Search results

1 – 10 of 14
Article
Publication date: 3 November 2022

Aba Essanowa Afful, Joshua Ayarkwa, Godwin Kojo Kumi Acquah, Ama Antwi Darkwa Ossei Assibey and Dickson Osei-Asibey

The purpose of this study is to identify the capacity needs of building professionals to deliver environmentally sustainable buildings (ESBs) globally, from a unique systems…

Abstract

Purpose

The purpose of this study is to identify the capacity needs of building professionals to deliver environmentally sustainable buildings (ESBs) globally, from a unique systems approach. Through a review of extant literature, this study contributes to knowledge of the global delivery of ESBs by identifying research trends and gaps that can be tackled in future research, and current hotspots in capacity building (CB) research within the built environment (BE). The adopted systems approach to CB postulates that the construction industry is systemized in nature, and thus, CB solutions within the industry should be approached from a systems approach.

Design/methodology/approach

A literature search was conducted using the Scopus search engine, augmented by Google Scholar and Web of Science, to produce 54 relevant articles for analysis. The scientometric analysis was undertaken with the use of VOSViewer to better understand the broad literature on CB in the construction industry which would not have been possible with traditional data analysis. The content analysis allowed, for a systematic review of selected articles, to reveal key themes in this study.

Findings

Through a content analysis, four levels of CB were identified within the construction industry; individual level, organizational level, industry level and state level. Nine sub-capacities were subsumed under the four identified levels adopted from Potter and Brough (2004), including but not limited to Performance capacity, Workload capacity, Supervisory capacity, Industry Role capacity and Systems capacity. Under each sub-capacity, key questions were posed to aid identify the capacity needs of BE professionals. A framework for identifying capacity needs in the BE is proposed.

Practical implications

The findings of this study serve as a useful reference for practitioners and policymakers to assess their level of commitment to CB efforts for ESB delivery. The findings of this study have revealed that building the capacities of BE professionals to deliver ESBs should be addressed as part of a broader framework, interdependent on the other levels of CB in the systemic construction industry.

Originality/value

As a review study identifying capacity needs for BE professionals to deliver ESBs, this study enhances knowledge of CB within the construction industry.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 5
Type: Research Article
ISSN: 1726-0531

Keywords

Open Access
Article
Publication date: 29 September 2023

Prateek Kalia, Meenu Singla and Robin Kaushal

This study is the maiden attempt to understand the effect of specific human resource practices (HRPs) on employee retention (ER) with the mediation of job satisfaction (JS) and…

6250

Abstract

Purpose

This study is the maiden attempt to understand the effect of specific human resource practices (HRPs) on employee retention (ER) with the mediation of job satisfaction (JS) and moderation of work experience (WE) and job hopping (JH) in the context of the textile industry.

Design/methodology/approach

This study adopted a quantitative methodology and applied quota sampling to gather data from employees (n = 365) of leading textile companies in India. The conceptual model and hypotheses were tested with the help of Partial Least Squares-Structural Equation Modelling (PLS-SEM).

Findings

The findings of a path analysis revealed that compensation and performance appraisal (CPA) have the highest impact on JS followed by employee work participation (EWP). On the other hand, EWP had the highest impact on ER followed by grievance handling (GRH). The study revealed that JS significantly mediates between HRPs like CPA and ER. During Multi-group analysis (MGA) it was found that the importance of EWP and health and safety (HAS) was more in employee groups with higher WE, but it was the opposite in the case of CPA. In the case of JH behavior, the study observed that EWP leads to JS in loyal employees. Similarly, JS led to ER, and the effect was more pronounced for loyal employees.

Originality/value

In the context of the Indian textile industry, this work is the first attempt to comprehend how HRPs affect ER. Secondly, it confirmed that JS is not a guaranteed mediator between HRPs and ER, it could act as an insignificant, partial or full mediator. Additionally, this study establishes the moderating effects of WE and JH in the model through multigroup analysis.

Details

International Journal of Productivity and Performance Management, vol. 73 no. 11
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 11 October 2022

Matti Haverila and Jenny Carita Twyford

Against the backdrop of management, planning, temporary organizations, Shannon–Weaver theory of communication and evaluation theories, the purpose of this research paper is to…

Abstract

Purpose

Against the backdrop of management, planning, temporary organizations, Shannon–Weaver theory of communication and evaluation theories, the purpose of this research paper is to examine the relative importance of specific project management tasks in the various phases of system delivery projects in distinguishing successful and unsuccessful projects.

Design/methodology/approach

A survey method was used (N = 3,129) to collect data from the customers of a major systems delivery project management company operating in the facilities management industry. Logistic regression was used to analyze the capability and relative importance of the tasks in discriminating successful and unsuccessful projects.

