Search results

1 – 10 of over 5000
Book part
Publication date: 5 October 2018

Nima Gerami Seresht, Rodolfo Lourenzutti, Ahmad Salah and Aminah Robinson Fayek

Due to the increasing size and complexity of construction projects, construction engineering and management involves the coordination of many complex and dynamic processes and…

Abstract

Due to the increasing size and complexity of construction projects, construction engineering and management involves the coordination of many complex and dynamic processes and relies on the analysis of uncertain, imprecise and incomplete information, including subjective and linguistically expressed information. Various modelling and computing techniques have been used by construction researchers and applied to practical construction problems in order to overcome these challenges, including fuzzy hybrid techniques. Fuzzy hybrid techniques combine the human-like reasoning capabilities of fuzzy logic with the capabilities of other techniques, such as optimization, machine learning, multi-criteria decision-making (MCDM) and simulation, to capitalise on their strengths and overcome their limitations. Based on a review of construction literature, this chapter identifies the most common types of fuzzy hybrid techniques applied to construction problems and reviews selected papers in each category of fuzzy hybrid technique to illustrate their capabilities for addressing construction challenges. Finally, this chapter discusses areas for future development of fuzzy hybrid techniques that will increase their capabilities for solving construction-related problems. The contributions of this chapter are threefold: (1) the limitations of some standard techniques for solving construction problems are discussed, as are the ways that fuzzy methods have been hybridized with these techniques in order to address their limitations; (2) a review of existing applications of fuzzy hybrid techniques in construction is provided in order to illustrate the capabilities of these techniques for solving a variety of construction problems and (3) potential improvements in each category of fuzzy hybrid technique in construction are provided, as areas for future research.

Details

Fuzzy Hybrid Computing in Construction Engineering and Management
Type: Book
ISBN: 978-1-78743-868-2

Keywords

Content available
Book part
Publication date: 5 October 2018

Abstract

Details

Fuzzy Hybrid Computing in Construction Engineering and Management
Type: Book
ISBN: 978-1-78743-868-2

Article
Publication date: 24 September 2019

Farman Afzal, Shao Yunfei, Mubasher Nazir and Saad Mahmood Bhatti

In the past decades, artificial intelligence (AI)-based hybrid methods have been increasingly applied in construction risk management practices. The purpose of this paper is to…

6672

Abstract

Purpose

In the past decades, artificial intelligence (AI)-based hybrid methods have been increasingly applied in construction risk management practices. The purpose of this paper is to review and compile the current AI methods used for cost-risk assessment in the construction management domain in order to capture complexity and risk interdependencies under high uncertainty.

Design/methodology/approach

This paper makes a content analysis, based on a comprehensive literature review of articles published in high-quality journals from the years 2008 to 2018. Fuzzy hybrid methods, such as fuzzy-analytical network processing, fuzzy-artificial neural network and fuzzy-simulation, have been widely used and dominated in the literature due to their ability to measure the complexity and uncertainty of the system.

Findings

The findings of this review article suggest that due to the limitation of subjective risk data and complex computation, the applications of these AI methods are limited in order to address cost overrun issues under high uncertainty. It is suggested that a hybrid approach of fuzzy logic and extended form of Bayesian belief network (BBN) can be applied in cost-risk assessment to better capture complexity-risk interdependencies under uncertainty.

Research limitations/implications

This study only focuses on the subjective risk assessment methods applied in construction management to overcome cost overrun problem. Therefore, future research can be extended to interpret the input data required to deal with uncertainties, rather than relying solely on subjective judgments in risk assessment analysis.

Practical implications

These results may assist in the management of cost overrun while addressing complexity and uncertainty to avoid chaos in a project. In addition, project managers, experts and practitioners should address the interrelationship between key complexity and risk factors in order to plan risk impact on project cost. The proposed hybrid method of fuzzy logic and BBN can better support the management implications in recent construction risk management practice.

Originality/value

This study addresses the applications of AI-based methods in complex construction projects. A proposed hybrid approach could better address the complexity-risk interdependencies which increase cost uncertainty in project.

Details

International Journal of Managing Projects in Business, vol. 14 no. 2
Type: Research Article
ISSN: 1753-8378

Keywords

Content available
Book part
Publication date: 5 October 2018

Abstract

Details

Fuzzy Hybrid Computing in Construction Engineering and Management
Type: Book
ISBN: 978-1-78743-868-2

Article
Publication date: 11 February 2019

Sanjay Kumar Behera, Dayal R. Parhi and Harish C. Das

With the development of research toward damage detection in structural elements, the use of artificial intelligent methods for crack detection plays a vital role in solving the…

Abstract

Purpose

With the development of research toward damage detection in structural elements, the use of artificial intelligent methods for crack detection plays a vital role in solving the crack-related problems. The purpose of this paper is to establish a methodology that can detect and analyze crack development in a beam structure subjected to transverse free vibration.

