Search results

1 – 8 of 8
Book part
Publication date: 8 August 2022

Louis Le Pen and William Powrie

The railway track system is the platform by which loads from moving trains are transferred to the underlying soil or supporting infrastructure such as bridges. The most common

Abstract

The railway track system is the platform by which loads from moving trains are transferred to the underlying soil or supporting infrastructure such as bridges. The most common type of railway track system is ballasted track, which has been in use for over a century. Ballasted track has proved versatile. It can be constructed using locally available materials and with modifications to the rails and sleepers, crossings transferring trains from one route to another can be created. The structure of a ballasted track system consists of two main parts. The upper portion, termed the superstructure, comprises the rails, fastenings and sleepers. It is formed of components whose shape, stiffness and strength are designed and closely controlled. Below the superstructure is the substructure, which comprises the ballast and sub-ballast. Although the materials used in the substructure may have been specified, their engineering properties and geometric placement are less well controlled. In this chapter, we will explore how a typical ballasted track system transfers load to the ground and the ways in which the track form deteriorates, requiring maintenance and eventually renewal.

Details

Sustainable Railway Engineering and Operations
Type: Book
ISBN: 978-1-83909-589-4

Keywords

Content available
Book part
Publication date: 8 August 2022

Abstract

Details

Sustainable Railway Engineering and Operations
Type: Book
ISBN: 978-1-83909-589-4

Book part
Publication date: 8 August 2022

Joel Smethurst and William Powrie

Earthworks are the embankments and cuttings that allow a railway to maintain a certain line, level and grade through the landscape. Earth embankments consist of an engineered bank

Abstract

Earthworks are the embankments and cuttings that allow a railway to maintain a certain line, level and grade through the landscape. Earth embankments consist of an engineered bank of earth that carries the railway above the natural ground. A cutting is used to carry the railway through ground with a natural level above the line of the railway. Modern (post 1960s) earthworks are carefully engineered to perform well. However, many railways run on earthworks that were constructed over 100 years ago without the use of mechanised plant. The quality of construction of older earthworks was often poor compared with present-day engineering practice. Ageing of the earthwork structures, and the greater demands of heavier and faster trains and climatic change, means that earthworks suffer ultimate and serviceability failures that can present operational difficulties. Older earthworks that fail or do not perform well require maintenance and repair, and sometimes complete replacement. This chapter explores the main engineering considerations for modern earthworks, and the challenges associated with older earthworks including their modes of failure and upgrade and repair.

Details

Sustainable Railway Engineering and Operations
Type: Book
ISBN: 978-1-83909-589-4

Keywords

Content available
Book part
Publication date: 8 August 2022

Abstract

Details

Sustainable Railway Engineering and Operations
Type: Book
ISBN: 978-1-83909-589-4

Book part
Publication date: 8 August 2022

John Preston and Simon Blainey

This book has reviewed the sustainability of rail engineering and operations with respect to both existing assets and new build in terms of the three pillars of economic, social

Abstract

This book has reviewed the sustainability of rail engineering and operations with respect to both existing assets and new build in terms of the three pillars of economic, social and environmental sustainability. It is argued that the composition of a sustainable railway is well understood, but there are practical issues with delivery. These issues may be overcome with an emphasis on infrastructure provision, finance (and funding), top-down governance and bottom-up participation.

Open Access
Article
Publication date: 16 June 2022

Qinghong Fu

This study aims to investigate the service performances of a new full-section asphalt concrete waterproof sealing structure (FSACWSS) for the high-speed railway subgrade through…

Abstract

Purpose

This study aims to investigate the service performances of a new full-section asphalt concrete waterproof sealing structure (FSACWSS) for the high-speed railway subgrade through on-site tracking, monitoring and post-construction investigation.

Design/methodology/approach

Based on the working state of the waterproof sealing structure, the main functional characteristics were analyzed, and a kind of roller-compacted high elastic modulus asphalt concrete (HEMAC) was designed and evaluated by several groups of laboratory tests. It is applied to an engineering test section, and the long-term performance monitoring and subgrade dynamic performance testing system were installed to track and monitor working performances of the test section and the adjacent contrast section with fiber-reinforced concrete.

