To read this content please select one of the options below:

Implementing lean construction to improve quality and megaproject construction: a case study

Khalil Idrissi Gartoumi (Department of Civil Engineering, National Higher School of Arts and Crafts, Moulay Ismail University, Meknes, Morocco)
Mohamed Aboussaleh (Department of Civil Engineering, National Higher School of Arts and Crafts, Moulay Ismail University, Meknes, Morocco)
Smail Zaki (Department of Civil Engineering, National Higher School of Arts and Crafts, Moulay Ismail University, Meknes, Morocco)

Journal of Financial Management of Property and Construction

ISSN: 1366-4387

Article publication date: 7 June 2023

Issue publication date: 7 February 2024

285

Abstract

Purpose

This paper aims to explore a framework for implementing Lean Construction (LC) to provide corrective actions for quality defects, customer dissatisfaction and value creation during the construction of megaprojects.

Design/methodology/approach

This paper presents a case study involving the construction of the Mohamed VI Tower in Morocco. It is the tallest tower in Africa, with 55 floors and a total height of 250 m. This study of the quality of the work and the involvement of the LC was carried out using the Define–Measure–Analysis–Improve–Control approach from Lean six sigma. It describes the Critical to Quality and analyses the root causes of quality defects, customer dissatisfaction and variation in the quality process.

Findings

Firstly, the results of this study map the causal factors of lack of quality as established in the literature. Secondly, the LC tools have reduced non-value-added sources of quality waste and, consequently, improved critical quality indicators.

Research limitations/implications

This document focuses on one part of the tower’s construction and is limited to a project case in a country where LC is rarely used.

Originality/value

This study reinforces the literature reviews, surveys and the small number of case studies that have validated the potential of LC and further clarifies future directions for the practical emergence of this quality improvement approach, especially for large-scale projects.

Keywords

Acknowledgements

The authors are thankful to Eng. Maha Ezekari, for providing the necessary for collection and investigation data.

Citation

Idrissi Gartoumi, K., Aboussaleh, M. and Zaki, S. (2024), "Implementing lean construction to improve quality and megaproject construction: a case study", Journal of Financial Management of Property and Construction, Vol. 29 No. 1, pp. 1-22. https://doi.org/10.1108/JFMPC-12-2022-0063

Publisher

:

Emerald Publishing Limited

Copyright © 2023, Emerald Publishing Limited

Related articles