Search results

1 – 10 of over 41000
Article
Publication date: 1 October 1999

Charles G. Petersen

Order picking, the activity by which a number of goods are retrieved from a warehousing system to satisfy a number of customer orders, is an essential link in the supply chain and…

9203

Abstract

Order picking, the activity by which a number of goods are retrieved from a warehousing system to satisfy a number of customer orders, is an essential link in the supply chain and is the major cost component of warehousing. The critical issue is to simultaneously reduce the cost and increase the speed of the order picking activity. The main objectives of this paper are: evaluate various routing heuristics and an optimal routine in a volume‐based and random storage environment; compare the performance of volume‐based storage to random storage; and examine the impact of travel speed and picking rates on routing and storage policy performance. The experimental results show the solution gap between routing heuristics and optimal routing is highly dependent on the travel speed and picking rate, the storage policy, and the size of the pick list. In addition, volume‐based storage produced significant savings over random storage, but again these savings are dependent on the travel speed and picking rate.

Details

International Journal of Operations & Production Management, vol. 19 no. 10
Type: Research Article
ISSN: 0144-3577

Keywords

Article
Publication date: 1 September 1995

Tiffany A. Sargent and Michael G. Kay

Companies using just‐in‐time principles are currently moving fromcentralized to decentralized storage areas. A question that needs to beaddressed is whether this move is cost…

1909

Abstract

Companies using just‐in‐time principles are currently moving from centralized to decentralized storage areas. A question that needs to be addressed is whether this move is cost efficient. Presents a costing model which can be used to determine if further consideration should be given to decentralized storage in a facility currently utilizing centralized storage. Evaluates whether the savings in material handling flow costs associated with moving from centralized to decentralized storage outweighs the additional costs associated with implementing and utilizing decentralized storage for a designated period of time. Through the process of solving the cost model, a new layout will be created for the decentralized storage system. The layout includes the placement of the additional material storage and receipt areas as well as the rearrangement of the other departments in the facility.

Details

International Journal of Operations & Production Management, vol. 15 no. 9
Type: Research Article
ISSN: 0144-3577

Keywords

Article
Publication date: 1 January 1988

Wah Ying Hui

Gas storage facilities are expensive and their siting is determined by the customer not the supplier. Accurate determination of optimum capacity is a “must”.

Abstract

Gas storage facilities are expensive and their siting is determined by the customer not the supplier. Accurate determination of optimum capacity is a “must”.

Details

International Journal of Physical Distribution & Materials Management, vol. 18 no. 1
Type: Research Article
ISSN: 0269-8218

Article
Publication date: 1 August 2004

Charles G. Petersen, Gerald R. Aase and Daniel R. Heiser

Class‐based storage (CBS) partitions stock‐keeping units (SKUs) into storage classes by demand and randomly assigns storage locations within each storage class area. This study…

8216

Abstract

Class‐based storage (CBS) partitions stock‐keeping units (SKUs) into storage classes by demand and randomly assigns storage locations within each storage class area. This study compares the performance implications of CBS to both random and volume‐based storage (VBS) for a manual order picking warehouse. In addition, this study considers the effect of the number of storage classes, the partition of storage classes, and the storage implementation strategy applied in the warehouse. The simulation results show that CBS provides savings in picker travel over random storage and offers performance that approaches VBS. Other operational issues having an impact on warehouse performance are examined. The results offer managers insight for improving distribution center operations.

Details

International Journal of Physical Distribution & Logistics Management, vol. 34 no. 7
Type: Research Article
ISSN: 0960-0035

Keywords

Article
Publication date: 31 October 2023

Eziaku Onyeizu Rasheed, Maryam Khoshbakht and George Baird

This paper aims to illustrate the extensive benefits of qualitative data analysis as a rarely undertaken process in post-occupancy evaluation surveys. As a result, there is…

Abstract

Purpose

This paper aims to illustrate the extensive benefits of qualitative data analysis as a rarely undertaken process in post-occupancy evaluation surveys. As a result, there is limited evidence of what occupants say about their buildings, especially for operational parameters, as opposed to how they rate them. While quantitative analyses provide useful information on how workers feel about workplace operational factors, qualitative analyses provide richer information on what aspects of the workplace workers identify as influential to their comfort, well-being and productivity.

