Open Access
Article
Publication date: 25 December 2023

Anna Trubetskaya, Alan Ryan, Daryl John Powell and Connor Moore

Output from the Irish Dairy Industry has grown rapidly since the abolition of quotas in 2015, with processors investing heavily in capacity expansion to deal with the extra milk…

Abstract

Purpose

Output from the Irish Dairy Industry has grown rapidly since the abolition of quotas in 2015, with processors investing heavily in capacity expansion to deal with the extra milk volumes. Further capacity gains may be achieved by extending the processing season into the winter, a key enabler for which being the reduction of duration of the winter maintenance overhaul period. This paper aims to investigate if Lean Six Sigma tools and techniques can be used to enhance operational maintenance performance, thereby releasing additional processing capacity.

Design/methodology/approach

Combining the Six-Sigma Define, Measure, Analyse, Improve, Control (DMAIC) methodology and the structured approach of Turnaround Maintenance (TAM) widely used in process industries creates a novel hybrid model that promises substantial improvement in maintenance overhaul execution. This paper presents a case study applying the DMAIC/TAM model to Ireland’s largest dairy processing site to optimise the annual maintenance shutdown. The objective was to deliver a 30% reduction in the duration of the overhaul, enabling an extension of the processing season.

Findings

Application of the DMAIC/TAM hybrid resulted in process enhancements, employee engagement and a clear roadmap for the operations team. Project goals were delivered, and original objectives exceeded, resulting in €8.9m additional value to the business and a reduction of 36% in the duration of the overhaul.

Practical implications

The results demonstrate that the model provides a structure that promotes systematic working and a continuous improvement focus that can have substantial benefits for wider industry. Opportunities for further model refinement were identified and will enhance performance in subsequent overhauls.

Originality/value

To the best of the authors’ knowledge, this is the first time that the structure and tools of DMAIC and TAM have been combined into a hybrid methodology and applied in an Irish industrial setting.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Open Access
Article
Publication date: 21 July 2022

Anna-Therése Järvenpää, Johan Larsson and Per Erik Eriksson

This paper aims to identify how a public client’s use of control systems (process, output and social control) affect innovation possibilities in construction projects.

Abstract

Purpose

This paper aims to identify how a public client’s use of control systems (process, output and social control) affect innovation possibilities in construction projects.

Design/methodology/approach

Semi-structured interviews about six infrastructure projects were conducted to identify respondents’ views on innovation possibilities. These possibilities were then analyzed from an organizational control perspective within principal–agent relationships between the Swedish Transport Administration (STA) and their contractors.

Findings

How the client uses control systems affects innovation possibilities. Relying on process control could negatively affect innovation opportunities, whereas output control could have a positive influence. In addition, social control seems to have a weak effect, as the STA appears not to use social control to facilitate joint innovation. Public clients must comply with the Public Procurement Act and, therefore, retain the requirements specified in the tendering documents. Much of the steering of the execution is connected to the ex ante phase (before signing the contract), which affects innovation possibilities in the design and execution phases for the contractor.

Research limitations/implications

This study was conducted with only one client, thus limiting its generalizability. However, the findings provide an important stepping stone to further investigation into balancing control systems and creating innovation possibilities in a principal–agent relationship.

Originality/value

Although public procurement has increasingly been emphasized as a major potential source of innovation, studying how a public client’s use of organizational control systems affects innovation possibilities in the construction sector has received scant attention.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 29 January 2024

Nilton Takagi, João Varajão and Thiago Ventura

As in the private sector, public organizational information systems (IS) development is commonly carried out through projects. One of the alternatives followed by governmental…

Abstract

Purpose

As in the private sector, public organizational information systems (IS) development is commonly carried out through projects. One of the alternatives followed by governmental organizations to perform their projects is outsourcing (by hiring other public institutions that have expertise in the IS area of the projects to be developed). However, limited research has been conducted on project success regarding these government-to-government (G2G) contexts. Since achieving success is crucial for public management, this paper proposes a model for Success Management of IS projects in G2G context.

Design/methodology/approach

The research method was design science research (DSR). In the evaluation step of the DSR, IS projects in a G2G environment were the object of case studies.

Findings

This work presents in detail how Success Management activities can be integrated into the processes and process groups of the Project Management Institute's project management guide. The authors also suggest tools and techniques to be used in each Success Management activity.

