Search results

1 – 10 of 65
Article
Publication date: 14 February 2023

Rehan Masood, Krishanu Roy, Vicente A. González, James B.P. Lim and Abdur Rehman Nasir

Globally, prefabrication in housebuilding has evolved as an innovative approach to attain sustainability and affordability. However, the SC, including non-producers and producers…

Abstract

Purpose

Globally, prefabrication in housebuilding has evolved as an innovative approach to attain sustainability and affordability. However, the SC, including non-producers and producers, of prefabricated housebuilding projects is still not perceptually aligned, hindering innovation diffusion. This paper investigates the contemporary industry perspective on PHB for conceptualisation, market share and growth, innovation diffusion and the producer's role in the context of New Zealand.

Design/methodology/approach

An exploratory qualitative research design was chosen to learn the perceptual stance of the industry. A semi-structured survey was conducted, followed by interviews with selected supply chain participants, who were producers and non-producers and had relevant experience in the PHB industry.

Findings

This study reports the common terminologies used by supply chain members, with justification and explanation. Further, the perceived market share and growth of the PHB industry are obtained and compared with subsequent studies to determine the capability and capacity. The perception of the diffusion of PHB by type is reported to portray the overall trend of the industry. In the last, the role of producers as the suppliers of PHB projects is investigated to establish the stakeholder positional criticality.

Practical implications

This study can help researchers and practitioners gain insight into the PHB industry from a multi-dimensional perspective. This study is a potential first step to formalise the policy, programme, strategies and action plan for the uptake of the PHB in the New Zealand.

Originality/value

PHB diffusion in the supply chain perspective, considering multi-dimensional aspects, has not been considered in previous studies as government agencies produce most of the literature. This academic research establishes the theoretical linkage towards PHB diffusion and reports the current status.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 20 June 2023

Rehan Masood, Krishanu Roy, Vicente A. Gonzalez, James B.P. Lim and Abdur Rehman Nasir

Prefabricated construction has proven to be superior in terms of affordability and sustainability over the years. As a result of sustainable production, prefabricated…

199

Abstract

Purpose

Prefabricated construction has proven to be superior in terms of affordability and sustainability over the years. As a result of sustainable production, prefabricated housebuilding has evolved into a distinct industry reliant on supplier companies acting as supply chains (SCs) for housing projects. These companies' performance is critical to the successful implementation of prefabricated housebuilding technologies. However, in comparison to those choosing manufacturing as a strategy in other industries, the life span of these companies, providing innovative housing solutions, is relatively short. This is due to critical factors influencing the performance, but the inter-relationship of the performance dimensions is more significant. This study establishes the inter-relationship of the companies involved in house building with steel prefabricated housebuilding technologies.

Design/methodology/approach

The most recent factors were extracted from the literature. The relationships were developed using the interpretive structural modeling (ISM) method with the input from industry experts, and the driving factors were determined using the Matrice d'Impacts Croisés Multiplication Appliqués à un Classement (MICMAC) technique.

Findings

Critical performance factors were classified according to performance dimensions, ranked and classified based on driving and dependence power. The inter-relationships among the performance dimensions of time, quality, cost, delivery, features and innovation were determined. Key performance strategies were proposed for prefabricated housebuilding companies involved in manufacturing and/or assembly of steel products.

Originality/value

This study established the interrelationship of performance dimensions for prefabricated house building (PHB) companies to develop strategies against critical challenges to remain competitive in the housing market. Previous research had not looked into interrelationship among the performance dimensions. The proposed performance strategies are applicable to supplier organizations using steel prefabricated technologies in similar markets around the world.

Article
Publication date: 21 December 2021

Liané van Wyk, Kahilu Kajimo-Shakantu and Akintayo Opawole

The South African construction industry appears to be lagging behind other industries in the country in terms of implementation and adoption of innovative technologies. Moreover…

936

Abstract

Purpose

The South African construction industry appears to be lagging behind other industries in the country in terms of implementation and adoption of innovative technologies. Moreover, sufficient empirical data on the adoption of innovative technologies, especially, in developing countries are not readily available. The aim of this study is therefore to assess the adoption and implementation of innovative technologies in the South African construction industry with a view to improving the industry's performance.

Design/methodology/approach

A survey was undertaken using a questionnaire, administered to construction professionals primarily in project management, quantity surveying and architectural firms.

Findings

The key findings show that there are some innovative technologies such as building information modelling, 3-dimensional mapping, drones, 3-dimensional printing and virtual reality that have been deployed. However, limited adoption of innovative technologies within the industry and low levels of knowledge of its benefits among the respondents were reported. This low implementation of innovative technologies was due to critical barriers such as high cost, limited knowledge, time requirement, fear of change, lack of interest, nature of construction processes and lack of team dynamics. Key drivers of innovation were found to include globalization and competition.

Practical implications

The current level of implementation of innovative technologies indicated that they are not yet optimized in the South African construction industry and suggests implications for change, adaptation and growth. The study recommends that firms should consider investing in research and development in order to exploit the potential of innovation for organizations and the industry at large.

Originality/value

The drivers and barriers indicated will help to prioritize the direction of adoption and growth which could help to improve the industry.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 24 April 2023

Minh Van Nguyen

This study aims to determine barriers to innovation and to develop a quantitative model for the barrier to innovation in Vietnamese construction organizations of different sizes.

Abstract

Purpose

This study aims to determine barriers to innovation and to develop a quantitative model for the barrier to innovation in Vietnamese construction organizations of different sizes.

Design/methodology/approach

A literature review and discussions with experienced practitioners were implemented to determine barriers to innovation in construction organizations. The rank-based non-parametric test analyzed collected data from a questionnaire survey to examine if there were significant differences between the three groups of organizations, including small, medium and large construction organizations. The fuzzy synthetic evaluation (FSE) technique was employed to develop barrier indexes (BIs) for organizations of different sizes in Vietnam.

Findings

The findings showed 17 barriers to innovation which were categorized into four groups, including organizational, human resources, economic and market barriers. Statistical analysis revealed significant differences regarding barriers to innovation between small, medium and large construction organizations in Vietnam. The post hoc test highlighted barriers to innovation differently separated into two groups: SMEs and large construction organizations. The FSE analysis integrated the identified barriers into the comprehensive BIs for SMEs and large construction organizations. The FSE analysis illustrated that the organizational barrier is the most critical barrier for SMEs. On the other hand, the market barrier received the most significant attention in large construction organizations.

Originality/value

This research is one of the first integrated barriers to innovation into a comprehensive formulation. The indexes provide the decision-makers with a practical and reliable tool to evaluate barriers to innovation in construction organizations of different sizes.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 28 June 2023

Nipuni Sumanarathna, Bismark Duodu, Shoeb Ahmed Memon and Steve Rowlinson

This study aims to explore the innovation deployment of construction contracting firms through exploratory–exploitative learning and organisational ambidexterity.

Abstract

Purpose

This study aims to explore the innovation deployment of construction contracting firms through exploratory–exploitative learning and organisational ambidexterity.

Design/methodology/approach

Firstly, a literature-based conceptual framework was developed to explain innovation implementation through exploratory–exploitative learning and organisational ambidexterity. A prominent Hong Kong construction contracting firm was then selected as the case study to explore its innovation deployment at different organisational levels (i.e. firm and project levels). Qualitative data were attained by conducting 12 semi-structured interviews with industry experts and document analysis. The thematic analysis using NVivo 12 software was adopted to analyse data.

Findings

Findings reveal that the case study firm successfully fosters innovation when ambidexterity is achieved through the balance between exploratory (i.e. radical innovation) and exploitative learnings (i.e. incremental innovation).

Research limitations/implications

Establishing uniform ambidexterity (i.e. 50:50) at the firm or project level is not mandatory to deploy innovation successfully. The ratio can vary based on the characteristics and requirements of construction firms.

Practical implications

This paper shall motivate construction practitioners to adopt radical–incremental innovation ambidexterity in firms and ultimately enhance the productivity and efficiency of the construction industry.

Originality/value

Previous construction innovation research has frequently explored firm or project-level innovation separately. This study identified a multi-level focus on innovation. Through the lens of exploratory–exploitative theory, different forms of innovation ambidexterity for different levels are suggested rather than one specific ambidexterity.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 29 May 2023

Yanhu Han, Xiao Fang, Xinyu Zhao and Lufan Wang

The development of prefabricated buildings has become one of the primary solutions to transform the traditional construction industry around the world. Incentive policy is one of…

Abstract

Purpose

The development of prefabricated buildings has become one of the primary solutions to transform the traditional construction industry around the world. Incentive policy is one of the important driving factors for the development of prefabricated building. The policy system in the field of prefabricated buildings needs to be improved urgently. However, there is still a dearth of research on how incentive policies exert impact on the development of prefabricated buildings. This paper aims to reveal the impact mechanisms of different types of policies on the development system of prefabricated buildings.

Design/methodology/approach

This study categorizes prefabricated building policies, constructs a system dynamics model of prefabricated building policies and conducts scenario simulations to examine the impact and sensitivity of different types of policies on the development system of prefabricated buildings.

Findings

The results show that compulsory policies play a greater role in the early stage of prefabricated building development and need to be withdrawn at the right time. Preferential and encouraging policies play an incentive role in the middle and later stages of prefabricated building development. Encouraging policies predominate in the later stage of prefabricated building development. Based on the research results, policy recommendations for prefabricated building development are put forward respectively from the government, developers and consumers.

Originality/value

The research results are expected to make up for the lack of clear policies paths in existing research and provide theoretical references for the formulation and optimization of future policies.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 29 August 2023

Ali Hassan Ali, Ahmed Farouk Kineber, Ahmed Elyamany, Ahmed Hussein Ibrahim and Ahmed Osama Daoud

This study aims to identify the most significant barriers and the stationary barrier to modular construction (MC) implementation and promote MC widespread use. By doing so, the…

Abstract

Purpose

This study aims to identify the most significant barriers and the stationary barrier to modular construction (MC) implementation and promote MC widespread use. By doing so, the construction industry can leverage the benefits of MC, such as faster construction times, improved quality control, reduced waste and increased sustainability.

Design/methodology/approach

This study uses a Gini’s mean analysis approach to identify the stationary barriers hindering the MC adoption in residential projects. The research focuses on the Egyptian context and uses a questionnaire survey to gather data from professionals in the construction industry.

Findings

According to the survey findings, the top five significant MC barriers are inability to modify the design; contractors asking for high bidding prices (higher initial cost); scepticism, conservation and resistance of clients to innovation and change; transportation restrictions; and lack of a one-size-fits-all tool for the design. In addition, Gini’s mean of dispersion demonstrated that the stationary barrier that faces MC adoption is the apprehension that architectural creativity will suffer because of MC.

Practical implications

The identified obstacles could be useful for decision makers in countries that have not yet adopted MC and may aid in the planning process to manage the risks associated with MC projects. The paper stresses the significance of devising techniques to overcome these barriers and proposes several methods to tackle these challenges.

Originality/value

This study fills the knowledge gap by identifying the stationary barrier and emphasising the potential risks associated with MC barriers. Furthermore, it suggests several strategies for overcoming and reducing these barriers in developing countries residential projects.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 12 April 2024

Kyudong Kim, Helena R. Tiedmann and Kasey M. Faust

The COVID-19 pandemic caused significant societal changes and altered how much of the construction industry operates. This study investigates the impacts of pandemic-related…

Abstract

Purpose

The COVID-19 pandemic caused significant societal changes and altered how much of the construction industry operates. This study investigates the impacts of pandemic-related changes, how these changes may apply to different companies, and which changes should continue post-pandemic.

Design/methodology/approach

We aim to identify pandemic-driven changes that have affected the construction workplace and the advantages and challenges associated with them. We then make recommendations for what could and should endure through the pandemic and beyond, and under what circumstances. To achieve this objective, we conducted both qualitative and quantitative analyses of 40 semi-structured interviews with US-based construction professionals.

