Article
Publication date: 13 December 2022

Zhenhua Luo, Juntao Guo, Jianqiang Han and Yuhong Wang

Prefabricated technology is gradually being applied to the construction of subway stations due to its characteristic of mechanization. However, the prefabricated subway station in…

Abstract

Purpose

Prefabricated technology is gradually being applied to the construction of subway stations due to its characteristic of mechanization. However, the prefabricated subway station in China is in the initial stage of development, which is prone to construction safety issues. This study aims to evaluate the construction safety risks of prefabricated subway stations in China and formulate corresponding countermeasures to ensure construction safety.

Design/methodology/approach

A construction safety risk evaluation index system for the prefabricated subway station was established through literature research and the Delphi method. Furthermore, based on the structure entropy weight method, matter-element theory and evidence theory, a hybrid evaluation model is developed to evaluate the construction safety risks of prefabricated subway stations. The basic probability assignment (BPA) function is obtained using the matter-element theory, the index weight is calculated using the structure entropy weight method to modify the BPA function and the risk evaluation level is determined using the evidence theory. Finally, the reliability and applicability of the evaluation model are verified with a case study of a prefabricated subway station project in China.

Findings

The results indicate that the level of construction safety risks in the prefabricated subway station project is relatively low. Man risk, machine risk and method risk are the key factors affecting the overall risk of the project. The evaluation results of the first-level indexes are discussed, and targeted countermeasures are proposed. Therefore, management personnel can deeply understand the construction safety risks of prefabricated subway stations.

Originality/value

This research fills the research gap in the field of construction safety risk assessment of prefabricated subway stations. The methods for construction safety risk assessment are summarized to establish a reliable hybrid evaluation model, laying the foundation for future research. Moreover, the construction safety risk evaluation index system for prefabricated subway stations is proposed, which can be adopted to guide construction safety management.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 2 January 2023

Jitendra Sharma and Bibhuti Bhusan Tripathy

Supplier evaluation and selection is an essential (multi-criteria decision-making) MCDM process that considers qualitative and quantitative factors. This research work attempts to…

Abstract

Purpose

Supplier evaluation and selection is an essential (multi-criteria decision-making) MCDM process that considers qualitative and quantitative factors. This research work attempts to use a MCDM technique based on merging fuzzy Technique for Order Preference by Similarity to Ideal Solution (F-TOPSIS) and Quality Function Deployment (QFD) ideas. The study attempts to find the supplier's attributes (HOWs) to accomplish its goals after determining the product's characteristics to suit the company's needs (WHATs).

Design/methodology/approach

The proposed research methodology comprises the following four steps: Step 1: Determine the product purchase requirements (“WHATs”) and those pertinent to supplier evaluation (“HOWs”). In Step 2, the relative importance of the “WHAT-HOW” correlation scores is determined and also the resulting weights of “HOWs”. In Step 3, linguistic evaluations of possible suppliers in comparison to subjective criteria are given to the decision-makers. Step 4 combines the QFD and F-TOPSIS techniques to select suppliers.

Findings

A fuzzy MCDM method based on fusing and integrating fuzzy information and QFD is presented to solve the drawbacks of conventional decision-making strategies used in supplier selection. Using the F-TOPSIS method, fuzzy positive ideal solution (FPIS) and fuzzy negative ideal solution (FNIS), the relative closeness coefficient values for all alternatives are computed. The suppliers are ranked by relating the closeness of coefficient values. This method permits the combination of ambiguous and subjective data expressed as fuzzy-defined integers or linguistic variables.

Originality/value

QFD and TOPSIS, two widely used approaches, are combined in this article to rank and evaluate suppliers based on the traits that the suppliers choose to prioritize. This study demonstrates that the method employed could address multiple-criteria decision-making scenarios in a computationally efficient manner. The effectiveness and applicability of the method are illustrated using an example.

Details

The TQM Journal, vol. 35 no. 8
Type: Research Article
ISSN: 1754-2731

Keywords

Article
Publication date: 19 August 2022

Karthik Bajar, Aditya Kamat, Saket Shanker and Akhilesh Barve

In recent times, reverse logistics (RL) is gaining significant traction in various automobile industries to recapture returned vehicles’ value. A good RL program can lower…

Abstract

Purpose

In recent times, reverse logistics (RL) is gaining significant traction in various automobile industries to recapture returned vehicles’ value. A good RL program can lower manufacturing costs, establish a green supply chain, enhance customer satisfaction and provide a competitive advantage. However, reducing disruptions and increasing operational efficiency in the automobile RL requires implementing innovative technology to improve information flow and security. Thus, this manuscript aims to examine the hurdles in automobile RL activities and how they can be effectively tackled by blockchain technology (BCT). Merging BCT and RL provides the entire automobile industry a chance to generate value for its consumers through effective vehicle return policies, manufacturing cost reduction, maintenance records tracking, administration of vehicle information and a clear payment record of insurance contracts.

