1 – 10 of 98Satyajit Mahato and Supriyo Roy
Managing project completion within the stipulated time is significant to all firms' sustainability. Especially for software start-up firms, it is of utmost importance. For any…
Abstract
Purpose
Managing project completion within the stipulated time is significant to all firms' sustainability. Especially for software start-up firms, it is of utmost importance. For any schedule variation, these firms must spend 25 to 40 percent of the development cost reworking quality defects. Significantly, the existing literature does not support defect rework opportunities under quality aspects among Indian IT start-ups. The present study aims to fill this niche by proposing a unique mathematical model of the defect rework aligned with the Six Sigma quality approach.
Design/methodology/approach
An optimization model was formulated, comprising the two objectives: rework “time” and rework “cost.” A case study was developed in relevance, and for the model solution, we used MATLAB and an elitist, Nondominated Sorting Genetic Algorithm (NSGA-II).
Findings
The output of the proposed approach reduced the “time” by 31 percent at a minimum “cost”. The derived “Pareto Optimal” front can be used to estimate the “cost” for a pre-determined rework “time” and vice versa, thus adding value to the existing literature.
Research limitations/implications
This work has deployed a decision tree for defect prediction, but it is often criticized for overfitting. This is one of the limitations of this paper. Apart from this, comparing the predicted defect count with other prediction models hasn’t been attempted. NSGA-II has been applied to solve the optimization problem; however, the optimal results obtained have yet to be compared with other algorithms. Further study is envisaged.
Practical implications
The Pareto front provides an effective visual aid for managers to compare multiple strategies to decide the best possible rework “cost” and “time” for their projects. It is beneficial for cost-sensitive start-ups to estimate the rework “cost” and “time” to negotiate with their customers effectively.
Originality/value
This paper proposes a novel quality management framework under the Six Sigma approach, which integrates optimization of critical metrics. As part of this study, a unique mathematical model of the software defect rework process was developed (combined with the proposed framework) to obtain the optimal solution for the perennial problem of schedule slippage in the rework process of software development.
Details
Keywords
Vu Hong Son Pham, Nghiep Trinh Nguyen Dang and Nguyen Van Nam
For successful management of construction projects, a precise analysis of the balance between time and cost is imperative to attain the most effective results. The aim of this…
Abstract
Purpose
For successful management of construction projects, a precise analysis of the balance between time and cost is imperative to attain the most effective results. The aim of this study is to present an innovative approach tailored to tackle the challenges posed by time-cost trade-off (TCTO) problems. This objective is achieved through the integration of the multi-verse optimizer (MVO) with opposition-based learning (OBL), thereby introducing a groundbreaking methodology in the field.
Design/methodology/approach
The paper aims to develop a new hybrid meta-heuristic algorithm. This is achieved by integrating the MVO with OBL, thereby forming the iMVO algorithm. The integration enhances the optimization capabilities of the algorithm, notably in terms of exploration and exploitation. Consequently, this results in expedited convergence and yields more accurate solutions. The efficacy of the iMVO algorithm will be evaluated through its application to four different TCTO problems. These problems vary in scale – small, medium and large – and include real-life case studies that possess complex relationships.
Findings
The efficacy of the proposed methodology is evaluated by examining TCTO problems, encompassing 18, 29, 69 and 290 activities, respectively. Results indicate that the iMVO provides competitive solutions for TCTO problems in construction projects. It is observed that the algorithm surpasses previous algorithms in terms of both mean deviation percentage (MD) and average running time (ART).
Originality/value
This research represents a significant advancement in the field of meta-heuristic algorithms, particularly in their application to managing TCTO in construction projects. It is noteworthy for being among the few studies that integrate the MVO with OBL for the management of TCTO in construction projects characterized by complex relationships.
Details
Keywords
Arsalan Zakeri Afshar, Hamidreza Abbasianjahromi, S. Mohammad Mirhosseini and Mohammad Ehsanifar
This research aims to measure the public sector comparator (PSC) to reach public–private partnership (PPP) projects' negotiable price range for water and sewage companies in Iran…
Abstract
Purpose
This research aims to measure the public sector comparator (PSC) to reach public–private partnership (PPP) projects' negotiable price range for water and sewage companies in Iran. PSC measurement drives the public sector to make valid decisions about costs.
