Article
Publication date: 19 February 2024

Murali Jagannathan, Vijayeta Malla, Venkata Santosh Kumar Delhi and Venkatesan Renganaidu

The dispute resolution process in the construction industry is known for delays in settlement, with some cases even escalating to complex arbitration and litigation. To avoid…

Abstract

Purpose

The dispute resolution process in the construction industry is known for delays in settlement, with some cases even escalating to complex arbitration and litigation. To avoid conflicts turning into disputes, the parties need to be proactive in identifying and resolving conflicts in their nascent stages. It is here that innovative lean construction practices can potentially act as a game-changer to avoid disputes, and this study aims to attempt to understand this phenomenon empirically.

Design/methodology/approach

A questionnaire-based empirical study, followed by semi-structured interviews, is conducted to understand the relevance of key tenets of lean principles in dispute avoidance.

Findings

Although stakeholders agree on the usefulness and practicality of lean principles in dispute avoidance, the extent of agreement is lesser when it comes to its implementation practicality. Moreover, there is a demographic influence observed on lean tenets such as “open communication”, “stakeholder collaboration” and “constraint identification”.

Practical implications

The results point towards an approach that combines contractual mandate, training and awareness creation to iron out the differences in the usefulness and practicality of lean approaches to avoid disputes.

Originality/value

Lean implementation is widely discussed in many construction contexts, such as sustainability, productivity improvement and planning. However, a discussion on lean philosophy’s role in dispute avoidance is muted. Therefore, this study assumes significance.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 5 June 2023

Peipei Wang, Peter Fenn and Kun Wang

This paper aims to devise a case-controlled method combined with Bradford Hill criteria for causal inference of contractual disputes in construction projects. It is a genuine…

Abstract

Purpose

This paper aims to devise a case-controlled method combined with Bradford Hill criteria for causal inference of contractual disputes in construction projects. It is a genuine attempt in a systematic method from research design to execution for causal issues where only observational data is available.

Design/methodology/approach

The authors located insufficient top management support as the putative pathogen of construction disputes based on a literature review, an interview and Delphi surveys. A questionnaire survey was then conducted to collect case-controlled data to ensure comparability, in which for each disputed project put in the experimental group, the authors sought for a dispute-free project of similar characteristics. The incidence rates of insufficient top management support in the experimental and control groups were then examined by Bradford Hill criteria as an alternative to the test of intervention effect.

Findings

The association of insufficient top management support and construction disputes was tested to conform with the Bradford Hill criteria with case-controlled data where applicable and logical deduction where statistical tests were not applicable. With a clear, positive, reasonable and statistically significant association, while excluding methodological biases, confounding and chance, the authors reached a causal verdict of insufficient top management support causing contractual disputes.

Originality/value

This paper supports the validity of applying a case-controlled method combined with Bradford Hill criteria in investigating causal issues in project management, especially the verdict of causal inference based on empirical data. In addition, the located root cause of contractual disputes could inform project management personnel with reasoned strategies for dispute avoidance.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 27 July 2023

Mianzhi Yang, Qing Hui, Qingru Yang, Mengwei Fan and Xin Li

China has recently introduced a new audit law that aims to increase the scope of audit supervision and raise the standards for preventing risks in auditing national public…

Abstract

Purpose

China has recently introduced a new audit law that aims to increase the scope of audit supervision and raise the standards for preventing risks in auditing national public projects. This paper presents a systematic research study on the causes of audit risks in national public projects and discusses the process by which these causes contribute to the emergence of such risks. Furthermore, the paper investigates the core risk sources in various types of national construction project audit. This paper aims to provide theoretical support for auditors of national construction projects in risk avoidance when conducting audits.

Design/methodology/approach

In this study, the authors carefully selected five national public audit projects from China and performed a comprehensive analysis of 85 relevant audit documentation. The textual analysis was conducted using Nvivo12 software, and the grounded theory approach was adopted for generalization purposes.

Findings

Based on the research results, the findings suggest that there are five key causes contributing to the audit risk of national construction projects: professional competence, risk awareness, management capacity, level of attention and deliberate fraud. The most critical factor identified is management capability, with 59.93% of the data supporting this view. This conclusion was based on an analysis of state-owned enterprises, administrative organs and public institutions. Building upon this, a framework titled “the mechanism of audit risk factors with management capability as the core” was constructed.