Design/methodology/approach

This research is presented in three stages to accomplish the task. First, previous literature and experts' opinions are examined to highlight certain factors that are an aggravation to BCT implementation. Next, this study proposed an interval-valued intuitionistic fuzzy set (IVIFS) – decision-making trial and evaluation laboratory (DEMATEL) with Choquet integral framework for computing and analyzing the comparative results of factor interrelationships. Finally, the causal outline diagrams are plotted to determine the influence of factors on one another for BCT implementation in automobile RL.

Findings

This study has categorized the barriers to BCT implementation into five major factors – operational and strategical, technical, knowledge and behavioral, financial and infrastructural, and government rules and regulations. The results revealed that disreputable technology, low-bearing capacity of IT systems and operational inefficiency are the most significant factors to be dealt with by automobile industry professionals for finer and enhanced RL processes utilizing BCT. The most noticeable advantage of BCT is its enormous amount of data, permitting automobile RL to develop client experience through real-time data insights.

Practical implications

This study reveals several factors that are hindering the implementation of BCT in RL activities of the automobile industry. The results can assist experts and policymakers improve their existing decision-making systems while making an effort to implement BCT into the automobile industry's RL activities.

Originality/value

Although there are several studies on the benefits of BCT in RL and the adoption of BCT in the automobile industry, individually, none have explicated the use of BCT in automobile RL. This is also the first kind of study that has used IVIFS-DEMATEL with the Choquet integral framework for computing and analyzing the comparative results of factor interrelationships hindering BCT implementation in automobile RL activities.

Details

Smart and Sustainable Built Environment, vol. 13 no. 1
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 9 February 2024

Runze Yu and Li Ma

The paper covers mega infrastructure construction supply chain (MICSC) in Engineering-Procurement-Construction (EPC) projects, where the frequent occurrence of risk incidents has…

142

Abstract

Purpose

The paper covers mega infrastructure construction supply chain (MICSC) in Engineering-Procurement-Construction (EPC) projects, where the frequent occurrence of risk incidents has greatly affected human life. The research aims to establish a risk evaluation index system for MICSC in EPC projects, exploring what risk factors lead to risk incidents and measure the importance and causality of all these risk factors.

Design/methodology/approach

The research applies a combination of quantitative and qualitative analysis methodology to process data sequentially. In the first place, risk factors for MICSC in EPC projects are extracted and identified from literature survey and expert interviews. In the second place, an integration model fuzzy Analytic Hierarchy Process (f-AHP) and fuzzy Decision-making Trial and Evaluation Laboratory (f-DEMATEL) is constructed to comprehensively analyze all these risk factors.

Findings

12 primary risk factors and 36 secondary risk factors comprise the risk evaluation index system for MICSC in EPC projects from 178 literature and 5 professionals. The results indicate that Political Situation (F1), Social Security (F2) and Management Mode (F8) are critical risk factors, where F1 and F2 are cause factors and F8 is an effect factor.

Originality/value

There are three main contributions of this paper. First and foremost, from the perspective of the research content, no other study has been able to assess risk factors for MICSC in EPC projects, while embedding nine phases of the whole project life cycle and six subjects of stakeholders into a risk evaluation index system. Additionally, from the perspective of research method, a combined model incorporating f-AHP and f-DEMATEL is constructed to avoid the one-sidedness of a single model. Last but not least, from the perspective of practical significance, focusing on the critical risk factors, a series of effective measures are formulated to make appropriate management decisions for nodal enterprises of MICSC, which can improve their risk management capabilities.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 29 January 2024

Hazwani Shafei, Rahimi A. Rahman and Yong Siang Lee

Policymakers are developing national strategic plans to encourage organizations to adopt Construction 4.0 technologies. However, organizations often adopt the recommended…

Abstract

Purpose

Policymakers are developing national strategic plans to encourage organizations to adopt Construction 4.0 technologies. However, organizations often adopt the recommended technologies without aligning with organizational vision. Furthermore, there is no prioritization on which Construction 4.0 technology should be adopted, including the impact of the technologies on different criteria such as safety and health. Therefore, this study aims to evaluate Construction 4.0 technologies listed in a national strategic plan that targets the enhancement of safety and health.

Design/methodology/approach

A list of Construction 4.0 technologies from a national strategic plan is evaluated using the fuzzy technique for order preference by similarity to ideal solution (TOPSIS) method. Then, the data are analyzed using reliability, fuzzy TOPSIS, normalization, Pareto, sensitivity, ranking and correlation analyses.

Findings

The analyses identified six Construction 4.0 technologies that are critical in enhancing safety and health: Internet of Things, autonomous construction, big data and predictive analytics, artificial Intelligence, building information modeling and augmented reality and virtualization. In addition, six pairs of Construction 4.0 technologies illustrate strong relationships.

Originality/value

This study contributes to the existing body of knowledge by ranking a list of Construction 4.0 technologies in a national strategic plan that targets the enhancement of safety and health. Decision-makers can use the study findings to prioritize the technologies during the adoption process. Also, to the best of the authors’ knowledge, this study is the first to evaluate the impact of Construction 4.0 technologies listed in a national strategic plan on a specific criterion.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 19 July 2022

Wenping Xu, Yuan Zhang, David. Proverbs and Zhi Zhong

This paper aims to clarify the resistance degree of group road logistics to flood disaster resilience. The paper measures the resilience of group road logistics by establishing…

Abstract

Purpose

This paper aims to clarify the resistance degree of group road logistics to flood disaster resilience. The paper measures the resilience of group road logistics by establishing network structure model. The purpose of this study is to improve the resilience of road log.

