Search results
1 – 10 of 616Hong Xue, Sujie Zhang, Zezhou Wu and Lin Zhang
Despite smart construction technology's great potential to improve the productivity of the architectural, engineering and construction (AEC) industry, the implementation of smart…
Abstract
Purpose
Despite smart construction technology's great potential to improve the productivity of the architectural, engineering and construction (AEC) industry, the implementation of smart construction technology has failed to achieve the expected benefits due to the negative usage behaviors of construction enterprise employees. This study aims to identify the determinants and their configuration effects on the smart construction technology usage behavior (SCTUB) based on the Technology-Organization-Environment (TOE) framework. This study then verifies the practical paths to improve the employee's SCTUB from the configuration perspective.
Design/methodology/approach
A mixed-method approach involving survey and qualitative comparative analysis (QCA) is conducted in this study. Based on the detailed literature review and semi-structured interview, this study identifies the factors and proposes the TOE framework to determine the configuration conditions affecting employee's SCTUB and verify practical paths to promote this user behavior.
Findings
The TOE framework's technical, organizational and environmental elements are interdependent. The emergence of a high SCTUB is not determined by a single determinant but by configuration conditions. Four equifinal conditions (e.g. organization-technology type, technology-organization type, environment type and organization-technology balanced type) are verified to promote construction enterprise employee's SCTUB.
Practical implications
The four verified configuration conditions could guide construction enterprises to formulate complementary strategies for promoting the construction enterprises' employees to implement smart construction technology and achieve the enterprise's digital transformation.
Originality/value
The inter-dependence of the three-dimension factors, namely technical, organizational and environmental elements are explored to enrich the literature on the TOE framework. Meanwhile, the configuration effects of these factors on usage behavior are identified, expanding the literature on the information technology acceptance model.
Details
Keywords
Tai Wai Kwok, SiWei Chang and Heng Li
The unitized curtain wall system (UCWS), a symbol of modern architecture, is gaining popularity among prefabricated components. Previous studies have focused on both construction…
Abstract
Purpose
The unitized curtain wall system (UCWS), a symbol of modern architecture, is gaining popularity among prefabricated components. Previous studies have focused on both construction technology advances and material selection strategies to facilitate the UCWS. However, the topic of client satisfaction, which drives industry development by targeting clients' demands, has gone unnoticed. Therefore, the current study aims to investigate client satisfaction with UCWS products in Hong Kong by finding its influential factors.
Design/methodology/approach
A systematic review was employed to first identify the influential factors. A semi-structured interview was employed to validate the reliability of the extracted factors. The machine learning algorithm Extreme Gradient Boosting (XGBoost) and the Pearson correlation were then employed to rank the importance and correlation of factors based on the 1–5 Likert scale scores obtained through a questionnaire survey.
Findings
The findings revealed that “reduction in construction time” and “reduction in construction waste” are the most important factors and have a strong positive influence on client satisfaction.
Originality/value
Unlike previous studies, the present study focused on a novel research topic and introduces an objective analysis process using machine learning algorithms. The findings contribute to narrowing the knowledge gap regarding client preference for UCWS products from both individual and collaborative perspectives, providing decision-makers with an objective, quantitative and thorough reference before making investments in the curtain wall management development.
Details
Keywords
Xin Jin, Geoffrey Shen, Lizi Luo and Xin Zhou
Modular integrated construction (MiC) is an innovative and effective manufacturing-based method of construction that has become the mainstream development direction of projects in…
Abstract
Purpose
Modular integrated construction (MiC) is an innovative and effective manufacturing-based method of construction that has become the mainstream development direction of projects in Hong Kong (HK). However, large-scale promotion of MiC practice still needs efforts. A pressing concern is that the impact of relevant policies on stakeholders during project implementation is rarely explored in depth. Therefore, to fill the research gap, this study aims to investigate the influence of policies on stakeholders to drive the successful implementation of MiC in HK.
Design/methodology/approach
This study uses a strategy of multiple methods. First, a comprehensively literature review and survey were adopted to identify critical policies and stakeholders. Second, semi-structured interviews with 28 experts were conducted to quantify their relationships. Third, three policy–stakeholder networks at initiation, planning and design and construction stages were established using social network analysis.
Findings
Environmental protection policy, COVID-19 pandemic policy and environmental protection policy and quality acceptance standard for project completion are found to be the most important policies of the three stages, respectively. The HK government and developers are highlighted as prominent stakeholders influencing policy implementation at all three stages. The dynamics of the influence stakeholders receive from critical policies at different stages of MiC are discussed. Valuable recommendations are accordingly proposed to enhance the successful implementation of MiC projects from the perspective of various stakeholders.
