Search results
1 – 10 of over 1000Johnson Adetooto, Abimbola Windapo, Francesco Pomponi, Fabio Companie, Kehinde Alade and Amanda Mtya
Sandbag building technologies (SBTs) have been offered as a cost-effective and sustainable alternative building technology (ABT) capable of accelerating house construction in…
Abstract
Purpose
Sandbag building technologies (SBTs) have been offered as a cost-effective and sustainable alternative building technology (ABT) capable of accelerating house construction in South Africa, but its acceptance remains low. However, knowledge about how to effectively improve SBT social acceptance is limited. This study aims to develop and prioritise SBT social acceptability strategies towards providing a comprehensive framework for the successful deployment and widespread adoption of sandbag technology.
Design/methodology/approach
This study used a quantitative research strategy that included a literature review and a structured questionnaire survey of 228 ABT professionals and stakeholders in the South African housing industry. The study statistically analysed 13 strategies for the social acceptance of SBT.
Findings
The analysis showed that the top three strategies include the availability of sandbag demonstration projects in all provinces, the approval of a sandbag building code and the availability of standard design methods for earthbags. A factor analysis clustered the 13 strategies into Stakeholders integration and policy formation, Effective education and knowledge sharing and Grassroots advocacy and incentives.
Practical implications
The current study’s findings provide a broad framework for the effective implementation and wide acceptance of sandbag technology in housing projects. It offered certain best practices that policymakers and practitioners might use to promote ABT and SBT societal acceptability.
Originality/value
To the best of the authors’ knowledge, the study represents the first and only attempt to investigate the viewpoints of experts and housing market stakeholders in South Africa regarding sandbag technology social acceptance strategies and contributes to the social acceptance body of knowledge in ABT and SBT.
Details
Keywords
James Olaonipekun Toyin and Modupe Cecilia Mewomo
The utilisation of building information modelling (BIM) technology is rapidly increasing among construction professionals across the world. Notwithstanding, recent studies…
Abstract
Purpose
The utilisation of building information modelling (BIM) technology is rapidly increasing among construction professionals across the world. Notwithstanding, recent studies revealed a low level of BIM implementation in the context of the Nigerian construction sector. Moreover, previous studies have established that BIM application comes with its share of various barriers. Therefore, this study aims to carry out an on-site survey on barriers to the application of BIM on construction sites in the Nigerian construction industry.
Design/methodology/approach
An extensive review of literature on BIM barriers was conducted, from where 33 factors were identified as significant BIM barriers peculiar to the developing countries. A questionnaire was developed and distributed to the targeted respondents, who are practicing professionals in the Nigerian construction industry, based on the identified barriers. The data collected were analysed by using both descriptive and inferential statistics.
Findings
The principal component analysis revealed that 27 barriers were peculiar to the Nigerian construction industry. The “lack of familiarity with BIM capacity, habitual resistance to change from the traditional style of design and build, and poor awareness of BIM benefit” were identified as the three most critical barriers hindering BIM application on construction sites in the Nigerian construction industry.
Practical implications
This study reveals key information on the peculiar barriers to BIM application in the Nigerian construction industry. The avoidance of these barriers will not only assist various construction stakeholders in the successful implementation of BIM application on a construction project but also promote information management systems and productivity within the construction industry to a great extent. These will further improve post-construction activities.
Originality/value
This study provides a substantial understanding of BIM state of the art in the context of barriers hindering BIM application on construction sites in the Nigerian construction industry.
Details
Keywords
Abderisak Adam and Göran Lindahl
The purpose of this paper is to examine the Company Dynamic Response Map (CDRM) risk management model that uses the dynamic capabilities concept. The study examines risks…
Abstract
Purpose
The purpose of this paper is to examine the Company Dynamic Response Map (CDRM) risk management model that uses the dynamic capabilities concept. The study examines risks associated with strategic decision-making in construction projects and evaluates proposed methods that connect the dynamic capabilities of project-based organisations with risk management.
