Article
Publication date: 2 February 2024

Quntao Wu, Qiushi Bo, Lan Luo, Chenxi Yang and Jianwang Wang

This study aims to obtain governance strategies for managing the complexity of megaprojects by analyzing the impact of individual factors and their configurations using the…

Abstract

Purpose

This study aims to obtain governance strategies for managing the complexity of megaprojects by analyzing the impact of individual factors and their configurations using the fuzzy-set qualitative comparative analysis (fsQCA) method and to provide references for project managers.

Design/methodology/approach

With the continuous development of the economy, society and construction industry, the number and scale of megaprojects are increasing, and the complexity is becoming serious. Based on the relevant literature, the factors affecting the complexity of megaprojects are determined through case analysis, and the paths of factors affecting the complexity are constructed for megaprojects. Then, the fsQCA method is used to analyze the factors affecting the complexity of megaprojects through 245 valid questionnaires from project engineers in this study.

Findings

The results support the correlation between the complexity factors of megaprojects, with six histological paths leading to high complexity and seven histological paths leading to low complexity.

Originality/value

It breaks the limitations of the traditional project complexity field through a “configuration perspective” and concludes that megaproject complexity is a synergistic effect of multiple factors. The study is important for enriching the theory of megaproject complexity and providing complexity governance strategies for managers in megaproject decision-making.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 9 January 2024

Dara Sruthilaya, Aneetha Vilventhan and P.R.C. Gopal

The purpose of this research is to develop a project complexity index (PCI) model using the best and worst method (BWM) to quantitatively analyze the impact of project…

Abstract

Purpose

The purpose of this research is to develop a project complexity index (PCI) model using the best and worst method (BWM) to quantitatively analyze the impact of project complexities on the performance of metro rail projects.

Design/methodology/approach

This study employed a two-phase research methodology. The first phase identifies complexities through a literature review and expert discussions and categorizes different types of complexities in metro rail projects. In the second phase, BWM, a robust multi-criteria decision-making (MCDM) technique, was used to prioritize key complexities, and a PCI model was developed. Further, the developed PCI was validated through case studies, and sensitivity analysis was performed to check the accuracy and applicability of the developed PCI model.

Findings

The analysis revealed that location complexity exerted the most substantial influence on project performance, followed by environmental, organizational, technological and contractual complexities. Sensitivity analysis revealed the varying impacts of complexity indices on the overall project complexity.

Practical implications

The study's findings offer a novel approach for measuring project complexity's impact on metro rail projects. This allows stakeholders to make informed decisions, allocate resources efficiently and plan strategically.

Originality/value

The existing studies on project complexity identification and quantification were limited to megaprojects other than metro rail projects. Efforts to quantitatively study and analyze the impact of project complexity on metro rail projects are left unattended. The developed PCI model and its validation contribute to the field by providing a definite method to measure and manage complexity in metro rail projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 11 October 2021

Sharareh Kermanshachi, Thahomina Jahan Nipa and Bac Dao

The purpose of this study is to ascertain and list the most effective management strategies in efficiently handling the project complexities to enhance the performance of the…

Abstract

Purpose

The purpose of this study is to ascertain and list the most effective management strategies in efficiently handling the project complexities to enhance the performance of the project.

Design/methodology/approach

To fulfill the aim of this study, a comprehensive literature review was conducted, and the qualitative Delphi technique in two rounds was applied. Participants of the Delphi technique consisted of 12 subject matter experts (SMEs) with cumulative experience of 250 years in working in construction projects. In the first round of the Delphi technique, SMEs were asked to provide complexity management strategies to address the complexities due to 37 complexity indicators (CIs) under 11 complexity categories. In the second round of the Delphi technique, SMEs identified the top three management strategies for each of the 37 CIs.