Practical implications

Managing success, particularly addressing success criteria and success factors, can help managers focus their efforts on what will really impact the success of a project. In the context of IS projects in G2G contexts, this contributes to decreasing waste and increasing the chances of providing better services to citizens.

Originality/value

This work contributes to theory by providing a new model for IS G2G projects that integrates Success Management and project management processes.

Details

International Journal of Managing Projects in Business, vol. 17 no. 1
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 29 September 2022

Najib AL-Fadhali

Construction project stakeholders can have a major effect on delivering projects on time. However, little attempt has been made to address the influence of internal stakeholders…

Abstract

Purpose

Construction project stakeholders can have a major effect on delivering projects on time. However, little attempt has been made to address the influence of internal stakeholders on delaying project delivery. This research aims to propose the internal stakeholders' influence as a solution to improving project delivery performance (PDP) in order to boost the value of investment in the construction industry's projects.

Design/methodology/approach

In Yemen, a structured questionnaire was distributed to owners, consultants and contractors, 283 of which were found usable after the data screening. A purposeful sampling technique was used and structural equation modelling (SEM) was adopted for analysis. The structural model was drawn up, based on seven categories of influencing factors: labour, supplier, designer, contractor, consultant, sub-contractor and owner.

Findings

The results of the structural model suggest that of these seven categories, designers, owners, suppliers and subcontractors have a significant p-value and impact on PDP, while the labour and consultant's impact was not substantiated. The findings support the proposal that internal stakeholders' influence contributes directly to construction PDP.

Originality/value

The influence of stakeholders on PDP is important. Nonetheless, few studies have focussed on their effectiveness, especially in developing countries. This paper's contribution is evaluating the cause–effect relationship between stakeholders' influence and construction PDP through analysis of moment structures (AMOS) analysis. The policy implications of the research are to encourage governments in general and construction companies in particular to take responsibility for improving PDP, as slow execution of construction projects leads to increased costs, failure and abandoning projects.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 April 2024

Zoubeir Lafhaj, Slim Rebai, Olfa Hamdi, Rateb Jabbar, Hamdi Ayech and Pascal Yim

This study aims to introduce and evaluate the COPULA framework, a construction project monitoring solution based on blockchain designed to address the inherent challenges of…

Abstract

Purpose

This study aims to introduce and evaluate the COPULA framework, a construction project monitoring solution based on blockchain designed to address the inherent challenges of construction project monitoring and management. This research aims to enhance efficiency, transparency and trust within the dynamic and collaborative environment of the construction industry by leveraging the decentralized, secure and immutable nature of blockchain technology.

Design/methodology/approach

This paper employs a comprehensive approach encompassing the formulation of the COPULA model, the development of a digital solution using the ethereum blockchain and extensive testing to assess performance in terms of execution cost, time, integrity, immutability and security. A case analysis is conducted to demonstrate the practical application and benefits of blockchain technology in real-world construction project monitoring scenarios.

Findings

The findings reveal that the COPULA framework effectively addresses critical issues such as centralization, privacy and security vulnerabilities in construction project management. It facilitates seamless data exchange among stakeholders, ensuring real-time transparency and the creation of a tamper-proof communication channel. The framework demonstrates the potential to significantly enhance project efficiency and foster trust among all parties involved.

Research limitations/implications

While the study provides promising insights into the application of blockchain technology in construction project monitoring, future research could explore the integration of COPULA with existing project management methodologies to broaden its applicability and impact. Further investigations into the solution’s scalability and adaptation to various construction project types and sizes are also suggested.

Originality/value

This research offers a comprehensive blockchain solution specifically tailored for the construction industry. Unlike prior studies focusing on theoretical aspects, this paper presents a practical, end-to-end solution encompassing model formulation, digital implementation, proof-of-concept testing and validation analysis. The COPULA framework marks a significant advancement in the digital transformation of construction project monitoring, providing a novel approach to overcoming longstanding industry challenges.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 11 October 2021

Achinthya Dharani Perera Halnetti, Nihal Jayamaha, Nigel Peter Grigg and Mark Tunnicliffe

The purpose of this paper is to investigate how successful lean six sigma (LSS) manifests in the Australasian (Australian and New Zealand) context relative to the context in the…

Abstract

Purpose

The purpose of this paper is to investigate how successful lean six sigma (LSS) manifests in the Australasian (Australian and New Zealand) context relative to the context in the USA in terms of LSS project definition, structure and practices.

