Article
Publication date: 8 December 2022

Timothy Adu Gyamfi, Clinton Ohis Aigbavboa and Wellington Didibhuku Thwala

Construction organisations cannot underestimate the improvement in public–private partnership (PPP) projects’ implementation. At the same time, construction organisations cannot…

Abstract

Purpose

Construction organisations cannot underestimate the improvement in public–private partnership (PPP) projects’ implementation. At the same time, construction organisations cannot overlook the risk arising from engaging in PPP construction projects. Hence, this study aims to establish the influence of risk resource management (RRM) in managing PPP risk in the construction industry in Ghana.

Design/methodology/approach

The researchers adopted qualitative and quantitative research methods to achieve the aim of the study, in which Delphi questions and a close-ended questionnaire were developed. A total of 650 construction specialists, including procurement officers, consultants, project managers, quantity surveyors, site engineers and planning officers were chosen using random and purposive sampling techniques. Recovered data were analysed using descriptive statistics and confirmatory factor analysis (CFA). The CFA maximum likelihood estimation extractor compresses 19 variables into 3 pattern matrices.

Findings

The results of the study revealed three factors that measure RRM in Ghana’s PPP construction industry, including financial resource management which was influenced by communicating the budget to project team members and project partners understanding the budget, and material resource management which was influenced by the provision of materials transportation and provision of delivery programs and labour resource management which was impacted by a commitment to pay social security and taxes and provision of good salaries, to address RRM in PPP construction organisations.

Research limitations/implications

To incessantly improve the PPP risk management (RM) in construction through RRM, there should be a strong liaison between the universities, government agencies and the construction industry, and such collaboration will assist the industry to obtain first-hand information regarding the study findings and how they can be implemented to help the development of RM in the construction industry. This study is limited to Ghana and CFA and further study should explore structural equation model to determine the structure and measurement model of the risk resource variables.

Originality/value

The study may be valuable to industry stakeholders looking for new approaches to improve RM in their construction activities, particularly in PPP projects. Also, to assist reduce PPP risk, construction companies should use RRM in their organisations.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 28 July 2022

Xiaoyan Jiang, Sai Wang, Yong Liu, Bo Xia, Martin Skitmore, Madhav Nepal and Amir Naser Ghanbaripour

With the increasing complexity of public–private partnership (PPP) projects, the amount of data generated during the construction process is massive. This paper aims to develop a…

Abstract

Purpose

With the increasing complexity of public–private partnership (PPP) projects, the amount of data generated during the construction process is massive. This paper aims to develop a new information management method to cope with the risk problems involved in dealing with such data, based on domain ontologies of the construction industry, to help manage PPP risks, share and reuse risk knowledge.

Design/methodology/approach

Risk knowledge concepts are acquired and summarized through PPP failure cases and an extensive literature review to establish a domain framework for risk knowledge using ontology technology to help manage PPP risks.

Findings

The results indicate that the risk ontology is capable of capturing key concepts and relationships involved in managing PPP risks and can be used to facilitate knowledge reuse and storage beneficial to risk management.

Research limitations/implications

The classes in the risk knowledge ontology model constructed in this research do not yet cover all the information in PPP project risks and need to be further extended. Moreover, only the framework and basic methods needed are developed, while the construction of a working ontology model and the relationship between implicit and explicit knowledge is a complicated process that requires repeated modifications and evaluations before it can be implemented.

Practical implications

The ontology provides a basis for turning PPP risk information into risk knowledge to allow the effective sharing and communication of project risks between different project stakeholders. It can also have the potential to help reduce the dependence on subjectivity by mining, using and storing tacit knowledge in the risk management process.

Originality/value

The apparent suitability of the nine classes of PPP risk knowledge (project model, risk type, risk occurrence stage, risk source, risk consequence, risk likelihood, risk carrier, risk management measures and risk case) is identified, and the proposed construction method and steps for a complete domain ontology for PPP risk management are unique. A combination of criteria- and task-based evaluations is also developed for assessing the PPP risk ontology for the first time.

Details

Construction Innovation , vol. 23 no. 5
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 25 December 2023

Isaac Akomea-Frimpong, Jacinta Rejoice Ama Delali Dzagli, Kenneth Eluerkeh, Franklina Boakyewaa Bonsu, Sabastina Opoku-Brafi, Samuel Gyimah, Nana Ama Sika Asuming, David Wireko Atibila and Augustine Senanu Kukah

Recent United Nations Climate Change Conferences recognise extreme climate change of heatwaves, floods and droughts as threatening risks to the resilience and success of…

Abstract

Purpose

Recent United Nations Climate Change Conferences recognise extreme climate change of heatwaves, floods and droughts as threatening risks to the resilience and success of public–private partnership (PPP) infrastructure projects. Such conferences together with available project reports and empirical studies recommend project managers and practitioners to adopt smart technologies and develop robust measures to tackle climate risk exposure. Comparatively, artificial intelligence (AI) risk management tools are better to mitigate climate risk, but it has been inadequately explored in the PPP sector. Thus, this study aims to explore the tools and roles of AI in climate risk management of PPP infrastructure projects.

Design/methodology/approach

Systematically, this study compiles and analyses 36 peer-reviewed journal articles sourced from Scopus, Web of Science, Google Scholar and PubMed.

Findings

The results demonstrate deep learning, building information modelling, robotic automations, remote sensors and fuzzy logic as major key AI-based risk models (tools) for PPP infrastructures. The roles of AI in climate risk management of PPPs include risk detection, analysis, controls and prediction.

Research limitations/implications

For researchers, the findings provide relevant guide for further investigations into AI and climate risks within the PPP research domain.

Practical implications

This article highlights the AI tools in mitigating climate crisis in PPP infrastructure management.

Originality/value

This article provides strong arguments for the utilisation of AI in understanding and managing numerous challenges related to climate change in PPP infrastructure projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 24 December 2020

Isaac Akomea-Frimpong, Xiaohua Jin and Robert Osei-Kyei

Globally, the management of financial risks has gained much attention in the public–private partnerships (PPP) market in recent years. Existing studies rank financial risks among…

2497

Abstract

Purpose

Globally, the management of financial risks has gained much attention in the public–private partnerships (PPP) market in recent years. Existing studies rank financial risks among the topmost risk factors that determine the success or failure of a PPP project. As essential for managing financial risks, a systematic review of previous studies on financial risk management of PPP from 1995 to 2019 (inclusive of both years) has been presented in this paper.

Design/methodology/approach

The paper undertakes a systematic analysis of 49 relevant and available studies on financial risk management of PPP projects.

Findings

From the results, high-interest charges, increased construction costs and increased market risks are some of the key financial risks hampering the success of PPP projects. Techniques used to assess financial risks include Monte Carlo Simulation (MCS) and Net Present Value (NPV). Financial risks control adopted by project managers include minimum revenue guarantee and real option pricing. Extremely limited studies on financial risk management in PPP projects in developing economies was revealed.

Practical implications

Project managers in developing financial risk management models may use the outcome of this paper to improve the financial success of PPP projects. Holistically, researchers will be guided to investigate and heighten the pertinent issues on financial risk management of PPP projects in academia.

Originality/value

The results provide a rare guide to project managers in controlling financial risks of PPP projects which is an unexplored topic. It is also the first paper to highlight the issues of financial risk management in PPP projects research.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 30 June 2021

Mouhcine Tallaki and Enrico Bracci

This paper examines risk and risk management in public–private partnership and private finance initiatives (PPP/PFI). Despite growing interest in PPP/PFI, there are knowledge gaps…

1313

Abstract

Purpose

This paper examines risk and risk management in public–private partnership and private finance initiatives (PPP/PFI). Despite growing interest in PPP/PFI, there are knowledge gaps in the literature. The authors’ aim is to analyse these knowledge gaps and define emerging themes to guide future research agendas.

Design/methodology/approach

The authors conduct a systematic literature review from 1990 to 2018 using the Scopus database.

Findings

The authors define six emerging themes: risk definition and types of risks; value for money (VFM) and risk; risk sharing, allocation and transfer; financial risk; contractualisation and renegotiation of risk; and risk management and governance. They proposed a conceptualisation of potential development of PPP/PFI research through the three phases of risk management cycle, i.e. prospective, real time and retrospective. This paper revealed some new aspects that could help to analyse better risk and risk management in PPP/PFI to reach value for money (VFM) and to exploit the potential of PPP/PFI.

Originality/value

Despite the increasing attention to PPP/PFI, further researches are required in relation to operational and post-operational risk studies, risk management and control, the role of trust. The authors’ analysis underlines the difficulties in how risk is perceived and how to ascertain VFM. In addition, the authors highlight how the increase of contract renegotiation is changing the provisions with reference to risk assignment creating market distortion. Risk should be managed as a cycle; PPP/PFI would benefit by engaging more with the risk management literature.