Design/methodology/approach

This paper adopts Delphi method to collect data, interviews mainly flood management experts and supply chain risk management experts, and then analyzes the data through the network structure model combined with interpretative structure model (ISM) and analytical network process (ANP).

Findings

The results show that flood frequency and drainage systems are the main factors affecting the resilience of road transport logistics in urban areas. These research results provide useful guidance for the effective planning and design of urban road construction and infrastructure.

Research limitations/implications

However, the main factors affecting the resilience of road transport logistics are likely to change with the development of factors such as climate, economy and environment. Therefore, in future work, the authors' research will focus on the further application of this evaluation method.

Practical implications

The results show that the impact of flooding on the four dimensions of road logistics resilience varies. This shows that in deciding what intervention measures are to be taken to improve the resilience of the road network to flooding, various measures need to be considered.

Social implications

This paper provides a more scientific analysis of the risk management ability of the road network in the face of floods. In addition, it also provides a useful reference for urban road planners.

Originality/value

This paper addresses a clear need to study how to build models to improve the resilience of road logistics in flood risk.

Details

International Journal of Building Pathology and Adaptation, vol. 42 no. 2
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 18 April 2022

Prashant Jain, Dhanraj P. Tambuskar and Vaibhav Narwane

The advancements in internet technologies and the use of sophisticated digital devices in supply chain operations incessantly generate enormous amounts of data, which is termed as…

Abstract

Purpose

The advancements in internet technologies and the use of sophisticated digital devices in supply chain operations incessantly generate enormous amounts of data, which is termed as big data (BD). The BD technologies have brought about a paradigm shift in the supply chain decision-making towards profitability and sustainability. The aim of this work is to address the issue of implementation of the big data analytics (BDA) in sustainable supply chain management (SSCM) by identifying the relevant factors and developing a structural model for this purpose.

Design/methodology/approach

Through a comprehensive literature review and experts’ opinion, the crucial factors are found using the PESTEL framework, which covers political, economic, social, technological, environmental and legal factors. The structural model is developed based on the results of the total interpretive structural modelling (TISM) procedure and MICMAC analysis.

Findings

The policy support regarding IT, culture of data-based decision-making, inappropriate selection of BDA technologies and the laws related to data security and privacy are found to affect most of the other factors. Also, the company’s vision towards environmental performance and willingness for material and energy optimization are found to be crucial for the environmental and social sustainability of the supply chain.

Research limitations/implications

The study is focused on the manufacturing supply chain in emerging economies. It may be extended to other industry sectors and geographical areas. Also, additional factors may be included to make the model more robust.

Practical implications

The proposed model imparts an understanding of the relative importance and interrelationship of factors. This may be useful to managers to assess their strengths and weaknesses and ascertain their priorities in the context of their organization for developing a suitable investment plan.

Social implications

The study establishes the importance of BDA for conservation and management of energy and material. This is crucial to develop strategies for enhancing eco-efficiency of the supply chain, which in turn enhances the economic returns for the society.

Originality/value

This study addresses the implementation of BDA in SSCM in the context of emerging economies. It uses the PESTEL framework for identifying the factors, which is a comprehensive framework for strategic planning and decision-making. This study makes use of the TISM methodology for model development and deliberates on the social and environmental implications too, apart from theoretical and managerial implications.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 2 January 2024

Raunaque Mujeeb Quaiser and Praveen Ranjan Srivastava

This research aims to identify the key factors affecting Outbound Open Innovation between Startups and Big organizations using the multiple criteria decision-making analysis…

Abstract

Purpose

This research aims to identify the key factors affecting Outbound Open Innovation between Startups and Big organizations using the multiple criteria decision-making analysis (MCDM) approach. The MCDM technique ranks the four key factors identified from the literature study that can help to improve collaboration opportunities with Startups.

Design/methodology/approach

Identification of key factors affecting Outbound Open Innovation between Startups and big organizations based on extant literature. A questionnaire is prepared based on these four identified key factors to gather views of the startup's employees, from the designer level to the startup's founder. MCDM techniques are used to evaluate the questionnaire. The ensemble technique is used to rank the key factors coming from three different MCDM methods.

Findings

The findings from the MCDM approach and Ensemble techniques give insight to the big organizations to facilitate outbound Open Innovation effectively. It also provides insight into the requirements of the startups and the kind of support they seek from the big organizations. The ranking can help the big organization close the gaps and make an informed decision to increase the effectiveness of the collaborations and boost innovation.

Originality/value

This is a unique research work where the MCDM approach is used to identify the ranking of key factors affecting outbound open innovation between startups and big organizations. The MCDM technique is followed by the ensemble method to rationalize the findings. Technology Relevance ranks highest, followed by Innovation Ecosystem, Organization commitment and Knowledge Sharing.