Article
Publication date: 8 March 2024

Satyajit Mahato and Supriyo Roy

Managing project completion within the stipulated time is significant to all firms' sustainability. Especially for software start-up firms, it is of utmost importance. For any…

Abstract

Purpose

Managing project completion within the stipulated time is significant to all firms' sustainability. Especially for software start-up firms, it is of utmost importance. For any schedule variation, these firms must spend 25 to 40 percent of the development cost reworking quality defects. Significantly, the existing literature does not support defect rework opportunities under quality aspects among Indian IT start-ups. The present study aims to fill this niche by proposing a unique mathematical model of the defect rework aligned with the Six Sigma quality approach.

Design/methodology/approach

An optimization model was formulated, comprising the two objectives: rework “time” and rework “cost.” A case study was developed in relevance, and for the model solution, we used MATLAB and an elitist, Nondominated Sorting Genetic Algorithm (NSGA-II).

Findings

The output of the proposed approach reduced the “time” by 31 percent at a minimum “cost”. The derived “Pareto Optimal” front can be used to estimate the “cost” for a pre-determined rework “time” and vice versa, thus adding value to the existing literature.

Research limitations/implications

This work has deployed a decision tree for defect prediction, but it is often criticized for overfitting. This is one of the limitations of this paper. Apart from this, comparing the predicted defect count with other prediction models hasn’t been attempted. NSGA-II has been applied to solve the optimization problem; however, the optimal results obtained have yet to be compared with other algorithms. Further study is envisaged.

Practical implications

The Pareto front provides an effective visual aid for managers to compare multiple strategies to decide the best possible rework “cost” and “time” for their projects. It is beneficial for cost-sensitive start-ups to estimate the rework “cost” and “time” to negotiate with their customers effectively.

Originality/value

This paper proposes a novel quality management framework under the Six Sigma approach, which integrates optimization of critical metrics. As part of this study, a unique mathematical model of the software defect rework process was developed (combined with the proposed framework) to obtain the optimal solution for the perennial problem of schedule slippage in the rework process of software development.

Details

International Journal of Quality & Reliability Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 13 May 2024

Vu Hong Son Pham, Nghiep Trinh Nguyen Dang and Nguyen Van Nam

For successful management of construction projects, a precise analysis of the balance between time and cost is imperative to attain the most effective results. The aim of this…

Abstract

Purpose

For successful management of construction projects, a precise analysis of the balance between time and cost is imperative to attain the most effective results. The aim of this study is to present an innovative approach tailored to tackle the challenges posed by time-cost trade-off (TCTO) problems. This objective is achieved through the integration of the multi-verse optimizer (MVO) with opposition-based learning (OBL), thereby introducing a groundbreaking methodology in the field.

Design/methodology/approach

The paper aims to develop a new hybrid meta-heuristic algorithm. This is achieved by integrating the MVO with OBL, thereby forming the iMVO algorithm. The integration enhances the optimization capabilities of the algorithm, notably in terms of exploration and exploitation. Consequently, this results in expedited convergence and yields more accurate solutions. The efficacy of the iMVO algorithm will be evaluated through its application to four different TCTO problems. These problems vary in scale – small, medium and large – and include real-life case studies that possess complex relationships.

Findings

The efficacy of the proposed methodology is evaluated by examining TCTO problems, encompassing 18, 29, 69 and 290 activities, respectively. Results indicate that the iMVO provides competitive solutions for TCTO problems in construction projects. It is observed that the algorithm surpasses previous algorithms in terms of both mean deviation percentage (MD) and average running time (ART).

Originality/value

This research represents a significant advancement in the field of meta-heuristic algorithms, particularly in their application to managing TCTO in construction projects. It is noteworthy for being among the few studies that integrate the MVO with OBL for the management of TCTO in construction projects characterized by complex relationships.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 16 May 2024

Arsalan Zakeri Afshar, Hamidreza Abbasianjahromi, S. Mohammad Mirhosseini and Mohammad Ehsanifar

This research aims to measure the public sector comparator (PSC) to reach public–private partnership (PPP) projects' negotiable price range for water and sewage companies in Iran…

Abstract

Purpose

This research aims to measure the public sector comparator (PSC) to reach public–private partnership (PPP) projects' negotiable price range for water and sewage companies in Iran. PSC measurement drives the public sector to make valid decisions about costs.