Design/Methodology/Approach
This preliminary study examines risks associated with strategic decision-making in construction projects and evaluates a proposed model that connects the dynamic capabilities of project-based organisations with risk management. Specifically, the CDRM model is evaluated, a risk management model developed by Arena et al. (2013) to better respond to risks and opportunities based on the concept of dynamic capabilities.
Findings
We argue that although the CDRM presents a promising development in that it uses dynamic capabilities prospectively in a risk management model to produce tangible results, there are, nonetheless, impediments to the CDRM being used by construction clients. The primary impediment relates to the issue of categorisation, the difficulty in assigning a specific identified risk to a particular category of dynamic capabilities.
Research Limitations/Implications
A conceptual argument is made and not an empirical one.
Practical Implications
The CDRM model was developed to be used in practice and this paper evaluates that model.
Originality/Value
Contributes to both the dynamic capabilities literature as well as risk management literature. The paper ends with a discussion on the possible merits of the CDRM, and an evaluation on potential impediments to its use by construction clients.
Details
Keywords
Douglas Aghimien, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala, Nicholas Chileshe and Bhekinkosi Jabulani Dlamini
This paper presents the findings of assessing the strategies required for improved work-life balance (WLB) of construction workers in Eswatini. This was done to improve the…
Abstract
Purpose
This paper presents the findings of assessing the strategies required for improved work-life balance (WLB) of construction workers in Eswatini. This was done to improve the work-life relationship of construction workers and, in turn, improve the service delivery of the construction industry in the country.
Design/methodology/approach
The study adopted a quantitative research approach using a questionnaire administered to construction professionals in the country. The data gathered were analysed using frequency, percentage, Mann–Whitney U test, exploratory and confirmatory factor analysis (CFA).
Findings
The findings revealed that the level of implementation of WLB initiatives in the Eswatini construction industry is still low. Following the attaining of several model fitness, the study found that the key strategies needed for effective WLB can be classified into four significant components, namely: (1) leave, (2) health and wellness, (3) work flexibility, and; (4) days off/shared work.
Practical implications
The findings offer valuable benefits to construction participants as the adoption of the identified critical strategies can lead to the fulfilment of WLB of the construction workforce and by extension, the construction industry can benefit from better job performance.
Originality/value
This study is the first to assess the strategies needed for improved WLB of construction workers in Eswatini. Furthermore, the study offers a theoretical platform for future discourse on WLB in Eswatini, a country that has not gained significant attention in past WLB literature.
Details
Keywords
Oluseyi Julius Adebowale and Justus Ngala Agumba
Labour productivity in construction has fallen behind other industries in most of the world and has declined continuously for decades. Although several scholarly research projects…
Abstract
Purpose
Labour productivity in construction has fallen behind other industries in most of the world and has declined continuously for decades. Although several scholarly research projects have been conducted to salvage the prevalent low labour productivity in construction, contractors in the construction industry have continued to grapple with the devastating impact of low productivity. The purpose of this study is to determine key areas of focus necessary to promote productivity growth in construction.
Design/methodology/approach
Bibliometric and scientometric assessments were conducted to map the existing construction labour productivity (CLP) studies and establish key focus areas in the research domain. The keywords “Construction Productivity” OR “Construction Labour Productivity” OR “Construction Labor Productivity” OR “Construction Worker Productivity”.
Findings
Emerging trends in the CLP research field are reported. The study also determined the most productive authors and collaboration among authors, most productive journals, most active regions and publications with the highest impact in CLP research.
Research limitations/implications
Documents published in the Scopus database were considered for analysis because of the wider coverage of the database. Journal and conference articles written in English language represent the inclusion criteria, while articles in press, review, book chapters, editorial, erratum, note, short survey and data paper were excluded from analysis. The study is also limited to documents published from 2012 to 2021.
Practical implications
The study brought to the awareness of the industry practitioners and other construction stakeholders, the key knowledge areas that are critical to promoting productivity growth in construction.
Originality/value
Except bibliometric analysis, previous research studies have used different approaches to investigate productivity in construction. The study presented future research directions through the emerging knowledge areas identified in the study.
Details
Keywords
Abdullahi Baba Ahmed, Innocent Musonda and J.H.C. Pretorius
This paper intends to investigate the empirical link between governance and energy investment in PPP. To succinctly account for biases in the fixed effects (FE) model, the authors…
Abstract
Purpose
This paper intends to investigate the empirical link between governance and energy investment in PPP. To succinctly account for biases in the fixed effects (FE) model, the authors adopted different bias-corrected techniques. The majority of these techniques provided evidence that PPP investments in energy are boosted by increasing the desire for accountability, prioritising the voice of the masses and disabusing the rule of laws. This study could not find any positive influence from the control of corruption to PPP investment in energy.
Design/methodology/approach
The acute shortage of power supply in SSA has attracted PPP investments in the energy subsector of the economy, leading to the recent debate on governance and public, private investment. The authors contributed to this argument by examining the impact of country governance on PPP investment in energy using a sample of countries in SSA.
Findings
Therefore, the authors concluded that low control of corruption is responsible for the inadequate volume of PPP investments. In the light of this, the government should redefine the anti-corruption bill of their sovereignty to accommodate severe sanctions when necessary.
Originality/value
This paper uses the fixed effects (FE) model by introducing batteries of nonlinear panel models to capture the relationship between the impacts of country governance on PPP investment in energy.
Details
Keywords
Gustav Gunnerud, Sondre Evjen, Rune Søfting, Ola Lædre, Nina Kjesbu and Jardar Lohne
The study aims to address the seemingly unexplored scope of action for project managers to conduct work-related crime in the Norwegian construction industry.
Abstract
Purpose
The study aims to address the seemingly unexplored scope of action for project managers to conduct work-related crime in the Norwegian construction industry.
Design/Methodology/Approach
Literature review: In-depth interview with 13 senior officials. Document study.
Findings
Broad scope of action to contract criminal subcontractors seems to be exploited intentionally and unintentionally.
Research Limitations/Implications
Limited number of interviewees. The scale of intentional exploitation unknown. Research could be used as basis to further research on incentives and countermeasures.
Practical Implications
Need for industry wide effort to improve barriers to avoid crime and contracting criminal subcontractors.
Originality/Value
Unexplored field globally and in Norway. Little to no documentation found in previous research.
Details
Keywords
Matthew Ikuabe, Clinton Ohis Aigbavboa, Chimay Anumba and Ayodeji Emmanuel Oke
The quest for improved facilities management (FM) delivery is receiving immense focus through the incorporation of innovative technologies such as cyber-physical systems (CPS)…
Abstract
Purpose
The quest for improved facilities management (FM) delivery is receiving immense focus through the incorporation of innovative technologies such as cyber-physical systems (CPS). The system’s high computational capabilities can aid in the abatement of some of the challenges plaguing FM functions. However, the requisite ingredients for the uptake of the system for FM have still not gained scholarly attention. Because performance measurement is a vital index in determining the outcome of FM methods, this study aims to investigate the influence of performance measurement indicators that are influential to the uptake of CPS for delivering FM functions.
Design/methodology/approach
A qualitative technique was adopted using the Delphi technique. The panel of experts for the study was selected through a well-defined process based on stipulated criteria. The experts gave their opinions in two rounds before consensus was attained on the identified performance measurement indicators, whereas methods of data analysis were measures of central tendency, inter-quartile deviation and Mann–Whitney U test.
Findings
Results from this study showed that 11 of the performance indicators were of very high significance in the determination of the uptake of CPS for FM functions, whereas 5 of the indicators were proven to be of high significance. Furthermore, there was no statistical difference in the opinions of the experts based on their affiliation with academic institutions and professional practice.
Practical implications
The findings of this study contribute practically by aiding policymakers, facility managers and relevant stakeholders with the vital knowledge of delivery mandates for efficient FM services that can spur the uptake of digital technologies such as CPS.
Originality/value
This study contributes to the body of knowledge as it unveils a roadmap of the expected performance output and its accompanying evaluation that would drive the adoption of a promising technology such as CPS in the delivery of FM tasks.
Details
Keywords
Emmanuel Chidiebere Eze, Onyinye Sofolahan and Olayinka Gideon Omoboye
Sustainable/Green building materials (SBMs/GBMs) offer a wide range of benefits which cut across the economic, social and environmental dimensions of sustainability. The…
Abstract
Purpose
Sustainable/Green building materials (SBMs/GBMs) offer a wide range of benefits which cut across the economic, social and environmental dimensions of sustainability. The incorporation of these materials in construction projects in most developing countries is still low owing to some factors. This study assessed the major barriers to the incorporation of SBMs in the delivery of construction projects in developing countries, with Nigeria as a case in point.
Design/methodology/approach
The well-structured quantitative questionnaire was used to gather data from the key players in the construction industry, using the snowball sampling method and electronic means of questionnaire administration. Frequencies, percentile, relative importance index, Kruskal–Wallis H test, Kendall's coefficient of concordance and exploratory factor analysis were used to analyse the gathered data.
Findings
The study revealed that the major constructs of barriers to SBM adoption in construction projects are: (1) resistance and information barriers (Eigenvalues = 5.237; % of V = 23.806), (2) regulation and funding of R&D (Eigenvalues = 2.741; % of V = 12.457), (3) cost and market barriers (Eigenvalues = 2.223; % of V = 10.105), (4) government incentive and suppliers' availability (Eigenvalues = 1.728; % of V = 7.852) and (5) GB experts and labour barriers (Eigenvalues = 1.307; % of V = 5.942).
Originality/value
This study assessed the view of construction experts in the five states of the south-eastern geo-political zone of Nigeria, particularly as regards the barriers to the incorporation of sustainable building materials in construction projects in the region.
Details
Keywords
Douglas Aghimien, Clinton Aigbavboa, Ayodeji Emmanuel Oke and John Aliu
Digitalisation, which involves the use of digital technologies in transforming an organisation’s activities, transcends just the acquiring of emerging digital tools. Having the…
Abstract
Purpose
Digitalisation, which involves the use of digital technologies in transforming an organisation’s activities, transcends just the acquiring of emerging digital tools. Having the right people to drive the implementation of these technologies and attaining strategic organisational goals is essential. While most studies have focused on the use of emerging technologies in the construction industry, less attention has been given to the ‘people’ dimension. Therefore, this study aims to assess the people-related features needed for construction digitalisation.
Design/methodology/approach
The study adopted pragmatic thinking using a mixed-method approach. A Delphi was used to achieve the qualitative aspect of the research, while a questionnaire survey conducted among 222 construction professionals was used to achieve the quantitative aspect. The data gathered were analysed using frequency, percentage, mean item score, Kruskal–Wallis H test, exploratory factor analysis and confirmatory factor analysis.
Findings
Based on acceptable reliability, validity and model fit indices, the study found that the people-related factors needed for construction digitalisation can be grouped into technical capability of personnel, attracting and retaining digital talent and organisation’s digital culture.
Practical implications
The findings offer valuable benefits to construction organisations as understanding these identified people features can help lead to better deployment of digital tools and the attainment of the digital transformation.
Originality/value
This study attempts to fill the gap in the shortage of literature exploring the people dimension of construction digitalisation. The study offers an excellent theoretical backdrop for future works on digital talent for construction digitalisation, which has gained less attention in the current construction digitalisation discourse.
Details