Design/methodology/approach

Hybrid intelligent systems have acquired their own distinction as a potential problem-solving methodology adopted by researchers and scientists. It can be applied in many areas like science, technology, business and commerce. There have been the efforts by researchers in the recent past to combine the individual artificial intelligent techniques in parallel to generate optimal solutions for the problems. So it is an innovative effort to develop a strong computationally intelligent hybrid system based on different combinations of available artificial intelligence (AI) techniques.

Findings

In the present research, an integration of different AI techniques has been tested for accuracy. Theoretical, numerical and experimental investigations have been carried out using a fix-hinge aluminum beam of specified dimension in the presence and absence of cracks. The paper also gives an insight into the comparison of relative crack locations and crack depths obtained from numerical and experimental results with that of the results of the hybrid intelligent model and found to be in good agreement.

Originality/value

The paper covers the work to verify the accuracy of hybrid controllers in a fix-hinge beam which is very rare to find in the available literature. To overcome the limitations of standalone AI techniques, a hybrid methodology has been adopted. The output results for crack location and crack depth have been compared with experimental results, and the deviation of results is found to be within the satisfactory limit.

Details

International Journal of Structural Integrity, vol. 10 no. 2
Type: Research Article
ISSN: 1757-9864

Keywords

Book part
Publication date: 5 October 2018

Aminah Robinson Fayek and Rodolfo Lourenzutti

Construction is a highly dynamic environment with numerous interacting factors that affect construction processes and decisions. Uncertainty is inherent in most aspects of…

Abstract

Construction is a highly dynamic environment with numerous interacting factors that affect construction processes and decisions. Uncertainty is inherent in most aspects of construction engineering and management, and traditionally, it has been treated as a random phenomenon. However, there are many types of uncertainty that are not naturally modelled by probability theory, such as subjectivity, ambiguity and vagueness. Fuzzy logic provides an approach for handling such uncertainties. However, fuzzy logic alone has some limitations, including its inability to learn from data and its extensive reliance on expert knowledge. To address these limitations, fuzzy logic has been combined with other techniques to create fuzzy hybrid techniques, which have helped solve complex problems in construction. In this chapter, a background on fuzzy logic in the context of construction engineering and management applications is presented. The chapter provides an introduction to uncertainty in construction and illustrates how fuzzy logic can improve construction modelling and decision-making. The role of fuzzy logic in representing uncertainty is contrasted with that of probability theory. Introductory material is presented on key definitions, properties and methods of fuzzy logic, including the definition and representation of fuzzy sets and membership functions, basic operations on fuzzy sets, fuzzy relations and compositions, defuzzification methods, entropy for fuzzy sets, fuzzy numbers, methods for the specification of membership functions and fuzzy rule-based systems. Finally, a discussion on the need for fuzzy hybrid modelling in construction applications is presented, and future research directions are proposed.

Details

Fuzzy Hybrid Computing in Construction Engineering and Management
Type: Book
ISBN: 978-1-78743-868-2

Keywords

Book part
Publication date: 5 October 2018

Olubukola Tokede, Adam Ayinla and Sam Wamuziri

The robust appraisal of exploration drilling concepts is essential for establishing the economic viability of a prospective recovery field. This study evaluates the different…

Abstract

The robust appraisal of exploration drilling concepts is essential for establishing the economic viability of a prospective recovery field. This study evaluates the different concept selection methods that were considered for drilling operations at the Trym field in Norway. The construction of drilling rigs is a capital-intensive process, and it involves high levels of economic risk. These risks can be broadly categorised as aleatoric (i.e. those related to chance) and epistemic (i.e. those related to knowledge). Evaluating risks in the investment appraisal process tends to be a complicated process. Project risks are evaluated using Monte Carlo simulation (MCS) and are based on the fuzzy analytic hierarchy process (AHP). MCS provides a useful means of evaluating variabilities (i.e. aleatoric risks) in oil drilling operations. However, many of the economic risks in oil drilling processes are unanticipated, and, in some cases, are not readily expressible in quantitative values. The fuzzy AHP is therefore used to appraise the qualitatively defined indirect revenues comprising risks that affect future flexibilities, schedule certainty and health and safety performance. Both the Monte Carlo technique and the fuzzy AHP technique found that a cumulative revenue variation of up to 30% is possible in any of the considered drilling options. The fuzzy AHP technique estimates that the chances of profitability being less than NOK 1 billion over a five-year period is 0.5%, while the Monte Carlo technique estimates suggest a more conservative proportion of 10%. Overall, the fuzzy AHP technique is easy to use and flexible, and it demonstrates increased robustness and improved predictability.

