Search results

1 – 10 of 53
Open Access
Article
Publication date: 13 October 2023

Roland Hellberg

A deteriorating security situation and an increased need for defence equipment calls for new forms of collaboration between Armed Forces and the defence industry. This paper aims…

1134

Abstract

Purpose

A deteriorating security situation and an increased need for defence equipment calls for new forms of collaboration between Armed Forces and the defence industry. This paper aims to investigate the ways in which the accelerating demand for increased security of supply of equipment and supplies to the Armed Forces requires adaptability in the procurement process that is governed by laws on public procurement (PP).

Design/methodology/approach

This paper is based on a review of current literature as well as empirical data obtained through interviews with representatives from the Swedish Defence Materiel Administration and the Swedish defence industry.

Findings

Collaboration with the globalized defence industry requires new approaches, where the PP rules make procurement of a safe supply of defence equipment difficult.

Research limitations/implications

The study's empirical data and findings are based on the Swedish context. In order to draw more general conclusions in a defence context, the study should be expanded to cover more nations.

Practical implications

The findings will enable the defence industry and the procurement authorizations to better understand the requirements of Armed Forces, and how to cooperate under applicable legal and regulatory requirements.

Originality/value

The paper extends the extant body of academic knowledge of the security of supply into the defence sector. It serves as a first step towards articulating a call for new approaches to collaboration in defence supply chains.

Details

Journal of Defense Analytics and Logistics, vol. 7 no. 2
Type: Research Article
ISSN: 2399-6439

Keywords

Open Access
Article
Publication date: 14 August 2023

Minh Ngoc Le and Hoang Long Chu

The authors investigate the impact of standards compliance on the participation in the global value chain and labour value-added of Vietnam’s small and medium-sized enterprises…

Abstract

Purpose

The authors investigate the impact of standards compliance on the participation in the global value chain and labour value-added of Vietnam’s small and medium-sized enterprises (SMEs).

Design/methodology/approach

The authors use a three-period panel dataset of SMEs combined with Vietnam’s Provincial Competitiveness Index. The authors also use multiple econometric models; and with each model, the authors include all independent variables that are available from the study's data and that are suggested by the literature.

Findings

The authors find that standards compliance by Vietnam’s SMEs improved their participation in the global value chain via subcontracts with FDI multinational firms. The authors also find that standards compliance improved the value-added of labour in Vietnam’s SMEs, which is robust to the choice of econometric models.

Practical implications

The study's results suggest that better outcomes for firms and society will be possible if standards are recognised and respected.

Originality/value

This paper complements scant literature on the impact of standards compliance on global value chain participation via subcontracting work and labour value-added, especially in developing countries.

Details

Fulbright Review of Economics and Policy, vol. 3 no. 2
Type: Research Article
ISSN: 2635-0173

Keywords

Open Access
Article
Publication date: 19 April 2024

Thi Bich Tran and Duy Khoi Nguyen

This study investigates the optimum size for manufacturing firms and the impact of subcontracting on firms' likelihood of achieving their optimal scale in Vietnam.

Abstract

Purpose

This study investigates the optimum size for manufacturing firms and the impact of subcontracting on firms' likelihood of achieving their optimal scale in Vietnam.

Design/methodology/approach

Using data from the enterprise census in 2017 and 2021, the paper first estimates the production function to identify the optimum firm size for manufacturing firms and then, applies the logit model to investigate factors associated with the optimal firm size.

Findings

The study reveals that medium-sized firms exhibit the highest level of productivity. Nevertheless, a consistent trend emerges, indicating that nearly 90% of manufacturing firms in Vietnam operated below their optimal scale in both 2017 and 2021. An analysis of the impact of subcontracting on firms' likelihood to achieve their optimal scale emphasizes its crucial role, especially for foreign firms, exerting an influence nearly five times greater than that of the judiciary system.

Practical implications

The paper's findings offer crucial policy implications, suggesting that initiatives aimed at enhancing the overall productivity of the manufacturing sector should prioritise facilitating contract arrangements to encourage firms to reach their optimal size. These insights are also valuable for other countries with comparable firm size distributions.

