1 – 10 of over 4000
Open Access
Article
Publication date: 10 June 2021

Ahm Shamsuzzoha, Sujan Piya and Mohammad Shamsuzzaman

This study aims to propose a method known as the fuzzy technique for order preference by similarity to ideal solution (fuzzy TOPSIS) for complex project selection in…

3610

Abstract

Purpose

This study aims to propose a method known as the fuzzy technique for order preference by similarity to ideal solution (fuzzy TOPSIS) for complex project selection in organizations. To fulfill study objectives, the factors responsible for making a project complex are collected through literature review, which is then analyzed by fuzzy TOPSIS, based on three decision-makers’ opinions.

Design/methodology/approach

The selection of complex projects is a multi-criteria decision-making (MCDM) process for global organizations. Traditional procedures for selecting complex projects are not adequate due to the limitations of linguistic assessment. To crossover such limitation, this study proposes the fuzzy MCDM method to select complex projects in organizations.

Findings

A large-scale engine manufacturing company, engaged in the energy business, is studied to validate the suitability of the fuzzy TOPSIS method and rank eight projects of the case company based on project complexity. Out of these eight projects, the closeness coefficient of the most complex project is found to be 0.817 and that of the least complex project is found to be 0.274. Finally, study outcomes are concluded in the conclusion section, along with study limitations and future works.

Research limitations/implications

The outcomes from this research may not be generalized sufficiently due to the subjectivity of the interviewers. The study outcomes support project managers to optimize their project selection processes, especially to select complex projects. The presented methodology can be used extensively used by the project planners/managers to find the driving factors related to project complexity.

Originality/value

The presented study deliberately explained how complex projects in an organization could be select efficiently. This selection methodology supports top management to maintain their proposed projects with optimum resource allocations and maximum productivity.

Details

Journal of Global Operations and Strategic Sourcing, vol. 14 no. 3
Type: Research Article
ISSN: 2398-5364

Keywords

Open Access
Article
Publication date: 25 July 2024

Per Erik Eriksson

This paper aims to examine how different contextual contingency factors and organizational goals influence construction clients’ decision-making when procuring contractors in the…

Abstract

Purpose

This paper aims to examine how different contextual contingency factors and organizational goals influence construction clients’ decision-making when procuring contractors in the housing sector. More specifically, it investigates how clients’ choice of procurement strategies and organizational control systems is contingent upon various contextual factors and organizational goals.

Design/methodology/approach

It is based on an explorative interview study of clients and contractors in the Swedish housing sector underpinned by a review of organizational control literature.

Findings

The client's knowledge and resources, as well as project complexity and uncertainty, are the most important contextual contingency factors, while property management and sustainable development are the most important organizational goals that housing clients consider when designing procurement strategies.

Research limitations/implications

The paper contributes to the understanding of how construction clients choose procurement strategies, by providing new insights into effects of the mentioned contextual contingency factors and organizational goals on clients’ choice of control systems through their procurement strategies.

Practical implications

Property owners who continuously procure housing projects with sustainability requirements and high degrees of complexity and uncertainty should develop knowledge and resources related to their client role, to enable the design and implementation of appropriate procurement strategies.

Originality/value

Novel aspects of the paper are the demonstration of the value of a holistic approach, considering both contextual contingency factors and organizational goals, when selecting control systems and explicit discussion of how the client's knowledge and resources influence possibilities to implement different control systems.

Details

Journal of Financial Management of Property and Construction , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1366-4387

Keywords

Open Access
Article
Publication date: 18 May 2022

Salman Ashkanani and Robert Franzoi

There is a large amount of published literature on project management. However, there exists a gap between the existing literature and current…

6881

Abstract

Purpose

There is a large amount of published literature on project management. However, there exists a gap between the existing literature and current practices in the industry for the development and execution of megaprojects. Existing literature generally focuses on individual elements applicable to project management in general. This article aims to provide an overview of the project management system components used in industrial megaprojects and identify the gaps between theory and practice, which can be used as input for further research on the topic.

Design/methodology/approach

The topic of megaproject management is reviewed based on available literature sources on megaproject management systems to identify the main gaps in the literature between theory and practice. Based on the findings, an analysis is provided to discuss the improvements required in distinct project management areas and phases.

