Search results

1 – 10 of over 8000
Open Access
Article
Publication date: 17 October 2022

Mervi Hamalainen and Asta Salmi

The purpose of this paper is to investigate two current transformation processes in the construction industry: the adoption of a novel material, cross-laminated timber (CLT), and…

1728

Abstract

Purpose

The purpose of this paper is to investigate two current transformation processes in the construction industry: the adoption of a novel material, cross-laminated timber (CLT), and the enhancement of digital transformation. This paper depicts the actors and interaction in the business network that is emerging around CLT construction and, in particular, how digital transformation (that is, the deployment of Construction 4.0 solutions) occurs in this business network.

Design/methodology/approach

Digital transformation is a relatively new phenomenon in CLT construction, and the authors, therefore, adopt a qualitative inductive research approach and rely on semi-structured interviews.

Findings

The findings of this paper suggest that it is critical for actors to adopt an interorganizational perspective in CLT construction, instead of only focusing on internal operations. An interorganizational perspective supports successful CLT construction, as well as the deployment of Construction 4.0 solutions. This will bring about the benefits of digital transformation in the construction industry.

Research limitations/implications

This paper investigates the network created around CLT construction in Finland but more generally illustrates the change toward Construction 4.0 solutions.

Practical implications

For managers, this paper explicates the importance of networking, instead of focusing on the internal development of the company, when adopting novel solutions emerging from both construction and information technology-related advancements.

Originality/value

Stability and traditions are characteristic of the construction industry. New technical solutions and materials, together with calls for sustainability, have challenged the traditional ways of constructing, and for example, the development of CLT construction has led to an emergence of new business networks. This material-related process and the ongoing digital transformation of business form an interesting context for an empirical-based analysis of changing interaction and networks. This paper gives the first insights into how digital transformation can benefit the evolution of the network.

Details

Journal of Business & Industrial Marketing, vol. 38 no. 6
Type: Research Article
ISSN: 0885-8624

Keywords

Article
Publication date: 9 September 2022

Lianhua Cheng and Dongqiang Cao

Clarifying the risk evolution mechanism of housing construction for work-safety management is essential. Existing studies have inadequately discussed the risk-accumulation process…

Abstract

Purpose

Clarifying the risk evolution mechanism of housing construction for work-safety management is essential. Existing studies have inadequately discussed the risk-accumulation process in housing construction. Therefore, this study aimed to use the complex network theory and risk allocation mechanisms to explore the evolution of risk factors.

Design/methodology/approach

The authors analysed a database of housing construction accidents in China from 2015 to 2020 to identify risk factors. Moreover, the causal relationship between risk factors was determined through a systematic analysis of the logical sequence of risk factors. A complex network was used to construct a risk network for housing construction accidents (RNHCA).

Findings

The risk matrix method was used to define the factor risk threshold, and a risk value was assigned based on the correlation between risk factors. This contributes to the examination of the evolution mechanism of risk networks in the process of risk factor transmission. The case verification results show that the RNHCA quantitative assessment model can better evaluate the system risk status of housing construction accidents. Furthermore, this model can identify the key risk factors and risk chains with high risk in the evolution of the risk network.

Research limitations/implications

Accident investigation reports need to be classified and processed to analyse the evolution law of risk networks under different scales of construction project, such as high-rise buildings, middle-rise buildings, and low-rise buildings.

Practical implications

This study clarified the risk evolution process of complex systems in housing construction and provided a new method for analysing accidents.

Originality/value

This study clarifies the risk value allocation of risk factors in the transmission process and reveals the process of risk factor evolution in housing construction. This study explains the individual risk factors that form a systemic risk through the transmission chain. Moreover, this paper clarified the transformation relationship between system risk and accidents. The paper also provided a new perspective for risk analysis.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 11 March 2024

Hisham Said, Aswathy Rajagopalan and Daniel M. Hall

Cross-laminated timber (CLT) is an innovative construction material that provides a balanced mix of structural stiffness, fabrication flexibility and sustainability. CLT…

Abstract

Purpose

Cross-laminated timber (CLT) is an innovative construction material that provides a balanced mix of structural stiffness, fabrication flexibility and sustainability. CLT development and innovation diffusion require close collaborations between its supply chain architectural, engineering, construction and manufacturing (AECM) stakeholders. As such, the purpose of this study is to provide a preliminary understanding of the knowledge diffusion and innovation process of CLT construction.

