Search results
1 – 2 of 2Mariah R. Jenkins, Sara K. McBride, Meredith Morgoch and Hollie Smith
The 2019 Global Assessment Report on Disaster Risk Reduction (GAR) cites earthquakes as the most damaging natural hazard globally, causing billions of dollars of damage and…
Abstract
Purpose
The 2019 Global Assessment Report on Disaster Risk Reduction (GAR) cites earthquakes as the most damaging natural hazard globally, causing billions of dollars of damage and killing thousands of people. Earthquakes have the potential to drastically impact physical, social and economic landscapes; to reduce this risk, earthquake early warning (EEW) systems have been developed. However, these technical EEW systems do not operate in a vacuum; the inequities in social systems, along with the needs of diverse populations, must be considered when developing these systems and their associated communication campaigns.
Design/methodology/approach
This article reviews aspects of social vulnerability as they relate to ShakeAlert, the EEW system for the USA. The authors identified two theories (relationship management theory and mute group theory) to inform self-reflective questions for agencies managing campaigns for EEW systems, which can assist in the development of more inclusive communication practices. Finally, the authors suggest this work contributes to important conversations about diversity, equity and inclusion (DEI) issues within early warning systems and earthquake preparedness campaigns in general.
Findings
To increase inclusivity, Macnamara (2012) argues that self-reflective questioning while analyzing perspective, philosophy and approaches for a campaign can help. Specific to EEW campaigns, developers may find self-reflective questions a useful approach to increase inclusion. These questions are guided by two theories and are explored in the paper.
Research limitations/implications
Several research limitations exist. First, this work explores two theories to develop a combined theoretical model for self-reflective questions. Further research is required to determine if this approach and the combination of these two theories have adequately informed the development of the reflective questions.
Originality/value
The authors could find little peer-reviewed work examining DEI for EEW systems, and ShakeAlert in particular. While articles on early warning systems exist that explore aspects of this, EEW and ShakeAlert, with its very limited time frames for warnings, creates unique challenges.
Details
Keywords
Pablo Ballesteros-Pérez, Maria Luisa del Campo-Hitschfeld, Manuel Alejandro González-Naranjo and Mari Carmen González-Cruz
Construction projects usually suffer delays, and the causes of these delays and its cost overruns have been widely discussed, the weather being one of the most recurrent. The…
Abstract
Purpose
Construction projects usually suffer delays, and the causes of these delays and its cost overruns have been widely discussed, the weather being one of the most recurrent. The purpose of this paper is to analyze the influence of climate on standard construction work activities through a case study.
Design/methodology/approach
By studying the extent at which some weather variables impede outdoor work from being effectively executed, new maps and tables for planning for delays are presented. In addition, a real case regarding the construction of several bridges in southern Chile is analyzed.
Findings
Few studies have thoroughly addressed the influences of major climatic agents on the most common outdoor construction activities. The method detailed here provides a first approximation for construction planners to assess to what extent construction productivity will be influenced by the climate.
Research limitations/implications
Although this study was performed in Chile, the simplified method proposed is entirely transferable to any other country, however, other weather or combinations of weather variables could be needed in other environments or countries.
Practical implications
The implications will help reducing the negative social, economic and environmental outcomes that usually emerge from project delays.
Originality/value
Climatic data were processed using extremely simple calculations to create a series of quantitative maps and tables that would be useful for any construction planner to decide the best moment of the year to start a project and, if possible, where to build it.