Search results

1 – 10 of over 12000
Article
Publication date: 14 December 2022

Bryan Pieterse, Kofi Agyekum, Patrick Manu, Saeed Reza Mohandes, Clara Cheung and Akilu Yunusa-Kaltungo

Major maintenance projects are often regarded as maintenance activities regardless of the projects' complexity and scale. Consequently, very scarce research attention has hitherto…

Abstract

Purpose

Major maintenance projects are often regarded as maintenance activities regardless of the projects' complexity and scale. Consequently, very scarce research attention has hitherto been paid to the critical skills required when undertaking these projects. More specifically, the body of relevant knowledge is deprived of a study focusing on maintenance projects within the energy sector. In view of this shortcoming, this research aims to examine the critical project management (PM) skills required to deliver major maintenance projects within the energy sector.

Design/methodology/approach

Based on a quantitative research strategy, this study addressed the knowledge gap through a cross-sectional survey of professionals involved in the delivery of major maintenance projects in the United Kingdom's (UK) energy sector. Data obtained were analyzed via descriptive (e.g. frequencies, mean and standard deviation [SD]) and inferential statistical analyses (One sample t-test and exploratory factor analysis (EFA)).

Findings

Out of the 45 PM skills identified in the literature and examined by the respondents, the results obtained from the One sample t-test (based on p (1-tailed) = 0.05) showed that 37 were considered to be at least “important,” accounting for 80.4% of all the skills identified. EFA revealed a clustering of the PM skills items into seven components: “skills related to work scheduling and coordination”; “communication, risk, safety and stakeholder management skills”; “quality assurance skills”; “people management skills”; “skills related to forecasting scope and duration of outage”; “implementation of processes and time management skills” and “technical/engineering skills and experience pertaining to the outage and local site knowledge.”

Originality/value

This study has identified and contributed to the limited state-of-the-art skills project managers must possess to manage major maintenance projects in the energy sector successfully. The findings would be useful to organizations within the energy sector in ensuring that the organizations have suitable personnel in place to deliver major maintenance projects on the organizations' assets.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 22 March 2023

Cinzia Battistella, Thomas Bortolotti, Stefania Boscari, Fabio Nonino and Giulia Palombi

Diverse cultures may make people behave differently and this, in turn, can impact project management. While the relationship between culture and project success has been widely…

1011

Abstract

Purpose

Diverse cultures may make people behave differently and this, in turn, can impact project management. While the relationship between culture and project success has been widely explored, there is a need of addressing the gap in the relationship between culture and project management performance outcomes, that is, the performance in implementing project management processes and practices. The purpose of this paper is to investigate this gap by studying the role of cultural dimensions on project management performance.

Design/methodology/approach

An explorative survey including 200 observations relating to the experiences of project managers with a big experience on projects involving many different national cultures has been conducted to collect primary data on the relationship between the nationality observed and the project management performance outcomes shown. Nationality has been used as a proxy to link individual cultural dimensions and project management performance.

Findings

The results of this paper show that individualism impacts project dynamics and project control positively. Moreover, masculinity impacts project dynamics positively, and uncertainty avoidance impacts project control negatively. When recognized, different cultural dimensions can drive project management performance outcomes. The increasing awareness on this topic can be a valid instrument to control the cultural effect and take advantage of it to enhance project success.

Originality/value

This study contributes to the theory of project management by recognizing linkages between cultural dimensions and project management performance. Moreover, this study overcomes the concept of nationality, focusing on individuals and their unique set of cultural dimensions.

Details

International Journal of Organizational Analysis, vol. 32 no. 1
Type: Research Article
ISSN: 1934-8835

Keywords

Article
Publication date: 29 January 2024

Nilton Takagi, João Varajão and Thiago Ventura

As in the private sector, public organizational information systems (IS) development is commonly carried out through projects. One of the alternatives followed by governmental…

Abstract

Purpose

As in the private sector, public organizational information systems (IS) development is commonly carried out through projects. One of the alternatives followed by governmental organizations to perform their projects is outsourcing (by hiring other public institutions that have expertise in the IS area of the projects to be developed). However, limited research has been conducted on project success regarding these government-to-government (G2G) contexts. Since achieving success is crucial for public management, this paper proposes a model for Success Management of IS projects in G2G context.

Design/methodology/approach

The research method was design science research (DSR). In the evaluation step of the DSR, IS projects in a G2G environment were the object of case studies.

Findings

This work presents in detail how Success Management activities can be integrated into the processes and process groups of the Project Management Institute's project management guide. The authors also suggest tools and techniques to be used in each Success Management activity.

Practical implications

Managing success, particularly addressing success criteria and success factors, can help managers focus their efforts on what will really impact the success of a project. In the context of IS projects in G2G contexts, this contributes to decreasing waste and increasing the chances of providing better services to citizens.

Originality/value

This work contributes to theory by providing a new model for IS G2G projects that integrates Success Management and project management processes.

