Search results

1 – 10 of over 1000
Article
Publication date: 27 March 2024

Erfan Anjomshoa

Key performance indicators (KPIs) play a pivotal role in evaluating the level of success of an organization in achieving its business objectives. The objective of the current…

39

Abstract

Purpose

Key performance indicators (KPIs) play a pivotal role in evaluating the level of success of an organization in achieving its business objectives. The objective of the current research is to identify and prioritize effective KPIs in branding products and construction projects, which contribute to the success of construction companies in a competitive environment.

Design/methodology/approach

The present research is of an inferential, descriptive and survey nature. In this study, we identified the influential key performance indicators of construction companies in branding products and construction projects for success in a competitive environment through a literature review and expert opinions. The data were collected using a questionnaire, and a combination of the one-sample t-test method with a 95% confidence level and the fuzzy multiple attribute decision-making (FMADM) method was employed for analysis.

Findings

The results indicate that the most influential key performance indicators for construction companies in branding products and construction projects for success in a competitive environment are, in order of significance, the following indices: “Marketing and Advertising,” “Financial,” “Creativity,” “Technical and Operational” and “Social and Political.”

Originality/value

The present research examines the importance of branding construction products and projects for the success of construction companies by improving their business objectives and utilizing key performance indicators throughout the product lifecycle (production and construction). This study provides solutions on how construction companies can increase their competitive advantage through branding and achieve long-term success in the global construction industry.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 12 March 2024

Mansour Abedian, Hadi Shirouyehzad and Sayyed Mohammad Reza Davoodi

This paper aims to propose an integrated use of balanced scorecard (BSC), data envelopment analysis (DEA) and game theory approach as an enhanced performance measurement technique…

Abstract

Purpose

This paper aims to propose an integrated use of balanced scorecard (BSC), data envelopment analysis (DEA) and game theory approach as an enhanced performance measurement technique to determine and rank the importance of manufacturing indicators of a steel company as a real case study.

Design/methodology/approach

An efficiency change ratio is defined to examine the characteristic function of each coalition which is super-additive. Then, the Shapley value index is used as the solution of the cooperative game to determine the importance of the BSC indicators of the company and rank order them.

Findings

The results reveal that “profitability rate” is the most important BSC indicator, whereas “customer satisfaction” is the least significant one. The ranking order of the importance of all BSC indicators makes it possible for the senior managers of the organization to realize the importance of each index separately and to improve the profitability and the number of customers by presenting programs according to the budget and time constraints.

Originality/value

The main contribution of this paper lies in the adoption of a game theory approach to performance measurement in the industrial sector that determines and ranks the importance of manufacturing indicators.

Details

Journal of Modelling in Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1746-5664

Keywords

Article
Publication date: 29 February 2024

Wenque Liu, Albert P.C. Chan, Man Wai Chan, Amos Darko and Goodenough D. Oppong

The successful implementation of hospital projects (HPs) tends to confront sundry challenges in the planning and construction (P&C) phases due to their complexity and…

Abstract

Purpose

The successful implementation of hospital projects (HPs) tends to confront sundry challenges in the planning and construction (P&C) phases due to their complexity and particularity. Employing key performance indicators (KPIs) facilitates the monitoring of HPs to advance their successful delivery. This study aims to comprehensively investigate the KPIs for hospital planning and construction (HPC).

Design/methodology/approach

The KPIs for HPC were identified through a systematic review. Then a comprehensive assessment of these KPIs was performed utilizing a meta-analysis method. In this process, basic statistical analysis, subgroup analysis, sensitive analysis and publication bias analysis were performed.

Findings

Results indicate that all 27 KPIs identified from the literature are significant for executing HPs in P&C phases. Also, some unconventional performance indicators are crucial for implementing HPs, such as “Project monitoring effectiveness” and “Industry innovation and synergy,” as their high significance is reflected in this study. Despite the fact that the findings of meta-analysis are more trustworthy than those of individual studies, a high heterogeneity still exists in the findings. It highlights the inherent uncertainty in the construction industry. Hence, this study applied subgroup analysis to explore the underlying factors causing the high level of heterogeneity and used sensitive analysis to assess the robustness of the findings.