Originality/value

This paper employs qualitative analysis methods to examine national construction projects in China, contributing new literature to the theoretical study of audit risk management. The article also provides practical recommendations for auditors on how to mitigate audit risks and improve the quality of audit services in national project governance.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 31 October 2023

Hong Zhou, Binwei Gao, Shilong Tang, Bing Li and Shuyu Wang

The number of construction dispute cases has maintained a high growth trend in recent years. The effective exploration and management of construction contract risk can directly…

Abstract

Purpose

The number of construction dispute cases has maintained a high growth trend in recent years. The effective exploration and management of construction contract risk can directly promote the overall performance of the project life cycle. The miss of clauses may result in a failure to match with standard contracts. If the contract, modified by the owner, omits key clauses, potential disputes may lead to contractors paying substantial compensation. Therefore, the identification of construction project contract missing clauses has heavily relied on the manual review technique, which is inefficient and highly restricted by personnel experience. The existing intelligent means only work for the contract query and storage. It is urgent to raise the level of intelligence for contract clause management. Therefore, this paper aims to propose an intelligent method to detect construction project contract missing clauses based on Natural Language Processing (NLP) and deep learning technology.

Design/methodology/approach

A complete classification scheme of contract clauses is designed based on NLP. First, construction contract texts are pre-processed and converted from unstructured natural language into structured digital vector form. Following the initial categorization, a multi-label classification of long text construction contract clauses is designed to preliminary identify whether the clause labels are missing. After the multi-label clause missing detection, the authors implement a clause similarity algorithm by creatively integrating the image detection thought, MatchPyramid model, with BERT to identify missing substantial content in the contract clauses.

Findings

1,322 construction project contracts were tested. Results showed that the accuracy of multi-label classification could reach 93%, the accuracy of similarity matching can reach 83%, and the recall rate and F1 mean of both can reach more than 0.7. The experimental results verify the feasibility of intelligently detecting contract risk through the NLP-based method to some extent.

Originality/value

NLP is adept at recognizing textual content and has shown promising results in some contract processing applications. However, the mostly used approaches of its utilization for risk detection in construction contract clauses predominantly are rule-based, which encounter challenges when handling intricate and lengthy engineering contracts. This paper introduces an NLP technique based on deep learning which reduces manual intervention and can autonomously identify and tag types of contractual deficiencies, aligning with the evolving complexities anticipated in future construction contracts. Moreover, this method achieves the recognition of extended contract clause texts. Ultimately, this approach boasts versatility; users simply need to adjust parameters such as segmentation based on language categories to detect omissions in contract clauses of diverse languages.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 20 February 2024

Huy Minh Vo, Jyh-Bin Yang and Veerakumar Rangasamy

Construction projects commonly encounter complicated delay problems. Over the past few decades, numerous delay analysis methods (DAMs) have been developed. There is no consensus…

Abstract

Purpose

Construction projects commonly encounter complicated delay problems. Over the past few decades, numerous delay analysis methods (DAMs) have been developed. There is no consensus on whether existing DAMs effectively resolve delays, particularly in the case of complex concurrent delays. Thus, the primary objective of this study is to undertake a comprehensive and systematic literature review on concurrent delays, aiming to answer the following research question: Do existing delay analysis techniques deal with concurrent delays well?

Design/methodology/approach

This study conducts a comprehensive review of concurrent delays by both bibliometric and systematic analysis of research publications published between 1982 and 2022 in the Web of Science (WoS) and Scopus databases. For quantitative analysis, a bibliometric mapping tool, the VOSviewer, was employed to analyze 68 selected publications to explore the co-occurrence of keywords, co-authorship and direct citation. Additionally, we conducted a qualitative analysis to answer the targeted research question, identify academic knowledge gaps and explore potential research directions for solving the theoretical and practical problems of concurrent delays.

Findings

Concurrent delays are a critical aspect of delay claims. Despite DAMs developed by a limited number of research teams to tackle issues like concurrence, float consumption and the critical path in concurrent delay resolution, practitioners continue to face significant challenges. This study has successfully identified knowledge gaps in defining, identifying, analyzing and allocating liability for concurrent delays while offering promising directions for further research. These findings reveal the incompleteness of available DAMs for solving concurrent delays.