Details

International Journal of Managing Projects in Business, vol. 17 no. 1
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 17 May 2023

Hazem Abdulla, Catherine McCauley-Smith and Sina Moradi

Project managers' competencies contribute toward project success in a considerable manner. The significance of technical competencies' (TCs) contribution toward success in Oil and…

Abstract

Purpose

Project managers' competencies contribute toward project success in a considerable manner. The significance of technical competencies' (TCs) contribution toward success in Oil and Gas (O&G) projects is even higher due to the complexity and the technology-intensive nature of these projects. However, technical competencies have often been overlooked in favor of behavioral competencies or simply identified and listed in terms of their significance. Thus, there is currently very limited research-based knowledge concerning the contribution mechanisms of technical competencies toward project execution success. Hence, the aim of this study is to explore the contribution mechanisms of TCs toward success in O&G projects.

Design/methodology/approach

A case study was employed as the research strategy through which data was collected from project professionals in O&G projects in the Kingdom of Bahrain using semi-structured interviews. Transcripts of the interviews were then analyzed through thematic analysis method with the aid of NVIVO 12.

Findings

The findings reveal six mechanisms through which technical competencies of project managers contribute toward execution success in O&G projects. TCs not only act as a launch pad toward project success, but also help in optimizing engineering designs throughout the project life cycle.

Originality/value

Instead of simply identifying and listing TCs, the obtained results enhance our current understanding of their contribution mechanisms toward project success in O&G projects.

Details

International Journal of Managing Projects in Business, vol. 16 no. 4/5
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 2 November 2023

Olivier Furrer, Mikèle Landry and Chloé Baillod

This study aims to develop a comprehensive, theoretically grounded framework of customer-to-customer interaction (CCI) management, by revisiting three older services marketing…

Abstract

Purpose

This study aims to develop a comprehensive, theoretically grounded framework of customer-to-customer interaction (CCI) management, by revisiting three older services marketing models: the servuction model, the services marketing triangle and the services marketing pyramid.

Design/methodology/approach

Noting the lack of theoretical frameworks of CCI management, this study adopts a problematization approach to identify foundational services marketing models, question their underlying assumptions, develop an alternative conceptual framework and evaluate its adequacy for CCI management, on the basis of a systematic literature review and content analyses.

Findings

By revisiting the assumptions underlying three relevant models in the light of the present-day, technology-infused service environment, this study proposes a four-triangle CCI management framework encompassing four specific modes of CCI management: managerial decisions by the firm; frontline employees; the design of the physical environment; and technology. Furthermore, this study emphasizes the triadic relationships involving the focal customer, other customers and the four modes of CCI management. Building on these findings, this study concludes with an extensive research agenda.

Originality/value

To the best of the authors’ knowledge, this study represents the first scholarly effort in services marketing literature to provide a comprehensive, theoretically grounded framework of CCI management. With its basis in foundational models, the new framework is well-suited to address future challenges to service marketplaces too.

Case study
Publication date: 26 June 2023

Prashanth Kumar Sreram and Savitha Chilakamarri

The learning outcomes of this study are as follows:1) illustrate the project management failures that contributed to the fire accident at Grenfell using a fishbone diagram;2…

Abstract

Learning outcomes

The learning outcomes of this study are as follows:

1) illustrate the project management failures that contributed to the fire accident at Grenfell using a fishbone diagram;

2) identify and classify the power and influence of various stakeholders involved in a brownfield project using a relevant framework; and

3) elaborate the need for following effective stakeholder management processes and project leadership, especially in the context of a refurbishment/renovation project.

Case overview/synopsis

On 14th June 2017, the Grenfell Tower in North Kensington, West London, UK, caught fire. The fire raged for 60 h and around 72 people lost their lives. Many criticized the response of the London Fire Brigade (LFB) and their lack of preparedness to respond to such an emergency. There were calls for Dany Cotton, the Chief of LFB, to resign. However, there had been a major cladding-related refurbishment at Grenfell, and subsequent investigations revealed that the use of combustible materials, a lack of compliance with the fire-safety norms and a blatant disregard for resident safety had contributed to the fire. The tragedy was a cumulative outcome of failure on two counts: effective project management and stakeholder management during the process of refurbishment, especially in the context of a low-cost housing project. Given this situation, this case considers whether Dany Cotton should own up to her responsibility and resign from her position. In the process, the case considers Grenfell refurbishment from the theoretical lens of project management in the construction management scenario to understand the factors that could have led to an “avoidable” tragedy.

Complexity academic level

Postgraduate students of construction management; final year undergraduate engineering students who have a foundational course on project management; and architects.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 2: Built environment.

Article
Publication date: 4 November 2022

Muhammad Zubair Alam, Muhammad Rafiq, Sumaira Rehman and Sobia Nasir

In this study, the situation strength theory (SST) has been applied to assess the predictability of empowering leadership (EL) in explaining intrapreneurial behaviour (IB) under…

Abstract

Purpose

In this study, the situation strength theory (SST) has been applied to assess the predictability of empowering leadership (EL) in explaining intrapreneurial behaviour (IB) under the strong situation effect of job autonomy (JA).

