Search results

1 – 10 of over 2000
Article
Publication date: 21 February 2024

Vivien Lefebvre

This paper aims to revisit the relationship between sales growth and profitability by exploring the direct and indirect effects of cost stickiness in the growth process. Cost…

Abstract

Purpose

This paper aims to revisit the relationship between sales growth and profitability by exploring the direct and indirect effects of cost stickiness in the growth process. Cost stickiness refers to asymmetric variations of costs associated with increases and decreases in sales. Cost stickiness is analyzed as a strategic liability that negatively affects profitability because it contributes to organizational rigidity that causes opportunity costs.

Design/methodology/approach

The empirical design is based on a large sample of 65,599 French firms drawn from the Amadeus database and it covers the period 2010 to 2019. The authors take advantage of the presentation of expenses made by nature in Amadeus to calculate cost stickiness in a more direct way than what is commonly done in the literature. The authors use various regression models to test the hypotheses.

Findings

For firms that experience rapid growth in sales, cost stickiness has a positive moderating effect on the relation between sales growth and profitability because of a higher asset turnover efficiency. However, for firms that experience slow growth, no growth or a decrease in sales, cost stickiness plays a negative moderating effect on the relation between sales and profitability.

Originality/value

This work contributes to the discussion about the conditions under which high growth is associated with greater profitability and conceptualizes cost stickiness as a strategic liability. The empirical context, privately held firms, has been overlooked by previous research.

Details

Journal of Accounting & Organizational Change, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1832-5912

Keywords

Article
Publication date: 25 April 2024

Abdul-Manan Sadick, Argaw Gurmu and Chathuri Gunarathna

Developing a reliable cost estimate at the early stage of construction projects is challenging due to inadequate project information. Most of the information during this stage is…

Abstract

Purpose

Developing a reliable cost estimate at the early stage of construction projects is challenging due to inadequate project information. Most of the information during this stage is qualitative, posing additional challenges to achieving accurate cost estimates. Additionally, there is a lack of tools that use qualitative project information and forecast the budgets required for project completion. This research, therefore, aims to develop a model for setting project budgets (excluding land) during the pre-conceptual stage of residential buildings, where project information is mainly qualitative.

Design/methodology/approach

Due to the qualitative nature of project information at the pre-conception stage, a natural language processing model, DistilBERT (Distilled Bidirectional Encoder Representations from Transformers), was trained to predict the cost range of residential buildings at the pre-conception stage. The training and evaluation data included 63,899 building permit activity records (2021–2022) from the Victorian State Building Authority, Australia. The input data comprised the project description of each record, which included project location and basic material types (floor, frame, roofing, and external wall).

Findings

This research designed a novel tool for predicting the project budget based on preliminary project information. The model achieved 79% accuracy in classifying residential buildings into three cost_classes ($100,000-$300,000, $300,000-$500,000, $500,000-$1,200,000) and F1-scores of 0.85, 0.73, and 0.74, respectively. Additionally, the results show that the model learnt the contextual relationship between qualitative data like project location and cost.

Research limitations/implications

The current model was developed using data from Victoria state in Australia; hence, it would not return relevant outcomes for other contexts. However, future studies can adopt the methods to develop similar models for their context.

Originality/value

This research is the first to leverage a deep learning model, DistilBERT, for cost estimation at the pre-conception stage using basic project information like location and material types. Therefore, the model would contribute to overcoming data limitations for cost estimation at the pre-conception stage. Residential building stakeholders, like clients, designers, and estimators, can use the model to forecast the project budget at the pre-conception stage to facilitate decision-making.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 2 February 2024

Mojdeh Naderi, Ahad Nazari, Ali Shafaat and Sepehr Abrishami

This study addresses the prevailing complexities and limitations in estimating and managing construction overhead costs (COCs) in the existing literature, with the purpose of…

Abstract

Purpose

This study addresses the prevailing complexities and limitations in estimating and managing construction overhead costs (COCs) in the existing literature, with the purpose of enhancing the accuracy of cost performance indicators in construction project management.

Design/methodology/approach

An innovative approach is proposed, employing the activity-based costing (ABC) accounting method combined with building information modelling (BIM) to assign real overhead costs to project activities. This study, distinguished by its incorporation of a real case study, focuses on an administrative building with a four-story concrete structure. It establishes an automated method for evaluating project cost performance through the detailed analysis of earned value management (EVM) cost indicators derived from ABC results and BIM data.