Design/methodology/approach

The study implemented a longitudinal social network analysis of the AECM companies involved in 100 CLT projects in the UK. The project data were acquired from an industry publication and decoded in the form of a multimode project-company network, which was projected into a single-mode company collaborative network. This complete network was filtered into a four-phase network to allow the longitudinal analysis of the CLT collaborations over time. A set of network and node social network analysis metrics was used to characterize the topology patters of the network and the centrality of the companies.

Findings

The study highlighted the scale-free structure of the CLT collaborative network that depends on the influential hubs of timber manufacturers, engineers and contractors to accelerate the innovation diffusion. However, such CLT supply collaborative network structure is more vulnerable to disruptions due to its dependence on these few prominent hubs. Also, the industry collaborative network’s decreased modularity confirms the maturity of the CLT technology and the formation of cohesive clusters of innovation partners. The macro analysis approach of the study highlighted the critical role of supply chain upstream stakeholders due to their higher centralities in the collaborative network. Stronger collaborations were found between the supply chain upstream stakeholders (timber manufacturers) and downstream stakeholders (architects and main contractors).

Originality/value

The study contributes to the field of industrialized and CLT construction by characterizing the collaborative networks between CLT supply chain stakeholders that are critical to propose governmental policies and industry initiatives to advance this sustainable construction material.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 16 October 2023

Dongqiang Cao and Lianhua Cheng

In the evolution process of building construction accidents, there are key nodes of risk change. This paper aims to quickly identify the key nodes and quantitatively assess the…

88

Abstract

Purpose

In the evolution process of building construction accidents, there are key nodes of risk change. This paper aims to quickly identify the key nodes and quantitatively assess the node risk. Furthermore, it is essential to propose risk accumulation assessment method of building construction.

Design/methodology/approach

Authors analyzed 419 accidents investigation reports on building construction. In total, 39 risk factors were identified by accidents analysis. These risk factors were combined with 245 risk evolution chains. Based on those, Gephi software was used to draw the risk evolution network model for building construction. Topological parameters were applied to interpret the risk evolution network characteristic.

Findings

Combining complex network with risk matrix, the standard of quantitative classification of node risk level is formulated. After quantitative analysis of node risk, 7 items of medium-risk node, 3 items of high-risk node and 2 items of higher-risk nodes are determined. The application results show that the system risk of the project is 44.67%, which is the high risk level. It can reflect the actual safety conditions of the project in a more comprehensive way.

Research limitations/implications

This paper determined the level of node risk only using the node degree and risk matrix. In future research, more node topological parameters that could be applied to node risk, such as clustering coefficients, mesoscopic numbers, centrality, PageRank, etc.

Practical implications

This article can quantitatively assess the risk accumulation of building construction. It would help safety managers could clarify the system risk status. Moreover, it also contributes to reveal the correspondence between risk accumulation and accident evolution.

Originality/value

This study comprehensively considers the likelihood, consequences and correlation to assess node risk. Based on this, single-node risk and system risk assessment methods of building construction systems were proposed. It provided a promising method and idea for the risk accumulation assessment method of building construction. Moreover, evolution process of node risk is explained from the perspective of risk accumulation.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 18 March 2022

Xiaoming Wang, Nanjun He and Xiaokang Li

Anti-epidemic Emergency Projects (AEEPs) have unique characteristics such as a short construction period, high-quality requirements, complex construction environment, many…

Abstract

Purpose

Anti-epidemic Emergency Projects (AEEPs) have unique characteristics such as a short construction period, high-quality requirements, complex construction environment, many construction participants and many uncertain affecting factors. The purpose of this paper was to propose the establishment method for the Construction Community (CC) of AEEPs (CC-AEEPs) by analyzing the management features of AEEPs, to establish the method of the Social Network Analysis (SNA) for CC-AEEPs, and to apply this method and the framework to Wuhan Huoshenshan Hospital for their verification.

Design/methodology/approach

According to the CC theory, this paper explored the member composition and the establishment method for CC-AEEPs. The optimal management factors of CC-AEEPs were proposed by combining the management features of AEEPs and the SNA method for CC-AEEPs was further established. Finally, the applicability of the method was verified through a case study, and some countermeasures for the CC-AEEP social networks were proposed.

Findings

The establishment of CC-AEEPs is an important guarantee to complete AEEPs with top speed and high quality. Ten types of CC-AEEP members all played different but irreplaceable roles in cooperative construction, among which the Government, the Contractor, and the Supervisor had outstanding performances. The SNA method could effectively analyze the complexity and cooperative relationship among the members in four aspects. The case study of Huoshenshan Hospital validated the important role of CC-AEEP and its social network in the AEEP research providing beneficial enlightenment for the cooperative optimization path of the AEEP construction participants.

Originality/value

The new establishment method for CC-AEEPs was proposed from the perspective of “cooperation among human, society, and engineering” according to the theories of the engineering sociology and the CC. In this paper, the SNA method was applied to the research on the AEEP construction for the first time and the SNA method for CC-AEEPs was purposed. The optimal management factors of CC-AEEPs and the expansion path of the CC-AEEP social networks were proposed according to the whole-process tracking of AEEPs in Wuhan.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 18 April 2023

Raphael Lissillour, Yuting Cui, Khaled Guesmi, Weijian Chen and Qianran Chen

This study aims to empirically examine the relationships among perceived environmental uncertainty (EV), the level of knowledge distance (KD) and the impact of value network on…

Abstract

Purpose

This study aims to empirically examine the relationships among perceived environmental uncertainty (EV), the level of knowledge distance (KD) and the impact of value network on firm performance.

Design/methodology/approach

The quantitative analysis is based on data from 243 Chinese companies with engineering, procurement and construction (EPC) business in the context of the COVID-19 pandemic.

Findings

The two dimensions of value network [network centrality (NC) and network openness (NO)] have a different impact on firm performance [financial performance (FP) and market performance (MP)]. NC has a positive impact on FP, but not on MP. NO has a positive effect on MP, but not on FP. A reduced KD mediates the relationship between value network and firm performance. Moreover, it fully mediates the relationship between NC and MP, NO and FP. Finally, during the COVID-19 pandemic, only EV has a moderating effect on KD and MP.

Research limitations/implications

This study is limited in terms of data set because it relies on a limited amount of cross-sectional data from one specific country. Therefore, researchers are encouraged to test the proposed propositions further.

Practical implications

The present findings suggest that EPC professionals should pay more attention to the EV, which may be impacted by policy, technology and the economy. This research has actionable implications for the reform of EPC in the construction industry, and practical recommendations for EPC firms to improve their corporate performance.

Originality/value

The results measure the complementary effects of both dimensions of value network (NC and NO) on two distinct aspects of firm performance (MP and FP) and assess the moderating effect of EV and KD in the context of the COVID-19 pandemics.

Details

Journal of Knowledge Management, vol. 28 no. 1
Type: Research Article
ISSN: 1367-3270

Keywords

Article
Publication date: 7 September 2023

Haiyi Zong, Guangbin Wang and Dongping Cao

As the foundation of social and economic development, infrastructure development projects are characterized by large initial investment, high technical requirements and thus…

Abstract

Purpose

As the foundation of social and economic development, infrastructure development projects are characterized by large initial investment, high technical requirements and thus generally delivered through complex contractor–subcontractor collaboration chains. This study aims to characterize the complexity of collaborative networks between contractors and subcontractors for infrastructure development through comparing the structural characteristics and the formation mechanisms of contractor–subcontractor collaborative networks for the following two different types of infrastructure: public works (PWCN) owned and operated by government agencies, and public utilities (PUCN) owned and operated by nongovernment agencies.

Design/methodology/approach

Based on the method of stochastic actor-oriented models and the longitudinal dataset of National Quality Award Projects in China during 2001–2020, this study compares how the structural characteristics of project-based collaborative networks between contractors and subcontractors for the two types of projects are different and how related micro-mechanisms, including both structure-based endogenous network effects and attribute-based exogenous homophily effects (institutional, organizational and geographical homophily), collectively underpin the formation of the networks.

Findings

The empirical results provide evidence that while the two networks are both characterized by relatively low levels of network density, PWCN is more globally connected around a minority of superconnected contractors as compared with PUCN. The results further reveal that compared with PUCN, the formation of PWCN is more significantly related to the structure-based anti in-isolates effect, suggesting that PWCN is more open for new entrant subcontractors. With regard to the attribute-based homophily effects, the results provide evidence that while both significantly and positively related to the effects of organizational (same company group) and geographical homophily (same location), the formation of PWCN and PUCN is oppositely driven by the institutional homophily effect (same ownership type).

Originality/value

As an exploratory effort of using network perspective to investigate the formation mechanisms of contractor–subcontractor relationships in the infrastructure development domain, this study contributes to a network and self-organizing system view of how contractors select subcontractors in different types of infrastructure projects. The study also provides insights into how contractor–subcontractor collaborative relationships can be better manipulated to promote the development of complex infrastructure in different contexts.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 3 May 2022

Zhen Chen, Yaqi Zhao, Xia Zhou, Shengyue Hao and Jin Li

Human–robot collaboration (HRC) is an emerging research field for the construction industry along with construction robot adoption, but its implementation remains limited in…

Abstract

Purpose

Human–robot collaboration (HRC) is an emerging research field for the construction industry along with construction robot adoption, but its implementation remains limited in construction sites. This paper aims to identify critical risk factors and their interactions of HRC implementation during engineering project construction.

Design/methodology/approach

Literature research, expert interviews, a questionnaire survey and a social network analysis (SNA) method were used. First, literature research and expert interviews were employed to identify risk factors of HRC implementation and preliminarily understand factor interactions. Second, a questionnaire survey was conducted to determine the degree of interactions between risk factors. Third, based on the data collected from the questionnaire survey, SNA metrics were used to find critical risk factors and critical interactions.

Findings

The critical risk factors consist of robot technology reliability, robot-perceived level, conflict between designers and users of construction robots, organisational culture, organisational strength, project cost requirements, changeability of project construction, project quality requirements and project safety requirements. The interactions between risk factors are strong and complex. Robot technology risk factors were relatively fundamental risk factors, and project risk factors had a direct influence on the risk of HRC implementation. The implementation cost of HRC was not identified as a critical risk factor. Individual risk factors could be mitigated by improving technical and organisational factors.

Originality/value

This paper contributes to the body of knowledge in the field of both HRC behaviours and its risk management in construction project management. Identifying the critical risk factors and their interactions of HRC implementation in the construction industry and introducing social network theory to the research on critical risk factors are the innovations of this paper. The findings and proposed suggestions could help construction professionals to better understand the HRC risk factors and to manage the risk of HRC implementation more effectively.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 7
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 24 November 2022

Ning Huang, Qiang Du, Patrick X.W. Zou and Youdan Huang

This study aims to analyze the interaction and key factors within the network of factors influencing the success of green highway projects.

275

Abstract

Purpose

This study aims to analyze the interaction and key factors within the network of factors influencing the success of green highway projects.

Design/methodology/approach

Through literature review and interviews with experienced project managers, this study identified 33 influencing factors from the perspectives of stakeholders and life cycle. The interaction between these influencing factors was determined by surveying different experts, most of whom have participated in green highway projects in China. Then, social network analysis (SNA) was used to explore the impact and control ability of different factors.

Findings

According to the prioritization of these factors, the results showed that some key factors were identified, especially incremental cost, lack of standards and regulations, development of innovative technologies and materials, public awareness and environmental protection behavior. Finally, some meaningful suggestions were put forward for different influencing factors of green highway projects.

Research limitations/implications

While the key influencing factors of the green highway projects have been identified by considering the interrelationships between different factors, the specific influencing paths and levels of different factors are not analyzed, more studies and methods should be conducted on this area in the future.

Practical implications

This finding of factors influencing the success of green highway projects which is useful for managers to overcome various obstacles encountered in similar projects. Moreover, considering the interaction among the influencing factors enables managers to make systematic and efficient decisions.

Social implications

Developing green highways have been perceived as a major innovation to help achieve the synergy of environmental protection, economic development and social responsibility. Studying the key factors influencing the success of green highway projects and putting forward targeted suggestions are crucial for promoting the environmental protection transformation of highway construction.

Originality/value

Compared with most studies on the identification of key influencing factors of construction projects, this research emphasized the interaction between different factors within the system in the analysis process. The findings could provide useful references to promote the successful implementation of green highway projects.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 19 May 2023

Ling Yan, Yichao Chen and Tingting Cao

The consulting team intervenes in the integrated construction consulting (ICC) network structure centered on “client-contractor-consultant.” Team boundary-spanning behavior (TBB…

Abstract

Purpose

The consulting team intervenes in the integrated construction consulting (ICC) network structure centered on “client-contractor-consultant.” Team boundary-spanning behavior (TBB) driven by the network structure is crucial to project performance. This article investigated how to stimulate the consulting project performance (CPP) improvement by considering the interactive effect of network structure and TBB. To be specific, this paper explored the configuration between structural characteristics of project networks, the dimension of TBB, and project performance in ICC projects.

Design/methodology/approach

Network density and centrality were used to reflect network structure. This study collected 216 valid responses from construction professionals (including project managers, department managers, and project engineers) via a questionnaire survey and analyzed the data using fsQCA.

Findings

Combining with the corresponding typical project case and analysis, the results concluded four types of configurations for achieving high performance in the ICC projects. Meanwhile, network centrality, density, ambassadorial behavior, coordination behavior, and detection behavior significantly impact high consulting project performance. Matching ICC network characteristics with the TBB is important. There are also three low performance configurations for the ICC projects. Low performance state also occurs when network centrality or density and coordination behavior is simultaneously low. Only the right match between the network characteristics and TBB can produce high consulting project performance.

Research limitations/implications

The network centrality and density, the implementation of TBB vary, and the paths to achieve high consulting project performance are different. Clients, ICC projects, and consulting teams should choose the appropriate development paths according to the actual situation. (1) Clients should commit to applying the ICC project model with high network centrality, density, and coordination behavior of ICC enterprises to promote project performance. (2) Consulting enterprises should carry out ICC business based on detecting behavior and coordinating behavior. (3) The market should cultivate head consulting enterprises with independence and integration, and bring into play the effectiveness of consulting team ambassadorial behavior.

Practical implications

Comparing the results of the four high CPP configurations, the network structure characteristics are essential, which means that in the Chinese consulting practice between the owner and the consulting firm pay attention to the use of appropriate ICC organizational structure model and arrange the degree of centralization of authorized responsibilities. Coordination behavior is necessary to achieve high CPP. Therefore, Chinese consulting firms should pay attention to effective communication and exchange with project contractors in order to get high CPP in conducting business; meanwhile, enabling behavior can achieve high CPP both in the presence and absence of configuration H1 and H4, which indicates that enabling behavior has substitution effect. Comparing the three low CPP configurations also contrarily confirms the indispensability of coordinating behavior. Comparing the results of high and low CPP configurations, the TBB is seriously missing and not properly applied in CPP enhancement. In detail, Chinese consulting firms have been regarded as independent third parties providing services, and less attention has been paid to the TBB of Chinese consulting firms in past practice, thus leading to the dilemma of inadequate empowerment of consulting firms due to their unclear status. To solve this dilemma, the findings of this paper offer a solution at the micro level to change the previous perception of consulting and demonstrate that Chinese consulting practice needs to pay attention to TBB with owners and contractors, and apply it well to enhance the reputation, management consulting level and capability, and experience and expertise of consulting firms to achieve high CPP.

Originality/value

The research results changed from the previous bilateral project governance to a new perspective of network embedding. It provided a theoretical basis for the improvement path of high consulting project performance, as well as providing ideas for clients on the organizational design of ICC projects. On the other hand, it provided a practical reference for TBB positioning of ICC enterprises for transformation and upgrading development.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of over 8000