Findings

The results of the paper indicate that three out four installation tasks were among the top three in their ability to differentiate the successful and unsuccessful systems delivery project. Especially critical tasks were “Meeting milestones” and “Allocation of appropriate resources” so that the project could be completed on-time. Relatively less important tasks were “Advice and suggestions regarding the development of specifications for the project” and “Proposal to meet the intent of the company’s specifications” in the proposal phase of the project, and “Resolving warranty issues as defined by the warranty process” in the commissioning phase.

Originality/value

Previous research has assessed the importance of the various project management phases. This research examines the capability of the more minutiae tasks to distinguish the successful and unsuccessful projects in the various phases of systems delivery projects, i.e. proposal, installation and commissioning.

Details

Journal of Facilities Management , vol. 22 no. 4
Type: Research Article
ISSN: 1472-5967

Keywords

Open Access
Article
Publication date: 31 May 2024

Prashanth Madhala, Hongxiu Li and Nina Helander

The information systems (IS) literature has indicated the importance of data analytics capabilities (DAC) in improving business performance in organizations. The literature has…

1446

Abstract

Purpose

The information systems (IS) literature has indicated the importance of data analytics capabilities (DAC) in improving business performance in organizations. The literature has also highlighted the roles of organizations’ data-related resources in developing their DAC and enhancing their business performance. However, little research has taken resource quality into account when studying DAC for business performance enhancement. Therefore, the purpose of this paper is to understand the impact of resource quality on DAC development for business performance enhancement.

Design/methodology/approach

We studied DAC development using the resource-based view and the IS success model based on empirical data collected via 19 semi-structured interviews.

Findings

Our findings show that data-related resource (including data, data systems, and data services) quality is vital to the development of DAC and the enhancement of organizations’ business performance. The study uncovers the factors that make up each quality dimension, which is required for developing DAC for business performance enhancement.

Originality/value

Using the resource quality view, this study contributes to the literature by exploring the role of data-related resource quality in DAC development and business performance enhancement.

Details

Industrial Management & Data Systems, vol. 124 no. 7
Type: Research Article
ISSN: 0263-5577

Keywords

Article
Publication date: 2 July 2024

Mahesh Babu Purushothaman, Leo Neil Resurreccion San Pedro and Ali GhaffarianHoseini

This review paper aims to highlight the causes of delays (COD) and their interactions in construction projects, potentially aiding in timely completion and waste reduction through…

Abstract

Purpose

This review paper aims to highlight the causes of delays (COD) and their interactions in construction projects, potentially aiding in timely completion and waste reduction through early anticipation.

Design/methodology/approach

Forty-seven global literature were examined in detail to identify CODS and its interactions using the systematic literature review (SLR) method that utilised the PRISMA guidelines to ensure the studies reviewed were adequate to safeguard the robustness and comprehensiveness. Three-way analysis, such as Pareto, degree of centrality and loops, was undertaken to identify the critical Level 1,2 and 3 CODS that affect the Construction projects.

Findings

The research findings demonstrate that 65 CODs in eight categories affect construction projects. The CODs act in coherence rather than silos; the CLD displays complex interconnections of 44 factors obtained through the pairwise comparison of the 47 identified literature of the SLR. Through its systematic analysis of interaction loops, this research identified Ten level 1 critical CODs, two second-level critical CODs and 4 Third-level critical CODs. “Contractors' excessive workload/beyond potential/inadequate experience” emerged as the top COD that affects scheduling and project delay.

Research limitations/implications

The study limitations include using only English articles and a restricted number of databases. However, the chosen databases were reputable and underwent thorough peer review processes. This study may have limitations due to the SLR, which means that factors affecting COD and interactions may vary by country, and future research is suggested for validation.

Practical implications

This study identified interactions of construction delays that potentially support scheduling risk management during the early stage of the project and reduce waste to improve sustainability. The theoretical implications of SLR-based research include helping develop a framework that would potentially have all COD in the current scenario and aid future academic and industrial research factor-wise and country-wise in aiding sustainability. This will support and provide construction professionals and academia with knowledge of the COD related to factors and their interactions to be considered in the early assessment and management of future projects and improve sustainability.