Findings

Identified through these interviews were 21 pandemic-driven changes across six categories: management and planning, technology, workforce, health and safety, supply chain, and contracts. This study noted both positive and negative impacts of the changes on cost, schedule, productivity, collaboration, employee retention, flexibility, quality, and risk mitigation. Participants indicated that some changes should remain after the pandemic and others (e.g. select safety measures, schedule adjustments) should be temporary.

Originality/value

By incorporating these lessons learned into recommendations, the findings of this study will help businesses identify and implement the most appropriate improvements for their organizations. The findings also provide policymakers with valuable insights on how to promote innovation in the construction industry and potentially enact more effective policies during crises to drive long-term improvements.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 18 April 2023

Wajiha Mohsin Shahzad, Siddenki Mahender Reddy, Ravindu Kahandawa and James Olabode Bamidele Rotimi

The ascendancy of modular offsite construction (MOSC) over traditional construction methods is well known. Despite the known potential of this construction approach, its adoption…

Abstract

Purpose

The ascendancy of modular offsite construction (MOSC) over traditional construction methods is well known. Despite the known potential of this construction approach, its adoption is minimal in New Zealand construction industry. This article investigates the potential benefits of using MOSC for delivery of high-rise buildings in New Zealand, underlying factors responsible for its low uptake and the measures that can facilitate its improved uptake.

Design/methodology/approach

This study utilised a mixed research approach. An empirical questionnaire survey was carried out with New Zealand construction industry professionals with expertise in MOSC. Factor analysis of survey data was carried out using SPSS software. Semi-structured interviews were carried out with subject matter experts to get further insights and expand the survey findings. Interview data were analysed using thematic analysis.

Findings

Study identified benefits of MOSC, thus establishing potential of its uptake for high-rise building construction. Constraining factors were investigated, most pronounced being low level of skills in construction industry to design, manufacture and integrate supply chain of MOSC, high initial investment, high cost of importing modules and negative perception about offsite manufactured buildings. This study also highlighted the enablers to improve uptake of MOSC. These enablers included; loan and mortgage policies to suit MOSC paradigm, building regulations to support OSC industry, increased support from the government and awareness and acceptance of standardised building designs among the clients.

Originality/value

Originality of this paper harps from little to no research carried out to investigate use of MOSC for high-rise buildings in New Zealand context.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 29 November 2022

Nazanin Kordestani Ghalenoei, Mostafa Babaeian Jelodar, Daniel Paes and Monty Sutrisna

The development of prefabrication into full-scale offsite manufacturing processes in the construction industry is paradigm-shifting. Moreover, Building Information Modelling (BIM…

Abstract

Purpose

The development of prefabrication into full-scale offsite manufacturing processes in the construction industry is paradigm-shifting. Moreover, Building Information Modelling (BIM) is becoming the primary mode of communication and integration in construction projects to facilitate the flow of information. Although research has been performed on BIM and Offsite Construction (OSC), integrating these two concepts remains ambiguous and complex and lacks documentation and structure, especially in New Zealand. Therefore, this paper develops a robust framework for OSC and BIM integration. The study focusses on identifying integration challenges and proposes strategies for overcoming these challenges.

Design/methodology/approach

This study applied scientometric analysis, a systematic literature review (SLR) and semi-structured expert interviews to investigate OSC and BIM integration challenges. Multiple themes were investigated and triangulation conducted in this research supports the creation of applicable knowledge in this field.

Findings

Multiple gaps, research trends and the pioneer countries in the paper's scope have been identified through scientometric analysis. Then, a classified cluster of challenges for OSC and BIM implementation and integration strategies of OSC and BIM were demonstrated from the findings. The interviews provided comprehensive and complementary data sets and analyses. The findings from the Systematic Literature Review and interview structured the integration framework.

Originality/value

The contribution of this paper to existing knowledge is a developed framework that serves as a guideline for the OSC stakeholders. This framework can assess OSC's alignment with BIM and consolidate strategies for incorporating OSC into a BIM-based project delivery process. The framework consists of 23 strategies categorised into 8 clusters: a policy document, training and professional development, documentation, technology management, governmental development, contract development, accurate definition and detailing and communication. The proposed strategies will streamline integration by reducing potential challenges, thus enhancing project productivity.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

1 – 10 of 65