Findings

There are multiple gaps associated with issues, failures, successes and challenges in industrial megaprojects. Improvements are needed in distinct management areas and over the entire project lifetime. Further guidelines are required for achieving improved megaproject management systems. Such concepts could benefit researchers and practitioners in streamlining their research toward the most relevant and critical areas of improvement of megaproject management systems.

Originality/value

This study addresses the literature gaps between theory and practices on megaproject management systems with an overview that provides helpful guidance for industrial applications and future research. A holistic analysis identifies gaps and critical drives in the body of knowledge, revealing avenues for future research focused on quality as the central pillar that affects the entire megaproject management system.

Details

Management Matters, vol. 19 no. 2
Type: Research Article
ISSN: 2752-8359

Keywords

Open Access
Article
Publication date: 12 May 2022

Kari-Pekka Tampio, Harri Haapasalo and Farooq Ali

This study primarily aims to analyse stakeholder management challenges and how these emerge in the stakeholder landscape in a large hospital project. From this analysis, the…

10415

Abstract

Purpose

This study primarily aims to analyse stakeholder management challenges and how these emerge in the stakeholder landscape in a large hospital project. From this analysis, the authors aim to identify the implications that stakeholder management has on value creation in a hospital project.

Design/methodology/approach

The research method is qualitative. Empirical data were collected in three cycles: project internal documentation, thematic interviews and survey. The literature related to hospital projects, stakeholder analysis and management, stakeholder salience and landscape is summarised, informing the qualitative design of the study.

Findings

The authors noted the importance of project-specific stakeholder identification, salience analysis and landscape description. The regulatory, formal and contractual stakeholders give an over-simplistic picture on stakeholder map. The operative stakeholder map and landscape describe the complexity, uncertainty, dynamism and institutional context inducing the challenges for the stakeholder management. There is an evident potential of utilising the stakeholder landscape and its elements in the resulting collaborative value creation in hospital projects. Multiple and changing stakeholders with differing expectations are an important opportunity to improve the value creation process.

Originality/value

Stakeholder management has recently attracted much attention in the industrial project setting. This research attempts to identify the operative stakeholder landscape in a large hospital project, not to mention its impact on value creation. This study offers a framework that can help academics and project management practitioners tackle the challenges amongst project stakeholders.

Details

International Journal of Managing Projects in Business, vol. 15 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Book part
Publication date: 1 May 2019

Gunnar Lucko and Yi Su

Construction projects operate within a risky environment. It materialises as delays, which must be prevented or mitigated to avoid becoming amplified into late completion. But…

Abstract

Purpose

Construction projects operate within a risky environment. It materialises as delays, which must be prevented or mitigated to avoid becoming amplified into late completion. But previous research has largely ignored how structural complexity of the underlying network schedules shapes their resilience.

Design/Methodology/Approach

This research hypothesizes that schedule structure plays a vital role in its ability to absorb or propagate delays. The impact of activity-level local risk factors is represented via activity duration distributions, i.e. probability density functions. The impact of project-level global risk factors is more challenging because they arise via interactions between multiple activities.

Findings

Modelling resilience to local and global risk factors can employ a matrix approach. Simulation shows that delay amplification depends on local structure, not global complexity.

Research Limitations/Implications

Criticality had merely relied upon a single deterministic analysis of a network schedule to categorize activities as having zero or nonzero float from fixed relative duration a dependency structure. Repeated probabilistic analysis with sampled durations gives criticality indices of activities. This research limits itself to network schedules with point-wise relations between activities.

Practical Implications

Managers can use this knowledge to develop schedules that protect their expected project duration with a suitable structural complexity.

Originality/Value

Contributions to the body of knowledge are as follows: It converts the dependency structure into a reachability matrix and adds a correlation matrix to capture how the predecessor performance may impact its successors. It correlates criticality of activities with structural complexity indices. And it ranks activities objectively by their cruciality, i.e. potential delay propagation.

