Search results
1 – 10 of 39Alaa Mashan Ubaid and Fikri T. Dweiri
This research paper aims to develop and validate an enhanced business process improvement methodology (EBPIM) by integrating the DMAIC (define, measure, analyze, improve and…
Abstract
Purpose
This research paper aims to develop and validate an enhanced business process improvement methodology (EBPIM) by integrating the DMAIC (define, measure, analyze, improve and control) and the comprehensive business process management (CBPM) methodologies.
Design/methodology/approach
A systematic literature review and analysis were conducted to prove the novelty of the research approach and identify the similarities, differences, strengths and weaknesses of the DMAIC and the CBPM methodologies. The EBPIM was proposed based on the analysis results. Then, a focus group approach was used to evaluate and validate the methodology.
Findings
The EBPIM consists of nine activities: preparation, selection, description, quantification, modeling, enactment, improvement opportunities selection, analysis and improvement and monitoring. The proposed methodology adopted the systematic and structured process of the DMAIC methodology by having one tollgate between every two activities to check the progress and authorize the team to go to the next activity. At the same time, it has the ability of the CBPM methodology to enhance the interaction between human activities and business process management systems (BPMS).
Research limitations/implications
The EBPIM was evaluated and validated by a focus group of academic professors. However, the main limitation of the proposed methodology is that it is still theoretical and needs to be empirically tested. Therefore, future work will focus on testing the EBPIM in different industries and organization sizes.
Practical implications
From the theoretical perspective, the proposed methodology adds value to the knowledge in the scope of business processes improvement methodologies (BPIMs) by integrating the DMAIC and the CBPM methodologies. It takes advantage of and combines the strengths of the DMAIC and CBPM methodologies. From the practical perspective, the proposed methodology presents a valuable tool that can facilitate the organization’s mission to improve the areas that need improvement using a systematic improvement methodology that will effectively enhance organizational performance (OP).
Originality/value
The BPIMs literature analysis proved that most of the reviewed methodologies could not support all phases of the business process improvement (BPI) activities. It was concluded that integrating the DMAIC and the CBPM methodologies is a novel approach. The proposed methodology will enhance the efficiency of both methodologies, fill the gaps that may exist in both of them and lead to better results in terms of BPI.
Details
Keywords
Anna Trubetskaya, Alan Ryan, Daryl John Powell and Connor Moore
Output from the Irish Dairy Industry has grown rapidly since the abolition of quotas in 2015, with processors investing heavily in capacity expansion to deal with the extra milk…
Abstract
Purpose
Output from the Irish Dairy Industry has grown rapidly since the abolition of quotas in 2015, with processors investing heavily in capacity expansion to deal with the extra milk volumes. Further capacity gains may be achieved by extending the processing season into the winter, a key enabler for which being the reduction of duration of the winter maintenance overhaul period. This paper aims to investigate if Lean Six Sigma tools and techniques can be used to enhance operational maintenance performance, thereby releasing additional processing capacity.
Design/methodology/approach
Combining the Six-Sigma Define, Measure, Analyse, Improve, Control (DMAIC) methodology and the structured approach of Turnaround Maintenance (TAM) widely used in process industries creates a novel hybrid model that promises substantial improvement in maintenance overhaul execution. This paper presents a case study applying the DMAIC/TAM model to Ireland’s largest dairy processing site to optimise the annual maintenance shutdown. The objective was to deliver a 30% reduction in the duration of the overhaul, enabling an extension of the processing season.
Findings
Application of the DMAIC/TAM hybrid resulted in process enhancements, employee engagement and a clear roadmap for the operations team. Project goals were delivered, and original objectives exceeded, resulting in €8.9m additional value to the business and a reduction of 36% in the duration of the overhaul.
Practical implications
The results demonstrate that the model provides a structure that promotes systematic working and a continuous improvement focus that can have substantial benefits for wider industry. Opportunities for further model refinement were identified and will enhance performance in subsequent overhauls.
Originality/value
To the best of the authors’ knowledge, this is the first time that the structure and tools of DMAIC and TAM have been combined into a hybrid methodology and applied in an Irish industrial setting.