Findings

This study collected the outcome of the two-round Delphi technique and based on the output developed the list of strategies to manage complexities related to each indicator. For example, establishing a well-informed governance team, assigning a Project Manager (PM) when the number of projects is more than one in an organization, and assigning a PM efficient enough to communicate with higher authority effectively will help in managing complexity that arises due to faulty assessment of the influence of a project on the organization’s overall success.

Originality/value

This study will help practitioners in effectively managing the project complexities, and thus will reduce the monetary loss associated with project complexities.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 8 January 2024

Kavita Bhangale, Kanchan Joshi, Ruchita Gupta and Bhaskar Gardas

Project complexity (PC) governs project success, but the project management literature primarily focuses on performance measures and rarely examines the complexity factors…

Abstract

Purpose

Project complexity (PC) governs project success, but the project management literature primarily focuses on performance measures and rarely examines the complexity factors, especially for megaprojects. This paper aims to determine the most significant complexity factors for the railway megaprojects in India.

Design/methodology/approach

A mixed approach using the Delphi and best–worst method (BWM) helped to identify, validate and determine the most critical factors that require intervention to diminish variance from project performance.

Findings

The BWM resulted in stakeholder management, followed by organizational and technological complexity as significant complexity factors, and the varied interests of the stakeholder as the most important among the 40 subfactors.

Practical implications

The finding indicates the necessity for strategic, tactical and operational-level interventions to effectively manage the complexity affecting project efficiency because of the varied stakeholders. This paper will guide the project and general managers to prioritize their resources to handle complexity for effective project performance measured in terms of time, cost and quality and help them make strategic decisions. The research findings of this study are expected to help researchers and practitioners in better planning and smoother execution of projects. In addition, this study would help the researchers formulate policies and strategies for better handling of the projects.

Originality/value

This study adds significant value to the body of knowledge related to PC in megaprojects in developing countries. The result of the investigation underlined that nine complexity factors and seven unique subfactors, namely, the sustainable environment, timely availability of information, communication in both directions, interdepartmental dependency and coordination, design, statutory norms, site challenges, socioeconomic conditions, the tendency of staff to accept new technology and the frequent changes in the requirements of stakeholders are significant in railway megaprojects. The BWM is applied to rank the complexity factors and subfactors in the case area.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 29 December 2023

Dara Sruthilaya, Aneetha Vilventhan and P.R.C. Gopal

The purpose of this paper is to identify and analyze the interdependence of project complexity factors (PCFs) in metro rail projects using the Decision-Making Trial and Evaluation…

Abstract

Purpose

The purpose of this paper is to identify and analyze the interdependence of project complexity factors (PCFs) in metro rail projects using the Decision-Making Trial and Evaluation Laboratory (DEMATEL). The study provides qualitative and quantitative analysis of project complexities factors and their relationships. The results of the study facilitate effective project planning, proactive risk management and informed decision-making by stakeholders.

Design/methodology/approach

This study employs a case-based method for identifying PCFs and a DEMATEL method for analyzing the interdependence of complexity factors in metro rail projects. Initially, PCFs were identified through an extensive literature review. To validate and refine these factors, semi-structured interviews were conducted with thirty experienced professionals, each having 5–20 years of experience in roles such as project management, engineering, and planning. Further, elevated and underground metro rail projects were purposefully selected as cases, for identifying the similarities and differences in PCFs. A questionnaire survey was conducted with various technical experts in metro rail projects. These experts rated the impact of PCFs on a five-point Likert scale, for the evaluation of the interdependence of PCFs. The DEMATEL technique was used to analyze the interdependencies of the PCFs.

Findings

Metro rail projects are influenced by project complexity, which significantly impacts their performance. The analysis reveals that “design problems with existing structures,” “change in design or construction” and “land acquisition” are the key factors contributing to project complexity.

