Search results

1 – 10 of over 1000
Article
Publication date: 24 September 2024

Mariastella Messina and Antonio Leotta

This paper aims to address the challenge raised in the literature regarding whether and how digitalization supports a servitized new product development (NPD) process, considering…

Abstract

Purpose

This paper aims to address the challenge raised in the literature regarding whether and how digitalization supports a servitized new product development (NPD) process, considering the customer’s involvement from the early stage of the process.

Design/methodology/approach

Pragmatic constructivism (PC) has been adopted for conceptualizing the NPD process as the construction of a new reality. PC is the method theory used for interpreting the field evidence drawn from a qualitative case study carried out at a multinational company operating in the semiconductor industry.

Findings

This study shows how digitalization supports the alignment to the overarching topoi of the company servitization strategy by enabling the integration and merging of different organizational topoi during the NPD process.

Research limitations/implications

This study is confined to a single-case study and context.

Practical implications

The results of this study are relevant for managers involved in the stage-gate product development of manufacturing companies, informing them on how the use of digital tools enables or hinders the progression of product development projects.

Originality/value

This paper contributes to the servitization literature by offering field evidence that demonstrates the importance for manufacturing firms of acquiring customer feedback from an early NPD phase. Another contribution is related to the literature on the role of digitalization in NPD processes, describing how digital tools give support during the different phases of the NPD process.

Details

Qualitative Research in Accounting & Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1176-6093

Keywords

Article
Publication date: 24 September 2024

Taha Shokatian, Sepehr Ghazinoory, Shohreh Nasri and Hadi Safari

This study aims to develop and apply a process model for prioritizing and selecting basic research projects in developing countries.

Abstract

Purpose

This study aims to develop and apply a process model for prioritizing and selecting basic research projects in developing countries.

Design/methodology/approach

Basic research is mainly funded by governments and since, unlike technological research, it does not have clear business goals, its prioritization is one of the complicated issues in formulating science and technology policy. Adopting a design science research methodology, the authors chose a general framework for project portfolio selection as an appropriate artifact for solving this problem. By customizing it for two specific features of this study, i.e. national scale of the problem and the basic nature of research proposals, the authors developed the proposed framework for solving the problem of priority setting.

Findings

The process for selecting basic research proposals consists of several steps, which can be categorized into eight steps including strategic decisions, preparation, pre-screening, evaluating individual proposals, screening, portfolio selection and monitoring. This study emphasizes the necessity of defining goals that can be evaluated for the national basic research portfolio, as a key strategic decision. Evaluating individual proposals is a peer-review-based process. In contrast, portfolio selection is done through a zero-one linear programming model. The validity of the proposed framework has been confirmed based on the data obtained from the Iran National Science Foundation.

Originality/value

To the best of the authors’ knowledge, in this research, for the first time, a mathematical model for prioritizing basic research at the national level has been presented, which effectively contributes to policymaking regarding the development of an optimum national research portfolio.

Details

Journal of Modelling in Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1746-5664

Keywords

Article
Publication date: 19 September 2024

Diana Ominde, Edward Godfrey Ochieng and Tarila Zuofa

The purpose of this study is to examine the influence of stakeholder integration and project complexity on information technology (IT) projects in Kenya. The following research…

Abstract

Purpose

The purpose of this study is to examine the influence of stakeholder integration and project complexity on information technology (IT) projects in Kenya. The following research question guided our inquiry: what is the influence of project complexity and stakeholder integration on the performance of IT projects in Kenya?

Design/methodology/approach

To advance the current understanding of the effect of stakeholder integration and project complexity on IT projects, multiple regressions were used to predict how project complexity and stakeholder integration influence project performance. Both government-funded and privately funded IT projects from a developing country were examined.

Findings

The study found that any project’s complexity and stakeholder integration levels offer a distinctive contribution to its success. Theoretically, the study contributes to linkages between stakeholder integration and project complexity concerning IT project performance. Through the adoption of actionable research and theoretical elaboration, we have shown that the successful execution of IT projects is driven by the successful integration of stakeholders and monitoring the level of complexity at each phase of the project.

