Article
Publication date: 11 July 2024

Ahmed Nouh Meshref, Elsayed Elkasaby and Omnia Wageh

To help decision-makers choose appropriate infrastructure project delivery systems (IPDS) and keep up with the construction industry’s rapid growth, this study aims to develop a…

Abstract

Purpose

To help decision-makers choose appropriate infrastructure project delivery systems (IPDS) and keep up with the construction industry’s rapid growth, this study aims to develop a goal optimization technique.This looks into team integration, large production and optimum sustainability. The suggested approach for meeting several infrastructure project objectives is flexible and expandable. This research overcomes the significant discrepancy between the construction industry’s progress and the rate at which project delivery methods evolve.

Design/methodology/approach

This study examined pertinent literature to choose an appropriate project delivery method and gave information on several elements that affect that decision. After optimization using a genetic algorithm (GA), a Pareto front of solutions has been found. The three construction goals of sustainability, mass production and team integration are all met by the chosen best solution. The four most popular possibilities for studying the suggested approach are five primary categories, each of which has 22 variables, and the weight of each variable was established using Simo’s procedure. This is optimized, demonstrating the accuracy of the optimization model.

Findings

Sustainability, mass production and team integration are the major goals of selecting the finest IPDS. The Pareto-optimal solutions discovered through analysis demonstrated that the created GA is reliable and generates solid outcomes. In fact, it enables decisions that were based on a single criterion to be overturned. The process has therefore demonstrated its efficacy in identifying the ideal answer. First integrated project delivery (IPD), second design-build (DB), third design-bid-build (DBB) and last construction manager at risk (CMR) are the best options. The weight of the aims function has found these rankings to be satisfactory.

Practical implications

The findings demonstrate that the suggested strategy can lead to optimization, providing the government with a wide range of options for attaining certain project objectives. The ability of this study to evaluate the combined effects of three objectives in choosing the best IPDS, the production of optimal selection solutions (IPDS), which can help with better decision-making when many objectives are present, and the flexibility and extendibility of the suggested approach for achieving priorities in infrastructure projects are what make it unique. This approach was able to select IPDS to meet developments in the construction project.

Originality/value

To confirm the validity of the GA, the factor of error was calculated, which is equal to 1.7599e-08.

Article
Publication date: 7 February 2022

Bankole Osita Awuzie, Zwelinzima P. Mcwari, Progress Shingai Chigangacha, Clinton Ohis Aigbavboa, Theo C. Haupt and Lovelin Obi

An increase in outsourcing of consultancy services has been observed during procurement and delivery of public-sector infrastructure projects. However, the incidence of project…

Abstract

Purpose

An increase in outsourcing of consultancy services has been observed during procurement and delivery of public-sector infrastructure projects. However, the incidence of project failure has continued unabated despite this shift by public-sector entities. Also, there appears to be limited literature focussed on seeking to provide the rationale governing the decision to outsource or insource consultancy services by public-sector organisations. The purpose of this study was to appraise the performance of public-sector projects in which consultancy services have been outsourced or insourced. These are the gaps which this study was undertaken to fill.

Design/methodology/approach

A grounded theory methodology (GTM) research design was adopted based on the nature of evidence sought and gathered from a Provincial Department of Public Works and Infrastructure (PDPWI) in South Africa. Data was obtained from a mixture of semi-structured interviews and project-specific documents spanning a five-year period and was analysed according to the procedures associated with GTM. Accordingly, open coding, axial coding and pattern matching were carried out at several intervals to develop categories and themes.

Findings

The findings of the study showed the absence of a structured approach within the PDPWI for facilitating decisions pertaining to outsourcing or insourcing consultancy services within construction projects. Furthermore, the study established that both approaches yielded similar results across all performance facets of cost, time and quality. In addition, a detailed insight into the steps required for the successful application of GTM in built environment research has been provided in the study.

Originality/value

Limited studies have been undertaken to compare the impact of either outsourced or insourced services on the organisational and project performance. This was the gap to which the study reported in this paper was undertaken to contribute.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 2
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 17 September 2024

Ghiwa Assaf and Rayan H. Assaad

Project bundling is an innovative practice that groups or bundles several infrastructure projects into a single contract. While project bundling has various benefits, agencies are…

Abstract

Purpose

Project bundling is an innovative practice that groups or bundles several infrastructure projects into a single contract. While project bundling has various benefits, agencies are facing some challenges when bundling their projects, including properly assessing the feasibility (or infeasibility) of project delivery methods (PDMs) of interest. More specifically, project owners face the challenge of properly selecting between traditional and alternative PDMs for their bundled projects. Although some research efforts were devoted to providing guidelines in relation to different aspects related to project bundling, no previous study was conducted to help project owners performing PDMs-related feasibility analysis for bundled projects, which differ from normal, singly delivered projects. To fill this knowledge gap, this paper develops a decision-support tool that assists agencies in deciding whether they should select a traditional or alternative PDM (i.e. whether to go with the Design-Bid-Build (DBB) PDM or not) for their bundled projects.

Design/methodology/approach

An analytical methodology comprised of four main steps was followed in this paper. First, an expert survey was developed and distributed to industry experts to quantify the importance of 25 project bundling objectives. Second, principal component analysis was used to determine the weights for the different project bundling objectives. Third, a series of statistical tests was implemented to identify different feasibility tiers. Fourth, a user-friendly decision-support tool was developed, and its capabilities were demonstrated.

Findings

The results showed that six tiers exist to classify the feasibility (or infeasibility) of traditional PDMs (i.e. the DBB method) for bundled projects. The research outcomes have also reflected that the following five project bundling objectives contribute the most to making traditional PDMs (i.e. the DBB method) more feasible for bundled projects: (1) Having well-defined design features; (2) Requiring prior knowledge or experience with similar project size and scope; (3) Completing the overall project on schedule; (4) Keeping rate of expenditures within cash flow plan; and (5) Acquiring specific legislative, regulatory and jurisdictional requirements early on.

Originality/value

This research adds to the body of knowledge by equipping agencies and project owners with a decision-support system that helps them identify whether traditional or alternative PDMs are more appropriate for the specific objectives of their bundling program(s). By making the right PDM decision, project owners can enhance their bundling practices (especially in relation to the PDM proper selection) and ultimately the performance of their bundled projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 22 August 2024

Chisomo Kapatsa, Neema Kavishe, Sambo Lyson Zulu and Godwin Maro

The purpose of this study is to identify sustainability assessment indicators of road infrastructure projects by analyzing and synthesizing existing literature, considering that…

Abstract

Purpose

The purpose of this study is to identify sustainability assessment indicators of road infrastructure projects by analyzing and synthesizing existing literature, considering that, despite being essential to achieving the sustainable development goals, sustainability performance in road infrastructure projects is a persistent challenge. Therefore, determining how sustainability can be assessed in these projects is crucial, necessitating a systematic review of the sustainability assessment indicators of road infrastructure projects.

Design/methodology/approach

Using PRISMA principles, 54 peer-reviewed papers from 2010 to 2022 were retrieved from three search databases (Scopus, Research for Life and Google Scholar) as part of a systematic literature review. Data analysis techniques included both descriptive and content analysis.

Findings

The study identified 22 indicators. The results emphasized that the sustainability of road infrastructure projects should consider all three sustainability dimensions to provide development while meeting human needs, preserving the planet Earth and enhancing economic growth. Similarly, indicators should be incorporated from the design phase to implement and attain sustainability successfully.

Practical implications

The outcome of this study will serve as a guide to road infrastructure stakeholders to understand the relevant sustainability indicators to assess the sustainability performance of their projects.

Originality/value

The study’s findings provide the sustainability assessment indicators for roads, which serve as a foundation for developing a sustainability assessment indicator framework for road infrastructure projects. Future research can look at establishing the indicators for the end-of-life phase of the project lifecycle.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 17 June 2024

Sonica Rautela, Nehajoan Panackal and Adya Sharma

India has been on the pathway of improvement concerning healthcare and health outcomes of its population. However, India must overcome its unique challenges and cover a long…

Abstract

Purpose

India has been on the pathway of improvement concerning healthcare and health outcomes of its population. However, India must overcome its unique challenges and cover a long journey ahead. This mandates a need for a high-quality, contemporary and community-based health system that promises consistent and quality healthcare, is trusted and valued by all its citizens, considers the changing population needs and should be affordable and accessible.

Design/methodology/approach

The study examines various dimensions and elements associated with the integrated healthcare system in India and uses input, process and output structural measures.

Findings

The present paper proposes an integrated, comprehensive healthcare system in India that endorses participation from diverse stakeholders such as the government, organizations, the community and individuals who can contribute uniquely. It also focuses on defined and measurable output that can make health a topic of social movement or “Jan Andolan” and create a sustainable and integrated care system.

Originality/value

The study is unique as it focuses on the role of stakeholders in health care. The research emphasized the involvement of the government, community, people and organizations in developing an integrated healthcare ecosystem that includes modern technology, skilled employees, enough finance, governance, efficient delivery platforms and top-tier infrastructure. The model’s output is focused on healthcare that is inexpensive, accessible, available, accountable and user-centered. This would gradually improve everyone’s health and well-being.

Details

Journal of Integrated Care, vol. 32 no. 3
Type: Research Article
ISSN: 1476-9018

Keywords

Article
Publication date: 16 August 2024

Dickson Osei-Asibey, Joshua Ayarkwa, Benjamin Baah, Aba Essanowa Afful, Gloria Anokye and Prince Asher Nkrumah

Many investors have less interest in tendering for public-private partnership (PPP) construction projects as a result of the uncertain risks associated with the project delivery…

Abstract

Purpose

Many investors have less interest in tendering for public-private partnership (PPP) construction projects as a result of the uncertain risks associated with the project delivery. Moreover, PPP project stakeholders have inadequate information about the probable impacts of time-based delay imposed on PPP projects under the PPP arrangement. This study aims to identify and categorize construction stakeholders’ perceptions of the impact of time-based delays on PPP construction projects.

Design/methodology/approach

A purposive sampling technique was adopted where questionnaires were used as the primary instrument for gathering data from PPP experts. Cronbach’s alpha coefficient and Kendall’s concordance were used to measure the reliability of the scale and the respondent’s level of agreement, respectively. One sample t-test, mean score ranking and principal component analysis were used to analyse the identified time-based delay impacts.

Findings

The study revealed seven significant impacts of time-based delay on PPP construction project delivery as: “project schedule overrun”, “idling of project resources”, “project cost overrun”, “poor quality of completed works”, “delayed realization of project benefits”, “frequent arbitration/litigation in PPP projects” and “total abandonment of PPP projects”. The study further identified the top five significant impacts of time-based delay on PPP project stakeholders as: “reduction in motivation to attract investment”, “high interest on finance (loans)”, “contractor in financial crisis”, “loss of public confidence in government” and “reduction in parties’ reputation”.

Practical implications

The identified significant impacts of time-based delays will increase stakeholders’ awareness of the repercussions and effects that time-based delays may impose on PPP construction projects if not appropriately managed throughout the project implementation. This awareness will further guide stakeholders to implement targeted risk management strategies to minimize the negative consequences of delays on PPP project performance.

Originality/value

As a pioneering study that provides a better understanding of the impacts of time-based delays on PPP construction projects, this study enhances knowledge of PPP construction project implementation.

Details

Journal of Financial Management of Property and Construction , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 8 December 2022

Timothy Adu Gyamfi, Clinton Ohis Aigbavboa and Wellington Didibhuku Thwala

Construction organisations cannot underestimate the improvement in public–private partnership (PPP) projects’ implementation. At the same time, construction organisations cannot…

Abstract

Purpose

Construction organisations cannot underestimate the improvement in public–private partnership (PPP) projects’ implementation. At the same time, construction organisations cannot overlook the risk arising from engaging in PPP construction projects. Hence, this study aims to establish the influence of risk resource management (RRM) in managing PPP risk in the construction industry in Ghana.

Design/methodology/approach

The researchers adopted qualitative and quantitative research methods to achieve the aim of the study, in which Delphi questions and a close-ended questionnaire were developed. A total of 650 construction specialists, including procurement officers, consultants, project managers, quantity surveyors, site engineers and planning officers were chosen using random and purposive sampling techniques. Recovered data were analysed using descriptive statistics and confirmatory factor analysis (CFA). The CFA maximum likelihood estimation extractor compresses 19 variables into 3 pattern matrices.

Findings

The results of the study revealed three factors that measure RRM in Ghana’s PPP construction industry, including financial resource management which was influenced by communicating the budget to project team members and project partners understanding the budget, and material resource management which was influenced by the provision of materials transportation and provision of delivery programs and labour resource management which was impacted by a commitment to pay social security and taxes and provision of good salaries, to address RRM in PPP construction organisations.

Research limitations/implications

To incessantly improve the PPP risk management (RM) in construction through RRM, there should be a strong liaison between the universities, government agencies and the construction industry, and such collaboration will assist the industry to obtain first-hand information regarding the study findings and how they can be implemented to help the development of RM in the construction industry. This study is limited to Ghana and CFA and further study should explore structural equation model to determine the structure and measurement model of the risk resource variables.