Findings

Results show that both the dynamic performance of the track structure and the subgrade in the test section meet the requirements of the specification limits. The water content in the subgrade of the test section is maintained at 8–18%, which is less affected by the weather. However, the water content in the subgrade bed of the contrast section is 10–35%, which fluctuates significantly with the weather. The heat absorption effect of asphalt concrete in the test section makes the temperature of the subgrade at the shoulder larger than that in the contrastive section. The monitoring value of the subgrade vertical deformation in the test section is slightly larger than that in the contrastive section, but all of them meet the limit requirements. The asphalt concrete in the test section is in good contact with the base, and there are no diseases such as looseness or spalling. Only a number of cracks are found at the joints of the base plates. However, there are more longitudinal and lateral cracks in the contrastive section, which seriously affects the waterproof and sealing effects. Besides, the asphalt concrete is easier to repair, featuring good maintainability.

Originality/value

This research can provide a basis for popularization and application of the asphalt concrete waterproof sealing structure in high-speed railways.

Details

Railway Sciences, vol. 1 no. 2
Type: Research Article
ISSN: 2755-0907

Keywords

Article
Publication date: 4 August 2021

Liudmyla Trykoz, Svetlana Kamchatnaya, Dmytro Borodin, Armen Atynian and Roman Tkachenko

The purpose of this paper is to develop a technological method of protection against electrical corrosion. One more way to protect the objects is to prevent the electrical current…

Abstract

Purpose

The purpose of this paper is to develop a technological method of protection against electrical corrosion. One more way to protect the objects is to prevent the electrical current from getting to them. For example, railway objects are surrounded with a material with raised electrical resistance.

Design/methodology/approach

The railway infrastructure objects (foundations, contact-line supports, reinforced concrete sub-bases, bridge structures, pipelines of engineering networks, supports of passenger platforms and pedestrian bridges, concrete plinth walls of station buildings) are subjected to destruction due to the action of electrical current. One of destruction factors is a corrosion of the concrete constructions which is caused by the leakage current action.

Findings

Leakage currents and stray currents bypass the structure of supports of high passenger platforms or pipes of engineering networks. These currents spread by the line with the least resistance outside of the structures.

Research limitations/implications

Electrical leakage current from the rails gets into such structures through sleepers, ballast and soil and leads to accelerated corrosion leaching of concrete.

Practical implications

The constructions are protected against the destructive effect of electrical corrosion on the metal or concrete of the structure. This scheme is suitable for the construction and reconstruction of railway structures which operate on electrified sections of railways.

Originality/value

Schemes of technological solution are proposed for protection of foundations, supports of high passenger platforms, pipelines of engineering networks, etc. For this, the arrangement of soil-contained screens with big electrical resistance is suggested.

Open Access
Article
Publication date: 21 March 2023

Shilei Wang, Zhan Peng, Guixian Liu, Weile Qiang and Chi Zhang

In this paper, a high-frequency radar test system was used to collect the data of clean ballast bed and fouled ballast bed of ballasted tracks, respectively, for a quantitative…

Abstract

Purpose

In this paper, a high-frequency radar test system was used to collect the data of clean ballast bed and fouled ballast bed of ballasted tracks, respectively, for a quantitative evaluation of the condition of railway ballast bed.

Design/methodology/approach

Based on original radar signals, the time–frequency characteristics of radar signals were analyzed, five ballast bed condition characteristic indexes were proposed, including the frequency domain integral area, scanning area, number of intersections with the time axis, number of time-domain inflection points and amplitude envelope obtained by Hilbert transform, and the effectiveness and sensitivity of the indexes were analyzed.

Findings

The thickness of ballast bed tested at the sleep bottom by high-frequency radar is up to 55 cm, which meets the requirements of ballast bed detection. Compared with clean ballast bed, the values of the five indexes of fouled ballast bed are larger, and the five indexes could effectively show the condition of the ballast bed. The computational efficiency of amplitude envelope obtained by Hilbert transform is 140 s·km−1, and the computational efficiency of other indexes is 5 s·km−1. The amplitude envelopes obtained by Hilbert transform in the subgrade sections and tunnel sections are the most sensitive, followed by scanning area. The number of intersections with the time axis in the bridge sections was the most sensitive, followed by the scanning area. The scanning area can adapt to different substructures such as subgrade, bridges and tunnels, with high comprehensive sensitivity.

Originality/value

The research can provide appropriate characteristic indexes from the high-frequency radar original signal to quantitatively evaluate ballast bed condition under different substructures.

Details

Railway Sciences, vol. 2 no. 1
Type: Research Article
ISSN: 2755-0907

Keywords

1 – 8 of 8