of the data would help in decision making.

Originality/value

Infrastructure agencies use diversified information systems to manage infrastructure systems. Due to propriety nature of the information systems, the TCA data generated is heterogeneous and inconsistent, which make it difficult to exchange with other organisations. Also, the existing applications focus on processing and managing the TCA data for a variety of tasks; however, lack to support data exchange with other organisations. This emphasises the gap that requires the development of an ontology-supported collaboration system in the domain of infrastructure asset management.

Article
Publication date: 3 April 2017

Jehan Zeb and Thomas Froese

The purpose of this paper is to develop an eight-step procedure – transaction formalism protocol (TFP) – in the area of infrastructure management. The proposed TFP is developed…

Abstract

Purpose

The purpose of this paper is to develop an eight-step procedure – transaction formalism protocol (TFP) – in the area of infrastructure management. The proposed TFP is developed from two perspectives: TFP Specification (conceptual) and TFP Tool (application). This paper introduces the TFP Specification and discusses the TFP Tool in detail.

Design/methodology/approach

To develop the proposed TFP Tool, a five-step methodology was used: identify and select existing standards, benchmark standards, link and build on these standards, develop the proposed TFP Tool and validate the protocol.

Findings

The TFP Specification defines each step as a function for which inputs, controls, mechanisms, tools/techniques and outputs are specified. The TFP Tool comprises a set of forms and guidance that the transaction development personnel, including transaction analysts, transaction designers, software developers, process modellers and industry experts, will use to define transactions in infrastructure management domain.

Practical implications

The proposed TFP Tool enables transaction development personnel to define transactions effectively and efficiently for information and communication technology (ICT)-based solutions through defining information in a structured, consistent and easy way.

Originality/value

The TFP Tool was built on existing standards incorporating their shortcomings, including lack of a step-by-step procedure to help guide the personnel what to do next, lack of transaction monitoring and improvement steps and lack of standardised forms to collect information in a prescribed format for implementation in ICT-based collaboration systems. The proposed Tool was evaluated and found to be feasible, usable and useful.

Details

Construction Innovation, vol. 17 no. 2
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 14 September 2017

Jehan Zeb

The purpose of this paper is to develop an ontology of eco or natural assets to represent eco asset knowledge at two levels: eco asset metal model and eco asset ontology…

Abstract

Purpose

The purpose of this paper is to develop an ontology of eco or natural assets to represent eco asset knowledge at two levels: eco asset metal model and eco asset ontology (EA_Onto). The three objectives of this paper are to: define eco assets explicitly to reach a common understanding of the terms; evaluate the ontology; and discuss a potential area of application.

Design/methodology/approach

A seven-step methodology was used to develop the proposed ontology: define the scope; develop the eco asset meta model (EA_MM), define taxonomy, code ontology, capture ontology, evaluate ontology and document ontology.

Findings

The EA_MM was developed to represent eco asset domain knowledge, which was further extended to develop the EA_Onto, explicitly defining the eco asset knowledge in asset management. As a part of evaluation, it was found that the knowledge representation is consistent, concise, clear, complete and correct.

Practical implications

Theoretically, the proposed ontology is a significant contribution to the body of knowledge in asset management. Practically, the knowledge representation provides a common understanding of eco assets for asset management experts. In addition, it will be used in applications for effective eco asset management.

Originality/value

The current literature lacks explicit declaration of eco assets, how they are related to built environment for effective integration and how asset management functions are to be applied to accomplish effective eco asset management. Presently, eco assets are managed on an ad hoc basis, which need to be explicitly defined through developing an EA_Onto for implementation in applications for effective eco asset management.

Details

Built Environment Project and Asset Management, vol. 7 no. 4
Type: Research Article
ISSN: 2044-124X

Keywords

Content available
Article
Publication date: 7 September 2015

Mohan M. Kumaraswamy

394

Abstract

Details

Built Environment Project and Asset Management, vol. 5 no. 4
Type: Research Article
ISSN: 2044-124X

Book part
Publication date: 1 November 2007

Irina Farquhar and Alan Sorkin

This study proposes targeted modernization of the Department of Defense (DoD's) Joint Forces Ammunition Logistics information system by implementing the optimized innovative…

Abstract

This study proposes targeted modernization of the Department of Defense (DoD's) Joint Forces Ammunition Logistics information system by implementing the optimized innovative information technology open architecture design and integrating Radio Frequency Identification Device data technologies and real-time optimization and control mechanisms as the critical technology components of the solution. The innovative information technology, which pursues the focused logistics, will be deployed in 36 months at the estimated cost of $568 million in constant dollars. We estimate that the Systems, Applications, Products (SAP)-based enterprise integration solution that the Army currently pursues will cost another $1.5 billion through the year 2014; however, it is unlikely to deliver the intended technical capabilities.

Details

The Value of Innovation: Impact on Health, Life Quality, Safety, and Regulatory Research
Type: Book
ISBN: 978-1-84950-551-2

Article
Publication date: 2 August 2019

Karen B. Blay, Martin Morgan Tuuli and Jojo France-Mensah

The purpose of this paper is to validate perceived benefits and challenges of managing change in Building Information Modelling (BIM) Level 2 projects and to further explore the…

1290

Abstract

Purpose

The purpose of this paper is to validate perceived benefits and challenges of managing change in Building Information Modelling (BIM) Level 2 projects and to further explore the opportunities for enhancing the benefits and reducing the challenges. This research is timely because, hitherto, the benefits and challenges of managing change in BIM Level 2 remained largely unvalidated and the opportunities for enhancing the benefits and reducing challenges remained relatively unexplored.

Design/methodology/approach

A combination of a questionnaire survey and interviews with BIM Level 2 practitioners in the UK was employed in this study. In all, 41 responses were received from the questionnaire survey and ten subsequent interviews with BIM practitioners were carried out to explore opportunities for reducing challenges and increasing benefits of managing change in BIM Level 2 projects.

Findings

The study confirms benefits and challenges of managing change in BIM Level 2 projects identified and synthesised from literature, a much needed validation. Additional benefits and challenges were also identified in this study, such as cost saving and risk reduction (benefits) and social dimension issues in the BIM Level 2 processes (challenges). Opportunities identified to enhance benefits and reduce challenges were mainly socially driven, and were either reactive or proactive in nature.

Research limitations/implications

Opportunities for reducing challenges and increasing benefits identified from this research can inform the change management processes in BIM-Level 2.

Practical implications

The findings provide concrete basis for shaping BIM Level 2 change management processes and requirements.

Social implications

The identification of behaviours as shaping the social requirements for BIM-Level 2 confirms the need for a socio-technical approach to successful BIM implementation.

Originality/value

The identification of behaviours as shaping the social requirements for BIM Level 2 confirms the need for a socio-technical approach to successful BIM implementation.

Details

Built Environment Project and Asset Management, vol. 9 no. 5
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 18 January 2013

Max Finne and Jan Holmström

The purpose of this paper is to explore servitization in the context of the service supply chain, particularly the effects of the relationship between the subsystem supplier and…

3082

Abstract

Purpose

The purpose of this paper is to explore servitization in the context of the service supply chain, particularly the effects of the relationship between the subsystem supplier and the end user on the supplier's as well as on the supply chain's ability to provide industrial services. In addition, it aims to present a solution to overcome the challenges of lack of this relationship.

Design/methodology/approach

A case study incorporating an explorative design science approach identifies a theoretically novel and practically relevant problem in the field of service supply chain management. The study combines empirical data collection; systematic conceptualization of means and ends; evaluation of proposed solutions in iterative‐ and action‐oriented cycles; and theoretical explanation of the observed phenomena and outcomes.

Findings

By establishing a triadic operational model with an integrator and end user, the subsystem supplier can servitize within a supply chain in which the end user relationship is controlled by the integrator. This enables the combining of critical service provision capabilities: supplier's maintenance‐related capabilities and integrator's end user access.

Research limitations/implications

Further research is needed to determine the importance of managing the transition to subsystem suppliers in different types of industrial service supply chains. Because these observations and proposals are based on a single case study, the authors cannot draw conclusions as to how they apply to manufacturers in different problem situations.

Practical implications

The paper presents a decision‐making procedure that describes how a subsystem supplier opting for cooperation in the service supply chain can formulate a coherent set of triadic operational models with intermediaries and end users.

Originality/value

The paper shows how servitization takes place on supply chain level.

Details

Supply Chain Management: An International Journal, vol. 18 no. 1
Type: Research Article
ISSN: 1359-8546

Keywords

Article
Publication date: 1 March 2001

K.G.B. Bakewell

Compiled by K.G.B. Bakewell covering the following journals published by MCB University Press: Facilities Volumes 8‐18; Journal of Property Investment & Finance Volumes 8‐18;…

18755

Abstract

Compiled by K.G.B. Bakewell covering the following journals published by MCB University Press: Facilities Volumes 8‐18; Journal of Property Investment & Finance Volumes 8‐18; Property Management Volumes 8‐18; Structural Survey Volumes 8‐18.

Details

Structural Survey, vol. 19 no. 3
Type: Research Article
ISSN: 0263-080X

Article
Publication date: 1 September 2001

Index by subjects, compiled by K.G.B. Bakewell covering the following journals: Facilities Volumes 8‐18; Journal of Property Investment & Finance Volumes 8‐18; Property Management…

14803

Abstract

Index by subjects, compiled by K.G.B. Bakewell covering the following journals: Facilities Volumes 8‐18; Journal of Property Investment & Finance Volumes 8‐18; Property Management Volumes 8‐18; Structural Survey Volumes 8‐18.

Details

Facilities, vol. 19 no. 9
Type: Research Article
ISSN: 0263-2772

Article
Publication date: 1 March 2001

K.G.B. Bakewell

Compiled by K.G.B. Bakewell covering the following journals published by MCB University Press: Facilities Volumes 8‐18; Journal of Property Investment & Finance Volumes 8‐18;…

14425

Abstract

Compiled by K.G.B. Bakewell covering the following journals published by MCB University Press: Facilities Volumes 8‐18; Journal of Property Investment & Finance Volumes 8‐18; Property Management Volumes 8‐18; Structural Survey Volumes 8‐18.

Details

Property Management, vol. 19 no. 3
Type: Research Article
ISSN: 0263-7472

1 – 10 of over 1000