Article
Publication date: 25 March 2024

Purva Mhatre-Shah, Vidyadhar Gedam and Seema Unnikrishnan

The aim of this study is to understand the environmental benefits and economic savings associated with adoption of circular economy in the construction sector. The research…

Abstract

Purpose

The aim of this study is to understand the environmental benefits and economic savings associated with adoption of circular economy in the construction sector. The research findings will support different stakeholders and decision makers to develop business models based on responsible consumption of resources and build sustainable business models.

Design/methodology/approach

The research uses mixed methodology wherein inventory for life cycle assessment and life cycle costing for environmental and economic impacts is based on primary data using on-site visits for qualitative and quantitative data.

Findings

Different types of land transportation infrastructures are compared for their environmental impacts. It is found that bridges have the highest environmental impacts as compared to tunnels, roads and railways. Further, the results affirm the environmental and economic benefits of adopting circular economy practices.

Originality/value

This is one of a kind research that compares the environmental and economic tradeoffs of adopting circular economy in different types of land transportation infrastructures.

Details

Journal of Indian Business Research, vol. 16 no. 1
Type: Research Article
ISSN: 1755-4195

Keywords

Article
Publication date: 13 September 2022

Mohamed Nabil Houhou, Tamir Amari and Abderahim Belounar

This paper aims to investigate the responses of single piles and pile groups due to tunneling-induced ground movements in a two-layered soil system. The analyses mainly focus on…

135

Abstract

Purpose

This paper aims to investigate the responses of single piles and pile groups due to tunneling-induced ground movements in a two-layered soil system. The analyses mainly focus on the additional single pile responses in terms of bending moment, lateral deflection, axial force, shaft resistance and pile settlement. Subsequently, a series of parametric studies were carried out to better understand the responses of single piles induced by tunneling. To give further understanding regarding the pile groups, a 2 × 2 pile group with two different pile head conditions, namely, free and capped, was considered.

Design/methodology/approach

Using the PLAXIS three-dimensional (3D) software, a full 3D numerical modeling is performed to investigate the effects of ground movements caused by tunneling on adjacent pile foundations. The numerical model was validated using centrifuge test data found in the literature. The relevance of the 3D model is also judged by comparison with the 2D plane strain model using the PLAXIS 2D code.

Findings

The numerical test results reveal that tunneling induces significant displacements and internal forces in nearby piles. The magnitude and distribution of internal forces depend mainly on the position of the pile toe relative to the tunnel depth and the distance between the pile and the vertical axis of the tunnel. As the volume loss increases from 1% to 3%, the apparent loss of pile capacity increases from 11% to 20%. By increasing the pile length from 0.5 to 1.5 times, the tunnel depth, the maximum pile settlement and lateral deflection decrease by about 63% and 18%, respectively. On the other hand, the maximum bending moment and axial load increase by about 7 and 13 times, respectively. When the pile is located at a distance of 2.5 times the tunnel diameter (Dt), the additional pile responses become insignificant. It was found that an increase in tunnel depth from 1.5Dt to 2.5Dt (with a pile length of 3Dt) increases the maximum lateral deflection by about 420%. Regarding the interaction between tunneling and group of piles, a positive group effect was observed with a significant reduction of the internal forces in rear piles. The maximum bending moment of the front piles was found to be higher than that of the rear piles by about 47%.

Originality/value

Soil is a complex material that shows differently in primary loading, unloading and reloading with stress-dependent stiffness. This general behavior was not possibly being accounted for in simple elastic perfectly plastic Mohr–Coulomb model which is often used to predict the behavior of soils. Thus, in the present study, the more advanced hardening soil model with small-strain stiffness (HSsmall) is used to model the non-linear stress–strain soil behavior. Moreover, unlike previous studies THAT are usually based on the assumption that the soil is homogeneous and using numerical methods by decoupled loadings under plane strain conditions; in this study, the pile responses have been exhaustively investigated in a two-layered soil system using a fully coupled 3D numerical analysis that takes into account the real interactions between tunneling and pile foundations. The paper presents a distinctive set of findings and insights that provide valuable guidance for the design and construction of shield tunnels passing through pile foundations.

Article
Publication date: 13 December 2022

Zhenhua Luo, Juntao Guo, Jianqiang Han and Yuhong Wang

Prefabricated technology is gradually being applied to the construction of subway stations due to its characteristic of mechanization. However, the prefabricated subway station in…

Abstract

Purpose

Prefabricated technology is gradually being applied to the construction of subway stations due to its characteristic of mechanization. However, the prefabricated subway station in China is in the initial stage of development, which is prone to construction safety issues. This study aims to evaluate the construction safety risks of prefabricated subway stations in China and formulate corresponding countermeasures to ensure construction safety.