Design/methodology/approach
Around 170 risks were primarily determined through studying numerous articles. Then, risk effects were specified by distributing questionnaires in two steps. The questionnaires are distributed among experts on PPP-related projects and the Monte Carlo simulation method is used for confidence factors of 70, 80 and 90%. PSC is measured based on these results to study cases of Sirjan’s sewerage and sewage purification systems.
Findings
11 risks were identified as the main risks that are effective on PSC, and project implementation costs were specified based on the modeling. The corruption of the private and public sectors was identified as the most effective risk in this research. It can affect a project’s cost up to 158% in the construction period and up to 134% in the operation period. Based on the obtained results, 63% of this risk’s cost goes to the public sector.
Originality/value
The originality of this research is the PSC measurement method and appointing the risk share of each private and public sector. The results of this research can be applied to all the infrastructure and PPP projects in Iran and other developing countries as a way for employers to estimate accurate negotiable price ranges.
Details
Keywords
Jing An, Suicheng Li and Xiao Ping Wu
Project managers bear the responsibility of selecting and developing resource scheduling methods that align with project requirements and organizational circumstances. This study…
Abstract
Purpose
Project managers bear the responsibility of selecting and developing resource scheduling methods that align with project requirements and organizational circumstances. This study focuses on resource-constrained project scheduling in multi-project environments. The research simplifies the problem by adopting a single-project perspective using gain coefficients.
Design/methodology/approach
It employs uncertainty theory and multi-objective programming to construct a model. The optimal solution is identified using Matlab, while LINGO determines satisfactory alternatives. By combining these methods and considering actual construction project situations, a compromise solution closely approximating the optimal one is derived.
Findings
The study provides fresh insights into modeling and resolving resource-constrained project scheduling issues, supported by real-world examples that effectively illustrate its practical significance.
Originality/value
The research highlights three main contributions: effective resource utilization, project prioritization and conflict management, and addressing uncertainty. It offers decision support for project managers to balance resource allocation, resolve conflicts, and adapt to changing project demands.
Details
Keywords
Ozan Okudan, Gökhan Demirdöğen and Zeynep Işık
The purpose of this study is to develop a decision-support framework that can be used by decision-makers to suspend public infrastructure projects. Additionally, the study also…
Abstract
Purpose
The purpose of this study is to develop a decision-support framework that can be used by decision-makers to suspend public infrastructure projects. Additionally, the study also investigates how to select the most convenient infrastructure project for suspension.
Design/methodology/approach
The proposed framework includes an extensive set of factors and a novel comparison mechanism that can reveal the most convenient infrastructure project to be suspended. A comprehensible literature review and focus group discussion (FGD) sessions were conducted to identify factors that should be considered for suspension. Then, the neutrosophic analytic hierarchy process (N-AHP) method was used to determine the relative importance of the factors. Finally, the proposed comparison mechanism was demonstrated through a hypothetical case study and Technique for order of preference by similarity to ideal solution (TOPSIS) analysis.
Findings
Results showed that suspension decisions cannot be made merely based on “financial” factors. Instead, the other aspects, namely “Technical and managerial” and “Social and Environmental”, should also be taken into consideration. Second, factors related to the initial investment, cost of refinancing, cash flow, permits and approvals, insufficiency of bidders, degradation of the components, reputation, impact on stakeholders and criticality of the infrastructure were particularly elaborated as the most significant, needing the utmost attention of the decision-makers. Lastly, the results demonstrated that the proposed comparison mechanism has considerable potential to identify the most convenient infrastructure project for suspension.
Originality/value
Public infrastructure projects are often under pressure due to the inflationary state and economic stagnation of countries after major crises. The suspension decision for infrastructure projects necessitates comprehensible assessments to consider all consequences. Studies have widely investigated the contractual and legal aspects of project suspension in light of existing literature. However, little effort has been devoted to identifying the factors that decision-makers should consider before suspending a particular infrastructure project. Furthermore, existing literature does not investigate how to select the most convenient infrastructure project for suspension either. Thus, by developing a specific suspension framework for infrastructure projects by considering various factors, this study is the earliest attempt to examine the contract suspension mechanism of public infrastructure projects. In this respect, the study significantly contributes to the theory of contract management domain and has important managerial implications.
Details
Keywords
Ramgy Pararajasingam, Anuradha Samarajeewa Waidyasekara and Hasith Chathuranga Victar
Construction material management plays a significant role in achieving successful project delivery of a construction project. However, ineffective material management is a…
Abstract
Purpose
Construction material management plays a significant role in achieving successful project delivery of a construction project. However, ineffective material management is a critical issue in the construction industry, especially in developing economies, of which Sri Lanka is not an exception. Therefore, this study aims to focus on exploring the causes of ineffective material management practices in civil engineering construction projects in Sri Lanka and their impact on successful project delivery.
Design/methodology/approach
Furthermore, the literature findings were validated through the preliminary survey. Subsequently, a quantitative research approach was adopted to pursue the research aim. Questionnaire responses were obtained from 215 construction professionals in civil engineering projects who were selected using the judgemental and snowball sampling techniques. Collected data were analysed through Statistical Package for the Social Sciences (SPSS) V26 and Microsoft Excel 2016.
Findings
Moreover, the study revealed that material price fluctuation, shortage of material in the market, delay in material procurement, inadequate planning and delays in material delivery are the most frequent causes of ineffective material management in civil engineering projects. In addition, it was evidenced that most ineffective material management practices cause both time and cost overruns in civil engineering construction projects. Most respondents emphasized inadequate planning, inadequate qualified and experienced staff, lack of supervision and lack of leadership as the causes for both time and cost overruns.
Originality/value
The study was concluded by proposing strategies for effective material management. Education/training/enlightenment of staff in charge of materials management, use of software like Microsoft Project, Primavera and similar software to eliminate manual errors in material management, and providing clear specifications to suppliers were the most agreed strategies for effective material management in civil engineering construction projects.
Details
Keywords
Jhumana Akter, Mobasshira Islam and Shuvo Dip Datta
Determining the suitable material and accurate thickness of the thermal insulation layer used in exterior walls during the design phase of a building can be challenging. This…
Abstract
Purpose
Determining the suitable material and accurate thickness of the thermal insulation layer used in exterior walls during the design phase of a building can be challenging. This study aims to determine suitable material and optimum thickness for the insulation layer considering both operational and embodied factors by a comprehensive assessment of the energy, economic and environmental (3E) parameters.
Design/methodology/approach
First, the energy model of an existing building was created by using Autodesk Revit software according to the as-built floor layout to evaluate the impact of five alternative insulating materials in varying thickness values. Second, using the results derived from the model, a thorough evaluation was conducted to ascertain the optimal insulation material and thickness through individual analysis of 3E factors, followed by a comprehensive analysis considering the three aforementioned factors simultaneously.
Findings
The findings indicated that polyurethane with 13 cm thickness, rockwool with 10 cm thickness and EPS with 20 cm thickness were the best states based on energy consumption, cost and environmental footprint, respectively. After completing the 3E investigation, the 15-cm-thick mineral wool insulation was presented as the ideal state.
Practical implications
This study explores how suitable material and thickness of insulating material can be determined in advance during the design phase of a building, which is a lot more accurate and cost-effective than applying insulating materials by assumed thickness in the construction phase.
Originality/value
To the best of the authors’ knowledge, this paper is unique in investigating the advantages of using thermally insulating materials in the context of a mosque structure, taking into account its distinctive attributes that deviate from those of typical buildings. Furthermore, there has been no prior analysis of the cost and sustainability implications of these materials concerning the characteristics of subtropical monsoon climate.
Details
Keywords
Adel Alshibani, Youssef Ahmed El Ghazzawi, Awsan Mohammed, Ahmed M. Ghaithan and Mohammad A. Hassanain
This paper aims to propose a novel model that addresses the limitations of current practices, through considering quantitative and qualitative criteria in the decision-making…
Abstract
Purpose
This paper aims to propose a novel model that addresses the limitations of current practices, through considering quantitative and qualitative criteria in the decision-making process for equipment replacement.
Design/methodology/approach
Literature review and consultation with professionals in the heavy construction industry was conducted to identify the criteria influencing the replacement of construction machines. A questionnaire survey using analytic hierarchy process and multi-attribute utility theory was used to rank these criteria and establish their utility scores. Sensitivity analysis was performed to assess how adjustments in the weights of main criteria would impact equipment replacement decisions.