Originality/value

The study of project complexity in metro rail projects is limited because most of the studies have studies on examining complexity in mega projects. The existing literature lacks adequate attention in identifying project complexity and its effects on metro rail project performance. This research aims to bridge this gap by examining project complexity and interdependencies in metro rail projects.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 21 November 2023

Sharaf AlKheder, Hajar Al Otaibi, Zahra Al Baghli, Shaikhah Al Ajmi and Mohammad Alkhedher

Megaproject's construction is essential for the development and economic growth of any country, especially in the developing world. In Kuwait, megaprojects are facing many…

Abstract

Purpose

Megaproject's construction is essential for the development and economic growth of any country, especially in the developing world. In Kuwait, megaprojects are facing many restrictions that discourage their execution causing a significant delay in bidding, design, construction and operation phases with the execution quality being affected. The objective of this study is to develop a complexity measurement model using analytic hierarchy process (AHP) for megaprojects in Kuwait, with a focus on the New Kuwait University multi-billion campus Shadadiyah (College of Social Science, Sharia and Law (CSSL)) as a case study.

Design/methodology/approach

The study applies a hybrid fuzzy analytic hierarchy process (FAHP) method to compare the results with those obtained using the conventional AHP method. This can facilitate the project management activities during the different stages of construction. Data were collected based on the results of a two-round Delphi questionnaire completed by seniors and experts of the selected project.

Findings

It was found that project modeling methodology was responsible for complexity. It was grouped under several categories that include technological, goal, organizational, environmental and cultural complexities. The study compares complexity degrees assessed by AHP and FAHP methods. “Technological Complexity” scores highest in both methods, with FAHP reaching 7.46. “Goal Complexity” follows closely behind, with FAHP. “Cultural Complexity” ranks third, differing between methods, while “Organizational” and “Environmental Complexity” consistently score lower, with FAHP values slightly higher. These results show varying complexity levels across dimensions. Assessing and understanding such complexities were essential toward the completion of such megaprojects.

Originality/value

The contribution of this study is on providing the empirical evidential knowledge for the priority over construction complexities in a developing country (Kuwait) in the Middle East.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 2 October 2023

Ki-Hyun Um

This study develops a conceptualization of NPD (new product development) complexity and explores how inter-organizational collaboration and conflict influence NPD performance.

Abstract

Purpose

This study develops a conceptualization of NPD (new product development) complexity and explores how inter-organizational collaboration and conflict influence NPD performance.

Design/methodology/approach

An empirical examination tests the proposed relationships in the context of Korean manufacturing firms, which currently engage in NPD projects with their key partners. Structural equation modeling (SEM) was used to examine the hypotheses.

Findings

The findings suggest that a higher level of NPD complexity simultaneously calls for inter-organizational collaboration and conflict, and these two factors influence NPD performance in a conflicting manner: inter-organizational collaboration serves as a driver, and inter-organizational conflict acts as a barrier against NPD performance.

Originality/value

This study provides answers to the academic and practical calls by providing how NPD complexity should be managed in a way to increase NPD performance. This study provides insight into how manufacturing firms form inter-organizational collaboration practices and why they need to mitigate inter-organizational conflict.

Details

Journal of Manufacturing Technology Management, vol. 34 no. 8
Type: Research Article
ISSN: 1741-038X

Keywords

Article
Publication date: 26 August 2022

Ercan Emin Cihan, Çiğdem Alabaş-Uslu and Özgür Kabak

This paper aims to develop an algorithm to pretest an industrial portfolio on a new scale. Portfolios include complex and uncertain projects at the front-end phase. The study…

Abstract

Purpose

This paper aims to develop an algorithm to pretest an industrial portfolio on a new scale. Portfolios include complex and uncertain projects at the front-end phase. The study, therefore, proposes a procedure that helps decision-makers to handle various complex projects and defines a common scale applicable to various kinds of industrial projects.

Design/methodology/approach

Decision-makers can employ the preference algorithm to reach a common understanding. To this end, the current paper posits the organization of criteria in various project sets. A sexagesimal scale is developed based on project complexity and its ability to achieve broad impact, both these factors being gauged on a five-point scale of user-friendly numberings.