Originality/value

Most literature studies the factors or causes of construction delays that affect construction projects. The CODs primarily do not operate in silos but combine with other causes to enhance their influence on delays. Hence, it is of utmost importance to study the interactions of COD to enhance the knowledge in the construction field that would aid in schedule repair and, in turn, on-time project delivery. The study is the first related to COD and their interactions in construction projects in the digital era.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 19 January 2024

Anna Fedyunina, Liudmila Ruzhanskaya, Nikolay Gorodnyi and Yuri Simachev

This paper aims to discuss the firm productivity premium for servitized firms. It discusses servitization across the product value chain and estimates the effects of the range and…

Abstract

Purpose

This paper aims to discuss the firm productivity premium for servitized firms. It discusses servitization across the product value chain and estimates the effects of the range and extent of servitization on productivity premium in manufacturing firms.

Design/methodology/approach

This paper develops a conceptual framework and tests the hypotheses on the effects of servitization on productivity premium using linear regression models with a sample of 20,837 Russian manufacturing firms gathered from the Ruslana Bureau van Dijk database and the Russian customs service.

Findings

Servitized firms exhibit higher total factor productivity and labor productivity. The labor productivity premium increases with the number of services offered. However, the impact of services on productivity varies along the product value chain: postmanufacturing and postsales services enhance productivity premium, while manufacturing and back-office services diminish them. The effect of establishment services remains ambiguous.

Practical implications

This paper offers an analytical framework for firms to assess their servitization strategies. These strategies should be gradual, focused on enhancing firm efficiency rather than being an end goal. Firms should initiate the process by introducing services at the postproduction and postsales stages of the product creation chain to achieve productivity premium.

Originality/value

The paper extends the evidence on firm-level productivity drivers and contributes to the servitization theory. A servitization strategy should be portfolio-based, considering both the potential gains and losses in productivity resulting from the implementation of specific services.

Details

Journal of Business & Industrial Marketing, vol. 39 no. 7
Type: Research Article
ISSN: 0885-8624

Keywords

Open Access
Article
Publication date: 13 September 2024

Baraka Israel and Beny Mwenda

Public procurement presents substantial market opportunities for small- and medium-sized enterprises (SMEs), which can contribute to their economic growth. However, limited…

Abstract

Purpose

Public procurement presents substantial market opportunities for small- and medium-sized enterprises (SMEs), which can contribute to their economic growth. However, limited dynamic capabilities often pose challenges for SMEs to participate effectively in public procurement markets. Drawing on dynamic capability (DC) theory, this study explores whether financial capability (FNCP) influences SMEs’ ability to leverage their technological capability (TECC) and marketing sensing capability (MKSC) and actively engage in public procurement.

Design/methodology/approach

Data for this study were collected from 248 SME managers in the Ilala District, Tanzania, using a cross-sectional questionnaire survey and stratified random sampling technique. The proposed hypotheses were tested empirically through confirmatory factor analysis (CFA) and the Hayes PROCESS macro.

Findings

TECC and MKSC demonstrated significant positive associations with SME participation in public procurement (SMPP). Moreover, the interaction between TECC and FNCP as well as the interaction between MKSC and FNCP demonstrate a significant positive effect, suggesting that FNCP strengthens the impact of TECC and MKSC on SMPP.

Research limitations/implications

The scope of this study was limited to SMEs in the Ilala District of Tanzania, hence affecting the generalizability of the findings to other contexts. More importantly, the study findings enrich the understanding of DC theory, signifying that the integration and reconfiguration of MKSC, TECC and FNCP add significant value to SMPP.

Practical implications

The findings suggest that policymakers, support institutions and SME managers should focus on enhancing SMEs' MKSC and TECC to improve their participation in public procurement. In addition, improving SMEs' access to financial resources can further strengthen these effects, enabling more inclusive participation in public procurement.

Originality/value

The study contributes to the literature on SMPP by highlighting the critical roles of MKSC and TECC. It also underscores the importance of FNCP as a moderator in these relationships, which has not been addressed in the existing literature. By integrating these factors, the study offers a comprehensive framework for understanding the dynamics that influence SMPP from financial, technological and marketing perspectives, particularly in developing economies like Tanzania.

Details

IIMBG Journal of Sustainable Business and Innovation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2976-8500

Keywords

Article
Publication date: 10 July 2024

Manabhanjan Sahu, Kishan Jee, Furquan Uddin, Alamgir Sani and Satish Chandra Tiwari

This study aims to assess the factors influencing the effective implementation of extended producer responsibility (EPR) practices within the context of sustainable accounting…

Abstract

Purpose

This study aims to assess the factors influencing the effective implementation of extended producer responsibility (EPR) practices within the context of sustainable accounting goals and circular economy principles. It seeks to provide insights into the significance of EPR policies for manufacturing industries striving to enhance their environmental, social and governance performance while ensuring sustainable accounting of their business operations.