Findings
The identified criteria were classified into three categories: economic, technical and socioenvironmental, encompassing a total of 15 criteria. The findings indicated that salvage value/meeting payback period/maximizing profitability held the highest importance in the replacement process, followed by considerations like high repair and maintenance cost; working condition and economic conditions. Safety and social benefits scored the least among all criteria and categories.
Research limitations/implications
This study focuses on earth-moving equipment and involves experts from the Eastern Province of Saudi Arabia. The model introduces a novel methodology to aid decision-makers, particularly contractors and project managers, in determining when to replace heavy construction equipment, which results in resource efficiency and time saving.
Originality/value
The model integrates expertise and knowledge from experts to establish criteria for replacing construction equipment. This research aims to improve the functionality of the decision-making process regarding the acquisition or replacement of equipment throughout its lifespan.
Details
Keywords
Sulakshya Gaur and Abhay Tawalare
Design cost overrun is one of the prominent factor that can impact the sustainable delivery of the project. It can be encountered due to a lack of information flow, design…
Abstract
Purpose
Design cost overrun is one of the prominent factor that can impact the sustainable delivery of the project. It can be encountered due to a lack of information flow, design variation, etc. thereby impacting the project budget, waste generation and schedule. An overarching impact of this is witnessed in the sustainability dimensions of the project, mainly in terms of economic and environmental aspects. This work, therefore, aims to assess the implications of a technological process, in the form of building information modelling (BIM), that can smoothen the design process and mitigate the risks, thus impacting the sustainability of the project holistically.
Design/methodology/approach
The identified design risks in construction projects from the literature were initially analysed using a fuzzy inference system (FIS). This was followed by the focus group discussion with the project experts to understand the role of BIM in mitigating the project risks and, in turn, fulfilling the sustainability dimensions.
Findings
The FIS-based risk assessment found seven risks under the intolerable category for which the BIM functionalities associated with the common data environment (CDE), data storage and exchange and improved project visualization were studied as mitigation approaches. The obtained benefits were then subsequently corroborated with the achievement of three sustainability dimensions.
Research limitations/implications
The conducted study strengthens the argument for the adoption of technological tools in the construction industry as they can serve multifaceted advantages. This has been shown through the use of BIM in risk mitigation, which inherently impacts project sustainability holistically.
Originality/value
The impact of BIM on all three dimensions of sustainability, i.e. social, economic and environmental, through its use in the mitigation of critical risks was one of the important findings. It presented a different picture as opposed to other studies that have mainly been dominated by the use of BIM to achieve environmental sustainability.
Details
Keywords
Malik Lakshan Hasantha, Anuradha Samarajeewa Waidyasekara and Hasith Chathuranga Victar
Insufficient time allocation for the bidding period occurs, causing drawbacks to both parties, the client and the bidder. Hence, this study aims to evaluate the time allocated for…
Abstract
Purpose
Insufficient time allocation for the bidding period occurs, causing drawbacks to both parties, the client and the bidder. Hence, this study aims to evaluate the time allocated for preparing a bid proposal as per the National Competitive Bidding (NCB) in the Sri Lankan context.
Design/methodology/approach
The study has adopted a mixed method approach and expert interviews and document review to detect, analyse and validate the issues, and solutions based on NCB along with the adequacy of the allocated bidding period used as main data collection tools. Both qualitative and quantitative data were analysed through manual content analysis and inferential analysis respectively.
Findings
Overall, 24 local issues with the existing competitive bidding process and solutions for each were identified. Among the 24 local issues, it was unanimously agreed by all interviewees that three specific issues require attention and improvement. These issues are related to the standard and incompleteness of bidding documents, inaccurate BOQ quantities measured by the consultant or the main contractor, and the excessive number of bidding document amendments by the consultant. It was revealed that a maximum of 42 calendar days (6 weeks) is sufficient for the bidding process while a minimum of 21 calendar days (3 weeks) is insufficient.
Originality/value
The findings of this study would be recommended that Information and Communication Technology Agency (ICTA) understand the necessity of revising the NCB reference to the time allocated for the preparation of bids. By recognising the importance of sufficient time allocation for bid preparation, this research serves as a practical guide for authorities involved in policy formulation, aiding them in implementing revisions that align with the dynamic requirements of bidding procedures.