Originality/value

The study may be valuable to industry stakeholders looking for new approaches to improve RM in their construction activities, particularly in PPP projects. Also, to assist reduce PPP risk, construction companies should use RRM in their organisations.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 5
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 27 August 2024

Madalina Pana, Yang Cheng, Sami Farooq and Melanie E. Kreye

The purpose of the study is to determine the local antecedents of subsidiary participation in global services and, subsequently, the impact on local performance.

Abstract

Purpose

The purpose of the study is to determine the local antecedents of subsidiary participation in global services and, subsequently, the impact on local performance.

Design/methodology/approach

The study is based on a survey with the local subsidiaries of 14 manufacturers engaged in global services as part of their servitisation strategy.

Findings

Findings show support for considering the local ability for global services as an antecedent for local subsidiary participation in global services and the local service performance as an outcome. In addition, the results reject our hypotheses related to the specific roles of local opportunity and motivation for global services.

Originality/value

This study provides novel insights on the global service operations of manufacturers by highlighting the perspective of subsidiaries engaged in the local service delivery and development of global services. This perspective sets the conditions of the global-local collaboration in the context of global service strategy with local service delivery.

Details

Journal of Manufacturing Technology Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1741-038X

Keywords

Open Access
Article
Publication date: 3 July 2024

Anna af Hällström

Managing megaprojects is challenging due to their inherent complexity and uncertainty. Collaborative project delivery models have been introduced as an alternative to traditional…

Abstract

Purpose

Managing megaprojects is challenging due to their inherent complexity and uncertainty. Collaborative project delivery models have been introduced as an alternative to traditional project management in public infrastructure megaprojects and are often realized through collaborative contracts. These project organizations act as institutional arenas for logic interaction as actors with differing institutional backgrounds interact within the project. This paper aims to study the delivery phase of three megaprojects through an institutional lens, investigating the institutional interaction and alignment of logics therein.

Design/methodology/approach

A multiple case study was employed to reach deep insight into the phenomenon. Sixty-one interviews were conducted over 3 cases with representatives from all levels of the project hierarchy. Respondents were selected through snowball sampling. In two cases, observations of the shared project office were conducted. Data analysis built on first-order codes and second-order themes, collected into a theoretical framework.

Findings

The empirical evidence demonstrates the dynamics shaping institutional logics and gives evidence for changing logics in projects with a well-applied collaborative contract. However, there is a risk of resistance and a return to traditional logics since institutional change is slow and an unsuitably applied collaborative contract can lead to adherence to the conventional way of work.

Originality/value

Current research has focused on the regulatory framework and procurement phase of such models, but little attention has been given to the delivery phase and the interaction of conflicting logics. This paper can serve as an exemplar of the different logics found within public infrastructure projects and their interaction and alignment. Contributions include a heightened emphasis on the start of the project as a meeting point for differing institutional logics and the role change necessary when using a collaborative contract.

Article
Publication date: 14 December 2023

Abdul karim Armah and Jinfa Li

Through the “Going Digital Initiative,” the Ghanaian government has introduced policies that aim at improving the information and communication technology (ICT) infrastructure of…

Abstract

Purpose

Through the “Going Digital Initiative,” the Ghanaian government has introduced policies that aim at improving the information and communication technology (ICT) infrastructure of the country. These ICT policies have benefited numerous sectors of the Ghanaian economy. In logistics management, ICT has impacted drone medical delivery in the healthcare and maritime sectors. However, the importance of ICT is not realized in the motorcycle goods transport (MGT) industry, regardless of its popularity and high economic dependency. Second, all research on motorcycles is focused on diverse social concerns, and no study has attempted to analyze ICT implementation for MGT operations. This is a significant gap in logistics management. Hence, the study aimed to investigate the impact of ICT on Ghana's MGT industry empirically.

Design/methodology/approach

The study adopts a two-phase data collection approach to collect the data. The authors use partial least square structural equation modeling to analyze the study's measurement and structural assessment model.

Findings

ICT positively impacts MGT and the drivers considered. The drivers positively influence MGT. The study further analyzes novel results on the relationships between the drivers and their mediating roles in enhancing MGT performance.

Originality/value

The study's originality is the extension of ICT adoption and usage in MGT. The lack of literature on the importance of ICT for MGT services makes this study the primary source of literature, and the relationships investigated are unique as the research area is unexplored.

Details

The International Journal of Logistics Management, vol. 35 no. 5
Type: Research Article
ISSN: 0957-4093

Keywords

1 – 10 of over 2000