Originality/value

This paper provides the first empirical evidence on the relationship between firm size and productivity as well as the role of subcontracting in firms' ability to reach their optimal scale in a country with a right-skewed distribution of firm sizes.

Details

Journal of Economics and Development, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1859-0020

Keywords

Open Access
Article
Publication date: 27 January 2023

Farooq Ali and Harri Haapasalo

This article aims to address the confusion related to the meanings of interorganisational cooperation, control, coordination and collaboration in collaborative projects by…

3397

Abstract

Purpose

This article aims to address the confusion related to the meanings of interorganisational cooperation, control, coordination and collaboration in collaborative projects by developing a conceptual framework. From this, the authors aim to describe the links among these concepts in terms of development levels of stakeholder relationships. In addition, the authors aim to identify challenges and preconditions in relation to developing relationships at different levels.

Design/methodology/approach

The authors have adopted the directed approach of qualitative content analysis method to validate and extend the conceptual framework of this study. The context of this study is a large hospital construction project located in northern Finland.

Findings

The findings of this study suggest that collaboration is a multilevel process of active engagement of multiple stakeholders. These stakeholders must have a high degree of shared understanding in terms of cooperation, control and coordination to achieve the mutually desired outcomes. This study also identifies the challenges that project stakeholders could face in developing collaborative relationships and propose preconditions for the same.

Practical implications

This study provides a better understanding for project managers to manage interorganisational collaborative construction projects successfully. The outcome of this research would be beneficial to project management team to deliver dispute-free construction projects.

Originality/value

Existing practical research on the development of relationships at different levels in collaborative construction projects is limited. This study offers a framework for the same which is validated in a real-life project.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 21 December 2021

Mirka Kans and Anders Ingwald

The purpose is to describe new business opportunities within the Swedish railway industry and to support the development of business models that corresponds with the needs and…

1936

Abstract

Purpose

The purpose is to describe new business opportunities within the Swedish railway industry and to support the development of business models that corresponds with the needs and requirements of Industry 4.0, here denoted as Service Management 4.0.

Design/methodology/approach

The study is an in-depth and descriptive case study of the Swedish railway system with specific focus on a railway vehicle maintainer. Public reports, statistics, internal documents, interviews and dialogues forms the basis for the empirical findings.

Findings

The article describes the complex business environment of the deregulated Swedish railway industry. Main findings are in the form of identified business opportunities and new business model propositions for one of the key actors, a vehicle maintainer.

Originality/value

The article provides valuable understanding of business strategy development within complex business environments and how maintenance related business models could be developed for reaching Service Management 4.0.

Details

Journal of Quality in Maintenance Engineering, vol. 29 no. 5
Type: Research Article
ISSN: 1355-2511

Keywords

Open Access
Article
Publication date: 4 August 2022

Christopher Amoah and Hlatshwayo Nkosazana

Contract risk management has become a critical mission, as contract issues may lead to a loss of vast amounts of money to parties involved or cause project failure. This study…

5115

Abstract

Purpose

Contract risk management has become a critical mission, as contract issues may lead to a loss of vast amounts of money to parties involved or cause project failure. This study sought to identify effective management strategies to mitigate construction contract issues that might emerge during construction.

Design/methodology/approach

A quantitative research approach was adopted for the study. Structured questionnaires made up of close-ended questions were distributed to construction professionals in South Africa via the SurveyMonkey platform. The data were then analysed using descriptive statistics.

Findings

The findings indicate that the critical sources of contract-related disputes are ambiguous definitions of the contract parties' scope of their rights and obligations, lack of precise arrangements regarding the calculation of contractual penalties for failure to meet the deadline, lack of detailed specification of the works and specific milestones, lack of provisions regulating changes to the project documentation during the construction stage, an excessive amount of contractual penalties on contractor's side and lack of provisions regarding the rules of performing additional and replacement works and their settlement. However, for these disputes to be effectively managed, strategies such as reduction uncertainties in project's phases, setting up contingency plans, construction guarantee, extension of time claims, payment guarantee, retention and escalation clause should be implemented by the parties involved.

Research limitations/implications

Even though the empirical study focused on construction professionals in South Africa, the findings could be applied to other countries outside of South Africa.

