Search results
1 – 10 of over 1000Khotso Dithebe, Clinton Aigbavboa and Didi Wellington Thwala
Targets set out by state institutions, with respect to supplying water to deprived communities, seem to be idealistic and not realistic. Study envisioned to assess challenges of…
Abstract
Purpose
Targets set out by state institutions, with respect to supplying water to deprived communities, seem to be idealistic and not realistic. Study envisioned to assess challenges of financing water infrastructure projects, and determines the role of the state towards infrastructure development by holistically planning and engaging with the private sector.
Design/Methodology/Approach
The study adopted a quantitative approach, whereby a questionnaire survey was conducted among different stakeholders involved in water infrastructure projects in South Africa. Data gathered were analysed using percentages, mean item score and standard deviation.
Findings
The study revealed that most challenges affecting the success of the financing of water infrastructure projects in South Africa are corruption, hostility towards private participation, cost recovery constraints, high fiscal deficits by state government, unreliable planning and procurement processes, and a rapid increasing number of municipalities that lack technical and administrative capacity to plan implement, operate and maintain water assets.
Research Limitations/Implications
This research paper investigates projects’ financing challenges with a broad inspection on the role of the public sector. The apparent role of the international structures such as OECD, IMF and World Bank had no influence in the study. From the findings, it is clear that the central government and state institutions lack the necessary resources to accelerate infrastructure development, water infrastructure in particular. The study, thus, recommends a complete expansion and development of state capacity as well as improved collaborations with the private sector to drive the success delivery of services to the public.
Originality/Value
Improved and flexible regulations and legislative guidelines are required to ensure that both sectors fulfil their side of the bargain, with an ultimate goal of meeting the predetermined targets of supplying adequate water to the deprived communities.
Details
Keywords
Prosper Babon-Ayeng, Eric Oduro-Ofori, De-Graft Owusu-Manu, David James Edwards, Ernest Kissi and Augustine Senanu Komla Kukah
There is a pressing need to increase investments in sustainable infrastructure to promote low carbon economic growth and ensure environmental sustainability. Consequently, this…
Abstract
Purpose
There is a pressing need to increase investments in sustainable infrastructure to promote low carbon economic growth and ensure environmental sustainability. Consequently, this study examines the socio-political factors underlying the adoption of green bond financing of infrastructure projects.
Design/methodology/approach
Primary data was gathered from experts with advanced experience in, or knowledge of green bonds in the Kumasi Metropolis. To identify respondents with pertinent knowledge that is relevant to the study, purposive and snowball sampling techniques were used. One-sample t-test and relative importance index were used in this study's statistical analysis.
Findings
‘Training and experience with sustainable finance’ was seen as the most important social factor underlying the adoption of green bond financing of infrastructure projects by the respondents and ‘Governmental tax-based incentives’ was rated as the leading political factor.
Originality/value
This pioneering research attempts to ascertain the socio-political factors affecting the adoption of green bond financing of infrastructure projects. Emergent results of analysis and concomitant discussions add knowledge to fill a void in literature on the social and political factors affecting the adoption of green bond financing of infrastructure projects in developing countries.
Details
Keywords
The study examines the impacts of debt financing on infrastructure development, investment, creation of new business entities, subsidies to private sector and GDP growth.
Abstract
Purpose
The study examines the impacts of debt financing on infrastructure development, investment, creation of new business entities, subsidies to private sector and GDP growth.
Design/methodology/approach
The methodology is based on five simultaneous equations which have been estimated through panel least square.
Findings
The most important conclusion of this study is the significant role of sovereign bonds in determination of subsidies to private sector. The role of domestic credit is important in South Asian context because of its significant role in creation of new businesses.
Research limitations/implications
This study supports the enhancement in credit financing to private sector for creation of new business activities in the economy.
Practical implications
The improvement in liquidity position by enhancing domestic credit facilities may ensure the sustainability and continuity of business activities. Such activities may improve GDP growth in future.
Social implications
The most important aspect of the study is to identify the role of debt financing in subsidies and creation of new businesses which are important elements of social economics.
Originality/value
Usually the impacts of sovereign bonds and external debts on infrastructure development and GDP growth are examined. But, to relate these debts to creation of business entities and subsidies is a new dimension.
