Search results

1 – 10 of over 26000
Article
Publication date: 12 March 2019

Khotso Dithebe, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala and Ayodeji Emmanuel Oke

Minimal private participation for infrastructure development continues to affect developing economies like South Africa. This study aims to determine the perceived occurrence of…

Abstract

Purpose

Minimal private participation for infrastructure development continues to affect developing economies like South Africa. This study aims to determine the perceived occurrence of challenges delaying the delivery of water infrastructure assets and the role of both public and private financing for infrastructure development.

Design/methodology/approach

Quantitative approach was used, and questionnaires were administered to stakeholders that have participated in delivering water infrastructure assets in South Africa. Of the 96 returned questionnaires, 91 were usable, representing 61 per cent response rate. Data from the survey were analysed using descriptive and exploratory factor analyses. The reliability test represented a value of 0.945, indicating internal consistency.

Findings

Data analysis revealed that corruption, hostility, weak project structuring, high fiscal deficits by state government, cost recovery constraints, high credit risk for private financing and unreliable planning and procurement processes are major challenges delaying the delivery of water infrastructure assets. More so, municipal government remains the key custodian of water infrastructure delivery with limited support from private capital as a result of political administrative instability, legislation and policy uncertainty and inadequate risk-adjusted returns.

Originality/value

Emphasis should be made on eradicating corruption and non-transparent financial management to improve municipal creditworthiness and amending and implementing much improved legislation and foreign inclusion. Additionally, financial models to complement the existing mechanisms of financing water infrastructure projects should be sought and used. Complete eradication of infrastructure challenges envisages to reduce fiscal deficits, improve service delivery and enhance the competitiveness and productivity of the economy.

Details

Journal of Engineering, Design and Technology , vol. 17 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 1 March 2015

Michael Regan, Peter E.D. Love and Jim Jim

Adversarial contracting methods are used for most public infrastructure procurement and timely delivery on budget remains a problem. In the past 20 years, OECD countries have…

Abstract

Adversarial contracting methods are used for most public infrastructure procurement and timely delivery on budget remains a problem. In the past 20 years, OECD countries have adopted a number of alternative procurement methods that are based on collaborative principles including public private partnerships, long-term outsourcing arrangements and relationship/alliance contracts. We review the theoretical principles that operate for both adversarial and collaborative contracting methods. We identify the characteristics of non-adversarial contracting methods such as the output specification, qualitative selection criteria, the alignment of incentives, discrete allocation of residual control rights, life cycle costing, and risk-weighted value for money measurement that are delivering better procurement outcomes for government.

Details

Journal of Public Procurement, vol. 15 no. 4
Type: Research Article
ISSN: 1535-0118

Article
Publication date: 12 June 2019

Ngxito Bonisile, Kahilu Kajimo-Shakantu and Akintayo Opawole

Anecdotal evidence indicates that there is a backlog in the pre-tertiary school infrastructure in the Eastern Cape Province of South Africa. The purpose of this paper is to assess…

Abstract

Purpose

Anecdotal evidence indicates that there is a backlog in the pre-tertiary school infrastructure in the Eastern Cape Province of South Africa. The purpose of this paper is to assess the adoption of alternative building technologies (ABT) for pre-tertiary educational infrastructure delivery with a view to providing empirical evidence that could guide policy responses towards its wider adoption.

Design/methodology/approach

The study adopted a mixed methodology approach. This comprises a triangulation of a questionnaire survey and interviews. In total, 100 participants were randomly selected from 182 built environment professionals namely quantity surveyors, architects and engineers (electrical, mechanical, civil and structural) from the Department of Roads and Public Works (DRPW), who are currently involved in the Eastern Cape School Building Program (ECSBP). The questionnaire survey was supplemented by semi-structured interviews conducted with four top government officials (three from the Department of Education (DoE) and one from DRPW) who were also part of the questionnaire survey. Data collected were analyzed using descriptive statistics and phenomenological interpretation respectively.

Findings

The key findings showed that the level of adoption of ABT for pre-tertiary school infrastructure in the Eastern Cape province is primarily influenced and explained by perceptions that ABT offers inferior quality products compared to the conventional method, and limited awareness of its benefits.