Findings

The results show that the ABC integration improves the accuracy of cost performance indicators by over 9%, revealing the project's true cost index for the first time and demonstrating the substantial value of the approach in construction engineering and management.

Research limitations/implications

The current study highlights a notable gap in the existing literature, addressing the challenges in onsite overhead cost estimation and offering a solution that incorporates the state-of-the-art techniques.

Practical implications

The proposed method has significant implications for project managers and practitioners, enabling better-informed decisions based on precise cost data, ultimately leading to enhanced project outcomes.

Originality/value

This research uniquely combines ABC and BIM, presenting a pioneering solution for the accurate estimation and management of COCs in construction projects, adding significant value to the current body of knowledge in this field.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 16 February 2024

Nandini Sharma and Boeing Laishram

Construction industry faces challenges in making objective decisions due to monetary value attached to quality. Among various quality management techniques available, cost of…

Abstract

Purpose

Construction industry faces challenges in making objective decisions due to monetary value attached to quality. Among various quality management techniques available, cost of quality (COQ) is one such method used to address the concern. However, the absence of measurable COQ factors to monitor quality costs hampers the implementation of COQ framework in the construction industry. Therefore, this study aims to identify COQ factors focused on visible factors (VF) and hidden factors (HF) and the current requirements to achieve it.

Design/methodology/approach

This study is based on Preferred Reporting Items for Systematic Review and Meta-Analyses protocol guidelines. The present study identified 57 articles published between 1992 and 2023 in peer-reviewed journals.

Findings

The findings reveal 22 factors, which are grouped into four categories based on COQ. Through systematic review, the authors observed limited methodological and theoretical diversity. In fact, there are no quantitative frameworks to calculate COQ. The study, therefore, developed a framework comprising four major routes/paths of COQ factors within the framework.

Practical implications

The COQ routes developed through this study will enable the practitioners to meticulously categorise VF and HF, facilitating quantifying of quality throughout the lifecycle of project, which is currently absent from the existing quality assurance/quality control (QA/QC) approach. In addition, these COQ routes stand as essential construction strategies, significantly enhancing outcomes related to time, cost, quality, sustainability and fostering closer relationships within project frameworks.

Originality/value

The current study contributes significantly to the existing body of knowledge by developing various COQ routes and proposing future research directions to address gaps in the literature.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 25 March 2024

Francis Nuako, Frank Ato Ghansah and Thomas Adusei

It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been…

Abstract

Purpose

It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been advancements in the management of building projects throughout time but cost overruns remain a key concern in the construction sector internationally, particularly in emerging economies such as Ghana. This study aims to answer the question, “What are the critical success factors (CSFs) that can assist reduce cost overruns in public sector infrastructure projects in the Ghanaian construction industry?”

Design/methodology/approach

This study used a quantitative survey method. The questionnaire was pre-tested by interviewing 15 contractors to ascertain the validity of the content. Factor analysis and multiple regression were adopted to analyze the data.

Findings

This study discovered that the critical factors that can reduce cost overruns in construction projects in Ghana are directly linked to five themes: early contractor involvement in the project planning stage, adequate funding, good project team relations, competent managers/supervisors and project participant incentives/bonuses. This study identifies indestructible, empirically measurable important success criteria for reducing cost overruns in public building projects in Ghana.

Practical implications

When well thought through from the project initiation stage to completion, these critical successes can also be used to deal with damaging economic effects such as allocative inefficiency of scarce resources, further delays, contractual disputes, claims and litigation, project failure and total abandonment.

Originality/value

The uniqueness of this research resides in the fact that it is, to the best of the authors’ knowledge, a first-of-its-kind investigation of the CSFs for reducing cost overruns in public building projects in developing countries.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 21 March 2024

Anas Al Qudah, Usama Al-Qalawi and Ahmad Alwaked

This study aims to investigate the intricate relationship between corruption and the credit costs faced by small and medium-sized enterprises (SMEs) in OECD countries, a critical…

Abstract

Purpose

This study aims to investigate the intricate relationship between corruption and the credit costs faced by small and medium-sized enterprises (SMEs) in OECD countries, a critical yet underexplored area in financial crime research. The primary aim is to dissect and understand how corruption impacts SMEs’ access to credit, highlighting a significant yet overlooked aspect of financial crime. This research seeks to fill a gap in the literature by providing empirical insights into the economic consequences of corruption, specifically on SMEs financing.