Design/methodology/approach

Around 170 risks were primarily determined through studying numerous articles. Then, risk effects were specified by distributing questionnaires in two steps. The questionnaires are distributed among experts on PPP-related projects and the Monte Carlo simulation method is used for confidence factors of 70, 80 and 90%. PSC is measured based on these results to study cases of Sirjan’s sewerage and sewage purification systems.

Findings

11 risks were identified as the main risks that are effective on PSC, and project implementation costs were specified based on the modeling. The corruption of the private and public sectors was identified as the most effective risk in this research. It can affect a project’s cost up to 158% in the construction period and up to 134% in the operation period. Based on the obtained results, 63% of this risk’s cost goes to the public sector.

Originality/value

The originality of this research is the PSC measurement method and appointing the risk share of each private and public sector. The results of this research can be applied to all the infrastructure and PPP projects in Iran and other developing countries as a way for employers to estimate accurate negotiable price ranges.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 26 March 2024

Jing An, Suicheng Li and Xiao Ping Wu

Project managers bear the responsibility of selecting and developing resource scheduling methods that align with project requirements and organizational circumstances. This study…

Abstract

Purpose

Project managers bear the responsibility of selecting and developing resource scheduling methods that align with project requirements and organizational circumstances. This study focuses on resource-constrained project scheduling in multi-project environments. The research simplifies the problem by adopting a single-project perspective using gain coefficients.

Design/methodology/approach

It employs uncertainty theory and multi-objective programming to construct a model. The optimal solution is identified using Matlab, while LINGO determines satisfactory alternatives. By combining these methods and considering actual construction project situations, a compromise solution closely approximating the optimal one is derived.

Findings

The study provides fresh insights into modeling and resolving resource-constrained project scheduling issues, supported by real-world examples that effectively illustrate its practical significance.

Originality/value

The research highlights three main contributions: effective resource utilization, project prioritization and conflict management, and addressing uncertainty. It offers decision support for project managers to balance resource allocation, resolve conflicts, and adapt to changing project demands.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 19 February 2024

Ozan Okudan, Gökhan Demirdöğen and Zeynep Işık

The purpose of this study is to develop a decision-support framework that can be used by decision-makers to suspend public infrastructure projects. Additionally, the study also…

Abstract

Purpose

The purpose of this study is to develop a decision-support framework that can be used by decision-makers to suspend public infrastructure projects. Additionally, the study also investigates how to select the most convenient infrastructure project for suspension.

Design/methodology/approach

The proposed framework includes an extensive set of factors and a novel comparison mechanism that can reveal the most convenient infrastructure project to be suspended. A comprehensible literature review and focus group discussion (FGD) sessions were conducted to identify factors that should be considered for suspension. Then, the neutrosophic analytic hierarchy process (N-AHP) method was used to determine the relative importance of the factors. Finally, the proposed comparison mechanism was demonstrated through a hypothetical case study and Technique for order of preference by similarity to ideal solution (TOPSIS) analysis.

Findings

Results showed that suspension decisions cannot be made merely based on “financial” factors. Instead, the other aspects, namely “Technical and managerial” and “Social and Environmental”, should also be taken into consideration. Second, factors related to the initial investment, cost of refinancing, cash flow, permits and approvals, insufficiency of bidders, degradation of the components, reputation, impact on stakeholders and criticality of the infrastructure were particularly elaborated as the most significant, needing the utmost attention of the decision-makers. Lastly, the results demonstrated that the proposed comparison mechanism has considerable potential to identify the most convenient infrastructure project for suspension.

Originality/value

Public infrastructure projects are often under pressure due to the inflationary state and economic stagnation of countries after major crises. The suspension decision for infrastructure projects necessitates comprehensible assessments to consider all consequences. Studies have widely investigated the contractual and legal aspects of project suspension in light of existing literature. However, little effort has been devoted to identifying the factors that decision-makers should consider before suspending a particular infrastructure project. Furthermore, existing literature does not investigate how to select the most convenient infrastructure project for suspension either. Thus, by developing a specific suspension framework for infrastructure projects by considering various factors, this study is the earliest attempt to examine the contract suspension mechanism of public infrastructure projects. In this respect, the study significantly contributes to the theory of contract management domain and has important managerial implications.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 22 March 2024

Ramgy Pararajasingam, Anuradha Samarajeewa Waidyasekara and Hasith Chathuranga Victar

Construction material management plays a significant role in achieving successful project delivery of a construction project. However, ineffective material management is a…

Abstract

Purpose

Construction material management plays a significant role in achieving successful project delivery of a construction project. However, ineffective material management is a critical issue in the construction industry, especially in developing economies, of which Sri Lanka is not an exception. Therefore, this study aims to focus on exploring the causes of ineffective material management practices in civil engineering construction projects in Sri Lanka and their impact on successful project delivery.

Design/methodology/approach

Furthermore, the literature findings were validated through the preliminary survey. Subsequently, a quantitative research approach was adopted to pursue the research aim. Questionnaire responses were obtained from 215 construction professionals in civil engineering projects who were selected using the judgemental and snowball sampling techniques. Collected data were analysed through Statistical Package for the Social Sciences (SPSS) V26 and Microsoft Excel 2016.

Findings

Moreover, the study revealed that material price fluctuation, shortage of material in the market, delay in material procurement, inadequate planning and delays in material delivery are the most frequent causes of ineffective material management in civil engineering projects. In addition, it was evidenced that most ineffective material management practices cause both time and cost overruns in civil engineering construction projects. Most respondents emphasized inadequate planning, inadequate qualified and experienced staff, lack of supervision and lack of leadership as the causes for both time and cost overruns.

Originality/value

The study was concluded by proposing strategies for effective material management. Education/training/enlightenment of staff in charge of materials management, use of software like Microsoft Project, Primavera and similar software to eliminate manual errors in material management, and providing clear specifications to suppliers were the most agreed strategies for effective material management in civil engineering construction projects.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 2 April 2024

Jhumana Akter, Mobasshira Islam and Shuvo Dip Datta

Determining the suitable material and accurate thickness of the thermal insulation layer used in exterior walls during the design phase of a building can be challenging. This…

Abstract

Purpose

Determining the suitable material and accurate thickness of the thermal insulation layer used in exterior walls during the design phase of a building can be challenging. This study aims to determine suitable material and optimum thickness for the insulation layer considering both operational and embodied factors by a comprehensive assessment of the energy, economic and environmental (3E) parameters.

Design/methodology/approach

First, the energy model of an existing building was created by using Autodesk Revit software according to the as-built floor layout to evaluate the impact of five alternative insulating materials in varying thickness values. Second, using the results derived from the model, a thorough evaluation was conducted to ascertain the optimal insulation material and thickness through individual analysis of 3E factors, followed by a comprehensive analysis considering the three aforementioned factors simultaneously.

Findings

The findings indicated that polyurethane with 13 cm thickness, rockwool with 10 cm thickness and EPS with 20 cm thickness were the best states based on energy consumption, cost and environmental footprint, respectively. After completing the 3E investigation, the 15-cm-thick mineral wool insulation was presented as the ideal state.

Practical implications

This study explores how suitable material and thickness of insulating material can be determined in advance during the design phase of a building, which is a lot more accurate and cost-effective than applying insulating materials by assumed thickness in the construction phase.

Originality/value

To the best of the authors’ knowledge, this paper is unique in investigating the advantages of using thermally insulating materials in the context of a mosque structure, taking into account its distinctive attributes that deviate from those of typical buildings. Furthermore, there has been no prior analysis of the cost and sustainability implications of these materials concerning the characteristics of subtropical monsoon climate.

Details

World Journal of Engineering, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1708-5284

Keywords

Article
Publication date: 17 May 2024

Adel Alshibani, Youssef Ahmed El Ghazzawi, Awsan Mohammed, Ahmed M. Ghaithan and Mohammad A. Hassanain

This paper aims to propose a novel model that addresses the limitations of current practices, through considering quantitative and qualitative criteria in the decision-making…

Abstract

Purpose

This paper aims to propose a novel model that addresses the limitations of current practices, through considering quantitative and qualitative criteria in the decision-making process for equipment replacement.

Design/methodology/approach

Literature review and consultation with professionals in the heavy construction industry was conducted to identify the criteria influencing the replacement of construction machines. A questionnaire survey using analytic hierarchy process and multi-attribute utility theory was used to rank these criteria and establish their utility scores. Sensitivity analysis was performed to assess how adjustments in the weights of main criteria would impact equipment replacement decisions.

Findings

The identified criteria were classified into three categories: economic, technical and socioenvironmental, encompassing a total of 15 criteria. The findings indicated that salvage value/meeting payback period/maximizing profitability held the highest importance in the replacement process, followed by considerations like high repair and maintenance cost; working condition and economic conditions. Safety and social benefits scored the least among all criteria and categories.

Research limitations/implications

This study focuses on earth-moving equipment and involves experts from the Eastern Province of Saudi Arabia. The model introduces a novel methodology to aid decision-makers, particularly contractors and project managers, in determining when to replace heavy construction equipment, which results in resource efficiency and time saving.

Originality/value

The model integrates expertise and knowledge from experts to establish criteria for replacing construction equipment. This research aims to improve the functionality of the decision-making process regarding the acquisition or replacement of equipment throughout its lifespan.

Details

Journal of Financial Management of Property and Construction , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 30 April 2024

Sulakshya Gaur and Abhay Tawalare

Design cost overrun is one of the prominent factor that can impact the sustainable delivery of the project. It can be encountered due to a lack of information flow, design…

Abstract

Purpose

Design cost overrun is one of the prominent factor that can impact the sustainable delivery of the project. It can be encountered due to a lack of information flow, design variation, etc. thereby impacting the project budget, waste generation and schedule. An overarching impact of this is witnessed in the sustainability dimensions of the project, mainly in terms of economic and environmental aspects. This work, therefore, aims to assess the implications of a technological process, in the form of building information modelling (BIM), that can smoothen the design process and mitigate the risks, thus impacting the sustainability of the project holistically.

Design/methodology/approach

The identified design risks in construction projects from the literature were initially analysed using a fuzzy inference system (FIS). This was followed by the focus group discussion with the project experts to understand the role of BIM in mitigating the project risks and, in turn, fulfilling the sustainability dimensions.

Findings

The FIS-based risk assessment found seven risks under the intolerable category for which the BIM functionalities associated with the common data environment (CDE), data storage and exchange and improved project visualization were studied as mitigation approaches. The obtained benefits were then subsequently corroborated with the achievement of three sustainability dimensions.

Research limitations/implications

The conducted study strengthens the argument for the adoption of technological tools in the construction industry as they can serve multifaceted advantages. This has been shown through the use of BIM in risk mitigation, which inherently impacts project sustainability holistically.

Originality/value

The impact of BIM on all three dimensions of sustainability, i.e. social, economic and environmental, through its use in the mitigation of critical risks was one of the important findings. It presented a different picture as opposed to other studies that have mainly been dominated by the use of BIM to achieve environmental sustainability.

Details

Built Environment Project and Asset Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 8 April 2024

Malik Lakshan Hasantha, Anuradha Samarajeewa Waidyasekara and Hasith Chathuranga Victar

Insufficient time allocation for the bidding period occurs, causing drawbacks to both parties, the client and the bidder. Hence, this study aims to evaluate the time allocated for…

Abstract

Purpose

Insufficient time allocation for the bidding period occurs, causing drawbacks to both parties, the client and the bidder. Hence, this study aims to evaluate the time allocated for preparing a bid proposal as per the National Competitive Bidding (NCB) in the Sri Lankan context.

Design/methodology/approach

The study has adopted a mixed method approach and expert interviews and document review to detect, analyse and validate the issues, and solutions based on NCB along with the adequacy of the allocated bidding period used as main data collection tools. Both qualitative and quantitative data were analysed through manual content analysis and inferential analysis respectively.

Findings

Overall, 24 local issues with the existing competitive bidding process and solutions for each were identified. Among the 24 local issues, it was unanimously agreed by all interviewees that three specific issues require attention and improvement. These issues are related to the standard and incompleteness of bidding documents, inaccurate BOQ quantities measured by the consultant or the main contractor, and the excessive number of bidding document amendments by the consultant. It was revealed that a maximum of 42 calendar days (6 weeks) is sufficient for the bidding process while a minimum of 21 calendar days (3 weeks) is insufficient.

Originality/value

The findings of this study would be recommended that Information and Communication Technology Agency (ICTA) understand the necessity of revising the NCB reference to the time allocated for the preparation of bids. By recognising the importance of sufficient time allocation for bid preparation, this research serves as a practical guide for authorities involved in policy formulation, aiding them in implementing revisions that align with the dynamic requirements of bidding procedures.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Access

Year

Last 3 months (98)

Content type

Earlycite article (98)
1 – 10 of 98