Originality/value
This study contributes to the body of knowledge by considering the mediating influence of stakeholders during policy implementation in the MiC uptake, and is valuable in helping policymakers to deeply understand the influence of policies to further forward successful MiC implementation and practicality in HK.
Details
Keywords
Yanhu Han, Xiyu Yan and Poorang Piroozfar
As a strand in industrialization movement in architecture, engineering and construction (AEC) industry, prefabricated construction (PC) has gained widespread popularity due to…
Abstract
Purpose
As a strand in industrialization movement in architecture, engineering and construction (AEC) industry, prefabricated construction (PC) has gained widespread popularity due to high efficiency, energy saving, low environmental impacts, safety and other advantages of PC. Well-managed supply chain can further leverage the advantages of PC. However, there is a lack of more systematically overview of the prefabricated construction supply chain (PCSC). This paper aims to comb the current status and look into the future direction of PCSC by reviewing the existing research.
Design/methodology/approach
In total, 131 articles related to prefabricated construction supply chain management (PCSCM) from 2000 to 2022 have been collated to (1) conduct a bibliometric analysis by using VOSviewer, including the literature sources, keywords co-occurrence, co-authorships, authorship citation and country active in the field of PCSCM; (2) classify and summarize the status of research in PCSCM through qualitative discussion and (3) point out the future research directions.
Findings
In total, 131 articles are carried out for bibliometric analysis and in-depth qualitative discussion, the visualization maps and the main research themes in the field of PCSCM are obtained. The results show that supply chain intelligentization and informatization are hot topics. Finally, future research directions that should be paid attention to in the field of PCSCM are pointed out.
Practical implications
This study can help project managers understand the current status and problems of PCSC operations and provide a basis for future management decisions.
Originality/value
Compared with previous studies, this study adds the dimension of “article authorship” to the quantitative analysis and discusses the research themes in the field of PCSCM in a comprehensive manner. In addition, this paper deeply discusses the main research topics from both the specific contents and research methods adopted.
Details
Keywords
Tai Wai Kwok, Siwei Chang and Heng Li
The unitized curtain wall system (UCWS), one of the prefabricated technologies, is increasingly attracting attention in the Hong Kong construction industry. However, this…
Abstract
Purpose
The unitized curtain wall system (UCWS), one of the prefabricated technologies, is increasingly attracting attention in the Hong Kong construction industry. However, this innovative technology still lacks on-site implementation in high-rise residential buildings. To promote its development, this study aims at identifying the influential factors of UCWS adoption in Hong Kong's high-rise residential buildings from a multi-stakeholder perspective.
Design/methodology/approach
Factors were first selected through an in-depth literature review and a semi-structured interview. Then the factors were validated through a questionnaire survey using Cronbach's Alpha Reliability Test. Next, the factors were ranked regarding their importance using mean-score ranking and standard deviation. Meanwhile, different stakeholders were clustered using an experimental factor analysis (EFA) model to find the shared preferences (namely common factors).
Findings
The result shows that reduction of construction time (B1) and insufficient site storage area (C1) are the most important factors. The six stakeholder groups were clustered into two segments. B1 and improved quality control are the shared interests. While C1 and the need of specification change are the common concerns.
Originality/value
There are two major breakthroughs in this study. First is the novelty of research objects. UCWS, particularly its application preference in high-rise residential buildings, has rarely been studied, yet it is urgently required. Second is the novel research perspective. The influential factors were studied from a multi-stakeholder perspective. Not only the significant factors for six specific stakeholders but also the shared preference for stakeholder groups was identified. The findings contribute to promoting UCWS more targeted, efficient and comprehensive, as well as demonstrating the collaborative possibilities of multi-stakeholders.
Details
Keywords
In the context of Industry 4.0, intelligent construction technologies (ICT) represented by information technology and networking will undoubtedly provide new impetus to the…
Abstract
Purpose
In the context of Industry 4.0, intelligent construction technologies (ICT) represented by information technology and networking will undoubtedly provide new impetus to the development of the prefabricated building supply chain (PBSC), but they will also bring various potential risks. So far, there is a large lack of research on the comprehensive consideration of the risks associated with the intelligent transformation of PBSC based on the information sharing perspective, and the critical risks and interactions are still unclear, making it difficult to identify efficient risk mitigation strategies. Therefore, this paper aims to reveal the interactions between stakeholders and clarify the critical risk nodes and interactions in information sharing of PBSC (IS-PBSC), and propose targeted risk mitigation strategies.
Design/methodology/approach
Firstly, this paper creatively delineates the risks and critical stakeholders of IS-PBSC. Secondly, Data is collected through questionnaires to understand the degree of risks impact. Thirdly, with the help of NetMiner 4 software, social network analysis is conducted and IS-PBSC risk network is established to reveal critical risk nodes and interactions. Finally, further targeted discussion of critical risk nodes, the effectiveness and reasonableness of the risk mitigation strategies are proposed and verified through NetMiner 4 software simulation.
Findings
The results show that the critical risks cover the entire process of information sharing, with the lack of information management norms and other information assurance-related risks accounting for the largest proportion. In addition, the government dominates in risk control, followed by other stakeholders. The implementation of risk mitigation strategies is effective, with the overall network density reduced by 41.15% and network cohesion reduced by 24%.
Research limitations/implications
In the context of Industry 4.0, ICT represented by information technology and networking will undoubtedly provide new impetus to the development of the PBSC, but they will also bring various potential risks. So far, there is a large lack of research on the comprehensive consideration of the risks associated with the intelligent transformation of PBSC based on the information sharing perspective, and the critical risks and interactions are still unclear, making it difficult to identify efficient risk mitigation strategies.
Originality/value
Based on the results of risk network visualization analysis, this paper proposes an ICT-based IS-PBSC mechanism that promotes the development of the integration of ICT and PBSC while safeguarding the benefits of various stakeholders.
Details
Keywords
Xiaohu Wen, Xiangkang Cao, Xiao-ze Ma, Zefan Zhang and Zehua Dong
The purpose of this paper was to prepare a ternary hierarchical rough particle to accelerate the anti-corrosive design for coastal concrete infrastructures.
Abstract
Purpose
The purpose of this paper was to prepare a ternary hierarchical rough particle to accelerate the anti-corrosive design for coastal concrete infrastructures.
Design/methodology/approach
A kind of micro-nano hydrophobic ternary microparticles was fabricated from SiO2/halloysite nanotubes (HNTs) and recycled concrete powders (RCPs), which was then mixed with sodium silicate and silane to form an inorganic slurry. The slurry was further sprayed on the concrete surface to construct a superhydrophobic coating (SHC). Transmission electron microscopy and energy-dispersive X-ray spectroscopy mappings demonstrate that the nano-sized SiO2 has been grafted on the sub-micron HNTs and then further adhered to the surface of micro-sized RCP, forming a kind of superhydrophobic particles (SiO2/HNTs@RCP) featured of abundant micro-nano hierarchical structures.
Findings
The SHC surface presents excellent superhydrophobicity with the water contact angle >156°. Electrochemical tests indicate that the corrosion rate of mild steel rebar in coated concrete reduces three-order magnitudes relative to the uncoated one in 3.5% NaCl solution. Water uptake and chloride ion (Cl-) diffusion tests show that the SHC exhibits high H2O and Cl- ions barrier properties thanks to the pore-sealing and water-repellence properties of SiO2/HNTs@RCP particles. Furthermore, the SHC possesses considerable mechanical durability and outstanding self-cleaning ability.
Originality/value
SHC inhibits water uptake, Cl- diffusion and rebar corrosion of concrete, which will promote the sustainable application of concrete waste in anti-corrosive concrete projects.
Details
Keywords
Ibrahim Yahaya Wuni, Geoffrey Qiping Shen and Abdullahi B. Saka
Modular integrated construction (MiC) reengineers the traditional construction process. By introducing factory production and onsite assembly (OA) of modules, MiC reinvents…
Abstract
Purpose
Modular integrated construction (MiC) reengineers the traditional construction process. By introducing factory production and onsite assembly (OA) of modules, MiC reinvents construction projects' uncertainties and risk profiles. The OA stage constitutes the highest end of the MiC delivery and supply chains, where several inherited and symbiotic errors and risk events become realities, negatively impacting the MiC project's success. This study explored the severities of OA risk factors for MiC projects.
Design/methodology/approach
A comprehensive literature review, consultation of experts and a questionnaire survey of domain experts were conducted to assess the severity of fifteen OA risk factors for MiC projects. The risk severity index was used to compute and rank the severities of critical OA risk factors for MiC projects, followed by proposed mitigation strategies.