Design/methodology/approach

A construction safety risk evaluation index system for the prefabricated subway station was established through literature research and the Delphi method. Furthermore, based on the structure entropy weight method, matter-element theory and evidence theory, a hybrid evaluation model is developed to evaluate the construction safety risks of prefabricated subway stations. The basic probability assignment (BPA) function is obtained using the matter-element theory, the index weight is calculated using the structure entropy weight method to modify the BPA function and the risk evaluation level is determined using the evidence theory. Finally, the reliability and applicability of the evaluation model are verified with a case study of a prefabricated subway station project in China.

Findings

The results indicate that the level of construction safety risks in the prefabricated subway station project is relatively low. Man risk, machine risk and method risk are the key factors affecting the overall risk of the project. The evaluation results of the first-level indexes are discussed, and targeted countermeasures are proposed. Therefore, management personnel can deeply understand the construction safety risks of prefabricated subway stations.

Originality/value

This research fills the research gap in the field of construction safety risk assessment of prefabricated subway stations. The methods for construction safety risk assessment are summarized to establish a reliable hybrid evaluation model, laying the foundation for future research. Moreover, the construction safety risk evaluation index system for prefabricated subway stations is proposed, which can be adopted to guide construction safety management.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 24 November 2022

Xianbo Zhao

This study collected the bibliographic data of 2034 journal articles published in 2000–2021 from Web of Science (WoS) core collection database and adopted two bibliometric…

514

Abstract

Purpose

This study collected the bibliographic data of 2034 journal articles published in 2000–2021 from Web of Science (WoS) core collection database and adopted two bibliometric analysis methods, namely historiography and keyword co-occurrence, to identify the evolution trend of construction risk management (CRM) research topics.

Design/methodology/approach

CRM has been a key issue in construction management research, producing a big number of publications. This study aims to undertake a review of the global CRM research published from 2000 to 2021 and identify the evolution of the research topics relating to CRM.

Findings

This study found that risk analysis methods have shifted from simply ranking risks in terms of their relative importance or significance toward examining the interrelationships among risks, and that the objects of CRM research have shifted from generic construction projects toward specified types of construction projects (e.g. small projects, underground construction projects, green buildings and prefabricated projects). In addition, researchers tend to pay more attention to an individual risk category (e.g. political risk, safety risk and social risk) and integrate CRM into cost, time, quality, safety and environment management functions with the increasing adoption of various information and communication technologies.

Research limitations/implications

This study focused on the journal articles in English in WoS core collection database only, thus excluding the publications in other languages, not indexed by WoS and conference proceedings. In addition, the historiography focused on the top documents in terms of document strength and thus ignored the role of the documents whose strengths were a little lower than the threshold.

Originality/value

This review study is more inclusive than any prior reviews on CRM and overcomes the drawbacks of mere reliance on either bibliometric analysis results or subjective opinions. Revealing the evolution process of the CRM knowledge domain, this study provides an in-depth understanding of the CRM research and benefits industry practitioners and researchers.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 9 September 2022

Siavash Ghorbany, Saied Yousefi and Esmatullah Noorzai

Being an efficient mechanism for the value of money, public–private partnership (PPP) is one of the most prominent approaches for infrastructure construction. Hence, many…

334

Abstract

Purpose

Being an efficient mechanism for the value of money, public–private partnership (PPP) is one of the most prominent approaches for infrastructure construction. Hence, many controversies about the performance effectiveness of these delivery systems have been debated. This research aims to develop a novel performance management perspective by revealing the causal effect of key performance indicators (KPIs) on PPP infrastructures.

Design/methodology/approach

The literature review was used in this study to extract the PPPs KPIs. Experts’ judgment and interviews, as well as questionnaires, were designed to obtain data. Copula Bayesian network (CBN) has been selected to achieve the research purpose. CBN is one of the most potent tools in statistics for analyzing the causal relationship of different elements and considering their quantitive impact on each other. By utilizing this technique and using Python as one of the best programming languages, this research used machine learning methods, SHAP and XGBoost, to optimize the network.

Findings

The sensitivity analysis of the KPIs verified the causation importance in PPPs performance management. This study determined the causal structure of KPIs in PPP projects, assessed each indicator’s priority to performance, and found 7 of them as a critical cluster to optimize the network. These KPIs include innovation for financing, feasibility study, macro-environment impact, appropriate financing option, risk identification, allocation, sharing, and transfer, finance infrastructure, and compliance with the legal and regulatory framework.

