Article
Publication date: 23 December 2022

Rouzbeh Shabani, Tobias Onshuus Malvik, Agnar Johansen and Olav Torp

Uncertainty management (UM) in projects has been a point of attention for researchers for many years. Research on UM has mainly been aimed at uncertainty analyses in the front-end…

2056

Abstract

Purpose

Uncertainty management (UM) in projects has been a point of attention for researchers for many years. Research on UM has mainly been aimed at uncertainty analyses in the front-end and managing uncertainty in the construction phase. In contrast, UM components in the design phase have received less attention. This research aims to improve knowledge about the key components of UM in the design phase of large road projects.

Design/methodology/approach

This study adopted a literature review and case study. The literature review was used to identify relevant criteria for UM. These criteria helped to design the interview guide. Multiple case study research was conducted, and data were collected through document study and interviews with project stakeholders in two road projects. Each case's owners, contractors and consultants were interviewed individually.

Findings

The data analysis obtained helpful information on the involved parties, process and exploit tools and techniques during the design phase. Johansen's (2015) framework [(a) human and organisation, (b) process and (c) tools and techniques)] was completed and developed by identifying relevant criteria (such as risk averse or risk-taker, culture and documentation level) for each component. These criteria help to measure UM performance. The authors found that owners and contractors are major formal UM actors, not consultants. Empirical data showed the effectiveness of Web-based tools in UM.

Research limitations/implications

The studied cases were Norwegian, and this study focussed on uncertainties in the project's design phase. Relevant criteria did not cover all the criteria for evaluating the performance of UM. Qualitative evaluation of criteria allows further quantitative analysis in the future.

Practical implications

This paper gave project owners and managers a better understanding of relevant criteria for measuring UM in the owners and managers' projects. The paper provides policy-makers with a deeper understanding of creating rigorous project criteria for UM during the design phase. This paper also provides a guideline for UM in road projects.

Originality/value

This research gives a holistic evaluation of UM by noticing relevant criteria and criteria's interconnection in the design phase.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Book part
Publication date: 1 May 2019

Olav Torp, Ingemund Jordanger, Ole Jonny Klakegg and Yvonne C.B. Bjerke

The purpose of the paper is 1) to address the importance of contingency at the right level when defining project control baseline, including cost reserves / “room to manoeuvre”…

Abstract

Purpose

The purpose of the paper is 1) to address the importance of contingency at the right level when defining project control baseline, including cost reserves / “room to manoeuvre” and 2) present proactive uncertainty management as a regime to ensure cost effective management of project reserves and contribute to project success.

Design/Methodology/Approach

The paper is a combination of literature study and quantitative research on how contingency develops during the lifetime of a case project. The investigation into the case project includes document study into quantitative material from the case project. The combination of empirical material and theory makes the discussion robust.

Findings

Unrealistic low cost uncertainty will lead to unrealistic low contingency. The case study from a Norwegian mega project shows a contingency of 15 per cent in addition to expected costs. The case study shows that by continuous opportunity management and risk reduction, the needs for management reserves are systematically reduced and the contingency is controlled.

Research Limitations/Implications

This research is limited to one case study. A higher number of cases are necessary to generalise the findings. However, the authors would claim that the systematic mapping of need for management reserve towards the project contingency, and a continuous uncertainty management system will help to obtain cost effective management. The findings from the case study could be applied on similar cases.

Practical Implications

The case study shows a way of setting contingencies and managing contingencies through systematic uncertainty management.

Originality/Value

Improved management of project provisions will increase the value of future projects.

Details

10th Nordic Conference on Construction Economics and Organization
Type: Book
ISBN: 978-1-83867-051-1

Keywords

Open Access
Article
Publication date: 11 October 2022

Peeter Peda and Eija Vinnari

Uncertainty, a state of unknowing linked to threats and opportunities, is a key characteristic of megaprojects, making it challenging for government officials and politicians to…

Abstract

Purpose

Uncertainty, a state of unknowing linked to threats and opportunities, is a key characteristic of megaprojects, making it challenging for government officials and politicians to decide on their initiation. For them, implementation by the private sector adds an extra layer of complexity and uncertainty to megaproject planning. In this context, only a few studies have focussed on governing and the mobilization of uncertainty arguments in communication between government actors and private developers either in favour of or against megaprojects. The purpose of this article is to shed light on how private megaproject proposals progress towards political acceptance or rejection in public decision-making.

Design/methodology/approach

This process of public decision-making on private megaproject proposals is examined in the case of the Helsinki–Tallinn undersea rail tunnel. In line with the interpretive research tradition, the authors’ study draws on a qualitative methodology underpinned by social constructionism. The research process can be characterized as abductive.

Findings

The authors’ findings suggest that while public decision-making on megaprojects is a conflictual and dynamic process, some types of uncertainty are relatively more important in affecting the perceived feasibility of the projects in the eyes of public sector decision-makers.

Originality/value

This study contributes to the debate on uncertainty management in megaprojects, proposing a new type of uncertaintyuncertainty about privateness – which has not been explicitly visible thus far.

Details

Journal of Public Budgeting, Accounting & Financial Management, vol. 34 no. 6
Type: Research Article
ISSN: 1096-3367

Keywords

Open Access
Article
Publication date: 29 August 2022

Henrik Franke, Finn Wynstra, Fabian Nullmeier and Chloe Nullmeier

Managing projects is an important part of operations management, but many projects fail. This study focuses on attribution processes of such disruption from the underrepresented…

1364

Abstract

Purpose

Managing projects is an important part of operations management, but many projects fail. This study focuses on attribution processes of such disruption from the underrepresented perspective of the project manager. The authors consider two types of causes: the more frequently researched environmental uncertainty (i.e. uncontrollable events) and the scarcely researched uncertainty imposed by non-collaborative project sponsors (i.e. other-controllable events).

Design/methodology/approach

The authors test conceptual arguments grounded in attribution theory and the notion of psychological contracts in a scenario-based experiment among 325 practicing project managers.

Findings

The findings indicate that non-collaborative project sponsors negatively affect project managers' motivation, whereas uncontrollable disruptions leave hope to achieve positive future outcomes. This latter effect is further strengthened when project managers have an internal attribution style. They tend to blame the disruption on themselves and generally feel in control of achieving success even if they are not.

Originality/value

These socio-psychological insights nuance the economic idea that uncertainty reduces motivation per se in the context of project disruption appraisal. The authors contribute to the behavioral project management literature and general attribution theory and help guide the allocation of resources during the recovery of failed projects.

Details

International Journal of Operations & Production Management, vol. 42 no. 13
Type: Research Article
ISSN: 0144-3577

Keywords

Open Access
Article
Publication date: 14 May 2020

Ulrika Uotila, Arto Saari and Juha-Matti Junnonen

Public authorities are required to organise new facilities to respond to changed user demands in terms of a public-owned school. The number of pupils attending the case study…

1912

Abstract

Purpose

Public authorities are required to organise new facilities to respond to changed user demands in terms of a public-owned school. The number of pupils attending the case study school will increase in the following years, as will the number of children attending a day nursery located on the present campus. In addition, the users of the campus have complained of building-related symptoms. This study aims to understand the municipal decision-making process in organising the school’s facilities, in particular, the factors used for decreasing uncertainty around a project.

Design/methodology/approach

This study is a case study undertaken through an action research approach. The researchers participated in the project planning meetings concerning the future activities to take place in the building.

Findings

Over a 13-month period, multiple stakeholders participated in the project planning meetings providing a deeper understanding of the space demands posed, current challenges and opportunities offered by the existing building. In addition, the alternative solutions generated were evaluated. The problem identification and information gathering periods lasted over nine months, which was far longer than predicted. Thus, generating alternative solutions and evaluation of the solutions also delayed. As the entire process was delayed substantially, the final decision on organising the facilities was not made during this research.

Practical implications

This research may be of practical value for a property owner and a project team for decision-making concerning changed facility demands.

Originality/value

This paper provides information about how public authorities are making decisions on facility organisation during conditions of uncertainty.

Open Access
Article
Publication date: 12 June 2019

Ximena Alejandra Flechas Chaparro, Leonardo Augusto de Vasconcelos Gomes and Paulo Tromboni de Souza Nascimento

The purpose of this paper is to identify how project portfolio selection (PPS) methods have evolved and which approaches are more suitable for radical innovation projects. This…

9841

Abstract

Purpose

The purpose of this paper is to identify how project portfolio selection (PPS) methods have evolved and which approaches are more suitable for radical innovation projects. This paper addressed the following research question: how have the selection approaches evolved to better fit within radical innovation conditions? The current literature offers a number of selection approaches with different and, in some cases, conflicting nature. Therefore, there is a lack of understanding regarding when and how to use these approaches in order to select a specific type of innovation projects (from incremental to more radical ones).

Design/methodology/approach

Given the nature of the research question, the authors perform a systematic literature review method and analyze 48 portfolio selection approaches. The authors then classified and characterized these articles in order to identify techniques, tools, required data and types of examined projects, among other aspects.

Findings

The authors identify four key features related to the selection of radical innovation projects: dynamism, interdependency management, uncertainty treatment and required input data. Based on the content analysis, the authors identified that approaches based on different sources and nature of data are more appropriated for uncertain conditions, such as behavioral methods, information gap theory, real options and integrated approaches.

Originality/value

The research provides a comprehensive framework about PPS methods and how they have been evolving over time. This portfolio selection framework considers the particular aspects of incremental and radical innovation projects. The authors hope that the framework contributes to reinvigorating the literature on selection approaches for innovation projects.

Details

Revista de Gestão, vol. 26 no. 3
Type: Research Article
ISSN: 2177-8736

Keywords

Open Access
Article
Publication date: 7 August 2017

Per Erik Eriksson

The purpose of this study is to investigate how procurement strategies may be designed to facilitate exploration and exploitation in construction projects.

12381

Abstract

Purpose

The purpose of this study is to investigate how procurement strategies may be designed to facilitate exploration and exploitation in construction projects.

Design/methodology/approach

This paper is based on a literature review of organizational research and construction management literature together with a brief interview study of Swedish clients and contractors.

Findings

The theoretical and empirical findings propose that small and simple projects with low uncertainty and scarce resources may focus on exploitation to enhance short-term efficiency through traditional procurement strategies including delivery systems that separate the actors and their activities (i.e. pure design-build- or design-bid-build-contracts), fixed price payment and price focus in bid evaluation. Large complex projects with high uncertainty and customization benefit from combining exploration and exploitation to enhance sustainable performance. This requires collaborative procurement strategies including joint specification through early contractor involvement, cost reimbursement coupled with incentive-based payment, bid evaluation based on multiple criteria and collaborative tools and activities in partnering arrangements.

Research limitations/implications

This paper contributes to organizational learning literature by pinpointing the need for integrating procurement strategies that enhance combination of exploration and exploitation. The main contribution to the construction management literature involves the investigation of how procurement strategies may affect exploration and exploitation, as identified and articulated in the propositions developed in this paper.

Practical implications

From a practical perspective, the findings highlight the importance of tailoring procurement strategies to project characteristics to enhance a suitable balance between exploration and exploitation in construction projects.

Originality/value

The explicit focus on the operational project-level is uncommon but relevant in organizational learning literature.

Details

Journal of Financial Management of Property and Construction, vol. 22 no. 2
Type: Research Article
ISSN: 1366-4387

Keywords

Open Access
Article
Publication date: 12 May 2022

Kari-Pekka Tampio, Harri Haapasalo and Farooq Ali

This study primarily aims to analyse stakeholder management challenges and how these emerge in the stakeholder landscape in a large hospital project. From this analysis, the…

8999

Abstract

Purpose

This study primarily aims to analyse stakeholder management challenges and how these emerge in the stakeholder landscape in a large hospital project. From this analysis, the authors aim to identify the implications that stakeholder management has on value creation in a hospital project.

Design/methodology/approach

The research method is qualitative. Empirical data were collected in three cycles: project internal documentation, thematic interviews and survey. The literature related to hospital projects, stakeholder analysis and management, stakeholder salience and landscape is summarised, informing the qualitative design of the study.

Findings

The authors noted the importance of project-specific stakeholder identification, salience analysis and landscape description. The regulatory, formal and contractual stakeholders give an over-simplistic picture on stakeholder map. The operative stakeholder map and landscape describe the complexity, uncertainty, dynamism and institutional context inducing the challenges for the stakeholder management. There is an evident potential of utilising the stakeholder landscape and its elements in the resulting collaborative value creation in hospital projects. Multiple and changing stakeholders with differing expectations are an important opportunity to improve the value creation process.

Originality/value

Stakeholder management has recently attracted much attention in the industrial project setting. This research attempts to identify the operative stakeholder landscape in a large hospital project, not to mention its impact on value creation. This study offers a framework that can help academics and project management practitioners tackle the challenges amongst project stakeholders.

Details

International Journal of Managing Projects in Business, vol. 15 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 4 August 2022

Christopher Amoah and Hlatshwayo Nkosazana

Contract risk management has become a critical mission, as contract issues may lead to a loss of vast amounts of money to parties involved or cause project failure. This study…

4943

Abstract

Purpose

Contract risk management has become a critical mission, as contract issues may lead to a loss of vast amounts of money to parties involved or cause project failure. This study sought to identify effective management strategies to mitigate construction contract issues that might emerge during construction.

Design/methodology/approach

A quantitative research approach was adopted for the study. Structured questionnaires made up of close-ended questions were distributed to construction professionals in South Africa via the SurveyMonkey platform. The data were then analysed using descriptive statistics.

Findings

The findings indicate that the critical sources of contract-related disputes are ambiguous definitions of the contract parties' scope of their rights and obligations, lack of precise arrangements regarding the calculation of contractual penalties for failure to meet the deadline, lack of detailed specification of the works and specific milestones, lack of provisions regulating changes to the project documentation during the construction stage, an excessive amount of contractual penalties on contractor's side and lack of provisions regarding the rules of performing additional and replacement works and their settlement. However, for these disputes to be effectively managed, strategies such as reduction uncertainties in project's phases, setting up contingency plans, construction guarantee, extension of time claims, payment guarantee, retention and escalation clause should be implemented by the parties involved.

Research limitations/implications

Even though the empirical study focused on construction professionals in South Africa, the findings could be applied to other countries outside of South Africa.

Practical implications

To effectively manage and prevent contract disputes from averting project failures and losses to parties involved in the contract, construction professionals need to be aware of strategies that must be implemented before and during the project execution. If well implemented, these strategies will help a construction project be successful and experience fewer contractual disputes.

Originality/value

The study has identified the knowledge gap concerning suitable contract risk management strategies available for implementation to effectively prevent any contract parties from losing money, time and project failure.

Details

International Journal of Building Pathology and Adaptation, vol. 41 no. 6
Type: Research Article
ISSN: 2398-4708

Keywords

Open Access
Article
Publication date: 10 June 2021

Ahm Shamsuzzoha, Sujan Piya and Mohammad Shamsuzzaman

This study aims to propose a method known as the fuzzy technique for order preference by similarity to ideal solution (fuzzy TOPSIS) for complex project selection in…

3276

Abstract

Purpose

This study aims to propose a method known as the fuzzy technique for order preference by similarity to ideal solution (fuzzy TOPSIS) for complex project selection in organizations. To fulfill study objectives, the factors responsible for making a project complex are collected through literature review, which is then analyzed by fuzzy TOPSIS, based on three decision-makers’ opinions.

Design/methodology/approach

The selection of complex projects is a multi-criteria decision-making (MCDM) process for global organizations. Traditional procedures for selecting complex projects are not adequate due to the limitations of linguistic assessment. To crossover such limitation, this study proposes the fuzzy MCDM method to select complex projects in organizations.

Findings

A large-scale engine manufacturing company, engaged in the energy business, is studied to validate the suitability of the fuzzy TOPSIS method and rank eight projects of the case company based on project complexity. Out of these eight projects, the closeness coefficient of the most complex project is found to be 0.817 and that of the least complex project is found to be 0.274. Finally, study outcomes are concluded in the conclusion section, along with study limitations and future works.

Research limitations/implications

The outcomes from this research may not be generalized sufficiently due to the subjectivity of the interviewers. The study outcomes support project managers to optimize their project selection processes, especially to select complex projects. The presented methodology can be used extensively used by the project planners/managers to find the driving factors related to project complexity.

Originality/value

The presented study deliberately explained how complex projects in an organization could be select efficiently. This selection methodology supports top management to maintain their proposed projects with optimum resource allocations and maximum productivity.

Details

Journal of Global Operations and Strategic Sourcing, vol. 14 no. 3
Type: Research Article
ISSN: 2398-5364

Keywords