Design/methodology/approach

In-depth investigation through case studies – 12 Australian/New Zealand cases and 4 US cases – on the implementation mechanisms of successful LSS initiatives.

Findings

A significant difference was found between Australasian and US definitions of an LSS project. However, firms in both regions followed similar project selection, initiating and execution practices. LSS reporting structures were found to be well-established in US organizations, but none of the Australasian organizations were found to be equipped with such a structure, although the effectiveness of LSS implementation success remained unaffected.

Research limitations/implications

Sufficient uniformity of LSS was found across two regions implying its usefulness/generalizability, but the findings are based only on 12 cases.

Originality/value

The paper provides the groundwork to develop a unique LSS model for Australasian organizations to improve processes in an effective and efficient manner.

Details

International Journal of Lean Six Sigma, vol. 15 no. 3
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 15 April 2024

Rabail Tariq, Yifan Wang and Khawaja Fawad Latif

Through the lens of resource-based view (RBV), knowledge-based view (KBV) and DCV, this paper aims to investigate the relationship of entrepreneurial leadership (EL) on the…

Abstract

Purpose

Through the lens of resource-based view (RBV), knowledge-based view (KBV) and DCV, this paper aims to investigate the relationship of entrepreneurial leadership (EL) on the project success (PS) and further examines the mediating effect of knowledge infrastructure capability (KIC), knowledge-based dynamic capability (KBDC) and Big data analytic capability (BDAC).

Design/methodology/approach

The data were collected from 467 employees working on project in software companies. The data were evaluated using SMART-PLS, a structural equation modeling (SEM) tool.

Findings

The study revealed a significant impact of EL on the PS, the study also found the significant mediation role of KIC, KBDC and BDAC on the EL and PS relationship.

Originality/value

The research gives valuable insight into the effective role of EL as a contemporary leadership style in project-based firms. Also, this research is one of the first to examine knowledge-oriented dynamic capabilities (DC) as a knowledge fulcrum in project execution. These DC have been empirically proven to facilitate EL in achieving PS and support the firm in competing in an uncertain environment.

Details

Journal of Enterprise Information Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1741-0398

Keywords

Article
Publication date: 8 March 2024

Md. Mohaimenul Islam Sourav, Mohammed Russedul Islam, Sheikh Mohibur Rahman and Md. Istiak Jahan

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of…

Abstract

Purpose

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of delays by taking responses from the stakeholders who are responsible for planning, design, funding, approval and implementation. There are few studies that have related infrastructure project delays to heterogeneity in stakeholders’ perceptions.

Design/methodology/approach

A structural equation (SE) model is developed with 350 normally distributed data points to understand the heterogeneity in stakeholders’ perceptions regarding delays in infrastructure projects in BD. Additionally, the relative importance index (RII) approach is used to assess the responses, validating the SE model.

Findings

The study finds that among the three latent variables, “Project itself related delay” has more influence on delays in infrastructure projects. Among the observed variables under the “project itself related delay” latent variable, “DPP approval process” has the most significance. From the heterogeneity analysis, the study found differences in responses among the stakeholders from “the Engineering Department,” “the Planning Office” and “the Construction Firm/Industry.” An important class of stakeholders believes that their stage is not being delayed and that other stages require attention.

Research limitations/implications

The data sample is 350. More data can improve the accuracy of the findings. Most of the respondents are civil engineers (74%) and represent the owner of the project. Sample data from more stakeholders’ will enhance the accuracy of the result.

Practical implications

This study addresses the requirements of Bangladeshi project stakeholders and how their interactions cause delays in projects. Furthermore, the opinions of other stakeholders are taken into consideration when determining the specific factors of individual stakeholders that are causing delays. Practically, the distance between stakeholders should be reduced. A project manager can play a role in this regard. Initiatives should be taken on how to complete the project quickly by eliminating the requirements discussed among the stakeholders and bureaucratic complications. Instead of placing blame on one another, stakeholders should take the initiative to figure out how to work together to finish the project on schedule. The Planning Commission’s approval of the Development Project Proposal (DPP) and Revised Development Project Proposal (RDPP) should be obtained as soon as possible by owner stakeholders. In order to avoid frequently changing the DPP, owners should also exercise greater caution when choosing contractors. Contractor stakeholders should use efficient and proper manpower and equipment so that unexpected delays are not created during the execution of work. Since the role of the contractor stakeholder is the most important among the three types of stakeholders, the contractor should raise awareness and urge the owners to get the RDPP approved quickly.