Design/methodology/approach

The authors analysed 6,938 comments from office buildings worldwide on workers’ perception of workplace operational factors: design, storage, needs, space at desks and storage in their work environments. These factors were analysed based on the buildings’ design intent and use, and the associated comments were coded into positive, negative and balanced comments. The authors used a combination of coding, descriptive analysis, content analysis and word cloud to dissect the comments.

Findings

The findings showed that whereas workers rated these operational factors favourably, there were significantly more negative comments about each factor. Also, the Chi-square test showed a significant association (p < 0.01) between the satisfaction scale and the type of comments received for all the operational factors. This means that when a factor is rated high in the satisfaction score (5–7), there were fewer negative and more positive comments and vice versa. The word cloud analysis highlighted vital aspects of the office environment the workers mostly commented on, such as open plan design, natural lighting, space and windows, toilets, facilities, kitchens, meeting room booking systems, storage and furniture.

Research limitations/implications

This study highlights the importance of dissecting building occupants’ comments as integral to building performance monitoring and measurement. These emphasise the richness and value of respondents’ comments and the importance of critically analysing them. A limitation is that only 6,938 comments were viable for analysis because most comments were either incomplete with no meaning or were not provided. This underlines the importance of encouraging respondents to comment and express their feelings in questionnaire surveys. Also, the building use studies questionnaire data set presents extensive opportunities for further analyses of interrelationships between demographics, building characteristics and environmental and operational factors.

Practical implications

The findings from this study can be applied to future projects and facility management to maintain and improve office buildings throughout their life cycle. Also, these findings are essential in predicting the requirements of future workplaces for robust workplace designs and management.

Originality/value

The authors identified specific comments on the performance of workplaces across the globe, showing similarities and differences between sustainable, conventional, commercial and institutional buildings. Specifically, the analysis showed that office workers’ comments do not always corroborate the ratings they give their buildings. There was a significantly higher percentage of negative comments than positive comments despite the high satisfaction scores of the operational factors.

Details

Facilities , vol. 42 no. 3/4
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 11 January 2024

Marco Fabio Benaglia, Mei-Hui Chen, Shih-Hao Lu, Kune-Muh Tsai and Shih-Han Hung

This research investigates how to optimize storage location assignment to decrease the order picking time and the waiting time of orders in the staging area of low-temperature…

Abstract

Purpose

This research investigates how to optimize storage location assignment to decrease the order picking time and the waiting time of orders in the staging area of low-temperature logistics centers, with the goal of reducing food loss caused by temperature abuse.

Design/methodology/approach

The authors applied ABC clustering to the products in a simulated database of historical orders modeled after the actual order pattern of a large cold logistics company; then, the authors mined the association rules and calculated the sales volume correlation indices of the ordered products. Finally, the authors generated three different simulated order databases to compare order picking time and waiting time of orders in the staging area under eight different storage location assignment strategies.

Findings

All the eight proposed storage location assignment strategies significantly improve the order picking time (by up to 8%) and the waiting time of orders in the staging area (by up to 22%) compared with random placement.

Research limitations/implications

The results of this research are based on a case study and simulated data, which implies that, if the best performing strategies are applied to different environments, the extent of the improvements may vary. Additionally, the authors only considered specific settings in terms of order picker routing, zoning and batching: other settings may lead to different results.

Practical implications

A storage location assignment strategy that adopts dispersion and takes into consideration ABC clustering and shipping frequency provides the best performance in minimizing order picker's travel distance, order picking time, and waiting time of orders in the staging area. Other strategies may be a better fit if the company's objectives differ.

Originality/value

Previous research on optimal storage location assignment rarely considered item association rules based on sales volume correlation. This study combines such rules with several storage planning strategies, ABC clustering, and two warehouse layouts; then, it evaluates their performance compared to the random placement, to find which one minimizes the order picking time and the order waiting time in the staging area, with a 30-min time limit to preserve the integrity of the cold chain. Order picking under these conditions was rarely studied before, because they may be irrelevant when dealing with temperature-insensitive items but become critical in cold warehouses to prevent temperature abuse.