Practical implications

To effectively manage and prevent contract disputes from averting project failures and losses to parties involved in the contract, construction professionals need to be aware of strategies that must be implemented before and during the project execution. If well implemented, these strategies will help a construction project be successful and experience fewer contractual disputes.

Originality/value

The study has identified the knowledge gap concerning suitable contract risk management strategies available for implementation to effectively prevent any contract parties from losing money, time and project failure.

Details

International Journal of Building Pathology and Adaptation, vol. 41 no. 6
Type: Research Article
ISSN: 2398-4708

Keywords

Open Access
Article
Publication date: 25 April 2022

Vuyokazi Precious Camngca, Christopher Amoah and Emma Ayesu-Koranteng

The construction industry’s daily processes demand heavy data usage and communication between project participants to meet client requirements. Thus, the application of…

2213

Abstract

Purpose

The construction industry’s daily processes demand heavy data usage and communication between project participants to meet client requirements. Thus, the application of information technology in project implementation has been increasing in the construction sector (CS) lately. However, the same cannot be seen in public sectors responsible for implementing government projects in South Africa. This study aimed to investigate the causes and effects of the underutilisation of information communication technology (ICT) in the building section of a public sector in a municipality in South Africa.

Design/methodology/approach

A qualitative approach was adopted for the study, using a public sector in one of the municipalities as a case study. Face-to-face interviews were conducted among the building unit workers, using unstructured interview questions. The data collected were analysed using the ATLAS.ti software.

Findings

The findings indicate a lack of understanding of existing and newly available ICT software and hardware technology among staff within the building technology due to lack of digitalisation in construction projects implementation, inadequate system upgrades, lack of adequate ICT resources, lack of financial resources for internet and software application subscriptions and lack of ICT training leading. The issues mentioned above have led to the outsourcing of projects professionals, slow pace of electronic emails, untrained professionals, usage of different and unlicensed software, resulting in the underutilisation of ICT within the whole building section. This change also adversely affects all officials, especially the junior officials who have graduated using the most recent ICT technology during their studies.

Research limitations/implications

The building department of only one public sector was used for the study; therefore, the findings may not be generalisable. The case study public sector’s name is withheld for confidentiality purposes.

Practical implications

Adequate change management and continuous development, combined with the allocation of proper resources, would be necessary for all staff members. Enormous investments had to be made in the ICT equipment by providing a sufficient budget in the building section of the public sectors. The building section within public sectors should provide change management to all aged skills staff by attending seminars to learn new ICT technology applied within its work environment.

Originality/value

The study established the causes of the underutilisation of ICT in the CS, especially in the public work departments and municipalities, and how this contributes to service delivery.

Details

Journal of Facilities Management , vol. 22 no. 1
Type: Research Article
ISSN: 1472-5967

Keywords

Open Access
Article
Publication date: 16 April 2024

Keon-Hyung Ahn

This study aims to provide the main contents of the revision of the 2023 OECD Guidelines for Multinational Enterprises and suggest implications for the Korean government and…

Abstract

Purpose

This study aims to provide the main contents of the revision of the 2023 OECD Guidelines for Multinational Enterprises and suggest implications for the Korean government and multinational enterprises.

Design/methodology/approach

Following the brief history of the revision of OECD Guidelines for Multinational Enterprises, this study reviews and evaluates major substantive and procedural revisions of the 2023 OECD Guidelines, and then suggests countermeasures for Korean government and businesses.

Findings

The most significant substantive change of the 2023 revision is that expectations for environmental due diligence and disclosure obligations, including climate change and biodiversity, for multinational enterprises have been expanded and strengthened. Regarding procedural changes, the biggest change is the introduction of a basis rule for the National Contact Points for Responsible Business Conduct (NCPs for RBC) to judge each issue and a rule that the final statement must include follow-up details and deadlines, which is expected to strengthen the effectiveness of the NCP dispute resolution mechanism.