Originality/value

There is no consensus among the prior studies on KPIs for HPC specifically and their degree of significance. Additionally, few reviews in this field have focused on the reliability of the results. This study comprehensively assesses the KPIs for HPC and explores the variability and robustness of the results, which provides a multi-dimensional perspective for practitioners and the research community to investigate the performance of HPs during the P&C stages.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 12 March 2024

Pornwasin Sirisawat, Tipavinee Suwanwong Rodbundith and Narat Hasachoo

This study aims to investigate and classify the hospital logistics key performance indicators (KPIs) using the context of public hospitals in remote areas.

Abstract

Purpose

This study aims to investigate and classify the hospital logistics key performance indicators (KPIs) using the context of public hospitals in remote areas.

Design/methodology/approach

The public hospitals in northern Thailand were selected for the case study. The questionnaire was developed and used to collect data from hospital logistics experts. Then, the analytic hierarchy process (AHP) method was used to evaluate the hospital logistics KPIs in each dimension.

Findings

This research found that the procurement management dimension is ranked highest. Information and technology management is the last rank in the hospital logistics KPIs used for public hospitals in remote areas.

Research limitations/implications

The public hospitals located in northern Thailand were selected for the case study. Fuzzy multi-criteria decision-making methods can be used to reduce the vagueness of the values.

Practical implications

The results from this study can be a guideline for hospitals to improve the efficiency of their logistics operations.

Social implications

The decision-makers in the hospital can use these results to improve the hospital’s logistics performance in the future, which could help increase the service level and the safety of the patients.

Originality/value

The hospital logistics KPIs were revised, and the crucial KPIs were prioritized for improving the hospital logistics using the AHP method.

Details

International Journal of Pharmaceutical and Healthcare Marketing, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1750-6123

Keywords

Article
Publication date: 24 April 2024

Vanessa Nappi, Thayla Tavares Sousa-Zomer, Paulo A. Cauchick-Miguel and Henrique Rozenfeld

The integration of sustainability, performance measurement and new product development (NPD) is key for aligning environmental and social objectives with business strategies…

Abstract

Purpose

The integration of sustainability, performance measurement and new product development (NPD) is key for aligning environmental and social objectives with business strategies. While previous research has initiated proposals for integrating sustainability into NPD or incorporating sustainability into corporate measurement systems, there is a notable deficiency in studies that comprehensively integrate these three perspectives. In this sense, this study proposes a performance framework (PF) to integrate sustainability performance indicators (PIs) into the measurement system considering the company’s NPD phases.

Design/methodology/approach

The PF was developed through a literature review and action research (AR). This resulting PF was positively evaluated by the practitioners in the company.

Findings

First, the review enabled the synthesis of an initial conceptual PF with 188 sustainability PIs and a five-step procedure. Then, the empirical results of the AR led to a new PF that presents the systematisation of the PIs database and a practice-based seven-stage approach.

Research limitations/implications

This action-oriented research limits the extent to which this study’s findings can be generalised. Future research should apply the PF in different research designs to produce managerially relevant knowledge.

Practical implications

This PF may provide managers with actionable knowledge that best supports the measurement system integration with sustainability PIs considering the NPD phases.

Originality/value

Integrating sustainability, performance measurement and the NPD has been recognised as critical for supporting decision-making concerning the impact of processes and products. Compared with previous frameworks, the proposed PF extends the existing literature by introducing a systematised PIs database and a novel procedure for integrating sustainability measurement throughout the NDP.

Details

International Journal of Productivity and Performance Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1741-0401

Keywords

Open Access
Article
Publication date: 12 February 2024

Ivo Hristov, Matteo Cristofaro, Riccardo Camilli and Luna Leoni

This paper aims to (1) identify the different performance drivers (lead indicators) and outcome measures (lag indicators) investigated in the literature concerning the four…

Abstract

Purpose

This paper aims to (1) identify the different performance drivers (lead indicators) and outcome measures (lag indicators) investigated in the literature concerning the four balanced scorecard (BSC) perspectives in operations management (OM) contexts and (2) understand how performance drivers and outcome measures (and substantiated perspectives) are related.

Design/methodology/approach

We undertake a systematic literature review of the BSC literature in OM journals. From the final sample of 40 articles, performance drivers and outcome measures have been identified, and the relationships amongst them have been synthesised according to the system dynamics approach.