Practical implications

The outcomes of this study are highly beneficial for practitioners and researchers. For practitioners, the discussions on the resolution process of concurrent delays in terms of identification, analysis and apportionment enable them to proactively address concurrent delays and lay the groundwork for preventing and resolving such issues in their construction projects. For researchers, five research directions, including advanced DAMs capable of solving concurrent delays, are proposed for reference.

Originality/value

Existing research on DAMs lacks comprehensive coverage of concurrent delays. Through a scientometric review, it is evident that current DAMs do not deal with concurrent delays well. This review identifies critical knowledge gaps and offers insights into potential directions for future research.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 12 September 2023

Pramod Malaka Silva, Niluka Domingo and Noushad Ali Naseem Ameer Ali

The construction industry is complex, human-intensive and driven by monetary values. Hence, disputes are widespread. Initial conflicts among parties may develop into a disastrous…

Abstract

Purpose

The construction industry is complex, human-intensive and driven by monetary values. Hence, disputes are widespread. Initial conflicts among parties may develop into a disastrous dispute that costs the project success and good relationships and affects stakeholders' expectations. There has been a focus on causes of construction-related disputes, and studies over the past three decades have attempted to identify a more comprehensive list of reasons for disputes. Some of these studies' limitations were geographical, project delivery methods and project types. The purpose of this study is to identify the most recent and conclusive list of causes of disputes based on current literature by undertaking a systematic literature review (SLR).

Design/methodology/approach

Considering the large number of studies that focused on causes of disputes, this study aims to develop a comprehensive list of causes, using a SLR, as it ensures that all previous articles in multiple databases are reviewed to produce a comprehensive outcome. A six-stage SLR was followed from background study to analysis and reporting.

Findings

Not surprisingly, the number of publications has increased over time, most from the Middle East region. The interconnected nature of the causes was widely emphasised. The SLR has produced eight common core causes of disputes. They are: poor contractual arrangements, employer-initiated scope changes, unforeseen site changes, poor contract understanding and administration, contractor’s quality of works, the inability of the contractor to achieve time targets, non- or delayed payments and poor quality of design. The majority of previous authors realised that disputes could be avoided by parties’ involvement during the early stages, avoiding being opportunistic and acting collaboratively.

Originality/value

Even though numerous studies have been carried out to identify the causes of disputes in the construction industry, none did a SLR. This study aggregates all the previous studies that focused on construction-related disputes systematically. Categorising causes based on the party primarily responsible help various stakeholders by providing a distinct list of factors to avoid that contribute to disputes.

Details

Journal of Financial Management of Property and Construction , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 8 April 2024

Issaka Ndekugri, Ana Karina Silverio and Jim Mason

States have intervened with legislation to improve cashflow within construction project supply chains. The operation of the UK’s Housing Grants, Construction and Regeneration Act…

Abstract

Purpose

States have intervened with legislation to improve cashflow within construction project supply chains. The operation of the UK’s Housing Grants, Construction and Regeneration Act 1996 leads to payment obligations stated either as a contract administrator’s certificate (or equivalent) or an adjudicator’s decision. The purpose of the intervention would be defeated unless there are speedy ways of transforming these pieces of paper into real money. The combination of the legislation, contractual provisions and insolvency law has produced a minefield of complexity concerning enforcement of payment obligations stated in these documents. Unfortunately, the knowledge and understanding required to navigate these complexities have been sorely lacking. The purpose of this paper is to plug this gap.

Design/methodology/approach

Legal research methods and case study approaches, using relevant court decisions as data, were adopted.

Findings

The enforcement method advised by the court is the summary judgment procedure provided under the Civil Procedure Rules. An overdue payment obligation, either under the terms of a construction contract or an adjudicator’s decision, amounts to a debt that can be the subject of insolvency proceedings. Although the insolvency enforcement method has been successfully used on some occasions, using it purely as a debt collection weapon would be inappropriate and likely to be punished by the court.

Originality/value

The paper contributes to knowledge in two ways: (i) it maps out the factual situations in which these payment challenges arise in language accessible to the construction industry’s professions; and (ii) comparative analysis of payment enforcement methods to aid decision-making by parties to construction industry contracts. It is relevant to the other common-law jurisdictions in which similar statutory interventions have been made.

Details

Journal of Financial Management of Property and Construction , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 21 December 2023

Ahmed Farouk Kineber, Ayodeji Emmanuel Oke, Ali Hassan Ali, Oluwaseun Dosumu, Kayode Fakunle and Oludolapo Ibrahim Olanrewaju

This study aims to explore the critical application areas of radio frequency identification (RFID) technology for sustainable buildings.

Abstract

Purpose

This study aims to explore the critical application areas of radio frequency identification (RFID) technology for sustainable buildings.

Design/methodology/approach

The quantitative research approach was adopted through a structured questionnaire administered to relevant stakeholders of construction projects. The data collected were analysed with the exploratory factor analysis, relative importance index (RII) and fuzzy synthetic evaluation (FSE).

Findings

The study’s results have categorised the crucial areas of application where construction industry stakeholders should focus their attention. These areas are divided into four categories: management technologies, production technologies, sensing technologies and monitoring technologies. The findings from the FSE indicate that monitoring technologies represent the most significant category, whereas management technologies rank as the least significant. Moreover, the RII analysis highlights that tools management stands out as the most important application of RFID, while dispute resolution emerges as the least significant RFID application.

Practical implications

The study establishes the core areas of RFID application and their benefits to sustainable buildings. Consequently, it helps stakeholders (consultants, clients and contractors) to examine the RFID application areas and make informed decision on sustainable construction. Furthermore, it provides systematic proof that can aid the implementation of RFID in developing countries.

Originality/value

The study provides an insight into the possible application areas and benefits of RFID technology in the construction industry of developing countries. It also developed a conceptual frame for the critical application areas of RFID technology in the construction industry of developing countries.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 2 May 2023

Dongyuan Zhao, Zhongjun Tang and Duokui He

With the intensification of market competition, there is a growing demand for weak signal identification and evolutionary analysis for enterprise foresight. For decades, many…

Abstract

Purpose

With the intensification of market competition, there is a growing demand for weak signal identification and evolutionary analysis for enterprise foresight. For decades, many scholars have conducted relevant research. However, the existing research only cuts in from a single angle and lacks a systematic and comprehensive overview. In this paper, the authors summarize the articles related to weak signal recognition and evolutionary analysis, in an attempt to make contributions to relevant research.

Design/methodology/approach

The authors develop a systematic overview framework based on the most classical three-dimensional space model of weak signals. Framework comprehensively summarizes the current research insights and knowledge from three dimensions of research field, identification methods and interpretation methods.

Findings

The research results show that it is necessary to improve the automation level in the process of weak signal recognition and analysis and transfer valuable human resources to the decision-making stage. In addition, it is necessary to coordinate multiple types of data sources, expand research subfields and optimize weak signal recognition and interpretation methods, with a view to expanding weak signal future research, making theoretical and practical contributions to enterprise foresight, and providing reference for the government to establish weak signal technology monitoring, evaluation and early warning mechanisms.

Originality/value

The authors develop a systematic overview framework based on the most classical three-dimensional space model of weak signals. It comprehensively summarizes the current research insights and knowledge from three dimensions of research field, identification methods and interpretation methods.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 18 December 2023

Kai Wang, Chi-Feng Tai and Han-fen Hu

Focusing on the social influence processes in the context of massively multiplayer online role-playing games (MMORPGs), this study aims to investigate the nomological network of…

Abstract

Purpose

Focusing on the social influence processes in the context of massively multiplayer online role-playing games (MMORPGs), this study aims to investigate the nomological network of social influence factors, a topic seldom explicitly articulated in the literature in this unique context.

Design/methodology/approach

This study adopts a mixed-methods approach to develop and test a context-specific model of social influence processes in MMORPGs. First, the authors conducted qualitative interviews with MMORPG players to identify the drivers shaping players' perceptions of social influences. Second, the authors formulated and tested a research model with quantitative data collected from 450 respondents of an online survey.

Findings

Through the qualitative study, the authors identify leader enthusiasm, social support and social presence as the critical drivers of social influence factors. The result of the quantitative study validates the influences of the critical drivers and demonstrates the impact of social influences on MMORPG players' we-intention to continue playing games.

Originality/value

This research extends the social influence theory by identifying contextualized drivers that shape MMORPG players' perception of social influences determining their we-intention to continue playing games. MMORPG service providers can draw on these drivers to leverage social influences to increase players' we-intention of continuance.