Research limitations/implications

The study provides useful insights into the implications of the limited awareness of ABT as a an alternative technology for educational infrastructure delivery and policy responses towards its wider adoption and environmental sustainability.

Originality/value

Empirical evidence from this study indicates that the main motivation for the adoption of ABT is the limited government’s budget to cope with school infrastructural backlog, while environmental sustainability benefit is only secondary. Nonetheless, the realization that the backlogs in the provision of school infrastructure has resulted from sole reliance on the use of the conventional method is an indication of the potential that the adoption of ABT holds for minimizing of the backlog.

Details

Management of Environmental Quality: An International Journal, vol. 30 no. 5
Type: Research Article
ISSN: 1477-7835

Keywords

Article
Publication date: 24 September 2021

Odwa Mazele and Christopher Amoah

Infrastructure development and management form the central part of the government's commitment and responsibility to deliver essential services to the communities. However, much…

1588

Abstract

Purpose

Infrastructure development and management form the central part of the government's commitment and responsibility to deliver essential services to the communities. However, much focus has been placed on the development aspect, with very little focus on the management and maintenance aspects, causing service delivery problems. This study explores the causes of poor management of immovable municipal infrastructure in South Africa.

Design/methodology/approach

A qualitative approach was adopted; thus, a sample of 15 participants consisting of senior municipal workers, local organizations and forums in Ngqushwa Municipality in Eastern Cape were identified and interviewed. The interview data were analyzed using thematic content analysis to determine the common themes and the frequencies.

Findings

The study's findings indicate numerous causes of poor municipal infrastructure management, including lack of funding, lack of capacity, poor planning and oversight, lack of By-laws, grant dependency and corruption. The municipality's failure to address these issues has resulted in increased service protests, destruction of public property, interruption of services and loss of confidence in municipal administrations.

Research limitations/implications

Although the study concentrated on one municipality, the findings may be applicable to other South African municipalities.

Practical implications

To provide efficient services for the inhabitants to curtail aggravated service delivery protests, there is an urgent need for the municipalities to institute effective measures to manage and maintain the infrastructure that serves the communities.

Originality/value

The study has identified the factors underpinning ineffective management of the municipalities' facilities and the resultant's effects. Thus, the findings will guide the government and the authorities on the infrastructural management strategies for effective service delivery.

Details

Property Management, vol. 40 no. 2
Type: Research Article
ISSN: 0263-7472

Keywords

Article
Publication date: 5 October 2020

Muhammed Temitayo Bolomope, Kwasi Gyau Baffour Awuah, Abdul-Rasheed Amidu and Olga Filippova

This study explores the challenges of access to finance from local financial institutions (LFIs), i.e. local banks, for public–private partnership (PPP) infrastructure project…

Abstract

Purpose

This study explores the challenges of access to finance from local financial institutions (LFIs), i.e. local banks, for public–private partnership (PPP) infrastructure project delivery in Nigeria. The aim is to provide useful insights that could inform policy solutions to ease the local funding of PPP infrastructure projects in Nigeria and, by extension, other developing economies.

Design/methodology/approach

Adopting a qualitative research methodology, the study engaged PPP stakeholders involved in securing funds for PPP infrastructure projects in Nigeria. A total of 15 PPP stakeholders, drawn from the public and private sectors, were purposively selected and their views on the research problem obtained through recorded telephone interviews. The opinions of the research participants were subsequently analyzed and the results discussed with the outcome of the examination of relevant literature.

Findings

The study found that the significant factors affecting access to local finance for PPP infrastructure projects in Nigeria include low capital base by LFIs, weak project viability, lack of capacity to manage PPP-related activities, inconsistent government policy, poor legal framework and public perception of PPP.

Research limitations/implications

Insights from this study are useful for PPP stakeholders in mitigating the barriers that influence access to local finance for PPP infrastructure projects in Nigeria and other developing economies. This study is also useful in enhancing the current policy structure in developing countries as a way of revamping the existing infrastructure framework through LFIs.

