Article
Publication date: 5 February 2018

Julius Akotia and Alex Opoku

The purpose of this paper is to explore the key practitioners’ level of involvement in the delivery of sustainable regeneration projects in the UK. Practitioners’ level of…

Abstract

Purpose

The purpose of this paper is to explore the key practitioners’ level of involvement in the delivery of sustainable regeneration projects in the UK. Practitioners’ level of involvement is a major factor that has and continues to determine the delivery of sustainability outcomes of regeneration projects.

Design/methodology/approach

The paper adopted a qualitative study that obtained data from 21 key practitioners through semi-structured interviews in exploring practitioners’ level of involvement in the delivery of sustainable regeneration projects in the UK. The semi-structured interviews are conducted with seven practitioners, each from the three construction organisations selected through a purposive sampling approach for the study.

Findings

The findings identify varied levels of involvement of the key practitioners at the three delivery stages – early, construction and post-construction of the projects. The findings further reveal that clients’ representatives, commercial managers and architects are the most frequently involved practitioners during the early stages of the projects. The findings also indicate that practitioners who have sustainability assigned to their roles and their responsibilities, such as sustainability managers, are the least involved in all the three delivery stages of the projects.

Research limitations/implications

The study involves interview with 21 practitioners from three organisations delivering sustainable regeneration projects; hence, this could limit the generalisation of the research findings. However, the findings of this study could serve as a useful source of information for the further study in this area.

Practical implications

The paper is of the view that the level of key practitioners’ involvement in the delivery of the projects will have an impact on their knowledge and will determine how sustainability benefits are promoted and delivered from the projects.

Originality/value

Although some studies have been carried out on practitioners’ engagement in the delivery of “normal” construction projects, none has focussed on practitioners’ levels of involvement in sustainable regeneration projects. Hence, this study has brought to the fore how the key practitioners tasked with the responsibilities of delivering sustainability benefits of regeneration projects have been involved (at various levels of the project life cycle) in the delivery of these projects.

Details

Journal of Facilities Management, vol. 16 no. 1
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 5 February 2018

Ayman Ahmed Ezzat Othman and Nermeen Mohamed Amin Abdelwahab

The purpose of this paper is to develop a framework integrating risk management (RM) into the architectural design process (ADP) as an approach for delivering sustainable

Abstract

Purpose

The purpose of this paper is to develop a framework integrating risk management (RM) into the architectural design process (ADP) as an approach for delivering sustainable construction projects.

Design/methodology/approach

A research methodology, which consisted of literature review and field study, is designed to accomplish four objectives. First, to provide a comprehensive literature review of the concepts of sustainability, ADP and RM. Second, to present and synthesis the results of two relevant studies focused on identifying, quantifying and classifying the risks associated with ADP; and investigating the perception and application of Egyptian architectural design firms (ADFs) towards integrating RM into ADP as an approach for delivering sustainable construction projects. Third, to develop a framework that integrates RM into ADP towards delivering sustainable construction projects. Finally, to draw conclusions and recommendations to improve the practice of delivering sustainable construction projects among ADFs, construction professionals and governmental authorities.

Findings

ADP is a fundamental phase of the construction process because the decisions adopted during this phase affect the project performance throughout its life cycle. While RM is widely applied in different sectors of the construction industry, its application in ADP received scant attention in construction literature. The research identified 18 key risks that affect the sustainable delivery of construction projects during ADP. The architect, the client and the project manager are the highest ranked responsible parties for the occurrence of these key risks. The field study highlighted the need to develop a framework to facilitate integrating RM into ADP.

Research limitations/implications

This paper focused only on the integration of RM into ADP.

Originality/value

The conducted literature review and field study provided an in-depth understanding of the key risks that affect the sustainable delivery of construction projects during ADP. Through its five stages, the proposed framework is expected to serve as a foundation for integrating RM into ADP as an approach for delivering sustainable projects. This ideology has received scant attention in construction literature. The developed framework represents a synthesis that is novel and creative in thought and adds value to the knowledge in a manner that has not previously occurred.

