Search results

1 – 5 of 5
Open Access
Article
Publication date: 22 March 2024

Ambra Galeazzo, Andrea Furlan, Diletta Tosetto and Andrea Vinelli

We studied the relationship between job engagement and systematic problem solving (SPS) among shop-floor employees and how lean production (LP) and Internet of Things (IoT…

Abstract

Purpose

We studied the relationship between job engagement and systematic problem solving (SPS) among shop-floor employees and how lean production (LP) and Internet of Things (IoT) systems moderate this relationship.

Design/methodology/approach

We collected data from a sample of 440 shop floor workers in 101 manufacturing work units across 33 plants. Because our data is nested, we employed a series of multilevel regression models to test the hypotheses. The application of IoT systems within work units was evaluated by our research team through direct observations from on-site visits.

Findings

Our findings indicate a positive association between job engagement and SPS. Additionally, we found that the adoption of lean bundles positively moderates this relationship, while, surprisingly, the adoption of IoT systems negatively moderates this relationship. Interestingly, we found that, when the adoption of IoT systems is complemented by a lean management system, workers tend to experience a higher effect on the SPS of their engagement.

Research limitations/implications

One limitation of this research is the reliance on the self-reported data collected from both workers (job engagement, SPS and control variables) and supervisors (lean bundles). Furthermore, our study was conducted in a specific country, Italy, which might have limitations on the generalizability of the results since cross-cultural differences in job engagement and SPS have been documented.

Practical implications

Our findings highlight that employees’ strong engagement in SPS behaviors is shaped by the managerial and technological systems implemented on the shop floor. Specifically, we point out that implementing IoT systems without the appropriate managerial practices can pose challenges to fostering employee engagement and SPS.

Originality/value

This paper provides new insights on how lean and new technologies contribute to the development of learning-to-learn capabilities at the individual level by empirically analyzing the moderating effects of IoT systems and LP on the relationship between job engagement and SPS.

Details

International Journal of Operations & Production Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0144-3577

Keywords

Open Access
Article
Publication date: 14 April 2023

Gideon Daniel Joubert and Atanda Kamoru Raji

Despite South Africa’s ailing electrical grid, substantial renewable energy (RE) integration is planned for the country. As grid-integrated RE affects all grids differently, this…

Abstract

Purpose

Despite South Africa’s ailing electrical grid, substantial renewable energy (RE) integration is planned for the country. As grid-integrated RE affects all grids differently, this study aims to develop an adaptable grid code-guided renewable power plant (RPP) control real-time simulation testbed, tailored to South African grid code requirements to study grid-integrated RE’s behaviour concerning South Africa’s unique conditions.

Design/methodology/approach

The testbed is designed using MATLAB’s Simulink and live script environments, to create an adaptable model where grid, RPP and RPP guiding grid codes are tailorable. This model is integrated with OPAL-RT’s RT-LAB and brought to real-time simulation using OPAL-RT’s OP4510 simulator. Voltage, frequency and short-circuit event case studies are performed through which the testbed’s abilities and performance are assessed.

Findings

Case study results show the following. The testbed accurately represents grid code voltage and frequency requirements. RPP point of connection (POC) conditions are consistently recognized and tracked, according to which the testbed then operates simulated RPPs, validating its design. Short-circuit event simulations show the simulated wind farm supports POC conditions relative to short-circuit intensity by curtailing active power in favour of reactive power, in line with local grid code requirements.

Originality/value

To the best of the authors’ knowledge, this is the first design of an adaptable grid code-guided RPP control testbed, tailored to South African grid code requirements in line with which RPP behavioural and grid integration studies can be performed.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Open Access
Article
Publication date: 30 March 2021

Christophe Gaie, Bertrand Florat and Steven Morvan

In the present article, the authors tackle the problem of IT documentation, which plays an important role in information technology (IT) project management.

2181

Abstract

Purpose

In the present article, the authors tackle the problem of IT documentation, which plays an important role in information technology (IT) project management.

Design/methodology/approach

They provide a simple tool based on five complementary views, which should be detailed by the project team using a classic source code management platform.

Findings

The proposed tool is open source and may be reused by any IT team in various project contexts and heterogeneous development methods.

Originality/value

This research provides an operational framework, which facilitates IT project management and documentation. The framework is open source and may be easily downloaded by any other IT team.

Details

Applied Computing and Informatics, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2634-1964

Keywords

Open Access
Article
Publication date: 9 March 2023

Anna Marrucci, Riccardo Rialti and Marco Balzano

The purpose of this article is to develop a configurational approach based on the TOE framework (technology, organization and environment) to understand the degree of…

2171

Abstract

Purpose

The purpose of this article is to develop a configurational approach based on the TOE framework (technology, organization and environment) to understand the degree of implementation of I4.0 technologies in manufacturing small- and medium-sized enterprises (SMEs). Specifically, the study considers technological infrastructure and competence, I4.0 integration capabilities, organizational agility and strategic flexibility, environmental dynamism and industry-specific forces as simultaneous pre-conditions for achieving an effective implementation of I4.0 technologies.

Design/methodology/approach

This study uses the fuzzy-set qualitative comparative analysis (fsQCA) methodology as it allows for asymmetric and configurational-focused testing of proposition and sound theoretical development. In total, 305 responses were collected through a survey administered to SME managers in Europe and the United Kingdom (UK).

Findings

The study examines the influence of technology, organizational and environmental aspects on I4.0 technologies implementation in SMEs. High I4.0 degree of implementation is structured around 5 configurations, while other 4 configurations are related to low levels of I4.0 implementation.

Originality/value

This study proposes a configurational approach for SMEs to become I4.0 ready and how they may successfully implement I4.0 technologies. Such findings represent an original and novel contribution to existing research, offering a broad view on the I4.0 implementation by manufacturing SMEs.

Details

Management Decision, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0025-1747

Keywords

Open Access
Article
Publication date: 22 November 2023

Christopher Owen Cox and Hamid Pasaei

According to the Project Management Institute, 70% of projects fail globally. The causes of project failure in many instances can be identified as non-technical or behavioral in…

Abstract

Purpose

According to the Project Management Institute, 70% of projects fail globally. The causes of project failure in many instances can be identified as non-technical or behavioral in nature arising from interactions between participants. These intangible risks can emerge in any project setting but especially in project settings having diversity of cultures, customs, beliefs and traditions of various companies or countries. This paper provides an objective framework to address these intangible risks.

Study design/methodology/approach

This paper presents a structured approach to identify, assess and manage intangible risks to enhance a project team’s ability to meet its objectives. The authors propose a user-friendly framework, Intangible Risk Assessment Methodology for Projects (IRAMP), to address these risks and the factors that cause them. Meta-network (e.g., a network of networks) simulation and established social network analysis (SNA) measures provide a quantitative assessment and ranking of causal events and their influence on the intangible behavior centric risks.

Findings

The proposed IRAMP and meta-network approach were utilized to examine the project delivery process of an international energy firm. Data were gathered using structured interviews, surveys and project team workshops. The use of the IRAMP to highlight intangible risk areas underpinned by the SNA measures led to changes in the company’s organizational structure to enhance project delivery effectiveness.

Originality/value

This work extends the existing project risk management literature by providing a novel objective approach to identify and quantify behavior centric intangible risks and the conditions that cause them to emerge.

Details

International Journal of Industrial Engineering and Operations Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2690-6090

Keywords

Access

Only Open Access

Year

Content type

Earlycite article (5)
1 – 5 of 5