Findings

Findings show (1) the most relevant performance drivers and outcome measures within each BSC perspective, (2) their relationships, (3) how the perspectives are linked through the performance drivers and outcome measures and (4) how the different measures relate systemically. Accordingly, four causal loops amongst identified measures have been built, which – jointly considered – allowed for the creation of a dynamic strategy map for OM.

Originality/value

This study is the first one that provides a comprehensive and holistic view of how the different performance drivers and outcome measures within and between the four BSC perspectives in OM relate systemically, increasing the knowledge and understanding of scholars and practitioners.

Details

Journal of Manufacturing Technology Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1741-038X

Keywords

Article
Publication date: 1 April 2024

Gianluca Elia, Gianpaolo Ghiani, Emanuele Manni and Alessandro Margherita

This study aims to present a methodology and a system to support the technical and managerial issues involved in anomaly detection within the reverse logistics process of an…

Abstract

Purpose

This study aims to present a methodology and a system to support the technical and managerial issues involved in anomaly detection within the reverse logistics process of an e-commerce company.

Design/methodology/approach

A case study approach is used to document the company’s experience, with interviews of key stakeholders and integration of obtained evidence with secondary data.

Findings

The paper presents an algorithm and a system to support a more efficient and smart management of reverse logistics based on a set of anticipatory actions, and continuous and automatic monitoring of returned goods. Improvements are described in terms of a number of key performance indicators.

Research limitations/implications

The analysis and the developed system need further applications and validations in other organizational contexts. However, the research presents a roadmap and a research agenda for the reverse logistics transformation in Industry 4.0, by also providing new insights to design a multidimensional performance dashboard for reverse logistics.

Practical implications

The paper describes a replicable experience and provides checklists for implementing similar initiatives in the domain of reverse logistics, in the aim to increase the company’s performance along four key complementary dimensions, i.e. time savings, accuracy, completeness of data analysis and interpretation and cost efficiency.

Originality/value

The main novelty of the study stays in carrying out a classification of anomalies by type and product category, with related causes, and in proposing operational recommendations, including process monitoring and control indicators that can be included to design a reverse logistics performance dashboard.

Details

Measuring Business Excellence, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1368-3047

Keywords

Open Access
Article
Publication date: 13 February 2024

Marzena Stor

The main goal of the article is to determine the mediating role of human resources management (HRM) outcomes in the relationships between shaping employee work engagement and job…

Abstract

Purpose

The main goal of the article is to determine the mediating role of human resources management (HRM) outcomes in the relationships between shaping employee work engagement and job satisfaction (SEWE&JS) and company performance results and to establish whether there are any identifiable regularities in this scope in the pre-pandemic and pandemic period in the headquarters (HQs) and foreign subsidiaries of multinational companies (MNCs).

Design/methodology/approach

The empirical research included 200 MNCs headquartered in Central Europe. The raw data in the variables were adjusted with the efficiency index (EI) to capture the actual relations between the variables under study. The partial least squares structural equation modeling (PLS-SEM) was used to verify the research hypotheses and assess the mediating effects.

Findings

The research findings show that the HRM outcomes positively mediate the relationships between SEWE&JS and the company performance results. HRM outcomes turned out to be a stronger mediator between SEWE&JS and company performance results in finance and quality in the HQs during the pandemic. By contrast, in the local subsidiaries, they were a stronger mediator of the relationships between the results in innovativeness and quality during the pandemic.

Originality/value

In addition to confirming the results of some other researchers, the research findings also provide new knowledge. They determine the mediating role of HRM outcomes in the relationship between SEWE&JS and the three categories of company performance results, namely finance, innovativeness and quality. In addition, they identify certain regularities in the four studied contexts, which is a novelty in this type of research. A novelty is also the use of employee key performance indicators (KPIs) in the data analysis as the efficiency index in analyzing the effect of the variables under study. The value of the research is also the fact that it covers HRM in MNCs established in Central Europe, which, compared to MNCs from the Western world, is not a frequent subject of research.