Details

Journal of Engineering, Design and Technology, vol. 16 no. 1
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 19 December 2022

Dinçer Aydın and Esma Mıhlayanlar

Many parameters influence the success of sustainable projects (SPs) in the architecture–engineering–construction. One of these important parameters is the project delivery

Abstract

Purpose

Many parameters influence the success of sustainable projects (SPs) in the architecture–engineering–construction. One of these important parameters is the project delivery attributes (PDA), which are influenced by the project delivery system (PDS) while affecting the selection of it. This study aims to evaluate the significance of PDAs in influencing both the performance and success of SPs in Turkey, where the interest in SPs is high.

Design/methodology/approach

The impact of PDAs was determined by applying the two-round Delphi method with a semistructured interview involving the main stakeholders of a construction project, like owners, designers, contractors and consultants who played active roles in SPs, as well as academics to theoretically evaluate the issue. The significance of PDAs was assessed using the relative importance index, and the results were validated using the interrater agreement analysis.

Findings

The study identified key PDAs impacting SPs as owner character, commitment and motivation; simulation and energy modelling; and timing of stakeholders/early involvement.

Originality/value

The investigation of the significance of the PDAs is a lesser-studied context. Therefore, a research framework that enables an effective set of methods for solving the sectoral problems of PDAs that have impacts on SPs has been proposed. The framework is expected to open new opportunities for the generation and regulation of the PDSs for SPs. The findings will provide valuable insights to project stakeholders, particularly owners, local authorities and policymakers to assess which PDAs have a greater impact on sustainability performance when setting PDSs in SPs in other developing countries.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 18 August 2021

Marios Stanitsas and Konstantinos Kirytopoulos

This study aims to investigate the underlying factors that give rise to the set of sustainability indicators which are used for the implementation of sustainable construction…

Abstract

Purpose

This study aims to investigate the underlying factors that give rise to the set of sustainability indicators which are used for the implementation of sustainable construction projects and eventually the production of sustainable built assets.

Design/methodology/approach

To accomplish the purpose of this research, an online questionnaire survey was administered to a sample of 200 experts. By employing the statistical method of exploratory factor analysis (EFA), five distinct dimensions (factors) of stakeholders' attitudes were revealed.

Findings

The findings indicate that the sustainability indicators are based on five underlying factors, namely (1) sustainable competitiveness; (2) stakeholder engagement; (3) sustainable economic growth; (4) social sustainability; and (5) resource conservation and environmental policy.

Research limitations/implications

More studies would be welcome to verify the underlying factors revealed in this paper.

Practical implications

The knowledge of the underlying factors enables senior management to maintain a balance of choices during the project management (PM) phase in order to implement and deliver sustainable construction projects. Furthermore, the findings deepen the understanding toward sustainable PM practices by providing insights on its core attributes.

Originality/value

As a theoretical contribution to knowledge, this study enhances the body of knowledge by revealing the underlying factors that give rise to the predefined set of the 82 sustainability indicators which are used to enable sustainable construction projects. In practice, the findings aid senior management in adopting strategies that enhance the delivery of sustainable construction projects.

Details

Built Environment Project and Asset Management, vol. 12 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 28 October 2014

Maria-Angeliki Zanni, Robby Soetanto and Kirti Ruikar

The purpose of this research is to develop a building information modelling (BIM)-enabled sustainable design process model that identifies critical decisions actions in the design…

2805

Abstract

Purpose

The purpose of this research is to develop a building information modelling (BIM)-enabled sustainable design process model that identifies critical decisions actions in the design process along with the information and level of detail that facilitate an informed and timely decision. Building performance analysis is usually performed after the design and construction documents are produced, resulting in lost opportunities.

Design/methodology/approach

A number of research methods have been adopted; these include extensive literature review and 11 in-depth exploratory interviews with industry practitioners (sustainable building design experts, early BIM adopters).

Findings

Project delivery methods have a significant effect on the sustainable outcome of buildings. The development of a structured process can assist sustainable design practice among building professionals. Learning from implemented projects, that have utilised BIM processes, facilitates the scope of creating this process and advises future projects to prevent failures. Process mapping is essential to streamline the process, support key project processes and help the design team manage their own responsibilities and deliverables required by them.

Originality/value

The identification of the gap and the need for a structured process for sustainable building design for BIM execution is discussed. The synergies that exist between BIM, building performance modelling, Building Research Establishment’s Environmental Assessment Method assessment and the Royal Institute of British Architects Plan of Work are shown. The effect that project delivery has on sustainable design outcome has been established. A coordinated collaborative design process model is presented based on the findings from interviewing early adopters.

Article
Publication date: 6 June 2020

Atle Engebø, Ole Jonny Klakegg, Jardar Lohne and Ola Lædre

To achieve the shift towards sustainable construction the industry must change the project delivery methods used. Therefore, this paper reports on a high-performance building…

1124

Abstract

Purpose

To achieve the shift towards sustainable construction the industry must change the project delivery methods used. Therefore, this paper reports on a high-performance building project that implemented a collaborative project delivery method through the examination of the following research questions: RQ1: What were the most important contractual, cultural and organisational elements studied in the collaborative project delivery method? RQ2: What were the effects of the studied elements?

Design/methodology/approach

A longitudinal case study approach was adopted. As for means of data collection, a document review, semi-structured interviews, and observations was conducted. A total of 20 observations (App. 80 h, 175 pages of notes) and 12 interviews (App. 20 h, 100 pages of notes) with project participants was conducted.

Findings

The analysis indicates that if attention is paid to task, team and individual needs through contractual, cultural and organisational elements, this will affect the development of an integrated team.

Research limitations/implications

We demonstrate that the effects of the elements are shown through their achievement in creating and sustaining an integrated team of inter-organisational participants working in a collaborative environment.

Practical implications

It provides a better understanding of how a collaborative project delivery method for the design phase emphasises team integration. We demonstrate that while the principal sets the contractual boundaries by deciding the contractual elements, the agent should be intentional in the selection and use of organizational and cultural elements.

Originality/value

The paper suggests that it is not enough to just have contractual elements implemented. Consequently, this insight suggests that managers should be attentive to the untapped potential that lies within organisational and cultural elements.

Details

International Journal of Managing Projects in Business, vol. 13 no. 6
Type: Research Article
ISSN: 1753-8378

Keywords

Book part
Publication date: 19 October 2022

Ayodeji E. Oke

Sustainability of construction project is incomplete without putting into consideration the health and safety of the workforce and other stakeholders working on a project

Abstract

Sustainability of construction project is incomplete without putting into consideration the health and safety of the workforce and other stakeholders working on a project environment. One of the criteria used to evaluate the performance of a sustainable construction project is health. This chapter gives an insight on health as a yardstick for measuring the success of a sustainable construction project, with respect to the health of the personnel working on a project, meaning of health, what constitutes health and health in construction. It also buttresses value of the health of workforce in construction and the need to see health as an important project performance index, as a healthy construction manpower on a construction project will determine and translate the quick delivery of construction project and on time.

Article
Publication date: 9 September 2022

Innocent Chigozie Osuizugbo and Olumide Afolarin Adenuga

This study aimed at determining the decisive factors for achieving sustainable procurement in construction projects.

Abstract

Purpose

This study aimed at determining the decisive factors for achieving sustainable procurement in construction projects.

Design/methodology/approach

Questionnaire survey of principal stakeholders involved in construction project delivery within client, consulting and contracting organisations in Nigeria were conducted to assess stakeholders' perspectives on the decisive factors for achieving sustainable procurement in construction projects using importance weights. A total of 243 questionnaires were distributed and a response rate of 51% (123 questionnaires were adequately filled and returned) was achieved. Descriptive and inferential statistics were utilised in analysing elicited data.

Findings

The results from data analysis showed that “satisfaction – including workforce satisfaction and user satisfaction”, “value for money” and “creating a healthy, nontoxic environment – including high indoor air quality” were the top most three decisive factors for achieving sustainable procurement in construction projects in Nigeria.

Originality/value

An understanding of these decisive factors can help principal stakeholders in the construction industry of developing countries to facilitate the development of methods required in supporting the adoption of sustainable procurement practice.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 27 February 2024

Alex Opoku, Kelvin Saddul, Georgios Kapogiannis, Godwin Kugblenu and Judith Amudjie

This paper explores project managers' (PMs') role in contributing to and achieving sustainability within construction projects, particularly focusing on Sustainable Development…

Abstract

Purpose

This paper explores project managers' (PMs') role in contributing to and achieving sustainability within construction projects, particularly focusing on Sustainable Development Goal (SDG) 11.