Originality/value

The findings from the study can help mitigate delays in infrastructure projects in BD, taking into account the perceptions of various stakeholders.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 28 March 2024

Elisa Gonzalez Santacruz, David Romero, Julieta Noguez and Thorsten Wuest

This research paper aims to analyze the scientific and grey literature on Quality 4.0 and zero-defect manufacturing (ZDM) frameworks to develop an integrated quality 4.0 framework…

Abstract

Purpose

This research paper aims to analyze the scientific and grey literature on Quality 4.0 and zero-defect manufacturing (ZDM) frameworks to develop an integrated quality 4.0 framework (IQ4.0F) for quality improvement (QI) based on Six Sigma and machine learning (ML) techniques towards ZDM. The IQ4.0F aims to contribute to the advancement of defect prediction approaches in diverse manufacturing processes. Furthermore, the work enables a comprehensive analysis of process variables influencing product quality with emphasis on the use of supervised and unsupervised ML techniques in Six Sigma’s DMAIC (Define, Measure, Analyze, Improve and Control) cycle stage of “Analyze.”

Design/methodology/approach

The research methodology employed a systematic literature review (SLR) based on PRISMA guidelines to develop the integrated framework, followed by a real industrial case study set in the automotive industry to fulfill the objectives of verifying and validating the proposed IQ4.0F with primary data.

Findings

This research work demonstrates the value of a “stepwise framework” to facilitate a shift from conventional quality management systems (QMSs) to QMSs 4.0. It uses the IDEF0 modeling methodology and Six Sigma’s DMAIC cycle to structure the steps to be followed to adopt the Quality 4.0 paradigm for QI. It also proves the worth of integrating Six Sigma and ML techniques into the “Analyze” stage of the DMAIC cycle for improving defect prediction in manufacturing processes and supporting problem-solving activities for quality managers.

Originality/value

This research paper introduces a first-of-its-kind Quality 4.0 framework – the IQ4.0F. Each step of the IQ4.0F was verified and validated in an original industrial case study set in the automotive industry. It is the first Quality 4.0 framework, according to the SLR conducted, to utilize the principal component analysis technique as a substitute for “Screening Design” in the Design of Experiments phase and K-means clustering technique for multivariable analysis, identifying process parameters that significantly impact product quality. The proposed IQ4.0F not only empowers decision-makers with the knowledge to launch a Quality 4.0 initiative but also provides quality managers with a systematic problem-solving methodology for quality improvement.

Details

The TQM Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1754-2731

Keywords

Article
Publication date: 3 October 2023

Renan Ribeiro Do Prado, Pedro Antonio Boareto, Joceir Chaves and Eduardo Alves Portela Santos

The aim of this paper is to explore the possibility of using the Define-Measure-Analyze-Improve-Control (DMAIC) cycle, process mining (PM) and multi-criteria decision methods in…

Abstract

Purpose

The aim of this paper is to explore the possibility of using the Define-Measure-Analyze-Improve-Control (DMAIC) cycle, process mining (PM) and multi-criteria decision methods in an integrated way so that these three elements combined result in a methodology called the Agile DMAIC cycle, which brings more agility and reliability in the execution of the Six Sigma process.

Design/methodology/approach

The approach taken by the authors in this study was to analyze the studies arising from this union of concepts and to focus on using PM tools where appropriate to accelerate the DMAIC cycle by improving the first two steps, and to test using the AHP as a decision-making process, to bring more excellent reliability in the definition of indicators.

Findings

It was indicated that there was a gain with acquiring indicators and process maps generated by PM. And through the AHP, there was a greater accuracy in determining the importance of the indicators.

Practical implications

Through the results and findings of this study, more organizations can understand the potential of integrating Six Sigma and PM. It was just developed for the first two steps of the DMAIC cycle, and it is also a replicable method for any Six Sigma project where data acquisition through mining is possible.

Originality/value

The authors develop a fully applicable and understandable methodology which can be replicated in other settings and expanded in future research.

Details

International Journal of Lean Six Sigma, vol. 15 no. 3
Type: Research Article
ISSN: 2040-4166