Details

Central European Management Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2658-0845

Keywords

Article
Publication date: 16 April 2024

Rahadian Haryo Bayu Sejati, Dermawan Wibisono and Akbar Adhiutama

This paper aims to design a hybrid model of knowledge-based performance management system (KBPMS) for facilitating Lean Six-Sigma (L6s) application to increase contractor…

Abstract

Purpose

This paper aims to design a hybrid model of knowledge-based performance management system (KBPMS) for facilitating Lean Six-Sigma (L6s) application to increase contractor productivity without compromising human safety in Indonesian upstream oil field operations that manage ageing and life extension (ALE) facilities.

Design/methodology/approach

The research design applies a pragmatic paradigm by employing action research strategy with qualitative-quantitative methodology involving 385 of 1,533 workers. The KBPMS-L6s conceptual framework is developed and enriched with the Analytical Hierarchy Process (AHP) to prioritize fit-for-purpose Key Performance Indicators. The application of L6s with Human Performance Modes analysis is used to provide a statistical baseline approach for pre-assessment of the contractor’s organizational capabilities. A comprehensive literature review is given for the main pillars of the contextual framework.

Findings

The KBPMS-L6s concept has given an improved hierarchy for strategic and operational levels to achieve a performance benchmark to manage ALE facilities in Indonesian upstream oil field operations. To increase quality management practices in managing ALE facilities, the L6s application requires an assessment of the organizational capability of contractors and an analysis of Human Performance Modes (HPM) to identify levels of construction workers’ productivity based on human competency and safety awareness that have never been done in this field.

Research limitations/implications

The action research will only focus on the contractors’ productivity and safety performances that are managed by infrastructure maintenance programs for managing integrity of ALE facilities in Indonesian upstream of oil field operations. Future research could go toward validating this approach in other sectors.

Practical implications

This paper discusses the implications of developing the hybrid KBPMS- L6s enriched with AHP methodology and the application of HPM analysis to achieve a 14% reduction in inefficient working time, a 28% reduction in supervision costs, a 15% reduction in schedule completion delays, and a 78% reduction in safety incident rates of Total Recordable Incident Rate (TRIR), Days Away Restricted or Job Transfer (DART) and Motor Vehicle Crash (MVC), as evidence of achieving fit-for-purpose KPIs with safer, better, faster, and at lower costs.

Social implications

This paper does not discuss social implications

Originality/value

This paper successfully demonstrates a novel use of Knowledge-Based system with the integration AHP and HPM analysis to develop a hybrid KBPMS-L6s concept that successfully increases contractor productivity without compromising human safety performance while implementing ALE facility infrastructure maintenance program in upstream oil field operations.

Details

International Journal of Lean Six Sigma, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 19 March 2024

Pengcheng Pan, Yu Wang, Yumiao Yang and Sujuan Zhang

Building Information Modeling (BIM) capabilities have been studied at the individual, project, organizational, and even industry levels to ensure the realization of BIM value in…

Abstract

Purpose

Building Information Modeling (BIM) capabilities have been studied at the individual, project, organizational, and even industry levels to ensure the realization of BIM value in the architectural, engineering, construction, and operation industry. However, limited research has focused on a project owner organization perspective to investigate owner BIM capabilities that are required to ensure effective project management and delivery. This present study aims to propose an indicator framework to evaluate owner BIM capabilities at the organizational level.

Design/methodology/approach

Leveraging the existing literature on BIM capabilities and synthesizing insights from the resource-based view and information technology capabilities research, this study conceptualizes the BIM capabilities of project owner organizations and offers a framework of indicators for measurement. Semi-structured interviews with BIM experts and a questionnaire survey were conducted to identify key indicators affecting owner BIM capabilities. A six-dimensional structural equation model with 29 indicators was then established.

Findings

The findings highlight the multidimensionality of owner BIM capabilities and show that process capabilities play a crucial role in enhancing owner BIM capabilities, while technical capabilities are considered as the least important aspect.

Research limitations/implications

The study sheds light on the key role of project owner organizations in ensuring BIM value and suggests that project owners focus more on the organizational processes of introducing BIM in managing projects.

Originality/value

This study reconceptualizes owner BIM capabilities drawing on the idea of resource-based view and information technology capabilities and highlights the important dimensions and indicators of owner BIM capabilities at the organizational level.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Access

Year

Last 3 months (1357)

Content type

Earlycite article (1357)
1 – 10 of over 1000