Details
Keywords
This article critically analyses the extent to which selected Public-Private Partnerships (PPPs) transportation projects in the Caribbean subregion embrace good practices and how…
Abstract
Purpose
This article critically analyses the extent to which selected Public-Private Partnerships (PPPs) transportation projects in the Caribbean subregion embrace good practices and how they benefit the public sector.
Design/methodology/approach
The article begins with the general rationale of PPPs, leading to a discussion on the specific challenges of the Caribbean subregion and an assessment of certain critical projects. The sample cases include the L F Wade International Airport in Bermuda, the cruise berthing and cargo port redevelopment project in the Cayman Islands, and the Sanger International Airport in Jamaica. There are five aspects to the critical assessment: (a) an evaluation of the type of PPP arrangement used; (b) the legal/policy framework; (c) financial implications; (d) accountability; and (e) miscellaneous data. Desk-based research is conducted as supported by both international and local sources to convey a uniquely local perspective in this under-researched area of scholarship.
Findings
PPP frameworks in the Caribbean are improving quickly but remain a work in progress. Jamaica leads the region. Bermuda trails behind. Problems of legal compliance with frameworks and limited market engagement persist, leading to risk management problems.
Originality/value
This article fills a literature gap on critical analysis of individual Caribbean PPP transportation projects. Previous reports, mostly by international organisations, cover regional or sectorial trends. Other sources take a descriptive but not critical approach.
Details
Keywords
Robby Soetanto, Ferry Hermawan, Alistair Milne, Jati Utomo Dwi Hatmoko, Sholihin As'ad and Chusu He
Recent years saw a paradigm shift from ex post (reactive) to ex ante (proactive) approaches (e.g. insurance) to disaster risk financing for building resilience of communities in…
Abstract
Purpose
Recent years saw a paradigm shift from ex post (reactive) to ex ante (proactive) approaches (e.g. insurance) to disaster risk financing for building resilience of communities in developing countries. To facilitate adoption, the approaches should be adapted so that they can be technically feasible and culturally desirable to the local context. This paper aims to report an exploratory study to elaborate the existing arrangements to deal with the impacts of disaster and the potential to shift to a more proactive disaster risk financing in Indonesia.
Design/methodology/approach
A series of stakeholder engagement activities in Semarang and Solo, Indonesia was conducted to ascertain the existing arrangements for disaster risk financing at local government level, the challenges/barriers to the adoption of insurance, education and policies to facilitate the transformation from reactive to proactive process. Thematic analysis was applied to transcribed conversations during interviews, focus groups and workshops. Identification of emerging issues/themes was also guided by the researchers’ notes during the events, and facilitated by qualitative analysis software, Atlas Ti®. This was complemented by an analysis of regulations and documents provided by the local stakeholders.
Findings
The local governments heavily rely on contingency fund, which is not enough and often significantly delayed to fund recovery and reconstruction of public infrastructure. The use of insurance is limited in both public and private sectors, particularly in the majority of low-income communities. Various barriers and challenges were identified under several categories, namely, institutional, cultural, affordability, lack of awareness and knowledge, insurance arrangement process and lack of trust. The findings also suggest that improving insurance education should involve multiple stakeholders, and both formal and informal routes should be pursued.
Originality/value
The research fills the gap of knowledge in disaster risk financing in the context of developing countries, specifically in local governments and communities in Indonesia. The findings may be replicable for other developing countries with low adoption of ex ante financial instruments for dealing with the impacts of disaster.
Details
Keywords
According to the growing role of stakeholders in the implementation of public-private partnership (PPP) initiatives, the purpose of this study is to diagnose the maturity of PPPs…
Abstract
Purpose
According to the growing role of stakeholders in the implementation of public-private partnership (PPP) initiatives, the purpose of this study is to diagnose the maturity of PPPs in Poland, taking into account the range of stakeholders’ participation in public-private initiatives.
Design/methodology/approach
The introductory study on the stakeholders of PPPs has been based on the report analysis of Polish initiatives and the case studies’ comparative analysis. The cases represent touristic projects realized within PPPs.
Findings
The results of the study indicate that the PPPs’ personal context, though recognized internationally, is to a very low extent present in the Polish case. As the PPP market is still in the process of development, the stakeholders’ issue should be taken into consideration in the processes of the PPP development in Poland.
Practical implications
As regional development is continuously a key issue, especially in rural areas context, the PPP initiatives are of great importance, and therefore the discussion of pros and cons in this context may contribute to the legislation at the regional level.