Practical implications

Identifying the most scenic indicators helps the private sector to allocate the limited resources more rationally and concentrate on the most influential parts of the project. It also provides the KPIs’ critical cluster that should be controlled and monitored closely by PPP project managers. Additionally, the public sector can evaluate the performance of the private sector more accurately. Finally, this research provides a comprehensive causal insight into the PPPs’ performance management that can be used to develop management systems in future research.

Originality/value

For the first time, this research proposes a model to determine the causal structure of KPIs in PPPs and indicate the importance of this insight. The developed innovative model identifies the KPIs’ behavior and takes a non-linear approach based on CBN and machine learning methods while providing valuable information for construction and performance managers to allocate resources more efficiently.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 17 December 2021

Samuel Adeniyi Adekunle, Clinton Ohis Aigbavboa, Obuks Ejohwomu, Emmanuel Abiodun Adekunle and Wellington Didibhuku Thwala

The construction industry has been traditionally referred to as slow when it comes to technological transformation. This study aims to investigate and present a scorecard of the…

2066

Abstract

Purpose

The construction industry has been traditionally referred to as slow when it comes to technological transformation. This study aims to investigate and present a scorecard of the construction industry in the past decade, the paper adopted Bibliometrics. The study identified the various digital transformation (DT) aspects in the construction industry and future research directions are also identified.

Design/methodology/approach

To achieve the aim of this research, an inductive approach was adopted through a grounded theory strategy. Secondary data was retrieved from the Scopus database and analysed using Biblioshiny and VOSviewer. The data was retrieved through specific keywords related to the study focus.

Findings

The study also proposed a balanced flow model for DT discussion in the construction industry. DT in the construction industry disrupts every aspect of the industry, albeit at different rates due to the existing barriers; hence, the study identified areas that require further research. It, thus, provides a theoretical and practical basis for researchers and practitioners alike.

Originality/value

The study reviewed the DT research discuss in the construction industry. It is worthy of note that this is the first study that analyses the DT of the construction industry in the past decade.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 1
Type: Research Article
ISSN: 1726-0531

Keywords

Open Access
Article
Publication date: 23 December 2022

Rouzbeh Shabani, Tobias Onshuus Malvik, Agnar Johansen and Olav Torp

Uncertainty management (UM) in projects has been a point of attention for researchers for many years. Research on UM has mainly been aimed at uncertainty analyses in the front-end…

2056

Abstract

Purpose

Uncertainty management (UM) in projects has been a point of attention for researchers for many years. Research on UM has mainly been aimed at uncertainty analyses in the front-end and managing uncertainty in the construction phase. In contrast, UM components in the design phase have received less attention. This research aims to improve knowledge about the key components of UM in the design phase of large road projects.

Design/methodology/approach

This study adopted a literature review and case study. The literature review was used to identify relevant criteria for UM. These criteria helped to design the interview guide. Multiple case study research was conducted, and data were collected through document study and interviews with project stakeholders in two road projects. Each case's owners, contractors and consultants were interviewed individually.

Findings

The data analysis obtained helpful information on the involved parties, process and exploit tools and techniques during the design phase. Johansen's (2015) framework [(a) human and organisation, (b) process and (c) tools and techniques)] was completed and developed by identifying relevant criteria (such as risk averse or risk-taker, culture and documentation level) for each component. These criteria help to measure UM performance. The authors found that owners and contractors are major formal UM actors, not consultants. Empirical data showed the effectiveness of Web-based tools in UM.

Research limitations/implications

The studied cases were Norwegian, and this study focussed on uncertainties in the project's design phase. Relevant criteria did not cover all the criteria for evaluating the performance of UM. Qualitative evaluation of criteria allows further quantitative analysis in the future.

Practical implications

This paper gave project owners and managers a better understanding of relevant criteria for measuring UM in the owners and managers' projects. The paper provides policy-makers with a deeper understanding of creating rigorous project criteria for UM during the design phase. This paper also provides a guideline for UM in road projects.

Originality/value

This research gives a holistic evaluation of UM by noticing relevant criteria and criteria's interconnection in the design phase.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 21 November 2023

Ping Li, Rui Xue, Sai Shao, Yuhao Zhu and Yi Liu

In recent years, railway systems worldwide have faced challenges such as the modernization of engineering projects, efficient management of intelligent digital railway equipment…

1291

Abstract

Purpose

In recent years, railway systems worldwide have faced challenges such as the modernization of engineering projects, efficient management of intelligent digital railway equipment, rapid growth in passenger and freight transport demands, customized transport services and ubiquitous transport safety. The transformation toward intelligent digital transformation in railways has emerged as an effective response to the formidable challenges confronting the railway industry, thereby becoming an inevitable global trend in railway development.