Design/methodology/approach

The proposed theoretical framework was assessed using cross-sectional survey data from 237 engineers employed in Pakistan's automotive firms. Covariance-based structural equation modelling (CB-SEM) was used to analyse the survey data.

Findings

The study's results revealed a positive relationship of EL with JA and IB. Drawing from the conceptualisation of SST, JA serves as an organisational strong situation by offering sufficient cues and significantly intensifies the relationship between EL and IB.

Practical implications

The study contributes by establishing the requirement of strong organisational situations for nurturing IB in organisations. The study's outcomes are useful for academia, practitioners and industry to identify strong situations for employees' organisational behavioural outcomes like IB to dampen the personality impacts of employees on organisational processes. Hence, the study offered a major shift or an alternative in existing human resource practices, from personality assessments to creating cues from strong situations for fostering human behaviours. This will impact organisational human resource management scope during talent management, selection, promotion and employment.

Originality/value

The present study is novel from the IB investigation due to situational response in organisations, as assessed by employees. The study contributes towards SST by extending its epistemology to explain IB as an outcome of EL. The present study offers important empirical evidence for the role of the strong organisational situation of JA.

Details

Journal of Organizational Effectiveness: People and Performance, vol. 10 no. 2
Type: Research Article
ISSN: 2051-6614

Keywords

Open Access
Article
Publication date: 4 August 2023

Christopher Amoah

In addressing the housing deficits for the less privileged citizens, the South African government began constructing social housing after coming to power in 1994. However, the…

1033

Abstract

Purpose

In addressing the housing deficits for the less privileged citizens, the South African government began constructing social housing after coming to power in 1994. However, the construction of these houses is bedevilled with many issues; prominent among them are poor quality of the constructed houses. This study seeks to develop a quality management framework for achieving quality and efficiency in public-sector housing construction, a hallmark of the country's procurement goals.

Design/methodology/approach

Telephone interviews were conducted with construction professionals involved in constructing government social houses across South Africa, chosen randomly. The data gathered were analysed using the content analysis method.

Findings

The study found that the most significant cause of poor quality government-constructed social housing is multifaceted, categorised into project management-related, procurement-related, contractor-related, corruption-related and political-related.

Practical implications

Failure to develop and implement a quality management framework on government-constructed social housing leads to poor quality social housing.

Originality/value

The study has identified quality-related issues and has developed a Quality Management (QM) framework for the stakeholders involved in the construction of the houses to guide them in the project implementation process to ensure project success and quality standards.

Details

International Journal of Building Pathology and Adaptation, vol. 41 no. 6
Type: Research Article
ISSN: 2398-4708

Keywords

Open Access
Book part
Publication date: 29 November 2023

Susi Poli, Fernanda Stringassi de Oliveira and Alice Trentini

The chapter aims to provide an overview of organisational structures in Research Management and Administration (RMA); in doing so, the chapter moves from explaining main sources…

Abstract

The chapter aims to provide an overview of organisational structures in Research Management and Administration (RMA); in doing so, the chapter moves from explaining main sources of knowledge – broadly on HE Management (HEM) and specifically on RMA – to assessing institutionalisation and maturity level of the profession.

Understanding these forms of knowledge will help readers design research support services and develop a competency/career development plan.

Additionally, the chapter aims to call for individuals and institutions to engage with the varied forms of knowledge associated with different phases of a research project life cycle (RPLC). The goal is to raise individual awareness while helping countries improve their RMA maturity.

Details

The Emerald Handbook of Research Management and Administration Around the World
Type: Book
ISBN: 978-1-80382-701-8

Keywords

Open Access
Article
Publication date: 1 March 2023

Rachel Madeira Magalhães, Luiz Carlos Brasil de Brito Mello and Maria Aparecida Steinherz Hippert

The main factor that leads organizations to implement Building Information Modeling (BIM) is customer demand. While this is a frequent topic in the BIM literature, few studies…

1601

Abstract

Purpose

The main factor that leads organizations to implement Building Information Modeling (BIM) is customer demand. While this is a frequent topic in the BIM literature, few studies address BIM organizational readiness. Due to this gap in BIM implementation literature, this paper aims to understand what affects organizational BIM readiness and how the BIM readiness process occurs.

Design/methodology/approach

The present paper adopts design science research as a methodological approach. A literature review examined 69 journal articles. The analysis focused on multiple theories, such as organizational readiness for change, adoption and diffusion of innovations and project management.

Findings

By investigating BIM organizational readiness, this study presents a construct and a conceptual model for driving BIM readiness.

Originality/value

This study can benefit researchers and organizations. The results presented may drive further research and discussions on the topic. But it is important to state that these results must be tested on real situations.

Details

Frontiers in Engineering and Built Environment, vol. 3 no. 2
Type: Research Article
ISSN: 2634-2499

Keywords

1 – 10 of over 12000