Originality/value

The findings of this study add to the burgeoning literature on the performance of IT projects and come with several managerial implications as well. It brings to the fore the concept of stakeholder integration as an essential element of project success. The findings suggest that the inclusion of stakeholder integration into corporate decisions, strategies and policies can be an asset to the production of sustainable competitive advantages needed during the implementation of IT projects in government entities and organisations. As shown in this study, all the above require a collaborative platform allowing for data sharing among diverse stakeholders to ameliorate distrust or lack of information.

Details

International Journal of Productivity and Performance Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 20 September 2024

Shaoze Fang and Yanjun Qin

This study identifies three main CSR motivations (i.e. strategic benefits, altruism and greenwashing) and explores the relationship between CSR motivations and environmental…

Abstract

Purpose

This study identifies three main CSR motivations (i.e. strategic benefits, altruism and greenwashing) and explores the relationship between CSR motivations and environmental collaboration by considering the mediating role of environmental commitment and the moderating role of team autonomy.

Design/methodology/approach

The data collected from 336 respondents in the construction industry, structural equation modeling and bootstrapping were used to test hypotheses.

Findings

The findings show that altruistic CSR enhances environmental collaboration through enhancing environmental commitment, whereas greenwashing CSR damages environmental collaboration through reducing environmental commitment. Although there is no direct association between strategic CSR and environmental collaboration, environmental commitment mediates the effects of strategic CSR on environmental collaboration. Moreover, the positive effect of strategic CSR and altruistic CSR on environment commitment is stronger when team autonomy is stronger, whereas the negative effect of greenwashing CSR on environment commitment is weaker when team autonomy is stronger.

Originality/value

The findings contribute to the understanding of how CSR motivations can act as catalysts for collaborative efforts in addressing environmental issues within construction projects and offer theoretical understanding of team autonomy by illustrating its role in shaping organizational responses to CSR motivations. The findings can provide insights into why and how participating teams can collaborate better on environmental management, enriching the knowledge of environmental management practices in construction projects.

Details

International Journal of Managing Projects in Business, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 18 September 2024

Rami Alkhudary and Paul Gardiner

This paper explores how blockchain technology can enhance information quality within project management information systems (PMIS), thereby positively affecting knowledge…

Abstract

Purpose

This paper explores how blockchain technology can enhance information quality within project management information systems (PMIS), thereby positively affecting knowledge management, learning capabilities and project portfolio success.

Design/methodology/approach

We employ a literature review and a theory-based approach to develop a conceptual framework and set of propositions that integrate key principles from blockchain technology, project management and dynamic capabilities theory. Subsequently, a focus group is conducted to refine our propositions, providing insights and examples demonstrating the potential value of blockchain in project management.

Findings

The findings suggest that blockchain significantly impacts the information quality within PMIS. This improvement in information quality enhances traceability, reliability and security of project data, facilitating better decision-making and governance. The focus group revealed blockchain’s benefits in managing confidential data and streamlining knowledge sharing processes, ultimately contributing to project portfolio success.

Originality/value

This research offers a novel conceptual framework and original insights into the application of blockchain in project management, particularly within the context of Industry 4.0, paving the way for future research on digital transformation in project management.

Details

International Journal of Managing Projects in Business, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 17 September 2024

Mahdi Salari, Milad Ghanbari, Martin Skitmore and Majid Alipour

This paper aims to create a comprehensive framework for selecting alternative materials in construction projects, integrating building information modeling (BIM) and the particle…

Abstract

Purpose

This paper aims to create a comprehensive framework for selecting alternative materials in construction projects, integrating building information modeling (BIM) and the particle swarm optimization (PSO) algorithm. Materials comprise 60%–65% of the total project cost, and current methods require significant time and human resources.

