Search results
1 – 10 of 89Andrew Ebekozien, Clinton Aigbavboa, Mohamad Shaharudin Samsurijan, Noor Alyani Nor Azazi and Okechukwu Dominic Saviour Duru
Studies show that building information modelling (BIM) technology can improve construction productivity regarding the design, construction and maintenance of a project life cycle…
Abstract
Purpose
Studies show that building information modelling (BIM) technology can improve construction productivity regarding the design, construction and maintenance of a project life cycle in the 21st century. Revit has been identified as a frequently used tool for delivering BIM in the built environment. Studies about BIM technology via Revit are scarce in training middle-level workforce higher education institutions. Thus, this study aims to investigate the relevance of BIM technology and offer measures to promote digitalisation in Nigeria’s built environment polytechnic undergraduates via Revit.
Design/methodology/approach
Given the unexplored nature of training the middle-level workforce in Nigeria, 37 semi-structured virtual interviews were conducted across Nigeria, and saturation was achieved. The participants were knowledgeable about construction-related BIM. The researchers used a thematic analysis for the collected data and honed them with secondary sources.
Findings
Improved visualisation of design, effective and efficient work productivity, automatic design and quantification, improved database management and collaboration and data storage in the centrally coordinated model, among others, emerged as BIM’s benefits. BIM technology via Revit is challenging, especially in Nigeria’s polytechnic education curriculum. The 24 perceived issues were grouped into government/regulatory agencies-related, polytechnic management-related and polytechnic undergraduate students-related hindrances in Nigeria’s built environment.
Research limitations/implications
This study is limited to BIM implications for Nigeria’s built environment polytechnic undergraduates.
Originality/value
This study contributes to the literature paucity in attempting to uncover perceived issues hindering the implementation of BIM technology via Revit in training Nigeria’s built environment polytechnic undergraduates via a qualitative approach.
Details
Keywords
Andrew Ebekozien, Clinton Ohis Aigbavboa and Mantoa Ramotshela
Stakeholder engagement in construction projects is an ingredient that contributes to project optimal performance. Many developing countries have a paucity of literature about…
Abstract
Purpose
Stakeholder engagement in construction projects is an ingredient that contributes to project optimal performance. Many developing countries have a paucity of literature about stakeholders' engagement in construction projects. Therefore, the study investigated South Africa's shareholders' engagement in construction projects and recommended possible measures to mitigate potential limitations.
Design/methodology/approach
The researchers collated data from South African experts in stakeholder engagement via a phenomenology type of qualitative research design. They explored the “perceived hindrances” facing stakeholders' engagement in construction projects and proffer measures to mitigate them. The study analysed collected data via thematic analysis and achieved saturation. Three themes emerged from the analysed data.
Findings
Findings show that efficient stakeholder engagement will enhance team collaboration and integrated construction project delivery. Results identified the perceived limitations facing stakeholders' engagement in South Africa's construction projects and categorised them into individual perceived hindrances, organisational perceived hindrances and government-related perceived hindrances. Also, findings proffer measures to mitigate perceived hindrances via policies and programmes within the sector.
Practical implications
Besides enhancing policymakers and other stakeholders in South Africa's construction industry to understand the benefits of stakeholder engagement better, the study may stir up the construction sector's stakeholders to embrace enhanced and effective stakeholders' management.
Originality/value
This study contributes to construction project practice that involves stakeholders, as it reveals the underlying causes of perceived hindrances facing stakeholders' engagement in construction projects. Also, it proffers feasible solutions to mitigate these hindrances and enhance stakeholders' engagement within South Africa's construction projects.
Details
Keywords
Andrew Ebekozien, Clinton Ohis Aigbavboa and Mohamad Shaharudin Samsurijan
Though alternative building technologies (ABTs) have been encouraged to address accessible and affordable issues in low-cost housing (LCH) provision, their adoption is still…
Abstract
Purpose
Though alternative building technologies (ABTs) have been encouraged to address accessible and affordable issues in low-cost housing (LCH) provision, their adoption is still overwhelmed with encumbrances. The encumbrances that hinder ABT adoption require an in-depth study, especially in developing countries like Nigeria. However, studies regarding ABT and its role in improving Nigeria's LCH to achieve Sustainable Development Goal (SDG) 11 are scarce. This research investigates encumbrances to ABT adoption in Nigeria's LCH provision and suggests feasible measures to prevent or reduce the encumbrances, thereby improving achieving SDG 11 (sustainable cities and communities).
Design/methodology/approach
This research utilised qualitative research and adopted a face-to-face interview as the primary data collection. The interviewees comprised ABT practitioners and end users in Nigeria who were chosen by a convenient sampling technique. The study's data were analysed manually through a thematic approach.
Findings
This study shows that stakeholders should embrace ABT in LCH provision to improve achieving SDG 11 in Nigeria. Also, it clustered the perceived 20 encumbrances to ABT adoption in LCH provision into government/policymaker, housing developers/building contractors, ABT users and ABT manufacturers-related issues in Nigeria's context. This study suggested mechanisms to mitigate encumbrances to ABT adoption in LCH provision, thereby improving achieving SDG 11.
Originality/value
This research adds to the limited literature by analysing ABT adoption encumbrances in Nigeria's LCH provision, which could assist policy formulation for the uptake of ABT in LCH provision and improve achieving Goal 11.
Details
Keywords
Andrew Ebekozien, Wellington Didibhuku Thwala, Clinton Ohis Aigbavboa and Mohamad Shaharudin Samsurijan
Studies showed that construction digitalisation could prevent or mitigate accidents rate on sites. Digitalisation applications may prevent or mitigate building project collapse…
Abstract
Purpose
Studies showed that construction digitalisation could prevent or mitigate accidents rate on sites. Digitalisation applications may prevent or mitigate building project collapse (BPC) but with some encumbrances, especially in developing countries. There is a paucity of research on digital technologies application to prevent or mitigate BPC in Nigeria. Thus, the research aims to explore the perceived barriers that may hinder digital technologies from preventing or mitigating building collapse and recommend measures to improve technology applications during development.
Design/methodology/approach
The study is exploratory because of the unexplored approach. The researchers collected data from knowledgeable participants in digitalisation and building collapse in Nigeria. The research employed a phenomenology approach and analysed collected data via a thematic approach. The study achieved saturation at the 29th interviewee.
Findings
Findings show that lax construction digitalisation implementation, absence of regulatory framework, lax policy, unsafe fieldworkers' behaviours, absence of basic infrastructure, government attitude, hesitation to implement and high technology budget, especially in developing countries, are threats to curbing building collapse menace via digitalisation. The study identified technologies relevant to preventing or mitigating building collapse. Also, it proffered measures to prevent or mitigate building collapse via improved digital technology applications during development.
Originality/value
This research contributes to the construction digitalisation literature, especially in developing countries, and investigates the perceived barriers that may hinder digital technologies usage in preventing or mitigating building collapse in Nigeria.
Details
Keywords
Christopher Amoah and Jeanne Smith
This study aims to examine the challenges for green retrofitting implementation in existing residential buildings to lower the running cost and achieve a better energy-efficient…
Abstract
Purpose
This study aims to examine the challenges for green retrofitting implementation in existing residential buildings to lower the running cost and achieve a better energy-efficient system.
Design/methodology/approach
This study adopted a qualitative approach by interviewing conveniently selected 16 construction professionals, made up of architects, quantity surveyors and engineers. Data received were analysed using the content analysis method.
Findings
The findings revealed that the main barriers to incorporating green retrofitting in the existing residential buildings as the nature of the existing structures, limited knowledge, not being a priority and high costs involved in the process. Moreover, other factors influencing property developers’ decision to apply energy-efficient principles in a residential home include cost (initial capital and maintenance), level of knowledge, nature of the climate in the area, local legislation, more independence and increasing the property’s market value and environmental aspect.
Research limitations/implications
This study is limited to South Africa; thus, the literature available was limited.
Practical implications
People’s perceptions, either wrong or correct, affect their ability to make an informed decision to adopt green retrofitting principles, thereby denying them the opportunity to reap the associated benefits. Therefore, there is an urgent need for the construction industry stakeholders and government to increase educational opportunities for property owners on the importance of green retrofitting.
Originality/value
This study provides the occupants with the possible barriers and problem areas with implementing these principles. They will thus make an informed decision when implementing sustainable design methods.
Details
Keywords
Emmanuel Dele Omopariola, Abimbola Olukemi Windapo, David John Edwards, Clinton Ohis Aigbavboa, Sunday Ukwe-Nya Yakubu and Onimisi Obari
Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective…
Abstract
Purpose
Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective project cash flow process. However, scant research has been undertaken to empirically establish the cash flow performance and domino effect of APS on project and organisational performance.
Design/methodology/approach
The epistemological design adopted a positivist philosophical stance augmented by deductive reasoning to explore the phenomena under investigation. Primary quantitative data were collected from 504 Construction Industry Development Board (CIDB) registered contractors (within the grade bandings 1–9) in South Africa. A five-point Likert scale was utilised, and subsequent data accrued were analysed using structural equation modelling (SEM).
Findings
Emergent findings reveal that the mandatory use of an APS does not guarantee a positive project cash flow, an improvement in organisational performance or an improvement in project performance.
Practical implications
The ensuing discussion reveals the contributory influence of APS on positive cash flow and organisational performance, although APS implementation alone will not achieve these objectives. Practically, the research accentuates the need for various measures to be concurrently adopted (including APS) towards ensuring a positive project cash flow and improved organisational and project performance.
Originality/value
There is limited empirical research on cash flow performance and the domino effect of APS on project and organisational performance in South Africa, nor indeed, the wider geographical location of Africa as a continent. This study addresses this gap in the prevailing body of knowledge.
Details
Keywords
Matthew Ikuabe, Clinton Ohis Aigbavboa, Chimay Anumba and Ayodeji Emmanuel Oke
The quest for improved facilities management (FM) delivery is receiving immense focus through the incorporation of innovative technologies such as cyber-physical systems (CPS)…
Abstract
Purpose
The quest for improved facilities management (FM) delivery is receiving immense focus through the incorporation of innovative technologies such as cyber-physical systems (CPS). The system’s high computational capabilities can aid in the abatement of some of the challenges plaguing FM functions. However, the requisite ingredients for the uptake of the system for FM have still not gained scholarly attention. Because performance measurement is a vital index in determining the outcome of FM methods, this study aims to investigate the influence of performance measurement indicators that are influential to the uptake of CPS for delivering FM functions.
Design/methodology/approach
A qualitative technique was adopted using the Delphi technique. The panel of experts for the study was selected through a well-defined process based on stipulated criteria. The experts gave their opinions in two rounds before consensus was attained on the identified performance measurement indicators, whereas methods of data analysis were measures of central tendency, inter-quartile deviation and Mann–Whitney U test.
Findings
Results from this study showed that 11 of the performance indicators were of very high significance in the determination of the uptake of CPS for FM functions, whereas 5 of the indicators were proven to be of high significance. Furthermore, there was no statistical difference in the opinions of the experts based on their affiliation with academic institutions and professional practice.
Practical implications
The findings of this study contribute practically by aiding policymakers, facility managers and relevant stakeholders with the vital knowledge of delivery mandates for efficient FM services that can spur the uptake of digital technologies such as CPS.
Originality/value
This study contributes to the body of knowledge as it unveils a roadmap of the expected performance output and its accompanying evaluation that would drive the adoption of a promising technology such as CPS in the delivery of FM tasks.
Details
Keywords
Matthew Ikuabe, Clinton Aigbavboa, Chimay Anumba and Ayodeji Emmanuel Oke
Through its advanced computational capabilities, cyber–physical systems (CPS) proffer solutions to some of the cultural challenges plaguing the effective delivery of facilities…
Abstract
Purpose
Through its advanced computational capabilities, cyber–physical systems (CPS) proffer solutions to some of the cultural challenges plaguing the effective delivery of facilities management (FM) mandates. This study aims to explore the drivers for the uptake of CPS for FM functions using a qualitative approach – the Delphi technique.
Design/methodology/approach
Using the Delphi technique, the study selected experts through a well-defined process entailing a pre-determined set of criteria. The experts gave their opinions in two iterations which were subjected to statistical analyses such as the measure of central tendency and interquartile deviation in ascertaining consensus among the experts and the Mann–Whitney U test in establishing if there is a difference in the opinions given by the experts.
Findings
The study’s findings show that six of the identified drivers of the uptake of CPS for FM were attributed to be of very high significance, while 12 were of high significance. Furthermore, it was revealed that there is no significant statistical difference in the opinions given by experts in professional practice and academia.
Practical implications
The study’s outcome provides the requisite insight into the propelling measures for the uptake of CPS for FM by organisations and, by extension, aiding digital transformation for effective FM delivery.
Originality/value
To the best of the authors’ knowledge, evidence from the literature suggests that no study has showcased the drivers of the incorporation of CPS for FM. Hence, this study fills this gap in knowledge by unravelling the significant propelling measures of the integration of CPS for FM functions.
Details
Keywords
Douglas Aghimien, Clinton Aigbavboa, Ayodeji Emmanuel Oke and John Aliu
Digitalisation, which involves the use of digital technologies in transforming an organisation’s activities, transcends just the acquiring of emerging digital tools. Having the…
Abstract
Purpose
Digitalisation, which involves the use of digital technologies in transforming an organisation’s activities, transcends just the acquiring of emerging digital tools. Having the right people to drive the implementation of these technologies and attaining strategic organisational goals is essential. While most studies have focused on the use of emerging technologies in the construction industry, less attention has been given to the ‘people’ dimension. Therefore, this study aims to assess the people-related features needed for construction digitalisation.
Design/methodology/approach
The study adopted pragmatic thinking using a mixed-method approach. A Delphi was used to achieve the qualitative aspect of the research, while a questionnaire survey conducted among 222 construction professionals was used to achieve the quantitative aspect. The data gathered were analysed using frequency, percentage, mean item score, Kruskal–Wallis H test, exploratory factor analysis and confirmatory factor analysis.
Findings
Based on acceptable reliability, validity and model fit indices, the study found that the people-related factors needed for construction digitalisation can be grouped into technical capability of personnel, attracting and retaining digital talent and organisation’s digital culture.
Practical implications
The findings offer valuable benefits to construction organisations as understanding these identified people features can help lead to better deployment of digital tools and the attainment of the digital transformation.
Originality/value
This study attempts to fill the gap in the shortage of literature exploring the people dimension of construction digitalisation. The study offers an excellent theoretical backdrop for future works on digital talent for construction digitalisation, which has gained less attention in the current construction digitalisation discourse.
Details
Keywords
Lina Gharaibeh, Sandra Matarneh, Kristina Eriksson and Björn Lantz
This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on…
Abstract
Purpose
This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on examining the extent, maturity and actual practices of BIM in the Swedish wood construction industry, by analysing practitioners’ perspectives on the current state of BIM and its perceived benefits.
Design/methodology/approach
A qualitative approach was selected, given the study’s exploratory character. Initially, an extensive review was undertaken to examine the current state of BIM utilisation and its associated advantages within the construction industry. Subsequently, empirical data were acquired through semi-structured interviews featuring open-ended questions, aimed at comprehensively assessing the prevailing extent of BIM integration within the Swedish wood construction sector.
Findings
The research concluded that the wood construction industry in Sweden is shifting towards BIM on different levels, where in some cases, the level of implementation is still modest. It should be emphasised that the wood construction industry in Sweden is not realising the full potential of BIM. The industry is still using a combination of BIM and traditional methods, thus, limiting the benefits that full BIM implementation could offer the industry.
Originality/value
This study provided empirical evidence on the current perceptions and state of practice of the Swedish wood construction industry regarding BIM maturity.
Details