Details

The International Journal of Logistics Management, vol. 35 no. 5
Type: Research Article
ISSN: 0957-4093

Keywords

Article
Publication date: 12 September 2023

Mingzhen Song, Lingcheng Kong and Jiaping Xie

Rapidly increasing the proportion of installed wind power capacity with zero carbon emission characteristics will help adjust the energy structure and support the realization of…

Abstract

Purpose

Rapidly increasing the proportion of installed wind power capacity with zero carbon emission characteristics will help adjust the energy structure and support the realization of carbon neutrality targets. The intermittency of wind resources and fluctuations in electricity demand has exacerbated the contradiction between power supply and demand. The time-of-use pricing and supply-side allocation of energy storage power stations will help “peak shaving and valley filling” and reduce the gap between power supply and demand. To this end, this paper constructs a decision-making model for the capacity investment of energy storage power stations under time-of-use pricing, which is intended to provide a reference for scientific decision-making on electricity prices and energy storage power station capacity.

Design/methodology/approach

Based on the research framework of time-of-use pricing, this paper constructs a profit-maximizing electricity price and capacity investment decision model of energy storage power station for flat pricing and time-of-use pricing respectively. In the process, this study considers the dual uncertain scenarios of intermittency of wind resources and random fluctuations in power demand.

Findings

(1) Investment in energy storage power stations is the optimal decision. Time-of-use pricing will reduce the optimal capacity of the energy storage power station. (2) The optimal capacity of the energy storage power station and optimal electricity price are related to factors such as the intermittency of wind resources, the unit investment cost, the price sensitivities of the demand, the proportion of time-of-use pricing and the thermal power price. (3) The carbon emission level is affected by the intermittency of wind resources, price sensitivities of the demand and the proportion of time-of-use pricing. Incentive policies can always reduce carbon emission levels.

Originality/value

This paper creatively introduced the research framework of time-of-use pricing into the capacity decision-making of energy storage power stations, and considering the influence of wind power intermittentness and power demand fluctuations, constructed the capacity investment decision model of energy storage power stations under different pricing methods, and compared the impact of pricing methods on optimal energy storage power station capacity and carbon emissions.

Highlights

  1. Electricity pricing and capacity of energy storage power stations in an uncertain electricity market.

  2. Investment strategy of energy storage power stations on the supply side of wind power generators.

  3. Impact of pricing method on the investment decisions of energy storage power stations.

  4. Impact of pricing method, energy storage investment and incentive policies on carbon emissions.

  5. A two-stage wind power supply chain including energy storage power stations.

Electricity pricing and capacity of energy storage power stations in an uncertain electricity market.

Investment strategy of energy storage power stations on the supply side of wind power generators.

Impact of pricing method on the investment decisions of energy storage power stations.

Impact of pricing method, energy storage investment and incentive policies on carbon emissions.

A two-stage wind power supply chain including energy storage power stations.

Details

Industrial Management & Data Systems, vol. 123 no. 11
Type: Research Article
ISSN: 0263-5577

Keywords

Article
Publication date: 18 April 2023

Andrew H. Appleyard

The British Library (BL) faces a significant challenge with storage space predicted to run out within the next three years. However, alongside a plan to create additional…

Abstract

Purpose

The British Library (BL) faces a significant challenge with storage space predicted to run out within the next three years. However, alongside a plan to create additional capacity, the BL also intends to take the opportunity to rethink the integration of storage and workflows in order to implement a fully optimised end-to-end model of content management. This approach will incorporate not only storage and workflow design and integration, but also the physical environments and facilities for staff and users.

Design/methodology/approach

This paper draws on years of experience in the context of systemic industry changes to lead the reader into new thinking and opportunities in relation to print preservation and access. It should be noted that some of the aspirational new thinking described within this article may not come to fruition due to construction market inflation and resulting budgetary constraints.

Findings

As the national library of the UK, BL, like all libraries, has the responsibility of storing (preserving) its collections while making them accessible to everyone. Traditional models of physical storage can often operate in isolation from the processes that accompany them – creating silos of materials, completely remote from either the acquisition and description processes that precede their storage, or misaligned with the processes in place to support access.

Practical implications

The presentation of this conceptual thinking could help inform other libraries planning to build new print repositories.

Originality/value

The strategic approach outlined within this paper has adopted ideas and concepts from non-library applications, bringing them together to form a holistic solution that delivers the ultimate aims of a library within a modern context.