Design/methodology/approach

This paper, therefore, conducts a comprehensive analysis of the current state of global railway intelligent digital transformation, focusing on the characteristics and applications of intelligent digital transformation technology. It summarizes and analyzes relevant technologies and applicable scenarios in the realm of railway intelligent digital transformation, theoretically elucidating the development process of global railway intelligent digital transformation and, in practice, providing guidance and empirical examples for railway intelligence and digital transformation.

Findings

Digital and intelligent technologies follow a wave-like pattern of continuous iterative evolution, progressing from the early stages, to a period of increasing attention and popularity, then to a phase of declining interest, followed by a resurgence and ultimately reaching a mature stage.

Originality/value

The results offer reference and guidance to fully leverage the opportunities presented by the latest wave of the digitalization revolution, accelerate the overall upgrade of the railway industry and promote global collaborative development in railway intelligent digital transformation.

Details

Railway Sciences, vol. 2 no. 4
Type: Research Article
ISSN: 2755-0907

Keywords

Article
Publication date: 15 November 2022

Esra Dobrucali, Sevilay Demirkesen, Emel Sadikoglu, Chengyi Zhang and Atilla Damci

Construction safety is heavily affected by using new technologies in this growing trend of technology adoption. Especially, safety performance is enhanced through the utilization…

1526

Abstract

Purpose

Construction safety is heavily affected by using new technologies in this growing trend of technology adoption. Especially, safety performance is enhanced through the utilization of some effective technologies such as artificial intelligence, virtual reality, BIM and wearable devices. Therefore, the main purpose of this study is to investigate the influence of emerging technologies on construction safety performance and quantify the relationship between those. The proposed components of emerging technologies are BIM, GIS, VR, RFID, AI, ML, eye tracking and serious games and wearable devices, whereas the dimensions of construction safety performance are safety planning, safety training, safety inspection and monitoring, safety audits and reviews and safety leadership.

Design/methodology/approach

A structural model was composed consisting of emerging technologies and safety performance indicators. Then, a questionnaire was designed and administered to construction professionals, and data from 167 projects were analyzed using structural equation modeling. The data were analyzed by using software, called SPSS AMOS.

Findings

The analysis of the structural model proves that there is a positive and significant relationship between emerging technologies and construction safety performance. Moreover, the factor loadings for each factor were found to be high indicating a good representation of the construct by the components developed. Among the technologies, BIM, robotics and automation, AI and wearable devices were detected to be the most significant technologies in terms of impacting safety performance.

Originality/value

The study contributes to the body of knowledge in that it develops a conceptual framework consisting of specific technologies in terms of emerging technologies, reveals the impact of such technologies on safety performance and proposes several tools and strategies for enabling effective safety management along the project lifecycle. Industry practitioners may benefit from the framework developed by adopting such technologies to enhance their safety performance on construction projects.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 28 July 2022

Xiaoyan Jiang, Sai Wang, Yong Liu, Bo Xia, Martin Skitmore, Madhav Nepal and Amir Naser Ghanbaripour

With the increasing complexity of public–private partnership (PPP) projects, the amount of data generated during the construction process is massive. This paper aims to develop a…

Abstract

Purpose

With the increasing complexity of public–private partnership (PPP) projects, the amount of data generated during the construction process is massive. This paper aims to develop a new information management method to cope with the risk problems involved in dealing with such data, based on domain ontologies of the construction industry, to help manage PPP risks, share and reuse risk knowledge.

Design/methodology/approach

Risk knowledge concepts are acquired and summarized through PPP failure cases and an extensive literature review to establish a domain framework for risk knowledge using ontology technology to help manage PPP risks.

Findings

The results indicate that the risk ontology is capable of capturing key concepts and relationships involved in managing PPP risks and can be used to facilitate knowledge reuse and storage beneficial to risk management.

Research limitations/implications

The classes in the risk knowledge ontology model constructed in this research do not yet cover all the information in PPP project risks and need to be further extended. Moreover, only the framework and basic methods needed are developed, while the construction of a working ontology model and the relationship between implicit and explicit knowledge is a complicated process that requires repeated modifications and evaluations before it can be implemented.

Practical implications

The ontology provides a basis for turning PPP risk information into risk knowledge to allow the effective sharing and communication of project risks between different project stakeholders. It can also have the potential to help reduce the dependence on subjectivity by mining, using and storing tacit knowledge in the risk management process.

Originality/value

The apparent suitability of the nine classes of PPP risk knowledge (project model, risk type, risk occurrence stage, risk source, risk consequence, risk likelihood, risk carrier, risk management measures and risk case) is identified, and the proposed construction method and steps for a complete domain ontology for PPP risk management are unique. A combination of criteria- and task-based evaluations is also developed for assessing the PPP risk ontology for the first time.