Design/methodology/approach

A prototype framework is developed that considers multiple criteria to optimize the material selection process, addressing the significant investment of time and resources required in current methods. The study uses surveys and interviews with construction professionals to collect primary data on alternative materials selection.

Findings

The results show that integrating BIM and the PSO algorithm improves cost optimization and material selection outcomes.

Originality/value

This comprehensive tool enhances decision-making capabilities and resource utilization, improving project outcomes and resource utilization. It offers a systematic approach to evaluating and selecting materials, making it a valuable resource for construction professionals.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 19 September 2024

Mohammad Azim Eirgash and Vedat Toğan

Most of the existing time-cost-quality-environmental impact trade-off (TCQET) analysis models have focused on solving a simple project representation without taking typical…

Abstract

Purpose

Most of the existing time-cost-quality-environmental impact trade-off (TCQET) analysis models have focused on solving a simple project representation without taking typical activity and project characteristics into account. This study aims to present a novel approach called the “hybrid opposition learning-based Aquila Optimizer” (HOLAO) for optimizing TCQET decisions in generalized construction projects.

Design/methodology/approach

In this paper, a HOLAO algorithm is designed, incorporating the quasi-opposition-based learning (QOBL) and quasi-reflection-based learning (QRBL) strategies in the initial population and generation jumping phases, respectively. The crowded distance rank (CDR) mechanism is utilized to rank the optimal Pareto-front solutions to assist decision-makers (DMs) in achieving a single compromise solution.

Findings

The efficacy of the proposed methodology is evaluated by examining TCQET problems, involving 69 and 290 activities, respectively. Results indicate that the HOLAO provides competitive solutions for TCQET problems in construction projects. It is observed that the algorithm surpasses multiple objective social group optimization (MOSGO), plain Aquila Optimization (AO), QRBL and QOBL algorithms in terms of both number of function evaluations (NFE) and hypervolume (HV) indicator.

Originality/value

This paper introduces a novel concept called hybrid opposition-based learning (HOL), which incorporates two opposition strategies: QOBL as an explorative opposition and QRBL as an exploitative opposition. Achieving an effective balance between exploration and exploitation is crucial for the success of any algorithm. To this end, QOBL and QRBL are developed to ensure a proper equilibrium between the exploration and exploitation phases of the basic AO algorithm. The third contribution is to provide TCQET resource utilizations (construction plans) to evaluate the impact of these resources on the construction project performance.

Details

Engineering Computations, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0264-4401

Keywords

Article
Publication date: 17 September 2024

Lavagnon Ika, Jack Meredith and Ofer Zwikael

The performance of large-scale projects is often challenged due to major environmental changes that occur during their life. However, literature has paid little attention to the…

Abstract

Purpose

The performance of large-scale projects is often challenged due to major environmental changes that occur during their life. However, literature has paid little attention to the governance adaptations required to respond effectively to these changes. This paper aims to study changes in the project environment over time, the corresponding governance adaptations and their impact on project performance.

Design/methodology/approach

To ensure triangulation between two sources of evidence, we used both primary and secondary data sources and examined 14 projects through 2 studies, the first focused on seven documented, illustrative case projects and the second on interviews with senior and project managers involved in seven additional projects.

Findings

We found the key environmental changes that should trigger appropriate governance adaptations to be market evolutions, technological advancements and sociopolitical events. However, we also found that these necessary governance adaptations are not commonly implemented timely, sufficiently or effectively.

Originality/value

The paper distills the dynamics of large-scale projects in achieving project effectiveness and raises theoretical propositions on the combination of environmental changes and deficient governance adaptations that, over time, turns efficient projects into ineffective projects and discusses implications for theory and practice.

Details

International Journal of Managing Projects in Business, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 17 September 2024

Ghiwa Assaf and Rayan H. Assaad

Project bundling is an innovative practice that groups or bundles several infrastructure projects into a single contract. While project bundling has various benefits, agencies are…

Abstract

Purpose

Project bundling is an innovative practice that groups or bundles several infrastructure projects into a single contract. While project bundling has various benefits, agencies are facing some challenges when bundling their projects, including properly assessing the feasibility (or infeasibility) of project delivery methods (PDMs) of interest. More specifically, project owners face the challenge of properly selecting between traditional and alternative PDMs for their bundled projects. Although some research efforts were devoted to providing guidelines in relation to different aspects related to project bundling, no previous study was conducted to help project owners performing PDMs-related feasibility analysis for bundled projects, which differ from normal, singly delivered projects. To fill this knowledge gap, this paper develops a decision-support tool that assists agencies in deciding whether they should select a traditional or alternative PDM (i.e. whether to go with the Design-Bid-Build (DBB) PDM or not) for their bundled projects.

Design/methodology/approach

An analytical methodology comprised of four main steps was followed in this paper. First, an expert survey was developed and distributed to industry experts to quantify the importance of 25 project bundling objectives. Second, principal component analysis was used to determine the weights for the different project bundling objectives. Third, a series of statistical tests was implemented to identify different feasibility tiers. Fourth, a user-friendly decision-support tool was developed, and its capabilities were demonstrated.

Findings

The results showed that six tiers exist to classify the feasibility (or infeasibility) of traditional PDMs (i.e. the DBB method) for bundled projects. The research outcomes have also reflected that the following five project bundling objectives contribute the most to making traditional PDMs (i.e. the DBB method) more feasible for bundled projects: (1) Having well-defined design features; (2) Requiring prior knowledge or experience with similar project size and scope; (3) Completing the overall project on schedule; (4) Keeping rate of expenditures within cash flow plan; and (5) Acquiring specific legislative, regulatory and jurisdictional requirements early on.

Originality/value

This research adds to the body of knowledge by equipping agencies and project owners with a decision-support system that helps them identify whether traditional or alternative PDMs are more appropriate for the specific objectives of their bundling program(s). By making the right PDM decision, project owners can enhance their bundling practices (especially in relation to the PDM proper selection) and ultimately the performance of their bundled projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 14 August 2024

Huijun Tu and Shitao Jin

Due to the complexity and diversity of megaprojects, the architectural programming process often involves multiple stakeholders, making decision-making difficult and susceptible…

Abstract

Purpose

Due to the complexity and diversity of megaprojects, the architectural programming process often involves multiple stakeholders, making decision-making difficult and susceptible to subjective factors. This study aims to propose an architectural programming methodology system (APMS) for megaprojects based on group decision-making model to enhance the accuracy and transparency of decision-making, and to facilitate participation and integration among stakeholders. This method allows multiple interest groups to participate in decision-making, gathers various perspectives and opinions, thereby improving the quality and efficiency of architectural programming and promoting the smooth implementation of projects.

Design/methodology/approach

This study first clarifies the decision-making subjects, decision objects, and decision methods of APMS based on group decision-making theory and value-based architectural programming methods. Furthermore, the entropy weight method and fuzzy TOPSIS method are employed as calculation methods to comprehensively evaluate decision alternatives and derive optimal decision conclusions. The workflow of APMS consists of four stages: preparation, information, decision, and evaluation, ensuring the scientific and systematic of the decision-making process.

Findings

This study conducted field research and empirical analysis on a practical megaproject of a comprehensive transport hub to verify the effectiveness of APMS. The results show that, in terms of both short-distance and long-distance transportation modes, the decision-making results of APMS are largely consistent with the preliminary programming outcomes of the project. However, regarding transfer modes, the APMS decision-making results revealed certain discrepancies between the project's current status and the preliminary programming.

Originality/value

APMS addresses the shortcomings in decision accuracy and stakeholder participation and integration in the current field of architectural programming. It not only enhances stakeholder participation and interaction but also considers various opinions and interests comprehensively. Additionally, APMS has significant potential in optimizing project performance, accelerating project processes, and reducing resource waste.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of over 1000