Design/methodology/approach

Semi-structured interviews were conducted with 15 PMs working with construction firms in the UK. Thematic analysis was also performed on the qualitative data retrieved using the NVivo software.

Findings

The study’s findings revealed that PMs working on construction projects considered various sustainable construction processes in attempts to solve problems with traditional construction technology. Furthermore, it was revealed that the PM’s role was key in achieving the SDGs in general and SDG 11 in particular through the process of perfecting the client brief, ensuring the client’s financial stability and creating an environment of teamwork. In terms of specific competencies, sustainability leadership and sustainable innovative capability were revealed to suggest that a PM is the leader of change.

Originality/value

The study highlights the essential role of the PM in delivering sustainable construction projects as part of the drive to achieve SDG 11. The study impacts the construction industry in developing strategies and training programs that build PMs' competencies and skills for contributing to the world we want.

Details

International Journal of Managing Projects in Business, vol. 17 no. 2
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 29 December 2023

Taofeeq D. Moshood, James O.B. Rotimi and Shahzad Wajiha

The purpose of this study is to get a clearer knowledge of the reasons for, approaches to and challenges associated with integrating sustainable development concerns into pipeline…

Abstract

Purpose

The purpose of this study is to get a clearer knowledge of the reasons for, approaches to and challenges associated with integrating sustainable development concerns into pipeline construction projects in New Zealand. To achieve this, this study delves deeply into sustainable construction to understand the reasons behind and incorporate sustainable development trials into their newly established product management and development procedure. As a result, this study looks at identifying key elements of sustainable construction practices and various interpretations of sustainability in the construction industry; offering a strategy for incorporating sustainable construction practices into the pipeline construction project in New Zealand; and benefits and difficulties that the construction industry encounters when implementing sustainable construction. Finally, a framework is developed to help in understanding the issues and potential solutions for integrating sustainable building methods into the pipeline construction project in New Zealand.

Design/methodology/approach

This study followed a four-step method (Figure 1), beginning with the identification of the data, continuing with the first screening of the data, determining eligibility and, finally, including the data. This data collection is being done to provide knowledge and direction for further research. Data were collected from various websites on the Web of Science and from Scopus databases. Additionally, data were gathered with the assistance of aggregator databases such as Scopus (scopus.com) and publishing databases such as Elsevier (sciencedirect.com), Inderscience, Taylor and Francis (tandfonline.com), Emerald Insight (emeraldinsight.com) and Google Scholar. These databases have been considered by a number of scholars to be reputable databases.

Findings

This research provided a thorough description of the key justifications for sustainable construction. This study demonstrated how the idea worked in practice by reviewing the literature on the relevance and analysis of sustainability in construction. This body of research identified crucial components of sustainable construction techniques and varied interpretations of sustainability in the construction industry. To better grasp the current application considerations in the construction sector, it also offered literature on sustainable construction methods. To determine the most effective strategy to make certain adjustments to the current construction processes, the literature also includes a wide range of sustainability-related topics in both developed and developing country contexts. This study also demonstrated the many perspectives and strategies for sustainable behaviors. Because the purpose of this study was to develop a strategy for implementing sustainable construction in New Zealand, it was of the utmost importance to shed light on the most well-known and prominent sustainable construction applications from across the world. The output of this aim provided the literature on construction practices to acquire insight into the ongoing conversations on sustainable practices and systems in the construction industry. This was done to obtain insight into the existing talks.

Originality/value

This research's contribution to the body of knowledge is demonstrated by the fact that this study has led to a better understanding of sustainable construction practices in the construction industry as well as the identification of the most significant challenges that businesses, organizations, educators and policymakers must face to improve their ability to put these strategies into practice. This research has provided a solid foundation for future research that aims to advance knowledge in this field by providing options for future research to evaluate the influence that the approach has had on enhancing the implementation of sustainable construction. Additionally, this study presents options for future research to evaluate the influence the approach has had on improving the implementation of sustainable construction. The successful completion of the research aim in the more traditional forms of higher education in the built environment can contribute to a better representation of new trends in the practice area associated with expanding and improving the construction industry sustainably.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords