Open Access
Article
Publication date: 13 August 2021

Juliana Parise Baldauf, Carlos Torres Formoso and Patricia Tzortzopoulos

This paper proposes a method for managing client requirements with the use of Building Information Modelling (BIM). The development of healthcare projects demands a large amount…

2539

Abstract

Purpose

This paper proposes a method for managing client requirements with the use of Building Information Modelling (BIM). The development of healthcare projects demands a large amount of requirements information, in order to deal with a diversity of clients and frequents changes in healthcare services. The proposed method supports healthcare design by adopting a process-based approach for client requirements management, with the aim of improving value generation.

Design/methodology/approach

Design Science Research was the methodological approach adopted in this investigation. The main outcome of this study emerged from an empirical study carried out in a healthcare project in Brazil.

Findings

The proposed method involves three stages: (1) capturing and processing requirements; (2) product and requirements modelling, which involves the connection between requirements and the BIM 3-D model and (3) supporting design solution refinement, through the communication of requirements and the assessment of design in relation to updated client requirements information.

Originality/value

This study explores client requirements management from a process perspective, proposing activities and their interdependences and possible sources of data, including healthcare services information. The main theoretical contributions are related to the understanding of the nature and complexity of the information involved in client requirements management, and how this can be modelled.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 16 October 2023

Emmanuel Dele Omopariola, Abimbola Olukemi Windapo, David John Edwards, Clinton Ohis Aigbavboa, Sunday Ukwe-Nya Yakubu and Onimisi Obari

Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective…

Abstract

Purpose

Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective project cash flow process. However, scant research has been undertaken to empirically establish the cash flow performance and domino effect of APS on project and organisational performance.

Design/methodology/approach

The epistemological design adopted a positivist philosophical stance augmented by deductive reasoning to explore the phenomena under investigation. Primary quantitative data were collected from 504 Construction Industry Development Board (CIDB) registered contractors (within the grade bandings 1–9) in South Africa. A five-point Likert scale was utilised, and subsequent data accrued were analysed using structural equation modelling (SEM).

Findings

Emergent findings reveal that the mandatory use of an APS does not guarantee a positive project cash flow, an improvement in organisational performance or an improvement in project performance.

Practical implications

The ensuing discussion reveals the contributory influence of APS on positive cash flow and organisational performance, although APS implementation alone will not achieve these objectives. Practically, the research accentuates the need for various measures to be concurrently adopted (including APS) towards ensuring a positive project cash flow and improved organisational and project performance.

Originality/value

There is limited empirical research on cash flow performance and the domino effect of APS on project and organisational performance in South Africa, nor indeed, the wider geographical location of Africa as a continent. This study addresses this gap in the prevailing body of knowledge.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Book part
Publication date: 1 May 2019

Maria Saridaki and Kim Haugbølle

The architecture, engineering and construction industry faces several challenges when performing life-cycle cost calculations. On the basis of activity theory, this study aims at…

Abstract

Purpose

The architecture, engineering and construction industry faces several challenges when performing life-cycle cost calculations. On the basis of activity theory, this study aims at improving our understanding of the current cost calculation in design practices as an activity system with a number of built-in contradictions.

Design/Methodology/Approach

Drawing on one of the authors’ practical experience from a design office, the research design comprises a paradigmatic case study of a Danish architecture firm, in which data are gathered through documents, observations, interviews and physical artefacts. Moreover, this paper applies a literature review on barriers for adopting life-cycle costing.

Findings

The paper identifies a number of primary, secondary, tertiary and quaternary contradictions between practices of design, cost calculations and data management. Thus, hypotheses are formulated on how and to what extent these different contradictions shape cost calculations in design practices to obstruct or support the application of life cycle costing principles in design.

Research Limitations/Implications

This study is part of an ongoing research project. Thus, additional analysis is required before the authors may conclude on final results.

Practical Implications

This paper identifies a number of factors that obstruct or support the implementation of life cycle costing in current design practices.

Originality/Value

This paper provides new insights into the various contradictions that shape data management in architectural offices as a prerequisite for improving life cycle design practices.

Details

10th Nordic Conference on Construction Economics and Organization
Type: Book
ISBN: 978-1-83867-051-1

Keywords

Open Access
Article
Publication date: 8 February 2021

Eryk Głodziński

The purpose of this paper is to discuss contemporary knowledge relevant to the application of performance measurement (PMe) in the concept of OPM and to compare findings from a…

1690

Abstract

Purpose

The purpose of this paper is to discuss contemporary knowledge relevant to the application of performance measurement (PMe) in the concept of OPM and to compare findings from a literature review with solutions recommended for utilization by managers from general contractors operating in Poland. There are few studies related to the mentioned topic, much fewer describing the geographical area of Eastern Europe.

Design/methodology/approach

Triangulation of research methods was selected. First literature review, next desk research and finally descriptive statistical analysis and interview were conducted. The research methods were applied in three steps whose beginnings overlapped and the mid-term findings from one study complemented others.

Findings

PMe should be focused on management and governance issues. Its evaluation is related to various organizational levels (permanent organization, portfolio, program, project, construction site and supply chain), most of them are under valuated by practitioners. The conducted study pointed out that there are numerous supporting tools and measures applicable in organizational project management (OPM). The managers recommend combining various tools in one comprehensive OPM system, to limit multiple manual incorporations of the same data to the various databases. The managers call to increase the practical usefulness of researchers’ proposals, to educate the construction managers in the application of complex performance systems and to promote portfolio thinking.

Originality/value

The comparison of performance measurement solutions proposed by academia with experience collected from Polish construction managers could support the better application of theoretical ideas in practice.

Details

Measuring Business Excellence, vol. 25 no. 3
Type: Research Article
ISSN: 1368-3047

Keywords

Open Access
Article
Publication date: 27 February 2024

Vartenie Aramali, George Edward Gibson, Hala Sanboskani and Mounir El Asmar

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on…

Abstract

Purpose

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on their technical aspects rather than social. This study aims to hypothesize that improving both the technical maturity of EVMS and the social environment elements of EVMS applications together will significantly impact project performance outcomes. For the first time, empirical evidence supports a strong relationship between EVMS maturity and environment.

Design/methodology/approach

Data was collected from 35 projects through four workshops, attended by 31 industry practitioners with an average of 19 years of EVMS experience. These experts, representing 23 organizations, provided over 2,800 data points on sociotechnical integration and performance outcomes, covering projects totaling $21.8 billion. Statistical analyses were performed to derive findings on the impact of technical maturity and social environment on project success.

Findings

The results show statistically significant differences in cost growth, compliance, meeting project objectives and business drivers and customer satisfaction, between projects with high EVMS maturity and environment and projects with poor EVMS maturity and environment. Moreover, the technical and social dimensions were found to be significantly correlated.

Originality/value

Key contributions include a novel and tested performance-driven framework to support integrated project management using EVMS. The adoption of this detailed assessment framework by government and industry is driving a paradigm shift in project management of some of the largest and most complex projects in the U.S.; specifically transitioning from a project assessment based upon a binary approach for EVMS technical maturity (i.e. compliant/noncompliant to standards) to a wide-ranging scale (i.e. 0–1,000) across two dimensions.

Details

International Journal of Managing Projects in Business, vol. 17 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 20 March 2017

Tristan Gerrish, Kirti Ruikar, Malcolm Cook, Mark Johnson and Mark Phillip

The purpose of this paper is to present a review of the implications building information modelling (BIM) is having on the building energy modelling (BEM) and design of buildings…

9699

Abstract

Purpose

The purpose of this paper is to present a review of the implications building information modelling (BIM) is having on the building energy modelling (BEM) and design of buildings. It addresses the issues surrounding exchange of information throughout the design process, and where BIM may be useful in contributing to effective design progression and information availability.

Design/methodology/approach

Through review of current design procedures and examination of the concurrency between architectural and thermophysical design modelling, a procedure for information generation relevant to design stakeholders is created, and applied to a high-performance building project currently under development.