Originality/value

This study provides clarity on the peculiar challenges impeding access to finance from LFIs for PPP infrastructure projects in Nigeria and will be useful for debt providers and policymakers in evaluating the bankability of PPP infrastructure projects in Nigeria and other developing countries.

Details

Journal of Financial Management of Property and Construction , vol. 26 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Open Access
Article
Publication date: 18 November 2021

Michael Opara, Oliver Nnamdi Okafor, Akolisa Ufodike and Kenneth Kalu

This study adopts an institutional entrepreneurship perspective in the context of public–private partnerships (P3s) to highlight the role of social actors in enacting…

1662

Abstract

Purpose

This study adopts an institutional entrepreneurship perspective in the context of public–private partnerships (P3s) to highlight the role of social actors in enacting institutional change in a complex organizational setting. By studying the actions of two prominent social actors, the authors argue that successful institutional change is the result of dynamic managerial activity supported by political clout, organizational authority and the social positioning of actors.

Design/methodology/approach

The authors conducted a field-based case study in a complex institutional and organizational setting in Alberta, Canada. The authors employed an institutional entrepreneurship perspective to identify and analyze the activities of two allied actors motivated to transform the institutional environment for public infrastructure delivery.

Findings

The empirical study suggests that the implementation of institutional change is both individualistic and collaborative. Moreover, it is grounded in everyday organizational practices and activities and involves a coalition of allies invested in enacting lasting change in organizational practice(s), even when maintaining the status quo seems advantageous.

Originality/value

The authors critique the structural explanations that dominate the literature on public–private partnership implementation, which downplays the role of agency and minimizes its interplay with institutional logics in effecting institutional change. Rather, the authors demonstrate that, given the observed impact of social actors, public–private partnership adoption and implementation can be theorized as a social phenomenon.

Details

Accounting, Auditing & Accountability Journal, vol. 34 no. 9
Type: Research Article
ISSN: 0951-3574

Keywords

Article
Publication date: 13 April 2018

Rasheed Isa, Fidelis Emuze, Dillip Das and Bankole Osita Awuzie

The purpose of this paper is to propose a model for operationalizing the integrated use of lean and sustainability concepts for infrastructure delivery. This model is premised on…

Abstract

Purpose

The purpose of this paper is to propose a model for operationalizing the integrated use of lean and sustainability concepts for infrastructure delivery. This model is premised on the need for the attainment of a sustainable built environment through efficient infrastructure delivery.

Design/methodology/approach

A case study research design was used in assessing five purposively selected cases within Gauteng province in South Africa. These facilities attained Green Building Council of South Africa ratings of 5- to 6-star, for the rating of green buildings and available evidence of integration of lean principles at the developmental stage. Questionnaires were administered to project’s role-players and semi-structured interviews were conducted with the users and facility managers, in order to elicit data for the model development. Questionnaire survey was adopted for the model validation.

Findings

The lean-sustainability platform for infrastructure delivery demonstrates features such as resources, drivers, barriers, activities, outputs, the results, and the ultimate impact. The findings give insight into various components of the model. It validates its robustness and highlights leadership among other critical factors necessary for successful operationalization of the lean-sustainability ethos required to transform the delivery of infrastructure.

Practical implications

The developed model provides a transformational route for achieving infrastructure sustainability. The lean-sustainable indicators identified will serve as evaluation tools for assessing lean-sustainability ethos during the delivery phases of infrastructure projects.

Originality/value

The model provides a new way of thinking about infrastructure project delivery regarding the need to promote sustainability in the built environment.

Details

Built Environment Project and Asset Management, vol. 8 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 1 June 2015

Steven De Schepper, Elvira Haezendonck and Michaël Dooms

The purpose of this paper is to offer a systematic assessment of the magnitude of transaction costs of public infrastructure delivery, based on the three attributes of transaction…

1296

Abstract

Purpose

The purpose of this paper is to offer a systematic assessment of the magnitude of transaction costs of public infrastructure delivery, based on the three attributes of transaction costs, being the asset specificity, uncertainty and frequency of a transaction.

Design/methodology/approach

Non-parametric tests were used to test the transaction cost differences between different procurement types.