Design/methodology/approach

The methodology proposed in this article is based on the decision-making trial and evaluation laboratory (DEMATEL) technique. This approach formulates a structural framework for evaluating influential elements among critical recognized factors. By using DEMATEL, the study examines the interconnectedness between assessed factors through a cause-and-effect diagram, facilitating the integration of EPR into sustainable accounting practices.

Findings

The research findings reveal that the most impactful contributors to sustainable accounting practices of EPR within the framework of sustainable development goals and circular economy are producers, consumers, eco-design, public awareness and the support of local authorities. These findings underscore the importance of considering these factors in implementing EPR and advancing sustainable accounting practices.

Originality/value

This paper contributes to the literature by proposing a DEMATEL-based model for evaluating the factors affecting the implementation of EPR within the context of sustainable accounting goals and circular economy principles.

Details

Journal of Accounting & Organizational Change, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1832-5912

Keywords

Article
Publication date: 2 August 2024

Mazen M. Omer, Rahimi A. Rahman, Muhammad Ashraf Fauzi and Saud Almutairi

This study aims to assess the competency gap among construction industry professionals concerning the competencies required for identifying construction activities that produce…

Abstract

Purpose

This study aims to assess the competency gap among construction industry professionals concerning the competencies required for identifying construction activities that produce recyclable materials. Accordingly, the study objectives are threefold: to identify key competencies, analyze the disparity between the level of importance and level of competence for each competency, and quantify the criticality of the competency gaps.

Design/methodology/approach

A systematic literature review was conducted to identify and categorize 20 competencies into knowledge, skills, and abilities. The competencies formed the basis for a questionnaire survey distributed to construction industry professionals. 120 valid responses were collected and analyzed using mean and normalized values, Wilcoxon signed-ranks test, and competency gap analysis.

Findings

The findings highlight eight key competencies: ability to prepare sustainable designs, skills in trading construction waste materials, skills in lean construction techniques, skills in designing out waste in construction activities, knowledge of diagnosing construction waste generation, knowledge of construction-related waste design, knowledge of the practice of sustainable facilities management, and knowledge on the sustainable characteristics of construction activities. Despite their importance, critical competency gaps exist among these key competencies and must be addressed.

Originality/value

This study equips decision-makers with insights to manage natural resources efficiently, offers practitioners a list of key competencies for sustainable project management, and provides researchers with a solid foundation for further investigations to advance sustainability in construction.

Details

Built Environment Project and Asset Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-124X

Keywords

Case study
Publication date: 20 August 2024

Syed Mohsin Amir Mukhtiar, Mujeeb U Rehman Bhayo and Saeed Abbas Shah

After reading and analyzing the case study, the students will be able to recognize the role of the mega environment in shaping business strategy, explore the challenges and…

Abstract

Learning outcomes

After reading and analyzing the case study, the students will be able to recognize the role of the mega environment in shaping business strategy, explore the challenges and opportunities in a mature industry (Foam), understand the business context of a family-owned firm and assess the implications and recommend managerial strategies.

Case overview/synopsis

In July 2019, Unifoam, a leading foam manufacturer, found itself at a crossroads as the company leadership grappled with diverging vision and future course of action. The newly appointed chief executive, Mr Faraz Khalid Shaikh, had overseen significant investments in expanding production capacity, and the time had come to reap the rewards. However, a series of unexpected events had unfolded, presenting the company with a unique set of challenges. Unifoam relied heavily on imported raw materials from China. Unifoam had high hopes of capitalizing on the opportunities presented by the China Pakistan Economic Corridor. However, the newly formed government had made significant policy changes regarding currency valuation and borrowing rates. This had increased the company’s working capital cost by 40%. This unexpected development had divided the board on the future direction and had forced the leadership to confront a crucial question: Should they hit the brakes or accelerate their growth strategies? This case study explored into the dynamic interplay between external factors, internal divisions and the family-owned nature of Unifoam. The analysis recognized the influence of the mega environment on the company’s strategy, exploring the challenges and opportunities within the mature foam industry and assessing the implications of conflicting approaches. This case study also offered valuable insights and managerial recommendations to guide the company’s path forward. Through embracing discomfort and confronting strategic dilemmas head-on, Unifoam sought to navigate uncharted waters and emerge as a resilient player in the evolving foam industry.

Complexity academic level

This is suitable for BBA or at the very start of MBA in the strategy courses, mainly business strategy and strategic management, and the case study can be positioned during the initial weeks in the course to provide a quick review of the basic analysis frameworks used in strategic decision-making.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 11: Strategy.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 3
Type: Case Study
ISSN: 2045-0621

Keywords

1 – 10 of 14