Findings
The study revealed that the top five OA risk factors with the severest impact on MiC projects include modules installation discrepancies and errors, poor cooperation among critical onsite stakeholders, a mismatch between production schedules and site conditions, improper lifting equipment selection for onsite installation and site-fit rework due to discrepancies in drawings.
Originality/value
This study is the first to offer some important insights into the uncertainties that could compromise the OA objectives of MiC projects. It discussed risk management strategies for known and unknown OA risks and made a unique contribution to the theory, practice, and praxis of MiC supply chain risk management.
Details
Keywords
Awel Haji Ibrahim, Dagnachew Daniel Molla and Tarun Kumar Lohani
The purpose of this study is to address a highly heterogeneous rift margin environment and exhibit considerable spatiotemporal hydro-climatic variations. In spite of limited…
Abstract
Purpose
The purpose of this study is to address a highly heterogeneous rift margin environment and exhibit considerable spatiotemporal hydro-climatic variations. In spite of limited, random and inaccurate data retrieved from rainfall gauging stations, the recent advancement of satellite rainfall estimate (SRE) has provided promising alternatives over such remote areas. The aim of this research is to take advantage of the technologies through performance evaluation of the SREs against ground-based-gauge rainfall data sets by incorporating its applicability in calibrating hydrological models.
Design/methodology/approach
Selected multi satellite-based rainfall estimates were primarily compared statistically with rain gauge observations using a point-to-pixel approach at different time scales (daily and seasonal). The continuous and categorical indices are used to evaluate the performance of SRE. The simple scaling time-variant bias correction method was further applied to remove the systematic error in satellite rainfall estimates before being used as input for a semi-distributed hydrologic engineering center's hydraulic modeling system (HEC-HMS). Runoff calibration and validation were conducted for consecutive periods ranging from 1999–2010 to 2011–2015, respectively.
Findings
The spatial patterns retrieved from climate hazards group infrared precipitation with stations (CHIRPS), multi-source weighted-ensemble precipitation (MSWEP) and tropical rainfall measuring mission (TRMM) rainfall estimates are more or less comparably underestimate the ground-based gauge observation at daily and seasonal scales. In comparison to the others, MSWEP has the best probability of detection followed by TRMM at all observation stations whereas CHIRPS performs the least in the study area. Accordingly, the relative calibration performance of the hydrological model (HEC-HMS) using ground-based gauge observation (Nash and Sutcliffe efficiency criteria [NSE] = 0.71; R2 = 0.72) is better as compared to MSWEP (NSE = 0.69; R2 = 0.7), TRMM (NSE = 0.67, R2 = 0.68) and CHIRPS (NSE = 0.58 and R2 = 0.62).
Practical implications
Calibration of hydrological model using the satellite rainfall estimate products have promising results. The results also suggest that products can be a potential alternative source of data sparse complex rift margin having heterogeneous characteristics for various water resource related applications in the study area.
Originality/value
This research is an original work that focuses on all three satellite rainfall estimates forced simulations displaying substantially improved performance after bias correction and recalibration.
Details
Keywords
Li Cheng, Gege Fang, Xiaoxue Zhang, Yuxiang Lv and Lingxuan Liu
This research aims to discover the relationship between social media usage (SMU) and the critical thinking ability (CTA) of university students, and to answer the question that…
Abstract
Purpose
This research aims to discover the relationship between social media usage (SMU) and the critical thinking ability (CTA) of university students, and to answer the question that whether social media dependence (SMD) affects the development of CTA, and thus providing a reference for the social media access strategy of academic libraries from the perspective of media information literacy.
Design/methodology/approach
The research data were collected via 300 valid questionnaires whose respondents are students from three universities in China. Multistage stratified cluster sampling method was used to select the respondents, which guarantees statistical representativeness. A pre-test was conducted to ensure the validity of the questionnaire.
Findings
It is shown that the total score of CTA and the six sub-dimensions are significantly positively correlated with SMU, but strongly negatively correlated with SMD. Based on the mediating effect testing, it is discovered that the degree of SMD can affect the promoting relations between the usage intensity of social media (UISM) and CTA. Clearly, SMU is a double-edged sword. While it narrows the digital gap in terms of accessibility, it widens the digital gap in terms of usage.
Originality/value
The differences in SMU have a significant impact on the development of CTA of university students. This inspires us to consider the ability of “using social media in a balanced way” as an important evaluation and training direction when inquiring media literacy. As social media is becoming a critical channel in cultivating individual's thinking skills, it is highly suggested that the amount of time spent on reading fragmented information on the internet should be controlled.
Details