Details

10th Nordic Conference on Construction Economics and Organization
Type: Book
ISBN: 978-1-83867-051-1

Keywords

Open Access
Article
Publication date: 16 February 2021

Priscila Ferreira de Araújo Lima, Sara Marcelino-Sadaba and Chiara Verbano

Despite the emergence and strategic importance of project risk management (PRM), its diffusion is limited mainly to large companies, leaving a lack of empirical evidence…

26846

Abstract

Purpose

Despite the emergence and strategic importance of project risk management (PRM), its diffusion is limited mainly to large companies, leaving a lack of empirical evidence addressing SMEs. Given the socio-economic importance of SMEs and their need to manage risks to ensure the success of their strategic and innovative projects, this research aims to investigate how to adopt PRM in SMEs with a positive cost–benefit ratio.

Design/methodology/approach

This study presents an exploratory and explanatory research conducted through multiple-case studies involving 10 projects performed in Spanish and Italian small and medium-sized enterprises (SMEs).

Findings

The results obtained highlight how project features (commitment type, innovativeness, strategic relevance and managerial complexity) and firms' characteristics (sector of activity, production system and access to public incentives) influence PRM adoption, leading to different levels and types of benefits.

Originality/value

The paper offers practical indications about PRM phases, activities, tools and organizational aspects to be considered in different contexts to ensure the project's success and, ultimately, the company's growth and sustainability. Such indications could not be found in the literature.

Details

International Journal of Managing Projects in Business, vol. 14 no. 4
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 13 January 2022

Andrea Patrucco, Christine Mary Harland, Davide Luzzini and Federico Frattini

Suppliers are essential partners in innovation projects, as they own resources, knowledge assets and capabilities that complement those of buying firms. In today’s competitive…

3334

Abstract

Purpose

Suppliers are essential partners in innovation projects, as they own resources, knowledge assets and capabilities that complement those of buying firms. In today’s competitive environment, firms may choose to collaborate with suppliers beyond dyads, forming triadic or three-party relationships. Using the theoretical lens of the relational view (RV), this study aims to explore what type of triad configurations firms use to govern supplier relationships in collaborative innovation projects, how they choose to share resources and implications for project performance.

Design/methodology/approach

The authors use interview data from buyers and suppliers in six case studies of firms involved in ten collaborative innovation projects. The four constructs of the RV are used to observe how firms govern triadic relationships, combine complementary resources, invest in relationship-specific assets and manage information and knowledge exchange with and between suppliers in innovation projects.

Findings

Four archetypes of triadic relationships in innovation projects – labeled Triangle, A-frame, D-Frame and Line – are presented and characterized in terms of their structural and relational features. The authors discuss how each triad archetype is applicable to different innovation projects according to specific project characteristics.

Originality/value

This study is pioneering in its empirical examination of triadic relationships in collaborative innovation projects. It provides a novel typology of four archetypes of triad from the perspective of collaborative relationships with suppliers. Through applying the RV, it advances understanding of how triadic relationships are governed, how they invest in relationship-specific assets, how they combine complementary resources and how they exchange knowledge and information in each type of triad appropriate to different innovation project settings. To date, much of the extant literature has focused on dyads.

Details

Supply Chain Management: An International Journal, vol. 27 no. 7
Type: Research Article
ISSN: 1359-8546

Keywords

Open Access
Article
Publication date: 23 December 2022

Rouzbeh Shabani, Tobias Onshuus Malvik, Agnar Johansen and Olav Torp

Uncertainty management (UM) in projects has been a point of attention for researchers for many years. Research on UM has mainly been aimed at uncertainty analyses in the front-end…

2456

Abstract

Purpose

Uncertainty management (UM) in projects has been a point of attention for researchers for many years. Research on UM has mainly been aimed at uncertainty analyses in the front-end and managing uncertainty in the construction phase. In contrast, UM components in the design phase have received less attention. This research aims to improve knowledge about the key components of UM in the design phase of large road projects.

Design/methodology/approach

This study adopted a literature review and case study. The literature review was used to identify relevant criteria for UM. These criteria helped to design the interview guide. Multiple case study research was conducted, and data were collected through document study and interviews with project stakeholders in two road projects. Each case's owners, contractors and consultants were interviewed individually.

