1 – 10 of 47A real-time production scheduling method for semiconductor back-end manufacturing process becomes increasingly important in industry 4.0. Semiconductor back-end manufacturing…
Abstract
Purpose
A real-time production scheduling method for semiconductor back-end manufacturing process becomes increasingly important in industry 4.0. Semiconductor back-end manufacturing process is always accompanied by order splitting and merging; besides, in each stage of the process, there are always multiple machine groups that have different production capabilities and capacities. This paper studies a multi-agent based scheduling architecture for the radio frequency identification (RFID)-enabled semiconductor back-end shopfloor, which integrates not only manufacturing resources but also human factors.
Design/methodology/approach
The architecture includes a task management (TM) agent, a staff instruction (SI) agent, a task scheduling (TS) agent, an information management center (IMC), machine group (MG) agent and a production monitoring (PM) agent. Then, based on the architecture, the authors developed a scheduling method consisting of capability & capacity planning and machine configuration modules in the TS agent.
Findings
The authors used greedy policy to assign each order to the appropriate machine groups based on the real-time utilization ration of each MG in the capability & capacity (C&C) planning module, and used a partial swarm optimization (PSO) algorithm to schedule each splitting job to the identified machine based on the C&C planning results. At last, we conducted a case study to demonstrate the proposed multi-agent based real-time production scheduling models and methods.
Originality/value
This paper proposes a multi-agent based real-time scheduling framework for semiconductor back-end industry. A C&C planning and a machine configuration algorithm are developed, respectively. The paper provides a feasible solution for semiconductor back-end manufacturing process to realize real-time scheduling.
Details
Keywords
There has been an avalanche of global natural disasters in recent times. In recent years approximately 210 million people were affected, an estimated economic cost of US$153bn was…
Abstract
Purpose
There has been an avalanche of global natural disasters in recent times. In recent years approximately 210 million people were affected, an estimated economic cost of US$153bn was incurred and 68,000 deaths were recorded. This was a work up call that made it imperative for humanitarian actors to impetuously adopt information and communication technologies (ICTs) to timeously assist affected populations in disaster prevention, mitigation response and recovery However, the use of ICTs in the humanitarian field is still at its infancy in most third world countries. The purpose of this study was, therefore, to evaluate the utilization of ICTs in humanitarian relief operations associated with Cyclone Idai in Zimbabwe.
Design/methodology/approach
Using a pragmatic approach, the study gathered data using semistructured questionnaires that were triangulated with interviews of humanitarian staff that were involved in Cyclone Idai relief efforts.
Findings
An observed suboptimal utilization of ICTs was further disadvantaged by the inequitable distribution of communication infrastructure. However, despite the suboptimal usage, there was a significant positive influence of ICT adoption on effectiveness, efficiency and flexibility in humanitarian relief operations.
Originality/value
Optimal use of ICTs has the potential to revolutionize humanitarian supply chain management. A smooth transition to new technologies is recommended in which personnel are given professional development opportunities on a regular basis.
Details
Keywords
Andrew Ebekozien, Wellington Didibhuku Thwala, Clinton Ohis Aigbavboa and Mohamad Shaharudin Samsurijan
Studies showed that construction digitalisation could prevent or mitigate accidents rate on sites. Digitalisation applications may prevent or mitigate building project collapse…
Abstract
Purpose
Studies showed that construction digitalisation could prevent or mitigate accidents rate on sites. Digitalisation applications may prevent or mitigate building project collapse (BPC) but with some encumbrances, especially in developing countries. There is a paucity of research on digital technologies application to prevent or mitigate BPC in Nigeria. Thus, the research aims to explore the perceived barriers that may hinder digital technologies from preventing or mitigating building collapse and recommend measures to improve technology applications during development.
Design/methodology/approach
The study is exploratory because of the unexplored approach. The researchers collected data from knowledgeable participants in digitalisation and building collapse in Nigeria. The research employed a phenomenology approach and analysed collected data via a thematic approach. The study achieved saturation at the 29th interviewee.
Findings
Findings show that lax construction digitalisation implementation, absence of regulatory framework, lax policy, unsafe fieldworkers' behaviours, absence of basic infrastructure, government attitude, hesitation to implement and high technology budget, especially in developing countries, are threats to curbing building collapse menace via digitalisation. The study identified technologies relevant to preventing or mitigating building collapse. Also, it proffered measures to prevent or mitigate building collapse via improved digital technology applications during development.
Originality/value
This research contributes to the construction digitalisation literature, especially in developing countries, and investigates the perceived barriers that may hinder digital technologies usage in preventing or mitigating building collapse in Nigeria.
Details
Keywords
This paper aims to present a highly accessible and affordable tracking model for earthmoving operations in an attempt to overcome some of the limitations of current tracking…
Abstract
Purpose
This paper aims to present a highly accessible and affordable tracking model for earthmoving operations in an attempt to overcome some of the limitations of current tracking models.
Design/methodology/approach
The proposed methodology involves four main processes: acquiring onsite terrestrial images, processing the images into 3D scaled cloud data, extracting volumetric measurements and crew productivity estimations from multiple point clouds using Delaunay triangulation and conducting earned value/schedule analysis and forecasting the remaining scope of work based on the estimated performance. For validation, the tracking model was compared with an observation-based tracking approach for a backfilling site. It was also used for tracking a coarse base aggregate inventory for a road construction project.
Findings
The presented model has proved to be a practical and accurate tracking approach that algorithmically estimates and forecasts all performance parameters from the captured data.
Originality/value
The proposed model is unique in extracting accurate volumetric measurements directly from multiple point clouds in a developed code using Delaunay triangulation instead of extracting them from textured models in modelling software which is neither automated nor time-effective. Furthermore, the presented model uses a self-calibration approach aiming to eliminate the pre-calibration procedure required before image capturing for each camera intended to be used. Thus, any worker onsite can directly capture the required images with an easily accessible camera (e.g. handheld camera or a smartphone) and can be sent to any processing device via e-mail, cloud-based storage or any communication application (e.g. WhatsApp).