Search results

1 – 10 of 197
Open Access
Article
Publication date: 25 December 2023

Anna Trubetskaya, Alan Ryan, Daryl John Powell and Connor Moore

Output from the Irish Dairy Industry has grown rapidly since the abolition of quotas in 2015, with processors investing heavily in capacity expansion to deal with the extra milk…

Abstract

Purpose

Output from the Irish Dairy Industry has grown rapidly since the abolition of quotas in 2015, with processors investing heavily in capacity expansion to deal with the extra milk volumes. Further capacity gains may be achieved by extending the processing season into the winter, a key enabler for which being the reduction of duration of the winter maintenance overhaul period. This paper aims to investigate if Lean Six Sigma tools and techniques can be used to enhance operational maintenance performance, thereby releasing additional processing capacity.

Design/methodology/approach

Combining the Six-Sigma Define, Measure, Analyse, Improve, Control (DMAIC) methodology and the structured approach of Turnaround Maintenance (TAM) widely used in process industries creates a novel hybrid model that promises substantial improvement in maintenance overhaul execution. This paper presents a case study applying the DMAIC/TAM model to Ireland’s largest dairy processing site to optimise the annual maintenance shutdown. The objective was to deliver a 30% reduction in the duration of the overhaul, enabling an extension of the processing season.

Findings

Application of the DMAIC/TAM hybrid resulted in process enhancements, employee engagement and a clear roadmap for the operations team. Project goals were delivered, and original objectives exceeded, resulting in €8.9m additional value to the business and a reduction of 36% in the duration of the overhaul.

Practical implications

The results demonstrate that the model provides a structure that promotes systematic working and a continuous improvement focus that can have substantial benefits for wider industry. Opportunities for further model refinement were identified and will enhance performance in subsequent overhauls.

Originality/value

To the best of the authors’ knowledge, this is the first time that the structure and tools of DMAIC and TAM have been combined into a hybrid methodology and applied in an Irish industrial setting.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Open Access
Article
Publication date: 18 May 2023

Anna Trubetskaya, Alan Ryan and Frank Murphy

This paper aims to introduce a model using a digital twin concept in a cold heading manufacturing and develop a digital visual management (VM) system using Lean overall equipment…

5681

Abstract

Purpose

This paper aims to introduce a model using a digital twin concept in a cold heading manufacturing and develop a digital visual management (VM) system using Lean overall equipment effectiveness (OEE) tool to enhance the process performance and establish Fourth Industrial Revolution (I4.0) platform in small and medium enterprises (SMEs).

Design/methodology/approach

This work utilised plan, do, check, act Lean methodology to create a digital twin of each machine in a smart manufacturing facility by taking the Lean tool OEE and digitally transforming it in the context of I4.0. To demonstrate the effectiveness of process digitisation, a case study was carried out at a manufacturing department to provide the data to the model and later validate synergy between Lean and I4.0 platform.

Findings

The OEE parameter can be increased by 10% using a proposed digital twin model with the introduction of a Level 0 into VM platform to clearly define the purpose of each data point gathered further replicate in projects across the value stream.

Research limitations/implications

The findings suggest that researchers should look beyond conversion of stored data into visualisations and predictive analytics to improve the model connectivity. The development of strong big data analytics capabilities in SMEs can be achieved by shortening the time between data gathering and impact on the model performance.

Originality/value

The novelty of this study is the application of OEE Lean tool in the smart manufacturing sector to allow SME organisations to introduce digitalisation on the back of structured and streamlined principles with well-defined end goals to reach the optimal OEE.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Open Access
Article
Publication date: 28 March 2023

Nicola Capolupo, Zuzana Virglerová and Paola Adinolfi

This paper explores total quality management (TQM) soft domain efficacy in social care organizations to determine the extent to which an organization's project success may stem…

1165

Abstract

Purpose

This paper explores total quality management (TQM) soft domain efficacy in social care organizations to determine the extent to which an organization's project success may stem from soft TQM critical success factors (CSFs).

Design/methodology/approach

Non-structured interviews were conducted with 16 managers overseeing the prosthetic device regeneration project of the Italian local health unit (located in Salerno) to explore which soft factors could contribute to the success of a social care multifunctional organization.

Findings

Organizations' handling of certain projects, such as pivoting on soft TQM issues, may allow them to be configured as multiservice organizations. Therefore, a conceptual model of a multiservice social care organization is proposed.

Practical implications

From a managerial perspective, this study presents an interesting success case of a multiservice social care organization with a total annual expenditure of €20 million on prosthetic assistance. Preliminary data show a 13% reduction in public expenditure for Salerno's local health unit via a refurbishment project.

Originality/value

The paper contributes to the soft TQM literature debate: although Italian local health professionals appear aware of soft TQM issues' implementation and consciously apply them in their organization and projects, this occurs more with specific CSFs emerging from the literature. Therefore, this article paves the way for further quantitative and theoretical investigations on the adoption of TQM soft issues in social care organizations' performance measurement.

Open Access
Article
Publication date: 13 February 2024

Kaisu Laitinen, Mika Luhtala, Maiju Örmä and Kalle Vaismaa

Insufficient productivity development in the global and Finnish infrastructure sectors indicates that there are challenges in genuinely achieving the goals of resource efficiency…

Abstract

Purpose

Insufficient productivity development in the global and Finnish infrastructure sectors indicates that there are challenges in genuinely achieving the goals of resource efficiency and digitalization. This study adapts the approach of capability maturity model integration (CMMI) for examining the capabilities for productivity development that reveal the enablers of improving productivity in the infrastructure sector.

Design/methodology/approach

Civil engineering in Finland was selected as the study area, and a qualitative research approach was adopted. A novel maturity model was constructed deductively through a three-step analytical process. Previous research literature was adapted to form a framework with maturity levels and key process areas (KPAs). KPA attributes and their maturity criteria were formed through a thematic analysis of interview data from 12 semi-structured group interviews. Finally, validation and refinement of the model were performed with an expert panel.

Findings

This paper provides a novel maturity model for examining and enhancing the infrastructure sector’s maturity in productivity development. The model brings into discussion the current business logics, relevance of lifecycle-thinking, binding targets and outcomes of limited activities in the surrounding infrastructure system.

Originality/value

This paper provides a new approach for pursuing productivity development in the infrastructure sector by constructing a maturity model that adapts the concepts of CMMI and change management. The model and findings benefit all actors in the sector and provide an understanding of the required elements and means to achieve a more sustainable built environment and effective operations.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Open Access
Article
Publication date: 6 June 2023

Vanessa Nappi and Kevin Kelly

Performance framework (PF) is a well-established practice to measure innovation performance and identify improvement opportunities. However, whether PFs academic research are…

Abstract

Purpose

Performance framework (PF) is a well-established practice to measure innovation performance and identify improvement opportunities. However, whether PFs academic research are applicable to companies remains unclear, as well as their support in the definition of improvement actions. This study aims to present the implementation and assessment of a new and updated PF proposed in previous research in a real industrial context.

Design/methodology/approach

The PF was implemented through an in-depth case study carried out in a European machinery manufacturer and further assessed by practitioners.

Findings

The results indicate that the PF enabled the creation of a multidimensional view of the innovation performance and the definition of improvement projects in the company. Additionally, the findings also reveal an overall positive assessment of the PF by senior managers who work with the innovation process.

Research limitations/implications

As a case study, this research is inherently limited in the extent to which results can be generalised. Thus, the analyses are reductive and rationalising. Future research is needed to assess the replicability of the PF.

Practical implications

The study's practical contribution is based on the combination of insights and steps that provide a straightforward and actionable approach for the company to improve performance.

Originality/value

This study aims to advance the importance of implementing the new and updated PF after its proposition, which is often overlooked in preceding research. Furthermore, the assessment of the PF also enables to infer its value to the company's employees.

Details

International Journal of Productivity and Performance Management, vol. 73 no. 11
Type: Research Article
ISSN: 1741-0401

Keywords

Open Access
Article
Publication date: 5 October 2023

Maria Vincenza Ciasullo, Alexander Douglas, Emilia Romeo and Nicola Capolupo

Lean Six Sigma in public and private healthcare organisations has received considerable attention over the last decade. Nevertheless, such process improvement methodologies are…

1393

Abstract

Purpose

Lean Six Sigma in public and private healthcare organisations has received considerable attention over the last decade. Nevertheless, such process improvement methodologies are not generalizable, and their effective implementation relies on contextual variables. The purpose of this study is to explore the readiness of Italian hospitals for Lean Six Sigma and Quality Performance Improvement (LSS&QPI), with a focus on gender differences.

Design/methodology/approach

A survey comprising 441 healthcare professionals from public and private hospitals was conducted. Multivariate analysis of variance was used to determine the mean scores on the LSS&QPI dimensions based on hospital type, gender and their interaction.

Findings

The results showed that public healthcare professional are more aware of quality performance improvement initiatives than private healthcare professionals. Moreover, gender differences emerged according to the type of hospital, with higher awareness for men than women in public hospitals, whereas for private hospitals the opposite was true.

Research limitations/implications

This study contributes to the Lean Six Sigma literature by focusing on the holistic assessment of LSS&QPI implementation.

Practical implications

This study informs healthcare managers about the revolution within healthcare organisations, especially public ones. Healthcare managers should spend time understanding Lean Six Sigma as a strategic orientation to promote the “lean hospital”, improving processes and fostering patient-centredness.

Originality/value

This is a preliminary study focussing on analysing inter-relationship between perceived importance of soft readiness factors such as gender dynamics as a missing jigsaw in the current literature. In addition, the research advances a holistic assessment of LSS&QPI, which sets it apart from the studies on single initiatives that have been documented to date.

Details

International Journal of Quality & Reliability Management, vol. 41 no. 3
Type: Research Article
ISSN: 0265-671X

Keywords

Open Access
Article
Publication date: 12 October 2023

Jiju Antony, Arshia Kaul, Shreeranga Bhat, Michael Sony, Vasundhara Kaul, Maryam Zulfiqar and Olivia McDermott

This study aims to investigate the adoption of Quality 4.0 (Q4.0) and assess the critical failure factors (CFFs) for its implementation and how its failure is measured.

Abstract

Purpose

This study aims to investigate the adoption of Quality 4.0 (Q4.0) and assess the critical failure factors (CFFs) for its implementation and how its failure is measured.

Design/methodology/approach

A qualitative study based on in-depth interviews with quality managers and executives was conducted to establish the CFFs for Q4.0.

Findings

The significant CFFs highlighted were resistance to change and a lack of understanding of the concept of Q4.0. There was also a complete lack of access to or availability of training around Q4.0.

Research limitations/implications

The study enhances the body of literature on Q4.0 and is one of the first research studies to provide insight into the CFFs of Q4.0.

Practical implications

Based on the discussions with experts in the area of quality in various large and small organizations, one can understand the types of Q4.0 initiatives and the CFFs of Q4.0. By identifying the CFFs, one can establish the steps for improvements for organizations worldwide if they want to implement Q4.0 in the future on the competitive global stage.

Originality/value

The concept of Q4.0 is at the very nascent stage, and thus, the CFFs have not been found in the extant literature. As a result, the article aids businesses in understanding possible problems that might derail their Q4.0 activities.

Details

International Journal of Quality & Reliability Management, vol. 41 no. 4
Type: Research Article
ISSN: 0265-671X

Keywords

Open Access
Article
Publication date: 3 March 2023

Amy B.C. Tan, Desirée H. van Dun and Celeste P.M. Wilderom

With the growing need for employees to be innovative, public-sector organizations are investing in employee training. This study aims to examine the effects of a combined Lean Six…

4860

Abstract

Purpose

With the growing need for employees to be innovative, public-sector organizations are investing in employee training. This study aims to examine the effects of a combined Lean Six Sigma and innovation training, using action learning, on public-sector employees’ creative role identity and innovative work behavior.

Design/methodology/approach

The authors studied a public service agency in Singapore in which a five-day Lean Innovation Training was implemented, using a combination of Lean Six Sigma and Creative Problem-Solving tools, with a simulation on day one and subsequent team-based project coaching, spread over six months. The authors administered pre- and postintervention surveys among all the employees, and initiated group interviews and observations before, during and after the intervention.

Findings

Creative role identity and innovative work behavior had significantly improved six months after the intervention, enabled through senior management’s transformational leadership. The training induced managers to role-model innovative work behaviors while cocreating, with their employees, a renewal of their agency’s core processes. The three completed improvement projects contributed to an innovative work culture and reduced service turnaround time.

Originality/value

Starting with a role-playing simulation on the first day, during which leaders and followers swapped roles, the action-learning type training taught all the organizational members to use various Lean Six Sigma and Creative Problem-Solving tools. This nimble Lean Innovation Training, and subsequent team-based project coaching, exemplifies how advancing the staff’s creative role identity can have a positive impact.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Open Access
Article
Publication date: 3 May 2023

Lars Stehn and Alexander Jimenez

The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels…

Abstract

Purpose

The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels. The take is that fragmentation of construction is one explanation for the lack of productivity growth, and that IHB could be an integrating method of overcoming horizontal and vertical fragmentation.

Design/methodology/approach

Singe-factor productivity measures are calculated based on data reported by IHB companies and compared to official produced and published research data. The survey covers the years 2013–2020 for IHB companies building multi-storey houses in timber. Generalization is sought through descriptive statistics by contrasting the data samples to the used means to control vertical and horizontal fragmentation formulated as three theoretical propositions.

Findings

According to the results, IHB in timber is on average more productive than conventional housebuilding at the company level, project level, in absolute and in growth terms over the eight-year period. On the company level, the labour productivity was on average 10% higher for IHB compared to general construction and positioned between general construction and general manufacturing. On the project level, IHB displayed an average cost productivity growth of 19% for an employed prefabrication degree of about 45%.

Originality/value

Empirical evidence is presented quantifying so far perceived advantages of IHB. By providing analysis of actual cost and project data derived from IHB companies, the article quantifies previous research that IHB is not only about prefabrication. The observed positive productivity growth in relation to the employed prefabrication degree indicates that off-site production is not a sufficient mean for reaching high productivity and productivity growth. Instead, the capabilities to integrate the operative logic of conventional housebuilding together with logic of IHB platform development and use is a probable explanation of the observed positive productivity growth.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 31 October 2023

Emilia Kääriä and Ahm Shamsuzzoha

This study is focused to support an ongoing development project of the case company's current state and the challenges of the order-to-cash (O2C) process. The O2C process is the…

1627

Abstract

Purpose

This study is focused to support an ongoing development project of the case company's current state and the challenges of the order-to-cash (O2C) process. The O2C process is the most visible process to the customer, and therefore, its punctual and fluent order management is vital. It is observed that the high degree of manual work in the O2C process causes mistakes, delays and rework in the process. The purpose of this article is therefore to analyze the case company's current state of the O2C process as well as to identify the areas of development in this process by deploying the means of Lean Six Sigma tools such as value stream mapping (VSM).

Design/methodology/approach

The study was conducted as a mix of quantitative and qualitative analysis. Based on both the quantitative and qualitative data, a workshop on VSM was organized to analyze the current state of the O2C process of a case company, engaged in the energy and environment sector in Finland.

Findings

The results found that excessive manual work was highly connected to inadequate or incorrect data in pricing and invoicing activities, which resulted in canceled invoices. Canceled invoices are visible to the customer and have a negative impact on the customer experience. This study found that by improving the performance of the O2C process activities and improving communication among the internal and external stakeholders, the whole O2C process can perform more effectively and provide better customer value.

Originality/value

The O2C process is the most visible process to the customer and therefore its punctual and fluent order management is vital. To ensure that the O2C process is operating as desired, suitable process performance metrics need to be aligned and followed. The results gathered from the case company's data, questionnaire interviews, and the VSM workshop are all highlighted in this study. The main practical and managerial implications were to understand the real-time O2C process performance, which is necessary to ensure strong performance and enhance continuous improvement of the O2C process that leads to operational excellence and commercial competitiveness of the studied case company.

Details

International Journal of Productivity and Performance Management, vol. 73 no. 11
Type: Research Article
ISSN: 1741-0401

Keywords

Access

Only content I have access to

Year

Last 3 months (197)

Content type

Article (197)
1 – 10 of 197