Originality/value

This study is the first academic paper to introduce major substantive and procedural revisions to the 2023 OECD Guidelines for Multinational Enterprises in Korea. This study also provides implications for the Korean government and companies following the 2023 revised OECD Guidelines for Multinational Enterprises as follows. First, the Korean government must establish a public–private partnership to closely communicate to prevent Korean companies from being harmed by failing to meet strengthening international Environment, Social and Governance (ESG) standards. In addition, Korean government should actively participate in ESG-related international forums, including the OECD, and strive to reflect the needs and interests of Korean companies. Second, the Korean NCP should strengthen its activities to prevent potential damage by expanding education and promotions for Korean businesses on related overseas legislative trends and NCP dispute case studies so that Korean companies can effectively deal with the strengthened ESG standards. Third, Korean multinational enterprises should preemptively establish an advanced ESG management system to seize new opportunities in the global supply chain previously concentrated in China and India in the process of reorganizing global supply chains according to the trend of strengthening ESG standards and the US value alliance strategy.

Details

Journal of International Logistics and Trade, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1738-2122

Keywords

Open Access
Article
Publication date: 12 July 2023

Hakan Karaosman and Donna Marshall

This impact pathways paper proposes that operations and supply chain management (OSCM) can help to ensure that the transition from a high-carbon to low-carbon fashion industry…

2692

Abstract

Purpose

This impact pathways paper proposes that operations and supply chain management (OSCM) can help to ensure that the transition from a high-carbon to low-carbon fashion industry takes place in a just, inclusive and fair way. By immersion in fashion brands, suppliers and workers' realities across multiple supply chains, the authors identify challenges and issues related to just transitions, whilst proposing research pathways to inspire future OSCM research and collaboration using innovative and creative methods to answer complex questions related to just transition.

Design/methodology/approach

The research the authors introduce used a multi-level field research approach to investigate multiple fashion supply chains in transition.

Findings

The authors uncovered that in the pursuit of lowering carbon emissions, fast-fashion giants work with industrial associations to create top-down governance tools, leading to severe problems in supply chain data and paradoxical demands. These demands are cascaded onto the workers in these supply chains. The goals and tools dictated by the fashion giants exclude workers, whilst the physiological and psychological effects on the workers are routinely ignored. These issues impede a just transition to a low-carbon fashion industry.

Originality/value

The authors introduce concepts largely missing from OSCM literature and ensure representation of the most marginalised group, supply chain workers, in a novel setting in a call for research in this emerging area.

Details

International Journal of Operations & Production Management, vol. 43 no. 13
Type: Research Article
ISSN: 0144-3577

Keywords

Open Access
Article
Publication date: 5 August 2022

Christopher Amoah and Demetri Steyn

Complying with the code of conduct by professionals in the construction industry worldwide has become a significant issue over the years. This has led to projects' failure…

8035

Abstract

Purpose

Complying with the code of conduct by professionals in the construction industry worldwide has become a significant issue over the years. This has led to projects' failure, leading to losses to both the client and contractors. The study's objective is to identify the challenges of construction professionals in complying with their code of conduct and preventing corrupt practices.

Design/methodology/approach

Quantitative approach was used to collect empirical data by sending questionnaires to 56 construction professionals in South Africa. Data gathered were analysed through Excel statistical tool. Mean values were calculated for the quantitative data, whilst thematic content analyses were used to generate frequencies and percentages for qualitative data.

Findings

The findings indicate that construction professionals experience many unethical issues in their work duties such as inflated tender prices, overpricing the rates, tender-based kickbacks, bribes for projects, unethical methods of project execution, use of lower grade materials than specified, discrimination, among others. However, issues such as greediness, acceptance of corruption as usual practice, lack of knowledge about the code of conduct, the only way to get contracts, part of the process, and peer pressure create a challenge in complying with the code of conduct and preventing corrupt practices among construction professionals.

Practical implications

Construction professionals face many unethical and corrupt practices in their project management and execution, which they cannot overcome due to many factors. Therefore, there is the need to sensitise the professionals in the construction industry regarding their code of conduct as well as the danger associated with engaging in corrupt practices in their work and their implication on project performance.

Originality/value

The findings give an insight into the critical factors curtailing the construction professional's ability to comply with their code of conduct and be corrupt-free in their line of duty. Thus, professional associations can use the findings in guiding their members.

Details

International Journal of Building Pathology and Adaptation, vol. 41 no. 6
Type: Research Article
ISSN: 2398-4708

Keywords

Access

Only content I have access to

Year

Last 6 months (53)

Content type

1 – 10 of 53