Article
Publication date: 17 November 2022

Asli Pelin Gurgun, Kerim Koc and Handan Kunkcu

Completing construction projects within the planned schedule has widely been considered as one of the major project success factors. This study investigates the use of…

1180

Abstract

Purpose

Completing construction projects within the planned schedule has widely been considered as one of the major project success factors. This study investigates the use of technologies to address delays in construction projects and aims to address three research questions (1) to identify the adopted technologies and proposed solutions in the literature, (2) to explore the reasons why the delays cannot be prevented despite disruptive technologies and (3) to determine the major strategies to prevent delays in construction projects.

Design/methodology/approach

In total, 208 research articles that used innovative technologies, methods, or tools to avoid delays in construction projects were investigated by conducting a comprehensive literature review. An elaborative content analysis was performed to cover the implemented technologies and their transformation, highlighted research fields in relation to selected technologies, focused delay causes and corresponding delay mitigation strategies and emphasized project types with specific delay causes. According to the analysis results, a typological framework with appropriate technological means was proposed.

Findings

The findings revealed that several tools such as planning, imaging, geo-spatial data collection, machine learning and optimization have widely been adopted to address specific delay causes. It was also observed that strategies to address various delay causes throughout the life cycle of construction projects have been overlooked in the literature. The findings of the present research underpin the trends and technological advances to address significant delay causes.

Originality/value

Despite the technological advancements in the digitalization era of Industry 4.0, many construction projects still suffer from poor schedule performance. However, the reason of this is questionable and has not been investigated thoroughly.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 10 January 2024

Sachin Batra

The partial least squares structural equation modeling (PLS-SEM) approach for construction management (CM) scholars has become the preferred approach for its capability of…

Abstract

Purpose

The partial least squares structural equation modeling (PLS-SEM) approach for construction management (CM) scholars has become the preferred approach for its capability of assessing the complex relationship and relaxed normality and sample size assumptions. This paper systematically maps the structure of knowledge about PLS-SEM in CM using bibliometric analysis. Also, the study employs meta-analysis to explore how data and model characteristics, model evaluation and advanced modeling techniques have been utilized in the CM domain.

Design/methodology/approach

This study integrated two methods: bibliometric analysis on a sample of 211 articles identified using the PRISMA framework and meta-analysis on 163 articles identified based on the availability of full-length articles and relevant information.

Findings

The results revealed the leading knowledge formation entities (countries, institutions, authors, sources and documents). Also, the study employs full content analysis to identify six research themes, and meta-analysis is used to explore the use of PLS-SEM based on the following criteria: (1) reasons for using PLS-SEM in CM, (2) data characteristics, (3) model characteristics and evaluation and (4) use of advanced modeling and analysis techniques. Further, the study uses regression analysis and identifies “advanced modeling and analysis techniques” as the critical feature responsible for the publication in a journal with high scientific prestige. Finally, the study presented the comprehensive guidelines to be used by construction management scholars who wish to use PLS-SEM in their research work.

Originality/value

To the author’s knowledge, it is the first study of this kind to use PLS-SEM in CM research. This study provides an extensive analysis of the Scopus database and an in-depth review of the data characteristics, model characteristics and use of advanced modeling techniques in CM research.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 12 September 2022

Kofi Agyekum, Samuel Amos-Abanyie, Victoria Maame Afriyie Kumah, Augustine Senanu Komla Kukah and Burcu Salgin

There are significantly fewer women than men in managerial positions, mainly project management. This problem is noticeable in the construction and engineering sectors…

Abstract

Purpose

There are significantly fewer women than men in managerial positions, mainly project management. This problem is noticeable in the construction and engineering sectors, traditionally male-dominated industries with leadership much dependent on masculine qualities. This study examines the obstacles to the career progression of professional female project managers (PFPMs) in the Ghanaian construction industry.

Design/methodology/approach

Twenty potential obstacles to women's career progression in the construction industry were identified from a comprehensive review of the literature. A questionnaire was prepared and administered among eighty project managers who work in large construction firms in Ghana. Data obtained were analysed using one sample t-test, Kendall's concordance test, Chi-square test and exploratory factor analysis.

Findings

The findings suggest the significance of all the twenty factors as potential obstacles to the career progression of PFPMs. The exploratory factor analysis identified five underlying grouped obstacles: “leadership and human capital related issues”, “issues related to discrimination of all forms”, “career aspiration and planning issues”, “female related role conflicts”, and “recruitment and selection issues”.

Research limitations/implications

The subjective nature of the views of the respondents could influence the evaluation of the obstacles. With this study only exploring the dimensions underlying the significant obstacles, future studies could examine the interrelationships between the various obstacles and move on to determine their impacts on the career progression of professional female PMs as well.

Practical implications

Having an in-depth understanding of these obstacles, stakeholders and other industry practitioners in Ghana could make informed decisions on measures to put in place to address some of these critical issues to raise the standard of professional female PMs in the construction industry. Policymakers and gender advocates in Ghana could also take up some of the critical obstacles identified and provide suitable strategies to educate and create the needed awareness of the industry on those obstacles. Practically, the findings from this study can be valuable for informing decision-making at different management levels in the construction industry.

Originality/value

With country-specific (Ghana) obstacles identified, the findings significantly contribute to the literature on the career advancement of females in the construction sector.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 10 January 2024

Sanjay Saifi and Ramiya M. Anandakumar

In an era overshadowed by the alarming consequences of climate change and the escalating peril of recurring floods for communities worldwide, the significance of proficient…

Abstract

Purpose

In an era overshadowed by the alarming consequences of climate change and the escalating peril of recurring floods for communities worldwide, the significance of proficient disaster risk management has reached unprecedented levels. The successful implementation of disaster risk management necessitates the ability to make informed decisions. To this end, the utilization of three-dimensional (3D) visualization and Web-based rendering offers decision-makers the opportunity to engage with interactive data representations. This study aims to focus on Thiruvananthapuram, India, where the analysis of flooding caused by the Karamana River aims to furnish valuable insights for facilitating well-informed decision-making in the realm of disaster management.

Design/methodology/approach

This work introduces a systematic procedure for evaluating the influence of flooding on 3D building models through the utilization of Web-based visualization and rendering techniques. To ensure precision, aerial light detection and ranging (LiDAR) data is used to generate accurate 3D building models in CityGML format, adhering to the standards set by the Open Geospatial Consortium. By using one-meter digital elevation models derived from LiDAR data, flood simulations are conducted to analyze flow patterns at different discharge levels. The integration of 3D building maps with geographic information system (GIS)-based vector maps and a flood risk map enables the assessment of the extent of inundation. To facilitate visualization and querying tasks, a Web-based graphical user interface (GUI) is developed.

Findings

The efficiency of comprehensive 3D building maps in evaluating flood consequences in Thiruvananthapuram has been established by the research. By merging with GIS-based vector maps and a flood risk map, it becomes possible to scrutinize the extent of inundation and the affected structures. Furthermore, the Web-based GUI facilitates interactive data exploration, visualization and querying, thereby assisting in decision-making.

Originality/value

The study introduces an innovative approach that merges LiDAR data, 3D building mapping, flood simulation and Web-based visualization, which can be advantageous for decision-makers in disaster risk management and may have practical use in various regions and urban areas.

Details

International Journal of Disaster Resilience in the Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1759-5908

Keywords

Article
Publication date: 27 March 2024

Khan Md. Raziuddin Taufique, Md. Mahiuddin Sabbir, Sarah Quinton and Syed Saad Andaleeb

Acknowledging previous scholarly focus on functional attributes in understanding technology acceptance behaviour, the current study aims to offer a novel perspective by…

Abstract

Purpose

Acknowledging previous scholarly focus on functional attributes in understanding technology acceptance behaviour, the current study aims to offer a novel perspective by integrating eight different dimensions of utilitarian and hedonic attributes to examine their influence in delivering a holistic web-based retail shopping experience.

Design/methodology/approach

The research model was tested and validated through data collected from 370 online shoppers across both hedonic and utilitarian product ranges. Hypotheses were tested using covariance-based structural equation modelling with multi-group analysis to examine the moderation effect.

Findings

The findings strongly support the model confirming eight new utilitarian and hedonic dimensions that influence web-based retail shopping behaviour. The findings also confirm that hedonic attributes remain important even for utilitarian product purchasing.

Practical implications

The key managerial implication is the demonstrated need to balance utilitarian and hedonic attributes in web-based retail platforms, where previously, there has been an overemphasis on functional features. Web-based retailers should consider the optimal blend of utilitarian (e.g. information quality) and hedonic (e.g. aesthetic) attributes in the design of a retail shopping site, irrespective of the product category.

Originality/value

This study integrates multiple dimensions of utilitarian and hedonic attributes into a single model and highlights the interplay of these attributes, thus extending the technology acceptance model. This paper also advances scholarship through its identification of attribute impact across different product categories.

Details

International Journal of Retail & Distribution Management, vol. 52 no. 4
Type: Research Article
ISSN: 0959-0552

Keywords

Article
Publication date: 3 April 2024

Michael Nii Addy, Evans Teye Addo, Sulemana Fatoama Abdulai, Titus Ebenezer Kwofie, Clinton Ohis Aigbavboa and Anita Odame Adade-Boateng

E-procurement has the advantage of improving the overall performance of construction project delivery. The purose of this study is to uncover the factors influencing e-procurement…

Abstract

Purpose

E-procurement has the advantage of improving the overall performance of construction project delivery. The purose of this study is to uncover the factors influencing e-procurement acceptance in the public sector of Ghana’s construction industry (GCI). Using an extended unified theory of acceptance and use of technology (UTAUT 2), variables that promote the acceptance of e-procurement in GCI were explored.

Design/methodology/approach

Data was collected using a mixed method strategy. In the first stage, a semi-structured interview was used to collect, assess and optimize the UTAUT2 model. Thematic analysis was used on the qualitative data, leading to modification of the proposed UTAUT2 model. The study subsequently used a questionnaire survey using the extended UTAUT2 model. Survey data was analyzed using structural equation modelling (SEM), leading to the identification and validation of factors that facilitate e-procurement acceptance in Ghanaian construction as well as the impact of these factors.

Findings

The findings of the study reveal that five independent constructs of the proposed UTAUT2 model significantly affects the behavioural intention of practitioners to accept and use e-procurement in the construction industry in Ghana.

Practical implications

The study will be of utility to government agencies, contracting organizations and other construction stakeholders in developing policy and programmes to support e-procurement acceptance within the sector.

Originality/value

This is a new extended UTAUT2 model that is applicable to technology acceptance within the public sector in sub-Saharan Africa.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 26 January 2022

Deden Sumirat Hidayat, Winaring Suryo Satuti, Dana Indra Sensuse, Damayanti Elisabeth and Lintang Matahari Hasani

Fish quarantine is a measure to prevent the entry and spread of quarantine fish pests and diseases abroad and from one area to another within Indonesia's territory. Based on these…

281

Abstract

Purpose

Fish quarantine is a measure to prevent the entry and spread of quarantine fish pests and diseases abroad and from one area to another within Indonesia's territory. Based on these backgrounds, this study aims to identify the knowledge, knowledge management (KM) processes and knowledge management system (KMS) priority needs for quarantine fish and other fishery products measures (QMFFP) and then develop a classification model and web-based decision support system (DSS) for QMFFP decisions.

Design/methodology/approach

This research methodology uses combination approaches, namely, contingency factor analysis (CFA), the cross-industry standard process for data mining (CRISP-DM) and knowledge management system development life cycle (KMSDLC). The CFA for KM solution design is performed by identifying KM processes and KMS priorities. The CRISP-DM for decision classification model is done by using a decision tree algorithm. The KMSDLC is used to develop a web-based DSS.

Findings

The highest priority requirements of KM technology for QMFFP are data mining and DSS with predictive features. The main finding of this study is to show that web-based DSS (functions and outputs) can support and accelerate QMFFP decisions by regulations and field practice needs. The DSS was developed using the CTree algorithm model, which has six main attributes and eight rules.

Originality/value

This study proposes a novel comprehensive framework for developing DSS (combination of CFA, CRISP-DM and KMSDLC), a novel classification model resulting from comparing two decision tree algorithms and a novel web-based DSS for QMFFP.

Details

VINE Journal of Information and Knowledge Management Systems, vol. 54 no. 2
Type: Research Article
ISSN: 2059-5891

Keywords

Open Access
Article
Publication date: 23 December 2022

Rouzbeh Shabani, Tobias Onshuus Malvik, Agnar Johansen and Olav Torp

Uncertainty management (UM) in projects has been a point of attention for researchers for many years. Research on UM has mainly been aimed at uncertainty analyses in the front-end…

2216

Abstract

Purpose

Uncertainty management (UM) in projects has been a point of attention for researchers for many years. Research on UM has mainly been aimed at uncertainty analyses in the front-end and managing uncertainty in the construction phase. In contrast, UM components in the design phase have received less attention. This research aims to improve knowledge about the key components of UM in the design phase of large road projects.

Design/methodology/approach

This study adopted a literature review and case study. The literature review was used to identify relevant criteria for UM. These criteria helped to design the interview guide. Multiple case study research was conducted, and data were collected through document study and interviews with project stakeholders in two road projects. Each case's owners, contractors and consultants were interviewed individually.

Findings

The data analysis obtained helpful information on the involved parties, process and exploit tools and techniques during the design phase. Johansen's (2015) framework [(a) human and organisation, (b) process and (c) tools and techniques)] was completed and developed by identifying relevant criteria (such as risk averse or risk-taker, culture and documentation level) for each component. These criteria help to measure UM performance. The authors found that owners and contractors are major formal UM actors, not consultants. Empirical data showed the effectiveness of Web-based tools in UM.

Research limitations/implications

The studied cases were Norwegian, and this study focussed on uncertainties in the project's design phase. Relevant criteria did not cover all the criteria for evaluating the performance of UM. Qualitative evaluation of criteria allows further quantitative analysis in the future.

Practical implications

This paper gave project owners and managers a better understanding of relevant criteria for measuring UM in the owners and managers' projects. The paper provides policy-makers with a deeper understanding of creating rigorous project criteria for UM during the design phase. This paper also provides a guideline for UM in road projects.

Originality/value

This research gives a holistic evaluation of UM by noticing relevant criteria and criteria's interconnection in the design phase.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 7 May 2024

Yazeed A. Alragabah and Mohd. Ahmed

There is a limited number of research work on critical success factors (CSFs) in public construction projects in Saudi Arabia. In response to this knowledge gap, the objective of…

Abstract

Purpose

There is a limited number of research work on critical success factors (CSFs) in public construction projects in Saudi Arabia. In response to this knowledge gap, the objective of this paper is to assess the impact of CSFs on the government construction projects in Saudi Arabia. The success factors are investigated from a broader consideration of failure criteria, from consideration of most effectiveness in successful project completion and also from consideration of the impact of implementing control processes for successful project completion.

Design/methodology/approach

This study has analysed the impact of success factors on construction projects in Saudi Arabia using a descriptive methodology. An exhaustive literature survey is undertaken to identify the success and failure factors related to government construction projects in Saudi Arabia. The survey data are sorted out and analysed by cost, schedule, technical, context and finance dimensions of the projects based on project types, engineering complexity, size, modality, jurisdictional control and funding approach. To evaluate the influence of success factors implementation, qualitative data were collected in a survey via a web-based questionnaire that was sent to officials working and occupying a responsible position in national project guidelines organizations and in government construction organizations in Saudi Arabia. In all, 28 CSFs were identified, ranked and evaluated for their impact on project success. The four identified factors belong to process categories of construction projects, nine factors belong to management of construction projects and 15 success factors are identified for impact assessment of implementation in construction projects.

Findings

The study's findings have identified and ranked the top five CSFs that significantly influence project outcomes, including meeting time targets, adhering to financial budgets, delivering desired outcomes for all stakeholders, effectively managing risks and assembling the appropriate team while optimizing resource allocation. Additionally, the research indicates that hindrances to projects primarily stem from execution, economic, human and political factors. The study advocates for strict controls over incomplete engineering designs and advises against contractors independently handling design work to ensure project success. Additionally, addressing contractors' qualifications and financial matters is crucial for project success. By highlighting these CSFs and challenges, the research provides actionable insights to enhance project management practices in the construction industry.

Research limitations/implications

This study is limited to the infrastructure projects constructed by governmental bodies with the participation of officials from government organizations. Further study, including private projects and officials working on private projects, may be needed to generalized the research outcome.

Originality/value

Numerous studies have investigated CSFs in construction projects, but few have examined their relevance to Saudi Arabian government projects. This study aims to fill this gap by identifying key CSFs specific to Saudi Arabian public sector construction projects and assessing their impact on project success. It advocates for stringent controls in the Saudi Arabian construction sector, emphasizing the importance of preventing incomplete or altered engineering designs by contractors to increase the success rate of public sector projects. This research offers practical insights to stakeholders, advancing project management practices in Saudi Arabia's construction sector for improved outcomes and resource utilization.

Details

Frontiers in Engineering and Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2634-2499

Keywords

Article
Publication date: 7 March 2024

Mohammed Ali Abd Ali Alsemari and Manu Ramegowda

The oil and gas industry form the main resource of economy in Iraq and constructing any project in such sectors requires a huge amount of expenses due to the unique requirements…

Abstract

Purpose

The oil and gas industry form the main resource of economy in Iraq and constructing any project in such sectors requires a huge amount of expenses due to the unique requirements that oil and gas facilities required in such projects. Therefore, adopting an appropriate technological approach such as building information modeling (BIM) which is unfortunately not adopted yet in Iraq is essential to successfully deliver these projects. Thus, this paper aimed to introduce BIM to Iraq through Basra Oil Company (BOC) which is one of the biggest public oil and gas companies in Iraq.

Design/methodology/approach

The related literature of journals articles, conference proceedings and published reports have been reviewed. As a result, firstly: a hypothesis has been derived that is “If Basra Oil Company (BOC) adopts and applies BIM approach instead of the 2D approach currently used to manage its projects, the company can overcome several constraints in managing its projects that associated with such 2D traditional approach”; secondly: homogenous, consistence and reliable web-based questionnaire has been designed as its Cronbach’s alpha equal to 0.897 and 0.711 for BIM benefits and barriers, respectively. This questionnaire distributed to the BOC related professionals to test such hypothesis by investigating their readiness and accepting of BIM approach and to rank BIM barriers based on five-point Likert scale.

Findings

Based on the analysis using IBM SPSS Statistics 26 of 115 responses, almost 50% of the respondents had experience 11–15 years, while 22.6% had experience more than 15 years in oil and gas industry construction projects. Those participants were from diverse engineering majors that are: 4.3% Architectural Engineers, 31.3% Civil Engineers, 20% Mechanical Engineers, 22.6% Electrical Engineers and 21.7% from other engineering majors. The respondents’ departments demography was 16.5% of design department, 12.2% of construction department, 20.9% of Project Management Department, 12.2% of Maintenance department, 4.3% of HSE Department, 13% of Production Department and 20.9% of “Other Department.” The study resulted in 1: accepting BIM approach to be an alternative of current 2D-traditional approach used by the company to manage and construct its projects, since mean of collected data is (4.4332), Kruskal–Wallis H test significance values were 0.398 and 0.372; and ANOVA test significance values were 0.433 and 0.599 among Engineering Majors groups and Company’s Department groups, respectively. 2: Disclosed and sequenced BIM barriers in the company based on their criticality. 3: verifying reliably how BIM attributes are important to oil and gas construction projects in Iraq, 4: the company top management and company policies are the most critical potential factors to hinder or adopt and implement BIM in the company, 5: while cost is not seen a critical barrier to implement BIM in the oil and gas sector.

Research limitations/implications

The limitation of this study is the excluding of decision makers of BOC, thus more profound future studies need to be conducted where top management and decision makers are involved, particularly the present study demonstrated that support of company top management is the most critical factor which can help the company to adopt (BIM).

Originality/value

The study concludes that BIM approach is valuable for managing projects in oil and gas sector in Iraq and identify the originality in output by using the research method. This noble study provides a leverage for enhanced research to adopt and implement building information modeling (BIM) in Iraq as the study originally demonstrates benefits and identifies the critical barriers in BIM implementation to push the boundaries toward adopt Digitalization and reduce CO2 emission in Iraqi oil and gas sector. The study can be used as evidence and platform to encourage professionals and practitioners to present more sophisticated tools of BIM in the oil and gas industry, especially for facility and operation management. These findings achieved via oil and gas experts, and it is first time to achieve such findings from a case study in Iraqi oil and gas sector.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

1 – 10 of 639