Details

Fuzzy Hybrid Computing in Construction Engineering and Management
Type: Book
ISBN: 978-1-78743-868-2

Keywords

Article
Publication date: 1 May 2023

Hajar Regragui, Naoufal Sefiani, Hamid Azzouzi and Naoufel Cheikhrouhou

Hospital structures serve to protect and improve public health; however, they are recognized as a major source of environmental degradation. Thus, an effective performance…

Abstract

Purpose

Hospital structures serve to protect and improve public health; however, they are recognized as a major source of environmental degradation. Thus, an effective performance evaluation framework is required to improve hospital sustainability. In this context, this study presents a holistic methodology that integrates the sustainability balanced scorecard (SBSC) with fuzzy Delphi method and fuzzy multi-criteria decision-making approaches for evaluating the sustainability performance of hospitals.

Design/methodology/approach

Initially, a comprehensive list of relevant sustainability evaluation criteria was considered based on six SBSC-based dimensions, in line with triple-bottom-line sustainability dimensions, and derived from the literature review and experts’ opinions. Then, the weights of perspectives and their respective criteria are computed and ranked utilizing the fuzzy analytic hierarchy process. Subsequently, the hospitals’ sustainable performance values are ranked based on these criteria using the Fuzzy Technique for Order of Preference by Similarity to Ideal Solution.

Findings

A numerical application was conducted in six public hospitals to exhibit the proposed model’s applicability. The results of this study revealed that “Patient satisfaction,” “Efficiency,” “Effectiveness,” “Access to care” and “Waste production,” respectively, are the five most important criteria of sustainable performance.

Practical implications

The new model will provide decision-makers with management tools that may help them identify the relevant factors for upgrading the level of sustainability in their hospitals and thus improve public health and community well-being.

Originality/value

This is the first study that proposes a new hybrid decision-making methodology for evaluating and comparing hospitals’ sustainability performance under a fuzzy environment.

Details

International Journal of Productivity and Performance Management, vol. 73 no. 3
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 21 May 2021

Mohammad Raoufi and Aminah Robinson Fayek

This paper aims to cover the development of a methodology for hybrid fuzzy Monte Carlo agent-based simulation (FMCABS) and its implementation on a parametric study of construction…

Abstract

Purpose

This paper aims to cover the development of a methodology for hybrid fuzzy Monte Carlo agent-based simulation (FMCABS) and its implementation on a parametric study of construction crew performance.

Design/methodology/approach

The developed methodology uses fuzzy logic, Monte Carlo simulation and agent-based modeling to simulate the behavior of construction crews and predict their performance. Both random and subjective uncertainties are considered in model variables.

Findings

The developed methodology was implemented on a real case involving the parametric study of construction crew performance to assess its applicability and suitability for this context.

Research limitations/implications

This parametric study demonstrates a practical application for the hybrid FMCABS methodology. Though findings from this study are limited to the context of construction crew motivation and performance, the applicability of the developed methodology extends beyond the construction domain.

Practical implications

This paper will help construction practitioners to predict and improve crew performance by taking into account both random and subjective uncertainties.

Social implications

This paper will advance construction modeling by allowing for the assessment of social interactions among crews and their effects on crew performance.

Originality/value

The developed hybrid FMCABS methodology represents an original contribution, as it allows agent-based models to simultaneously process all types of variables (i.e. deterministic, random and subjective) in the same simulation experiment while accounting for interactions among different agents. In addition, the developed methodology is implemented in a novel and extensive parametric study of construction crew performance.

Article
Publication date: 13 June 2023

Aniruddh Nain, Deepika Jain and Ashish Trivedi

This paper aims to examine and compare extant literature on the application of multi-criteria decision-making (MCDM) techniques in humanitarian operations (HOs) and humanitarian…

Abstract

Purpose

This paper aims to examine and compare extant literature on the application of multi-criteria decision-making (MCDM) techniques in humanitarian operations (HOs) and humanitarian supply chains (HSCs). It identifies the status of existing research in the field and suggests a roadmap for academicians to undertake further research in HOs and HSCs using MCDM techniques.

Design/methodology/approach

The paper systematically reviews the research on MCDM applications in HO and HSC domains from 2011 to 2022, as the field gained traction post-2004 Indian Ocean Tsunami phenomena. In the first step, an exhaustive search for journal articles is conducted using 48 keyword searches. To ensure quality, only those articles published in journals featuring in the first quartile of the Scimago Journal Ranking were selected. A total of 103 peer-reviewed articles were selected for the review and then segregated into different categories for analysis.

Findings

The paper highlights insufficient high-quality research in HOs that utilizes MCDM methods. It proposes a roadmap for scholars to enhance the research outcomes by advocating adopting mixed methods. The analysis of various studies revealed a notable absence of contextual reference. A contextual mind map specific to HOs has been developed to assist future research endeavors. This resource can guide researchers in determining the appropriate contextual framework for their studies.

Practical implications

This paper will help practitioners understand the research carried out in the field. The aspiring researchers will identify the gap in the extant research and work on future research directions.

Originality/value

To the best of the authors’ knowledge, this is the first literature review on applying MCDM in HOs and HSCs. It summarises the current status and proposes future research directions.

Details

Benchmarking: An International Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1463-5771

Keywords

1 – 10 of over 5000