Findings

The extents of information key to the successful design of a buildings energy performance in relation to its architectural objectives are given, with indication of the level of development required at each stage of the design process.

Practical implications

BIM offers an extensible medium for parametric information storage, and its implementation in design development offers the capability to include BEM parameter-integrated construction information. The extent of information required for accurate BEM at stages of a building’s design is key to understanding how best to record performance information in a BIM environment.

Originality/value

This paper contributes to the discussion around the integration of concurrent design procedures and a common data environment. It presents a framework for the creation and dissemination of information during design, exemplifies this on a real building project and evaluates the barriers experienced in successful implementation.

Details

Engineering, Construction and Architectural Management, vol. 24 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 19 March 2018

Josana Gabriele Bolzan Wesz, Carlos Torres Formoso and Patricia Tzortzopoulos

The purpose of this paper is to propose a model for planning and controlling the design process in companies that design, manufacture and assemble prefabricated engineer-to-order…

3838

Abstract

Purpose

The purpose of this paper is to propose a model for planning and controlling the design process in companies that design, manufacture and assemble prefabricated engineer-to-order (ETO) building systems. This model was devised as an adaptation of the Last Planner® System for ETO multiple-project environments.

Design/methodology/approach

Design science research, also known as prescriptive research, was the methodological approach adopted in this research. An empirical study was carried out at the design department of a leading steel fabricator from Brazil, in which the proposed model was implemented in six different design teams.

Findings

The main benefits of the proposed model were shielding design work from variability, encouraging collaborative planning, creating opportunities for learning, increasing process transparency, and flexibility according to project status. Two main factors affected the effectiveness of the implementation process commitment and leadership of design managers, and training on design management and project planning and control core concepts and practices.

Research limitations/implications

Some limitations were identified in the implementation process: similarly to some previous studies (Ballard, 2002; Codinhoto and Formoso, 2005), the success of constraint analysis was still limited; some of the metrics produced (e.g. ABI, causes of planning failures) have not been fully used for process improvement; and systematic feedback about project status was not properly implemented and tested.

Originality/value

The main contributions of this study in relation to traditional design planning and control practices are related to the use of two levels of look-ahead planning, the introduction of a decoupling point between conceptual and detail design, the proposition of new metrics for the Last Planner® System, and understanding the potential role of visual management to support planning and control.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 29 June 2023

Gunilla Carlsson, Oskar Jonsson, Stefan Olander, Marianne Salén, Eva Månsson Lexell and Björn Slaug

This study aims to explore how an accessibility database (AD) has been developed and implemented as a tool for facility managers to evaluate and increase the accessibility of…

Abstract

Purpose

This study aims to explore how an accessibility database (AD) has been developed and implemented as a tool for facility managers to evaluate and increase the accessibility of public facilities.

Design/methodology/approach

Eight participants were strategically sampled for semi-structured interviews, and documents on the AD were gathered. The Consolidated Framework for Implementation Research (CFIR) was used for a directed content analysis of the data. The CFIR domains used for the analysis were: intervention characteristics, outer setting, inner setting, characteristics of individuals and process.

Findings

The development and implementation of the AD demonstrated the complexity in assessing and planning for increased accessibility. The communication and iterative processes within the inner as well as with the outer setting was an important part of the development and implementation, as well as anchoring each step locally, regionally and nationally, within public authorities and disability organizations.

Practical implications

The assessments of environmental barriers and the results reported in the AD can serve as a guide for identification of accessibility issues. However, singular identified barriers were reported as a fragmentation of the building regulations, and thereby when retrofitting is carried out, experts who have the competence to suggest solutions based on the entirety need to be involved to reach the goals of increased accessibility and countering of exclusion and discrimination.

Originality/value

By structuring the implementation process by means of the CFIR, facilitators and barriers of using an AD as a basis for retrofitting were revealed. The practical challenges outlined in assessing and increasing accessibility can guide facility managers when considering actions to increase accessibility.