Details
Keywords
Renan Ribeiro Do Prado, Pedro Antonio Boareto, Joceir Chaves and Eduardo Alves Portela Santos
The aim of this paper is to explore the possibility of using the Define-Measure-Analyze-Improve-Control (DMAIC) cycle, process mining (PM) and multi-criteria decision methods in…
Abstract
Purpose
The aim of this paper is to explore the possibility of using the Define-Measure-Analyze-Improve-Control (DMAIC) cycle, process mining (PM) and multi-criteria decision methods in an integrated way so that these three elements combined result in a methodology called the Agile DMAIC cycle, which brings more agility and reliability in the execution of the Six Sigma process.
Design/methodology/approach
The approach taken by the authors in this study was to analyze the studies arising from this union of concepts and to focus on using PM tools where appropriate to accelerate the DMAIC cycle by improving the first two steps, and to test using the AHP as a decision-making process, to bring more excellent reliability in the definition of indicators.
Findings
It was indicated that there was a gain with acquiring indicators and process maps generated by PM. And through the AHP, there was a greater accuracy in determining the importance of the indicators.
Practical implications
Through the results and findings of this study, more organizations can understand the potential of integrating Six Sigma and PM. It was just developed for the first two steps of the DMAIC cycle, and it is also a replicable method for any Six Sigma project where data acquisition through mining is possible.
Originality/value
The authors develop a fully applicable and understandable methodology which can be replicated in other settings and expanded in future research.
Details
Keywords
Panagiotis Tsarouhas and Niki Sidiropoulou
In a packaging olives manufacturing system, the drained weight of the product plays a decisive role in customer’s satisfaction as well as in financial saving for the organization…
Abstract
Purpose
In a packaging olives manufacturing system, the drained weight of the product plays a decisive role in customer’s satisfaction as well as in financial saving for the organization. The purpose of this study is to minimize the variation of the drained weight of olives in the production system to avoid the negative consequences.
Design/methodology/approach
The research develops a practical implementation step-by-step of Six Sigma define, measure, analyze, improve and control (DMAIC) in reducing the variation of the drained weight of olives.
Findings
Data analysis was used at various phases of the project to identify the root causes of rejection and rework. As a result of the necessary interventions and actions to optimize the manufacturing process, the standard deviation of drained weight was significantly reduced by 51.02%, with a 99.97% decrease in the number of parts per million defectives. Thus, the yield of the production process was improved by 8.24%. The estimated annual savings from this project were US$ 228,000 resulting from reduced rejection and rework.
Practical implications
This research may be used in packaging olives production systems as a tool for managers and engineers planning to increase productivity and efficiency while also improving product quality. The study also provided the organization with helpful actions that will be used to guide future Six Sigma operations management on the system. Thus, practical guidelines and solutions are provided.
Originality/value
In this project, for the first time, the Six Sigma methodology has been applied to solve a real-world problem in the packaging olives manufacturing system and to show that the DMAIC approach may assist to improve the efficiency of their operations and hence contribute to their quest toward continuous improvement.
Details
Keywords
This study aims to construct a mental health service system for middle school students in the post-COVID-19 era with the framework of Six Sigma DMAIC (define, measure, analyze…
Abstract
Purpose
This study aims to construct a mental health service system for middle school students in the post-COVID-19 era with the framework of Six Sigma DMAIC (define, measure, analyze, improve and control) and analyze the influencing factors of the mental health service system to study the implementation strategies of quality-oriented mental health services in middle schools.
Design/methodology/approach
This study was conducted in Tianjin, China, from September to November 2022, and 350 middle school students from Tianjin Public Middle School were selected as subjects. A questionnaire survey was used to collect data. In this study, the Six Sigma DMAIC method, sensitivity analysis method, exploratory factor analysis and principal component analysis were used to analyze the mental health services provided to middle school students.
Findings
Based on the Six Sigma DMAIC framework, this study indicates that the contribution rate of the mental health service process factor is the largest in the post-COVID-19 era. The mental health cultivation factor ranks second in terms of its contribution. Mental health quality and policy factors are also important in the construction of middle school students’ mental health service system. In addition, the study highlights the importance of parental involvement and social support in student mental health services during the post-COVID-19 era.
Originality/value
To the best of the authors’ knowledge, a study on middle school students’ mental health in the post-Covid-19 era has not yet been conducted. This study developed a quality-oriented mental health system and analyzed the influencing factors of mental health for middle school students based on data analysis and the Six Sigma DMAIC method.
Details
Keywords
Tatiana da Costa Reis Moreira, Daniel Luiz de Mattos Nascimento, Yelena Smirnova and Ana Carla de Souza Gomes dos Santos
This paper explores Lean Six Sigma principles and the DMAIC (define, measure, analyze, improve, control) methodology to propose a new Lean Six Sigma 4.0 (LSS 4.0) framework for…
Abstract
Purpose
This paper explores Lean Six Sigma principles and the DMAIC (define, measure, analyze, improve, control) methodology to propose a new Lean Six Sigma 4.0 (LSS 4.0) framework for employee occupational exams and address the real-world issue of high-variability exams that may arise.
Design/methodology/approach
This study uses mixed methods, combining qualitative and quantitative data collection. A detailed case study assesses the impact of LSS interventions on the exam management process and tests the applicability of the proposed LSS 4.0 framework for employee occupational exams.
Findings
The results reveal that changing the health service supplier in the explored organization caused a substantial raise in occupational exams, leading to increased costs. By using syntactic interoperability, lean, six sigma and DMAIC approaches, improvements were identified, addressing process deviations and information requirements. Implementing corrective actions improved the exam process, reducing the number of exams and associated expenses.
Research limitations/implications
It is important to acknowledge certain limitations, such as the specific context of the case study and the exclusion of certain exam categories.
Practical implications
The practical implications of this research are substantial, providing organizations with valuable managerial insights into improving efficiency, reducing costs and ensuring regulatory compliance while managing occupational exams.
Originality/value
This study fills a research gap by applying LSS 4.0 to occupational exam management, offering a practical framework for organizations. It contributes to the existing knowledge base by addressing a relatively novel context and providing a detailed roadmap for process optimization.
Details
Keywords
Daniele dos Reis Pereira Maia, Fabiane Letícia Lizarelli and Lillian Do Nascimento Gambi
There is increasing interest in the connection between Industry 4.0 (I4.0) and operational excellence approaches; however, studies on the integration between Six Sigma (SS) and…
Abstract
Purpose
There is increasing interest in the connection between Industry 4.0 (I4.0) and operational excellence approaches; however, studies on the integration between Six Sigma (SS) and I4.0 have been absent from the literature. Integration with I4.0 technologies can maximize the positive effects of SS. The purpose of this study is to understand what types of relationships exist between SS and I4.0 and with I4.0's technologies, as well as the benefits derived from this integration and future directions for this field of study.
Design/methodology/approach
A Systematic Literature Review (SLR) was carried out to analyze studies about connections between I4.0 technologies and SS. SLR analyzed 59 articles from 2013 to 2021 extracted from the Web of Science and Scopus databases, including documents from journals and conferences.
Findings
The SLR identified relationships between SS and several I4.0 technologies, the most cited and with the greatest possibilities of relationships being Big Data/Big Data Analytics (BDA) and Internet of Things (IoT). Three main types of relationships were identified: (1) support of I4.0 technologies to SS; (2) assistance from the SS to the introduction of I4.0 technologies, and, to a lesser extent; (3) incompatibilities between SS and I4.0 technologies. The benefits are mainly related to availability of large data sets and real-time information, enabling better decision-making in less time.
Practical implications
In addition, the study can help managers to understand the integration relationships, which may encourage companies to adopt SS/Lean Six Sigma (LSS) in conjunction with I4.0 technologies. The results also drew attention to the incompatibilities between SS and I4.0 to anticipate potential barriers to implementation.
Originality/value
The study focuses on three previously unexplored subjects: the connection between SS and I4.0, the existing relationships with different technologies and the benefits resulting from the relationships. In addition, the study compiled and structured different types of relationships for SS and I4.0 and I4.0's technologies, identifying patterns and presenting evidence on how these relationships occur. Finally, exposes current trends and possible research directions.
Details
Keywords
Elisa Gonzalez Santacruz, David Romero, Julieta Noguez and Thorsten Wuest
This research paper aims to analyze the scientific and grey literature on Quality 4.0 and zero-defect manufacturing (ZDM) frameworks to develop an integrated quality 4.0 framework…
Abstract
Purpose
This research paper aims to analyze the scientific and grey literature on Quality 4.0 and zero-defect manufacturing (ZDM) frameworks to develop an integrated quality 4.0 framework (IQ4.0F) for quality improvement (QI) based on Six Sigma and machine learning (ML) techniques towards ZDM. The IQ4.0F aims to contribute to the advancement of defect prediction approaches in diverse manufacturing processes. Furthermore, the work enables a comprehensive analysis of process variables influencing product quality with emphasis on the use of supervised and unsupervised ML techniques in Six Sigma’s DMAIC (Define, Measure, Analyze, Improve and Control) cycle stage of “Analyze.”
Design/methodology/approach
The research methodology employed a systematic literature review (SLR) based on PRISMA guidelines to develop the integrated framework, followed by a real industrial case study set in the automotive industry to fulfill the objectives of verifying and validating the proposed IQ4.0F with primary data.
Findings
This research work demonstrates the value of a “stepwise framework” to facilitate a shift from conventional quality management systems (QMSs) to QMSs 4.0. It uses the IDEF0 modeling methodology and Six Sigma’s DMAIC cycle to structure the steps to be followed to adopt the Quality 4.0 paradigm for QI. It also proves the worth of integrating Six Sigma and ML techniques into the “Analyze” stage of the DMAIC cycle for improving defect prediction in manufacturing processes and supporting problem-solving activities for quality managers.
Originality/value
This research paper introduces a first-of-its-kind Quality 4.0 framework – the IQ4.0F. Each step of the IQ4.0F was verified and validated in an original industrial case study set in the automotive industry. It is the first Quality 4.0 framework, according to the SLR conducted, to utilize the principal component analysis technique as a substitute for “Screening Design” in the Design of Experiments phase and K-means clustering technique for multivariable analysis, identifying process parameters that significantly impact product quality. The proposed IQ4.0F not only empowers decision-makers with the knowledge to launch a Quality 4.0 initiative but also provides quality managers with a systematic problem-solving methodology for quality improvement.
Details
Keywords
Kumar Srinivasan, Parikshit Sarulkar and Vineet Kumar Yadav
This article aims to focus on implementing Lean Six Sigma (LSS) in steel manufacturing to enhance productivity and quality in the galvanizing process line. In recent trends…
Abstract
Purpose
This article aims to focus on implementing Lean Six Sigma (LSS) in steel manufacturing to enhance productivity and quality in the galvanizing process line. In recent trends, manufacturing organizations have expressed strong interest in the LSS since they attempt to enhance its overall operations without imposing significant financial burdens.
Design/methodology/approach
This article used lean tools and Six Sigma's DMAIC (Define, Measure, Analyze, Improve and Control) with Yin's case study approach. This study tried to implement the LSS for the steel galvanizing process in order to reduce the number of defects using various LSS tools, including 5S, Value stream map (VSM), Pareto chart, cause and effect diagram, Design of experiments (DoE).
Findings
Results revealed a significant reduction in nonvalue-added time in the process, which led to improved productivity and Process cycle efficiency (PCE) attributed to applying lean-Kaizen techniques. By deploying the LSS, the overall PCE improved from 22% to 62%, and lead time was reduced from 1,347 min to 501 min. DoE results showed that the optimum process parameter levels decreased defects per unit steel sheet.
Practical implications
This research demonstrated how successful LSS implementation eliminates waste, improves process performance and accomplishes operational distinction in steel manufacturing.
Originality/value
Since low-cost/high-effect improvement initiatives have not been adequately presented, further research studies on adopting LSS in manufacturing sectors are needed. The cost-effective method of process improvement can be considered as an innovation.
Details
Keywords
Khalil Idrissi Gartoumi, Mohamed Aboussaleh and Smail Zaki
This paper aims to explore a framework for implementing Lean Construction (LC) to provide corrective actions for quality defects, customer dissatisfaction and value creation…
Abstract
Purpose
This paper aims to explore a framework for implementing Lean Construction (LC) to provide corrective actions for quality defects, customer dissatisfaction and value creation during the construction of megaprojects.
Design/methodology/approach
This paper presents a case study involving the construction of the Mohamed VI Tower in Morocco. It is the tallest tower in Africa, with 55 floors and a total height of 250 m. This study of the quality of the work and the involvement of the LC was carried out using the Define–Measure–Analysis–Improve–Control approach from Lean six sigma. It describes the Critical to Quality and analyses the root causes of quality defects, customer dissatisfaction and variation in the quality process.
Findings
Firstly, the results of this study map the causal factors of lack of quality as established in the literature. Secondly, the LC tools have reduced non-value-added sources of quality waste and, consequently, improved critical quality indicators.
Research limitations/implications
This document focuses on one part of the tower’s construction and is limited to a project case in a country where LC is rarely used.
Originality/value
This study reinforces the literature reviews, surveys and the small number of case studies that have validated the potential of LC and further clarifies future directions for the practical emergence of this quality improvement approach, especially for large-scale projects.
Details