Details

Library Management, vol. 44 no. 5
Type: Research Article
ISSN: 0143-5124

Keywords

Article
Publication date: 7 March 2023

Anastasios Chrysochoou, Dimitris Zissis, Konstantinos Chalvatzis and Kostas Andriosopoulos

The purpose of this study is to investigate the impact of the construction and operation of underground gas storage (UGS) facilities, under the prism of the recent rise in energy…

Abstract

Purpose

The purpose of this study is to investigate the impact of the construction and operation of underground gas storage (UGS) facilities, under the prism of the recent rise in energy prices. The focus is on developing energy markets interconnected with gas producers through pipelines and has access to liquefied natural gas (LNG) facilities in parallel.

Design/methodology/approach

Through a focal market in Europe, the authors estimate the economic value for both stakeholders and consumers by introducing a methodology, appropriately adjusted to the specificities of the domestic energy market. The Transmission System Operator, the Energy Market Regulator, the Energy Exchange and Eurostat are the main data sources for our calculations and conclusions.

Findings

The authors investigate the perspectives of UGS facilities, identifying financial challenges considering specific energy market conditions which are barriers to new storage facilities. Nevertheless, the energy price rocketing coupled with the security of gas supply issues, which arose in autumn 2021 and were continuing in 2022 due to the Russia–Ukraine crisis, highlight that gas storage remains, at least for the midterm, at the core of European priorities.

Originality/value

The paper emphasizes on developing markets toward green transition, proposing tangible policy recommendations regarding gas storage. A new methodological approach is proposed, appropriate to quantify the economic value of UGSs in such markets. Last, a mix of energy policy options is suggested which include regulatory reforms, support schemes and new energy infrastructures that could make the gas storage investments economically viable.

Details

Benchmarking: An International Journal, vol. 31 no. 2
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 7 June 2023

Debadyuti Das and Aditya Singh

The present work seeks to determine the optimal delivery schedule of equipment at a project site in the backdrop of limited storage space, at a minimum cost, and without…

Abstract

Purpose

The present work seeks to determine the optimal delivery schedule of equipment at a project site in the backdrop of limited storage space, at a minimum cost, and without disturbing the overall project schedule. In addition, the optimized delivery schedule helps in minimizing the fluctuating requirements of space at the project site across the entire project lifespan.

Design/methodology/approach

The study is carried out at a Steel plant operating in a constrained space but undergoing a production capacity expansion. The problem motivated us to explore the possibility of postponing the delivery dates of certain equipment closer to the erection dates without compromising on the project schedule. Given the versatility of linear programming models in dealing with such schedule optimization problems, the authors formulated the above problem as a Zero-One Integer Linear Programming problem.

Findings

The model is implemented for all the new equipment arriving for two major units – the Hot Strip Mill (HSM) and the Blast Furnace (BF). It generates an optimized delivery schedule by delaying the delivery of some equipment by a certain number of periods, without compromising the overall project schedule and at a minimum storage cost. The average space utilization increases by 25.85 and 14.79% in HSM and BF units respectively. The fluctuations in space requirements are reduced substantially in both units.

Originality/value

The study shows a timeline in the form of a Gantt chart for the delivery of equipment, storage of equipment across different periods, and the number of periods for which the delivery of certain equipment needs to be postponed. The study uses linearly increasing storage costs with the increase in the number of periods for storage of the equipment in the temporary shed.

Highlights

  1. Determined the optimal delivery schedule of the equipment in a project environment in the backdrop of limited storage space in the project site.

  2. Formulated the above problem as a Zero-One Integer Linear Programming (ILP) problem.

  3. The average space utilization has increased by 25.85 and 14.79% in HSM and BF units respectively.

  4. The optimized delivery schedule helps in reducing the fluctuations in space requirements substantially across the entire lifespan of the project.

  5. The timeline of delivery of equipment, storage of equipment across different periods and periods of postponement of the equipment are shown in the form of a Gantt Chart.

Determined the optimal delivery schedule of the equipment in a project environment in the backdrop of limited storage space in the project site.

Formulated the above problem as a Zero-One Integer Linear Programming (ILP) problem.

The average space utilization has increased by 25.85 and 14.79% in HSM and BF units respectively.

The optimized delivery schedule helps in reducing the fluctuations in space requirements substantially across the entire lifespan of the project.

The timeline of delivery of equipment, storage of equipment across different periods and periods of postponement of the equipment are shown in the form of a Gantt Chart.

Details

Journal of Advances in Management Research, vol. 20 no. 5
Type: Research Article
ISSN: 0972-7981

Keywords

1 – 10 of over 41000