Findings

The proposed algorithm shows the equivalence of industrial projects in different fields. Also, the algorithm articulates the status in terms of uncertainty, complexity, risk, and value of projects. The connections between decision-makers and criteria operate on the basis of the foreseen complexity, risk, and value. It can be said that this study exemplifies and visualizes the portfolio and criteria relationship.

Research limitations/implications

The procedure covers contingency exercises at the front-end phase of a portfolio and supports decisions. However, updated information can change support positions.

Originality/value

The paper presents original scoring guidance for portfolio complexity on a new scale. The scaling and scoring are adjustable and calibrated using the proposed sexagesimal system. It presents an original classification of project risk and value. The main contribution is the presented algorithm which can be used to pretest industrial portfolios composed of projects that vary in both size and context.

Details

Kybernetes, vol. 52 no. 12
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 26 January 2024

Kai Liu, Yuming Liu and Yuanyuan Kou

Inter-organizational collaboration is the organizational guarantee and key link to achieve the goals of megaproject management. Project governance has always played an important…

Abstract

Purpose

Inter-organizational collaboration is the organizational guarantee and key link to achieve the goals of megaproject management. Project governance has always played an important role in the construction of megaprojects, but the relationship between project governance and organizational collaboration is unclear. The purpose of this study is to explore the role paths of different project governance mechanisms in influencing the collaborative behaviors of stakeholders and collaborative performance and to elucidate the mechanism of project governance on inter-organizational collaboration.

Design/methodology/approach

A conceptual framework was developed based on a comprehensive literature review, termed the structural equation model (SEM). The hypotheses of the model were tested based on data obtained from a questionnaire survey of 235 experts with experience in megaprojects within the construction industry in China.

Findings

The results show that project governance positively contributes to the collaborative behavior of megaproject stakeholders and the collaborative performance of the project team. Collaborative behavior acts as a partial mediator between project governance and the collaborative performance of the megaproject inter-organization alliance. The complexity of the project modulates the relationship between the governance mechanism of the project and the collaborative behavior of the stakeholders, which affects the collaborative performance of the megaproject inter-organization alliance.

Originality/value

The findings provide theoretical and practical implications for promoting positive collaborative behavior among stakeholders in megaproject selection and improving the collaborative performance of megaproject inter-organization alliances.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 17 October 2023

Qiong Wu, Qiwei Zhou and Kathryn Cormican

Shared leadership is an effective mechanism for managing project teams. Its performance-enhancing benefits have been demonstrated in many studies. Nonetheless, there is an obvious…

Abstract

Purpose

Shared leadership is an effective mechanism for managing project teams. Its performance-enhancing benefits have been demonstrated in many studies. Nonetheless, there is an obvious silence about how to promote shared leadership in Lean Six Sigma (LSS) project teams. To address this deficit, the purposes of this study are to investigate the influence of shared leadership on LSS project success and to explore how team psychological safety, project task complexity and project task interdependence influence shared leadership.

Design/methodology/approach

A multi-source, time-lagged survey design with a four-month interval was conducted. To do this, the authors collected data from 71 project teams (comprising 71 project managers and 352 project members) using LSS approaches in the manufacturing and service industries.

Findings

The findings show that shared leadership positively influences LSS project success. The authors also found that team psychological safety fosters the development of shared leadership and, more importantly, these effects are stronger when the tasks are more complex and more interdependent.

Practical implications

These findings advance our understanding of the factors that enable shared leadership and equip LSS project managers with practical techniques to improve shared leadership for the success of their projects.

Originality/value

This study extends the theory of shared leadership to the context of LSS project management and is among the first, to the best of the authors’ knowledge, to theoretically propose and empirically validate how to promote shared leadership in LSS project teams.

Details

International Journal of Lean Six Sigma, vol. 15 no. 3
Type: Research Article
ISSN: 2040-4166