Originality/value
The study sheds some light and gives some interesting perspectives on the issue of the personal context of PPPs and social capital. Also, the text describes the path of developing PPPs in Poland and especially the touristic projects. The research part presents the original case study comparative analysis based on table-oriented form and as such enables the new way of contextual analysis.
Details
Keywords
Hugo Iasco-Pereira and Rafael Duregger
Our study aims to evaluate the impact of infrastructure and public investment on private investment in machinery and equipment in Brazil from 1947 to 2017. The contribution of our…
Abstract
Purpose
Our study aims to evaluate the impact of infrastructure and public investment on private investment in machinery and equipment in Brazil from 1947 to 2017. The contribution of our article to the existing literature lies in providing a more comprehensive understanding of the presence or absence of the crowding effect in the Brazilian economy by leveraging an extensive historical database. Our central argument posits that the recent decline in private capital accumulation over the last few decades can be attributed to shifts in economic policies – moving from a developmentalist orientation to nondevelopmental guidance since the early 1990s, which is reflected in the diminished levels of public investment and infrastructure since the 1980s.
Design/methodology/approach
We conducted a series of econometric regressions utilizing the autoregressive distributed lag (ARDL) model as our chosen econometric methodology.
Findings
Employing two different variables to measure public investment and infrastructure, our results – robust across various specifications – have substantiated the existence of a crowding-in effect in Brazil over the examined period. Thus, we have empirical evidence indicating that the state has influenced private capital accumulation in the Brazilian economy over the past decades.
Originality/value
Our article contributes to the existing literature by offering a more comprehensive understanding of the crowding effect in the Brazilian economy, utilizing an extensive historical database.
Details
Keywords
Paulos A. Wondimu, Ole Jonny Klakegg and Ola Lædre
Early contractor involvement (ECI) faces many barriers because it differs from traditional business practices. Public owners, especially, face a major challenge because they must…
Abstract
Purpose
Early contractor involvement (ECI) faces many barriers because it differs from traditional business practices. Public owners, especially, face a major challenge because they must comply with international and national legislation. The purpose of this paper is to develop a framework that illustrates the various approaches that public project owners can take to implement ECI.
Design/methodology/approach
In addition to a literature review, three groups of case studies were carried out. The case studies were based on 54 semi-structured in-depth interviews with key personnel from 21 Norwegian public projects and document study.
Findings
In all, 25 approaches to ECI were identified during the research. Twelve of these were used in the cases studied.
Social implications
There are several approaches to ECI that are suitable for public owners. However, the contractor’s contribution depends on which approach is implemented and how it is implemented.
Originality/value
As original contribution, this study presents a novel framework that defines options for implementing ECI in public projects. Furthermore, this paper provides insights on how ECI can be implemented in public projects based on Norwegian experiences. Although the empirical data of the study is limited to Norwegian public projects, this study contributes to knowledge about how to implement ECI internationally.
Details
Keywords
Sara Ursić, Jelena Zlatar Gamberožić and Andrija Mišetić
By merging good countryside and rural capitals frameworks, a model for reimagining the island's development is formulated, which is then applied to the female perspective to…
Abstract
Purpose
By merging good countryside and rural capitals frameworks, a model for reimagining the island's development is formulated, which is then applied to the female perspective to provide valuable insights from a group that is often marginalized in rural areas. As Croatian islands are highly tourism-oriented, this study finds it important to explore possibilities for future island development that can provide balanced and vibrant settlements on the islands.
Design/methodology/approach
The present paper synthesizes Shucksmith's (2018) model of a good countryside, which serves as a goal, with Gkartzios et al.'s (2022) capitals framework, which is viewed as a means of attaining a good countryside, specifically a good island. The research is delimited to the island of Brac, Croatia. By conducting interviews with female respondents, this study aims to capture the female perspective on envisioning potential futures of “good” island living, a perspective that is frequently underestimated despite its significant contributions to the creation of an ideal locale.
Findings
The results demonstrate that there is a substantial amount of socio-cultural rural capital that is leveraged to strengthen relatedness and rights as development objectives. However, low levels of economic, built and land-based rural capital pose challenges to achieving repair and re-enchantment, which are crucial for settlements that rely on tourism.
Originality/value
These findings bear immense implications for policymakers and planners, underscoring the imperative to account for the perspectives and needs of diverse social groups, including women, in the design and implementation of development strategies for islands. By doing so, a sustainable and equitable future, rich in tourism potential, can be cultivated on the island.
Details