Findings

The authors find empirical support, based on a sample of 172 public infrastructure projects in Belgium, that construction firms make higher relation specific investments to their transaction partners under a public-private partnership (PPP) than a under a traditional public procurement (TPP). In addition, the authors found that PPP transactions are burdened by a greater uncertainty and a less mature market than TPP transactions.

Research limitations/implications

Given the complexity of this research, the scope is limited to: a strict distinction between two procurement types, one geographical area, a limited time scope and a focus on the private sector. Hence, the authors suggest that further research broadens the scope of either one of these aspects in order to get a better understanding of the total transaction cost burden of the public infrastructure market.

Practical implications

This study offers policy makers form a better understanding of the transaction cost implications when evaluating different procurement types.

Originality/value

This paper serves as one of the first systematic comparative analyses of the magnitude and determinants of transaction costs for the delivery of public infrastructure.

Details

International Journal of Managing Projects in Business, vol. 8 no. 3
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 8 March 2022

Diana Ominde, Edward G. Ochieng and Vincent O. Omwenga

The aim of this study was to appraise the delivery of information communication technology (ICT) projects and identify key determinants for stakeholder integration.

Abstract

Purpose

The aim of this study was to appraise the delivery of information communication technology (ICT) projects and identify key determinants for stakeholder integration.

Design/methodology/approach

Given that empirically, little was known about stakeholder integration in the ICT sector and its influence or effect on project delivery; qualitative method was used. Forty-seven semi-structured interviews were carried out to derive senior project practitioners and policymakers' constructs of stakeholder integration and infrastructure performance improvement of ICT projects. The verification and validation of the proposed assessment tool were achieved through the use of focus group discussion.

Findings

As established in this research study, there is a need for project delivery teams to evaluate the level of stakeholder integration, the formulation of a project business case, the project processes and issues of compliance and regulation in ICT projects. What is evident in the findings of the study is that the management model adopted for the stakeholders in the Kenyan ICT sector ought to make communication the fulcrum of their engagement.

Originality/value

The inferences made herein are critical in contributing to knowledge regarding the ICT infrastructure project management terrain in developing countries. There is evidence in the study to conclude that the concept of stakeholder management and integration has implications for the sustainability of ICT projects. One of the issues that predominantly featured in the research was the input of stakeholder integration in terms of project sustainability.

Details

International Journal of Productivity and Performance Management, vol. 72 no. 7
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 15 August 2016

Deepak Dahiya and Saji K. Mathew

Although government investments in IT is growing, it is unclear how and what kind of IT investments lead to desirable E-Government performance. Several studies pertaining to the…

1475

Abstract

Purpose

Although government investments in IT is growing, it is unclear how and what kind of IT investments lead to desirable E-Government performance. Several studies pertaining to the business value of IT have developed and tested frameworks for IT infrastructure, IT capability and business performance. However, E-Government-related IT investment outcomes cannot be measured by profits and hence requires a separate investigation. E-Government research using theoretical approach has been reported as very scarce in previous studies. This research aims to bridge the gap by developing a model to study IT infrastructure capability and E-Government performance in the emerging context of new IT service delivery models.

Design/methodology/approach

This paper follows a case study method in this research with a priori conceptual framework. The data were collected following an interview method used for deductive theory building.

Findings

The results identified a positive relationship between IT assets and IT infrastructure performance in the presence of service delivery channels and an anticipation of a positive influence of infrastructure performance variables on IT capability which in turn shows positive effect on E-Government performance.

Research limitations/implications

Because the study followed a qualitative approach, the findings from this study are not useful for statistical generalization. However, the analytical framework provides sufficient ground to test E-Government performance.

Practical implications

The study provides insights in the choice of IT infrastructure elements fitting an E-Government strategy.

Social implications

This study provides an integrated framework for measuring E-Government performance, thereby making deployment of IT infrastructure accountable both in terms of IT performance and IT capability. This in turn will lead to improvement in citizen services.

Originality/value

This paper builds on the existing literature on IT assets, IT infrastructure performance, IT infrastructure capability and applies to the E-Government domain.

Details

Transforming Government: People, Process and Policy, vol. 10 no. 3
Type: Research Article
ISSN: 1750-6166

Keywords

1 – 10 of over 26000