Design/methodology/approach

This study used secondary panel data from the World Bank and OECD databases. The data covered the period 2007–2020 for 25 OECD countries. This study used interest rate for SMEs loans as a dependent variable and GDP per capita, inflation and corruption index as independent variables. This study used the panel autoregressive distributed lag (ARDL) model to examine the relationship between variables.

Findings

The empirical findings derived from Panel ARDL postulate an intriguing dichotomy in the effects of GDP per capita, inflation rate and corruption on interest rates in both the short and long run. It was discerned that an increase in GDP per capita and inflation rate correlates with a decrement in interest rates in the long run, suggesting a potential compromise by central banks between controlling inflation and fostering economic growth.

Originality/value

This paper makes a novel contribution to the field of financial crime by illuminating the often-overlooked economic dimensions of corruption in the context of SMEs financing. It provides a unique perspective on the ripple effects of corrupt practices in credit markets, enriching the academic discourse and informing practical approaches to combating financial crime.

Details

Journal of Financial Crime, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1359-0790

Keywords

Article
Publication date: 19 April 2024

Devid Jegerson and Charilaos Mertzanis

In the evolving landscape of global remittances, this study systematically explores cryptocurrency's transformative impact on remittance services through a comprehensive…

Abstract

Purpose

In the evolving landscape of global remittances, this study systematically explores cryptocurrency's transformative impact on remittance services through a comprehensive literature review and bibliometric analysis.

Design/methodology/approach

Through meticulous PRISMA-guided analysis, the research identifies cryptocurrency technology as a pivotal force in enhancing remittance efficiency, reducing costs and broadening access contributing significantly to financial inclusion.

Findings

Findings revealed that cryptocurrency technology could significantly enhance remittance services, offering improved efficiency, reduced costs and increased accessibility. This suggests a transformative potential for financial inclusion, presenting a compelling case for broader adoption and regulatory support to leverage these benefits effectively.

Research limitations/implications

By integrating recent research, this work underlines the urgent need for broader adoption and regulatory support to leverage these benefits effectively. It offers novel insights for institutions and policymakers, highlighting the potential for technology adoption in remittances to enhance financial inclusivity.

Originality/value

More cryptocurrency studies are needed to concentrate on remittance markets. Thus, this investigation constitutes a unique addition to the field. Additional investigation in this domain presents significant possibilities for future exploration and progress.

Details

Management & Sustainability: An Arab Review, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2752-9819

Keywords

Article
Publication date: 9 April 2024

Derek L. Nazareth, Jae Choi and Thomas Ngo-Ye

This paper aims to examine the conditions under which small and medium enterprises (SMEs) invest in security services when they migrate their e-commerce applications to the cloud…

Abstract

Purpose

This paper aims to examine the conditions under which small and medium enterprises (SMEs) invest in security services when they migrate their e-commerce applications to the cloud environment. Using a risk management perspective, the paper assesses the impact of security service pricing, security incident prevalence and virulence to estimate SME security spending at the market level and draw out implications for SMEs and security service providers.

Design/methodology/approach

Security risks are inherently characterized by uncertainty. This study uses a Monte Carlo approach to understand the role of uncertainty in the decision to adopt security services. A model relating key security constructs is assembled based on key constructs from the domain. By manipulating security service costs and security incident types, the model estimates the market-level adoption of services, security incidents and damages incurred, along with measures of their relative dispersion.

Findings

Three key findings emerge from this study. First, adoption of services and protection is higher when tiered security services are provided, indicating that SMEs prefer to choose their security services rather than accept uniformly priced products. Second, SMEs are considered price-sensitive, resulting in a maximum level of spending in the market. Third, results indicate that security incidents and damages can be much higher than the mean in some cases, and this should serve as a cautionary note to SMEs.

Originality/value

Security spending has been modeled at the firm level. Adopting a market-level perspective represents a novel contribution. Additionally, the Monte Carlo approach provides managers with tangible measures of uncertainty, affording additional information and insight when making security service adoption decisions.