Details

International Journal of Public Sector Management, vol. 34 no. 7
Type: Research Article
ISSN: 0951-3558

Keywords

Article
Publication date: 7 July 2020

Yan-Chun Zhang, Wu-Zan Luo, Ming Shan, Dong-Wen Pan and Wen-Jie Mu

The aims of this study are to conduct a systematic review of public–private partnership (PPP) studies published from 2009 to 2019, to compare the results with Ke et al. (2009) who…

Abstract

Purpose

The aims of this study are to conduct a systematic review of public–private partnership (PPP) studies published from 2009 to 2019, to compare the results with Ke et al. (2009) who reviewed the PPP literature published from 1998 to 2008, and to trace the evolution of the PPP knowledge in the past two decades. This study also presents the possible directions that the PPP research may go towards in the future, arguably.

Design/methodology/approach

This study carried out a top journal-based search to identify the quality PPP articles published from 2009 to 2019. A total of 12 top-tier construction journals were systematically searched in the database of web of science (WOS), from which 279 PPP articles were identified for review.

Findings

The number of the identified articles, the titles of the journals, institutions, the most cited papers, and prevalent research methods were analyzed and compared. The existing PPP studies in construction journals were classified into seven streams. Through analysis of the PPP research status and gaps, five future research directions were revealed.

Originality/value

This study contributes to the current body of knowledge by revealing the research trend of PPP from 2009 to 2019. It presents the change of PPP development trend in the past decade through comparison with Ke et al. (2009). It also reveals the major research streams and points out the directions that the PPP research may go towards in the future. Moreover, this study is helpful to the practice as well. It can enhance the practitioners' understanding of the PPP development in the past decade. In addition, it identified the research institutions contributing the most in the area of PPP, which may serve as valuable reference for practitioners to locate the best institutions for consultancy or collaboration.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 15 June 2012

Paul Andon

The purpose of this paper is to review research investigating the implications of public private partnership (PPP) schemes for public investment, focusing on the role and effects…

3280

Abstract

Purpose

The purpose of this paper is to review research investigating the implications of public private partnership (PPP) schemes for public investment, focusing on the role and effects of accounting as it relates to the assessment, management, control, reporting, accountability and policy direction of these arrangements. Based on this review, it aims to offer reflections on future directions for this research agenda.

Design/methodology/approach

This paper derives five research themes adapted from the PPP research agenda outlined by Broadbent and Laughlin as a framework to guide a literature‐based analysis and critique of the relevant PPP literature published up to December 2010.

Findings

The review highlights the range of interesting contributions that extant accounting‐related research has made to current knowledge about PPP policy and procedure. From this, concentrations of research effort are identified (its largely technical, critical, procurement‐oriented and Anglo‐centric focus), and opportunities for future research are proposed. With regard to the latter, the opportunities proffered have in common a need to question the nature and functioning of PPPs, consider the complexities of PPPs in action, and explore connections between research and practice.

Originality/value

The main contributions this paper makes relate to understanding the “state of the art” of accounting‐related PPP research, the progress this research agenda has made in line with Broadbent and Laughlin's agenda, as well as insights into fruitful directions future research could take.

Details

Accounting, Auditing & Accountability Journal, vol. 25 no. 5
Type: Research Article
ISSN: 0951-3574

Keywords

Book part
Publication date: 29 July 2019

Valentina N. Parakhina, Galina V. Vorontsova, Oksana N. Momotova, Olga A. Boris and Rustam M. Ustaev

This chapter studies the importance of implementation of innovational projects of technological growth through public–private partnership (PPP). The authors determine the…

Abstract

This chapter studies the importance of implementation of innovational projects of technological growth through public–private partnership (PPP). The authors determine the probability of implementing a project of PPP depending on distribution of risks between its participants. Usage of the mechanism of PPP allows optimizing possible risks during implementation of innovational activities, attracting large business for creation and implementation of new technologies, and forming sustainable ties between R&D departments and business structures. The types of risks in the projects of PPP are given, as well as tendencies of their emergence depending on the stage of implementation of the innovational project, including the following: formation of policy on development of PPP; preparatory, implementary, commercialization of the results of joint activities; and monitoring and control over execution of the project. The algorithm of the system of risk management in innovational projects of technological growth on the platform of PPP is presented. The methods of overcoming the risks that appear during implementation of an innovational project of technological growth within PPP are given. A special attention should be paid to the fourth (distribution of risks) and fifth (reduction of risks) stages. During implementation of innovational projects with application of a business model of PPP, the risks are dealt with by the participant who can manage them better. Reduction of risks is achieved better if several strategies are used – for decreasing the influence of the risk on the innovational project (strategies of risk evasion, acceptance of the risk situation, compensation, transfer, and reduction).

Details

Tech, Smart Cities, and Regional Development in Contemporary Russia
Type: Book
ISBN: 978-1-78973-881-0

Keywords

Article
Publication date: 6 March 2023

Isaac Akomea-Frimpong, Xiaohua Jin, Robert Osei-Kyei and Fatemeh Pariafsai

Public–private partnership (PPP), a project financing arrangement between private investors and the public sector, has revolutionized the approach to the funding and development…

Abstract

Purpose

Public–private partnership (PPP), a project financing arrangement between private investors and the public sector, has revolutionized the approach to the funding and development of public infrastructure worldwide. However, the increasing cases of financial risks and poor financial risk management related to the model threaten the sustainability and financial success of PPP projects leading to huge financial investment losses. This study aims to review existing literature to establish the key measures to control the financial risks of sustainable PPP projects.

Design/methodology/approach

A PRISMA-compliant systematic literature review method was used in this study. Data were sourced from academic databases consisting of 56 impactful peer-reviewed journal articles.

Findings

The review outcomes demonstrate 41 critical factors (measures) in mitigating the financial risks of sustainable PPP projects. They include minimum revenue guarantee, strategic alliance with private investors, financial transparency and accountability and sound macroeconomic policies. The principal results of the study were categorized and conceptualized into a financial risk management maturity model for sustainable PPP projects. Lastly, the study reveals that further studies and project policies must focus more on addressing financial challenges relating to climate risks, and health and safety concerns such as COVID-19 outbreak that have negative impacts on PPP projects.

Research limitations/implications

The results provide essential research gaps and directions for future studies on measures to mitigate the financial risks of sustainable PPP projects. However, this study used small but significant existing publications.

Practical implications

A checklist and a conceptual maturity model are provided in this study to help practitioners to learn and improve upon their practices to mitigate the financial risks of sustainable PPP projects.

Originality/value

This study contributes to managerial measures to reduce huge losses in financial investments of PPP projects and the attainment of sustainability in public infrastructure projects with a financial risk maturity model.

Details

Journal of Financial Management of Property and Construction , vol. 28 no. 3
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 5 May 2015

Ernest Effah Ameyaw and Albert P.C Chan

This paper aims to identify and evaluate the most significant risk factors that strongly affect the implementation of public–private partnership (PPP) water supply projects. PPP

3078

Abstract

Purpose

This paper aims to identify and evaluate the most significant risk factors that strongly affect the implementation of public–private partnership (PPP) water supply projects. PPP for water supply infrastructure services has seen continued growth over the past two decades, following public sector’s budgetary constraints and inability to provide infrastructure-based water services efficiently and cost effectively. However, these projects are often subjected to major risks leading to failures.

Design/methodology/approach

Following extensive literature review and case study analyses, an international questionnaire survey was conducted with practicing and experienced PPP experts to establish the significant risks in PPP water projects. Both the probability of occurrence and severity of 40 risks were evaluated by the expert panel to determine their significance and impact on water projects procured under the PPP arrangement.

Findings

The paper presents a derived risk factor list, ranks the factors and describes the “top-ranked” risk factors as: poor contract design, water pricing and tariff review uncertainty, political interference, public resistance to PPP, construction time and cost overrun, non-payment of bills, lack of PPP experience, financing risk, faulty demand forecasting, high operational costs and conflict between partners.

Originality/value

This factor list broadens PPP stakeholders’ view of important project risks, rather than relying on culture-dependent studies – an area that has received less attention in PPP risk management research. The identified risk factors would provide governments and investors a useful tool in implementing constructive water PPPs by facilitating the development of risk mitigation strategies, particularly for developing countries with poor risk management practices.

Details

Facilities, vol. 33 no. 7/8
Type: Research Article
ISSN: 0263-2772

Keywords

1 – 10 of over 2000