Findings

The data analysis obtained helpful information on the involved parties, process and exploit tools and techniques during the design phase. Johansen's (2015) framework [(a) human and organisation, (b) process and (c) tools and techniques)] was completed and developed by identifying relevant criteria (such as risk averse or risk-taker, culture and documentation level) for each component. These criteria help to measure UM performance. The authors found that owners and contractors are major formal UM actors, not consultants. Empirical data showed the effectiveness of Web-based tools in UM.

Research limitations/implications

The studied cases were Norwegian, and this study focussed on uncertainties in the project's design phase. Relevant criteria did not cover all the criteria for evaluating the performance of UM. Qualitative evaluation of criteria allows further quantitative analysis in the future.

Practical implications

This paper gave project owners and managers a better understanding of relevant criteria for measuring UM in the owners and managers' projects. The paper provides policy-makers with a deeper understanding of creating rigorous project criteria for UM during the design phase. This paper also provides a guideline for UM in road projects.

Originality/value

This research gives a holistic evaluation of UM by noticing relevant criteria and criteria's interconnection in the design phase.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 7 December 2023

Neil Govender, Samuel Laryea and Ron Watermeyer

Competitive tendering in South Africa is often associated with procurement based on the lowest fee tendered. Previous research on this topic did not provide in-depth examinations…

1254

Abstract

Purpose

Competitive tendering in South Africa is often associated with procurement based on the lowest fee tendered. Previous research on this topic did not provide in-depth examinations of how pricing within consulting engineering companies was affected by competitive tendering nor did it illuminate the extent to which professional services were impacted by competitive tendering. This paper aims to examine the implications of competitive tendering on pricing and delivery of consulting engineering services in South Africa.

Design/methodology/approach

A survey research strategy with a questionnaire as the research instrument elicited qualitative data from 28 experienced consulting engineers in South Africa. Thematic analysis was used to analyse qualitative data from the questionnaires.

Findings

Three key themes were identified, namely: considerations when determining consulting engineering fees on competitively tendered projects; the impact of reduced fees due to competitive tendering on the delivery of consulting engineering services; and interventions to prevent unsustainably “low” professional fees. Many consulting engineers in South Africa still determine fees using fee scales, while other considerations include resources, project complexity, risk, etc. Most participants asserted that design optimisation/value engineering, training, meetings and construction monitoring were adversely impacted by “low” fees.

Originality/value

This paper provides in-depth qualitative feedback from experienced consulting engineers (most having more than 20 years’ experience) on a topical issue in the South African construction industry. Thematic analysis was a novel method of analysis that was not used previously in this area of study.

Details

Journal of Financial Management of Property and Construction , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1366-4387

Keywords

Open Access
Article
Publication date: 11 August 2023

Guus Keusters, Frédérique Batelaan, Froukje SleeswijkVisser, Erik-Jan Houwing and Hans Bakker

The increasing complexity of civil engineering projects necessitates focusing on new competencies of project participants. Based on the research on team performance and design…

1280

Abstract

Purpose

The increasing complexity of civil engineering projects necessitates focusing on new competencies of project participants. Based on the research on team performance and design processes that are more closely linked to the relevance of the project context, it is hypothesised that empathic abilities could play an important role in the performance of civil engineering projects. Therefore, this study aims to investigate whether performance can be improved by focusing on empathic abilities during the integrated design phase.

Design/methodology/approach

Semi-structured in-depth interviews with experts were conducted to explore the relevance of empathic abilities and their interaction with performance in a real-life infrastructure project. The project team’s empathy level was measured by means of a survey using Davis’ Interpersonal Reactivity Index method. Finally, differences between expected and measured levels of empathy were analysed.

Findings

The results provide insights into how empathic abilities interact with performance. The measurement indicates that, on average, professionals in the civil engineering industry score relatively low on empathy. In addition, differences were identified between the expected distribution and the measured empathy levels of the team, implying a potential for improvement, in particular by increasing the empathic abilities of the project management and increasing gender diversity.

Originality/value

To the best of the authors’ knowledge, this study is the first to investigate a relationship between empathy and the performance of civil engineering projects. The results provide initial insights into the empathic ability of civil engineering project teams and the potential of empathy to improve performance. Furthermore, from an empathy perspective, this study advocates increasing the gender diversity of project teams to improve performance.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords