Open Access
Article
Publication date: 17 April 2024

Daan Kabel, Jason Martin and Mattias Elg

The integration of industry 4.0 has become a priority for many organizations. However, not all organizations are suitable and capable of implementing industry 4.0 because it…

Abstract

Purpose

The integration of industry 4.0 has become a priority for many organizations. However, not all organizations are suitable and capable of implementing industry 4.0 because it requires a dynamic and flexible implementation strategy. The implementation of industry 4.0 often involves overcoming several tensions between internal and external stakeholders. This paper aims to explore the paradoxical tensions that arise for health-care organizations when integrating industry 4.0. Moreover, it discusses how a paradox lens can support the conceptualization and proposes techniques for handling tensions during the integration of industry 4.0.

Design/methodology/approach

This qualitative and in-depth study draws upon 32 semi-structured interviews. The empirical case concerns how two health-care organizations handle paradoxical tensions during the integration of industry 4.0.

Findings

The exploration resulted in six recurring technology tensions: technology invention (modularized design vs. flexible design), technology collaboration (automation vs. human augmentation), technology-driven patient experience (control vs. autonomy), technology uncertainty (short-term experimentation vs. long-term planning), technology invention and diffusion through collaborative efforts among stakeholders (selective vs. intensive collaboration) and technological innovation (market maintenance vs. disruption).

Originality/value

A paradox theory-informed conceptual model is proposed for how to handle tensions during the integration of industry 4.0. To the best of the authors’ knowledge, this is the first paper to introduce paradox theory for quality management, including lean and Six Sigma.

Details

International Journal of Lean Six Sigma, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 26 March 2024

Keyu Chen, Beiyu You, Yanbo Zhang and Zhengyi Chen

Prefabricated building has been widely applied in the construction industry all over the world, which can significantly reduce labor consumption and improve construction…

Abstract

Purpose

Prefabricated building has been widely applied in the construction industry all over the world, which can significantly reduce labor consumption and improve construction efficiency compared with conventional approaches. During the construction of prefabricated buildings, the overall efficiency largely depends on the lifting sequence and path of each prefabricated component. To improve the efficiency and safety of the lifting process, this study proposes a framework for automatically optimizing the lifting path of prefabricated building components using building information modeling (BIM), improved 3D-A* and a physic-informed genetic algorithm (GA).

Design/methodology/approach

Firstly, the industry foundation class (IFC) schema for prefabricated buildings is established to enrich the semantic information of BIM. After extracting corresponding component attributes from BIM, the models of typical prefabricated components and their slings are simplified. Further, the slings and elements’ rotations are considered to build a safety bounding box. Secondly, an efficient 3D-A* is proposed for element path planning by integrating both safety factors and variable step size. Finally, an efficient GA is designed to obtain the optimal lifting sequence that satisfies physical constraints.

Findings

The proposed optimization framework is validated in a physics engine with a pilot project, which enables better understanding. The results show that the framework can intuitively and automatically generate the optimal lifting path for each type of prefabricated building component. Compared with traditional algorithms, the improved path planning algorithm significantly reduces the number of nodes computed by 91.48%, resulting in a notable decrease in search time by 75.68%.

Originality/value

In this study, a prefabricated component path planning framework based on the improved A* algorithm and GA is proposed for the first time. In addition, this study proposes a safety-bounding box that considers the effects of torsion and slinging of components during lifting. The semantic information of IFC for component lifting is enriched by taking into account lifting data such as binding positions, lifting methods, lifting angles and lifting offsets.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 22 March 2024

Qianmai Luo, Chengshuang Sun, Ying Li, Zhenqiang Qi and Guozong Zhang

With increasing complexity of construction projects and new construction processes and methods are adopted, more safety hazards are emerging at construction sites, requiring the…

Abstract

Purpose

With increasing complexity of construction projects and new construction processes and methods are adopted, more safety hazards are emerging at construction sites, requiring the application of the modern risk management methods. As an emerging technology, digital twin has already made valuable contributions to safety risk management in many fields. Therefore, exploring the application of digital twin technology in construction safety risk management is of great significance. The purpose of this study is to explore the current research status and application potential of digital twin technology in construction safety risk management.

Design/methodology/approach

This study followed a four-stage literature processing approach as outlined in the systematic literature review procedure guidelines. It then combined the quantitative analysis tools and qualitative analysis methods to organize and summarize the current research status of digital twin technology in the field of construction safety risk management, analyze the application of digital twin technology in construction safety risk management and identify future research trends.

Findings

The research findings indicate that the application of digital twin technology in the field of construction safety risk management is still in its early stages. Based on the results of the literature analysis, this paper summarizes five aspects of digital twin technology's application in construction safety risk management: real-time monitoring and early warning, safety risk prediction and assessment, accident simulation and emergency response, safety risk management decision support and safety training and education. It also proposes future research trends based on the current research challenges.

Originality/value

This study provides valuable references for the extended application of digital twin technology and offers a new perspective and approach for modern construction safety risk management. It contributes to the enhancement of the theoretical framework for construction safety risk management and the improvement of on-site construction safety.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 29 April 2024

Rui Zhu and Lihong Li

In the context of Industry 4.0, intelligent construction technologies (ICT) represented by information technology and networking will undoubtedly provide new impetus to the…

Abstract

Purpose

In the context of Industry 4.0, intelligent construction technologies (ICT) represented by information technology and networking will undoubtedly provide new impetus to the development of the prefabricated building supply chain (PBSC), but they will also bring various potential risks. So far, there is a large lack of research on the comprehensive consideration of the risks associated with the intelligent transformation of PBSC based on the information sharing perspective, and the critical risks and interactions are still unclear, making it difficult to identify efficient risk mitigation strategies. Therefore, this paper aims to reveal the interactions between stakeholders and clarify the critical risk nodes and interactions in information sharing of PBSC (IS-PBSC), and propose targeted risk mitigation strategies.

Design/methodology/approach

Firstly, this paper creatively delineates the risks and critical stakeholders of IS-PBSC. Secondly, Data is collected through questionnaires to understand the degree of risks impact. Thirdly, with the help of NetMiner 4 software, social network analysis is conducted and IS-PBSC risk network is established to reveal critical risk nodes and interactions. Finally, further targeted discussion of critical risk nodes, the effectiveness and reasonableness of the risk mitigation strategies are proposed and verified through NetMiner 4 software simulation.

Findings

The results show that the critical risks cover the entire process of information sharing, with the lack of information management norms and other information assurance-related risks accounting for the largest proportion. In addition, the government dominates in risk control, followed by other stakeholders. The implementation of risk mitigation strategies is effective, with the overall network density reduced by 41.15% and network cohesion reduced by 24%.

Research limitations/implications

In the context of Industry 4.0, ICT represented by information technology and networking will undoubtedly provide new impetus to the development of the PBSC, but they will also bring various potential risks. So far, there is a large lack of research on the comprehensive consideration of the risks associated with the intelligent transformation of PBSC based on the information sharing perspective, and the critical risks and interactions are still unclear, making it difficult to identify efficient risk mitigation strategies.

Originality/value

Based on the results of risk network visualization analysis, this paper proposes an ICT-based IS-PBSC mechanism that promotes the development of the integration of ICT and PBSC while safeguarding the benefits of various stakeholders.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 23 February 2024

Xinnan Liu, Jiani Meng, Jiayi Wang and Yingbo Ji

This study adopts the perspective of dynamic capabilities to investigate influencing factors and proposes improvement strategies of supply chain resilience of prefabricated…

Abstract

Purpose

This study adopts the perspective of dynamic capabilities to investigate influencing factors and proposes improvement strategies of supply chain resilience of prefabricated construction.

Design/methodology/approach

The structural equation model (SEM) is used to identify and verify the relationship between factors influencing supply chain resilience of prefabricated construction from the perspective of dynamic capabilities. The system dynamics (SD) model is constructed to dynamically simulate the specific effects of different influencing factors.

Findings

Results indicate that: (1) An evaluation index system for supply chain resilience of prefabricated construction containing five first-level indicators and 36 second-level indicators is constructed; (2) Ability to anticipate, ability to respond, ability to adapt, ability to recover and ability to learn are positively correlated with the supply chain resilience of prefabricated construction and (3) ANT3 (information system), RES1 (quick response), ADA3 (buffer stock) and LEA4 (trust) are the most leading factors influencing supply chain resilience of prefabricated construction over time.

Originality/value

This study fulfills the need for an in-depth exploration of the various influencing factors on supply chain resilience of prefabricated construction from the perspective of dynamic capabilities. Furthermore, this study provides improvement strategies to enhance supply chain resilience of prefabricated construction in China.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 28 February 2024

Dat Tien Doan, Tuyet Phuoc Anh Mai, Ali GhaffarianHoseini, Amirhosein Ghaffarianhoseini and Nicola Naismith

This study aims to identify the primary research areas of modern methods of construction (MMC) along with its current trends and developments.

Abstract

Purpose

This study aims to identify the primary research areas of modern methods of construction (MMC) along with its current trends and developments.

Design/methodology/approach

A combination of bibliometric and qualitative analysis is adopted to examine 1,957 MMC articles in the Scopus database. With the support of CiteSpace 6.1.R6, the clusters, leading authors, journals, institutions and countries in the field of MMC are examined.

Findings

Offsite construction, inter-modular connections, augmenting output, prefabricated concrete beams and earthquake-resilient prefabricated beam–column steel joints are the top five research areas in MMC. Among them, offsite construction and inter-modular connections are significantly focused, with many research articles. The potential for collaboration, among prominent authors such as Wang, J., Liu, Y. and Wang, Y., explains the recent rapid growth of the MMC field of research. With a total of 225 articles, Engineering Structures is the journal that has published the most articles on MMC. China is the leading country in this field, and the Ministry of Education China is the top institution in MMC.

Originality/value

The findings of this study bear significant implications for stakeholders in academia and industry alike. In academia, these insights allow researchers to identify research gaps and foster collaboration, steering efforts toward innovative and impactful outcomes. For industries using MMC practices, the clarity provided on MMC techniques facilitates the efficient adoption of best practices, thereby promoting collaboration, innovation and global problem-solving within the construction field.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 28 February 2024

Eyad Buhulaiga and Arnesh Telukdarie

Multinational business deliver value via multiple sites with similar operational capacities. The age of the Fourth Industrial Revolution (4IR) delivers significant opportunities…

Abstract

Purpose

Multinational business deliver value via multiple sites with similar operational capacities. The age of the Fourth Industrial Revolution (4IR) delivers significant opportunities for the deployment of digital tools for business optimization. Therefore, this study aims to study the Industry 4.0 implementation for multinationals.

Design/methodology/approach

The key objective of this research is multi-site systems integration using a reproducible, modular and standardized “Cyber Physical System (CPS) as-a-Service”.

Findings

A best practice reference architecture is adopted to guide the design and delivery of a pioneering CPS multi-site deployment. The CPS deployed is a cloud-based platform adopted to enable all manufacturing areas within a multinational energy and petrochemical company. A methodology is developed to quantify the system environmental and sustainability benefits focusing on reduced carbon dioxide (CO2) emissions and energy consumption. These results demonstrate the benefits of standardization, replication and digital enablement for multinational businesses.

Originality/value

The research illustrates the ability to design a single system, reproducible for multiple sites. This research also illustrates the beneficial impact of system reuse due to reduced environmental impact from lower CO2 emissions and energy consumption. The paper assists organizations in deploying complex systems while addressing multinational systems implementation constraints and standardization.

Details

Digital Transformation and Society, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2755-0761

Keywords

Article
Publication date: 26 March 2024

Xichen Chen, Alice Yan Chang-Richards, Florence Yean Yng Ling, Tak Wing Yiu, Antony Pelosi and Nan Yang

Despite extensive academic research related to digital technologies (DT), their integration into architecture, engineering and construction (AEC) projects lags in practice. This…

Abstract

Purpose

Despite extensive academic research related to digital technologies (DT), their integration into architecture, engineering and construction (AEC) projects lags in practice. This paper aims to discover DT deployment patterns and emerging trends in real-life AEC projects.

Design/methodology/approach

A case study methodology was adopted, including individual case analyses and comparative multiple-case analyses.

Findings

The results revealed the temporal distribution of DT in practical AEC projects, specific DT products/software, major project types integrated with digital solutions, DT application areas and project stages and associated project performance. Three distinct patterns in DT adoption have been observed, reflecting the evolution of DT applications, the progression from single to multiple DT integration and alignment with emerging industry requirements. The DT adoption behavior in the studied cases has been examined using the technology-organization-environment-human (TOE + H) framework. Further, eight emerging trend streams for future DT adoption were identified, with “leveraging the diverse features of certain mature DT” being a shared recognition of all studied companies.

Practical implications

This research offers actionable insights for AEC companies, facilitating the development of customized DT implementation roadmaps aligned with organizational needs. Policymakers, industry associations and DT suppliers may leverage these findings for informed decision-making, collaborative educational initiatives and product/service customization.

Originality/value

This research provides empirical evidence of applicable products/software, application areas and project performance. The examination of the TOE + H framework offers a holistic understanding of the collective influences on DT adoption. The identification of emerging trends addresses the evolving demands of the AEC industry in the digital era.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 14 February 2024

Batuhan Kocaoglu and Mehmet Kirmizi

This study aims to develop a modular and prescriptive digital transformation maturity model whose constituent elements have conceptual integrity as well as reveal the priority…

Abstract

Purpose

This study aims to develop a modular and prescriptive digital transformation maturity model whose constituent elements have conceptual integrity as well as reveal the priority weights of maturity model components.

Design/methodology/approach

A literature review with a concept-centric analysis enlightens the characteristics of constituent parts and reveals the gaps for each component. Therefore, the interdependency network among model dimensions and priority weights are identified using decision-making trial and evaluation laboratory (DEMATEL)-based analytic network process (ANP) method, including 19 industrial experts, and the results are robustly validated with three different analyses. Finally, the applicability of the developed maturity model and the constituent elements are validated in the context of the manufacturing industry with two case applications through a strict protocol.

Findings

Results obtained from DEMATEL-based ANP suggest that smart processes with a priority weight of 17.91% are the most important subdimension for reaching higher digital maturity. Customer integration and value, with a priority weight of 17.30%, is the second most important subdimension and talented employee, with 16.24%, is the third most important subdimension.

Research limitations/implications

The developed maturity model enables companies to make factual assessments with specially designed measurement instrument including incrementally evolved questions, prioritize action fields and investment strategies according to maturity index calculations and adapt to the dynamic change in the environment with spiral maturity level identification.

Originality/value

A novel spiral maturity level identification is proposed with conceptual consistency for evolutionary progress to adapt to dynamic change. A measurement instrument that is incrementally structured with 234 statements and a measurement method that is based on the priority weights and leads to calculating the maturity index are designed to assess digital maturity, create an improvement roadmap to reach higher maturity levels and prioritize actions and investments without any external support and assistance.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 17 April 2024

Hazwani Shafei, Rahimi A. Rahman, Yong Siang Lee and Che Khairil Izam Che Ibrahim

Amid rapid technological progress, the construction industry is embracing Construction 4.0, redefining work practices through emerging technologies. However, the implications of…

Abstract

Purpose

Amid rapid technological progress, the construction industry is embracing Construction 4.0, redefining work practices through emerging technologies. However, the implications of Construction 4.0 technologies to enhancing well-being are still poorly understood. Particularly, the challenge lies in selecting technologies that critically contribute to well-being enhancement. Therefore, this study aims to evaluate the implications of Construction 4.0 technologies to enhancing well-being.

Design/methodology/approach

A list of Construction 4.0 technologies was identified from a national strategic plan on Construction 4.0, using Malaysia as a case study. Fourteen construction industry experts were selected to evaluate the implications of Construction 4.0 technologies on well-being using fuzzy Technique for Order Preference by Similarity to Ideal Solution (TOPSIS). The expert judgment was measured using linguistic variables that were transformed into fuzzy values. Then, the collected data was analyzed using the following analyses: fuzzy TOPSIS, Pareto, normalization, sensitivity, ranking performance and correlation.

Findings

Six Construction 4.0 technologies are critical to enhancing well-being: cloud & real-time collaboration, big data & predictive analytics, Internet of Things, building information modeling, autonomous construction and augmented reality & virtualization. In addition, artificial intelligence and advanced building materials are recommended to be implemented simultaneously as a very strong correlation exists between them.

Originality/value

The novelty of this study lies in a comprehensive understanding of the implications of Construction 4.0 technologies to enhancing well-being. The findings can assist researchers, industry practitioners and policymakers in making well-informed decisions to select Construction 4.0 technologies when targeting the enhancement of the overall well-being of the local construction industry.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print