Details

Journal of Systems and Information Technology, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1328-7265

Keywords

Article
Publication date: 16 April 2024

Rahadian Haryo Bayu Sejati, Dermawan Wibisono and Akbar Adhiutama

This paper aims to design a hybrid model of knowledge-based performance management system (KBPMS) for facilitating Lean Six-Sigma (L6s) application to increase contractor…

Abstract

Purpose

This paper aims to design a hybrid model of knowledge-based performance management system (KBPMS) for facilitating Lean Six-Sigma (L6s) application to increase contractor productivity without compromising human safety in Indonesian upstream oil field operations that manage ageing and life extension (ALE) facilities.

Design/methodology/approach

The research design applies a pragmatic paradigm by employing action research strategy with qualitative-quantitative methodology involving 385 of 1,533 workers. The KBPMS-L6s conceptual framework is developed and enriched with the Analytical Hierarchy Process (AHP) to prioritize fit-for-purpose Key Performance Indicators. The application of L6s with Human Performance Modes analysis is used to provide a statistical baseline approach for pre-assessment of the contractor’s organizational capabilities. A comprehensive literature review is given for the main pillars of the contextual framework.

Findings

The KBPMS-L6s concept has given an improved hierarchy for strategic and operational levels to achieve a performance benchmark to manage ALE facilities in Indonesian upstream oil field operations. To increase quality management practices in managing ALE facilities, the L6s application requires an assessment of the organizational capability of contractors and an analysis of Human Performance Modes (HPM) to identify levels of construction workers’ productivity based on human competency and safety awareness that have never been done in this field.

Research limitations/implications

The action research will only focus on the contractors’ productivity and safety performances that are managed by infrastructure maintenance programs for managing integrity of ALE facilities in Indonesian upstream of oil field operations. Future research could go toward validating this approach in other sectors.

Practical implications

This paper discusses the implications of developing the hybrid KBPMS- L6s enriched with AHP methodology and the application of HPM analysis to achieve a 14% reduction in inefficient working time, a 28% reduction in supervision costs, a 15% reduction in schedule completion delays, and a 78% reduction in safety incident rates of Total Recordable Incident Rate (TRIR), Days Away Restricted or Job Transfer (DART) and Motor Vehicle Crash (MVC), as evidence of achieving fit-for-purpose KPIs with safer, better, faster, and at lower costs.

Social implications

This paper does not discuss social implications

Originality/value

This paper successfully demonstrates a novel use of Knowledge-Based system with the integration AHP and HPM analysis to develop a hybrid KBPMS-L6s concept that successfully increases contractor productivity without compromising human safety performance while implementing ALE facility infrastructure maintenance program in upstream oil field operations.

Details

International Journal of Lean Six Sigma, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2040-4166

Keywords

Open Access
Article
Publication date: 14 February 2024

Chao Lu and Xiaohai Xin

The promotion of autonomous vehicles introduces privacy and security risks, underscoring the pressing need for responsible innovation implementation. To more effectively address…

Abstract

Purpose

The promotion of autonomous vehicles introduces privacy and security risks, underscoring the pressing need for responsible innovation implementation. To more effectively address the societal risks posed by autonomous vehicles, considering collaborative engagement of key stakeholders is essential. This study aims to provide insights into the governance of potential privacy and security issues in the innovation of autonomous driving technology by analyzing the micro-level decision-making processes of various stakeholders.

Design/methodology/approach

For this study, the authors use a nuanced approach, integrating key stakeholder theory, perceived value theory and prospect theory. The study constructs a model based on evolutionary game for the privacy and security governance mechanism of autonomous vehicles, involving enterprises, governments and consumers.

Findings

The governance of privacy and security in autonomous driving technology is influenced by key stakeholders’ decision-making behaviors and pivotal factors such as perceived value factors. The study finds that the governmental is influenced to a lesser extent by the decisions of other stakeholders, and factors such as risk preference coefficient, which contribute to perceived value, have a more significant influence than appearance factors like participation costs.

Research limitations/implications

This study lacks an investigation into the risk sensitivity of various stakeholders in different scenarios.

Originality/value

The study delineates the roles and behaviors of key stakeholders and contributes valuable insights toward addressing pertinent risk concerns within the governance of autonomous vehicles. Through the study, the practical application of Responsible Innovation theory has been enriched, addressing the shortcomings in the analysis of micro-level processes within the framework of evolutionary game.

Details

Asia Pacific Journal of Innovation and Entrepreneurship, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2071-1395

Keywords

Access

Year

Last 3 months (2323)

Content type

Earlycite article (2323)
1 – 10 of over 2000