1 – 10 of 734Sondre Evjen, Gustav Gunnerud, Ola Lædre, Rune Søfting and Jardar Lohne
Reports from the Norwegian police indicate that actors in the architecture, engineering and construction industry face severe competition from criminal actors. Sub-contractors…
Abstract
Purpose
Reports from the Norwegian police indicate that actors in the architecture, engineering and construction industry face severe competition from criminal actors. Sub-contractors working within the law struggle to be competitive compared to dubious sub-contractors. This study aims to examine (1) what the sub-contractors’ perceptions of current contracting practices are, (2) what problems they face and (3) what countermeasures can be used to improve the situation.
Design/Methodology/Approach
The research was carried out on the basis of a qualitative approach. A literature review and a document study of reports from the sub-contractors, public agencies and other relevant organisations were conducted. In addition, in-depth interviews were conducted with the management of eight sub-contractors in the Norwegian architecture, engineering and construction industry.
Findings
There is a significant difference in the perception of the reality between contractors’ management and the blue-collar workers. Management among the contractors maintain that their control systems work; however, the result from this study shows that it is easy for the sub-contractors to take advantage of loopholes or avoid the countermeasures.
Research Limitations/Implications
This paper is limited to Norway and use only the paint industry as a case study.
Practical Implications
This study shows that sub-contractors constitute an important source of information in the effort to prevent dubious sub-contractors as they are the actors who experience the greatest pressure and competition from them. Therefore, contractors should include the sub-contractors in the process of developing measures to prevent this misconduct.
Originality/Value
A very little research has been carried out within this field of study in Norway.
Details
Keywords
Gijsbert van de Waerdt, Leentje Volker, Lynn Vosman and Hans Voordijk
The aim of this research is to explore how a programmatic multi-project context influences project-based firms (PBFs) in organizing their relations with other PBFs and suppliers…
Abstract
Purpose
The aim of this research is to explore how a programmatic multi-project context influences project-based firms (PBFs) in organizing their relations with other PBFs and suppliers in a project-based industry.
Design/methodology/approach
A multiple case study research is conducted. Data are collected from two case studies in the construction infrastructure sector. Eleven interviews with contractors and other suppliers are the primary source of data collection. The data are complemented by procurement documents and expert consultations.
Findings
The findings show that within a programmatic multi-project context, PBFs settle relations with (1) key partners for program management capacity, PBFs establish relations with (2) main contractors to divide projects and (innovation) tasks, and PBFs intensify relations with (3) suppliers to ensure continuity and expertise.
Research limitations/implications
The study contributes to the body of project management literature by exploring PBF’s relations with other PBFs and suppliers in a multi-project context. Based on empirical data, the study provides a distinction in layers presenting distinct levels of PBF’s supplier relations. This layer structure provides an excellent starting point for future studies exploring the program perspective of PBFs in the integrated supply chain.
Originality/value
Given the increase in programmatic multi-project context for project-based domains, discussed in both literature and practice, this study explores the effect of programs on relations of PBFs with other PBFs and suppliers. The study distinguishes PBF’s relations with the different suppliers in three layers and discusses the characteristics of these relations.
Details
Keywords
Joseph Kuruneri and Wiston Zivanai
Governments worldwide seek to optimize value in public project bids. Social procurement (SP) has become a global tool for achieving project goals. The purpose of this study is to…
Abstract
Purpose
Governments worldwide seek to optimize value in public project bids. Social procurement (SP) has become a global tool for achieving project goals. The purpose of this study is to assess the understanding of SP among contractors and identify its drivers to optimize the value associated with public projects.
Design/methodology/approach
A total of 15 major contractors were interviewed to obtain their views on SP, appreciate their current practices and identify the main drivers of SP in projects. A semistructured interview was used to gather relevant data. Neo-institutional theory is the lens of the study used to provide the focus of the research. The collected data were analyzed using the thematic data analysis technique.
Findings
The study found that SP is understood as corporate social responsibility and is not handled in a structured manner guided by policies or clearly defined procedures. Additionally, research has shown that compliance requirements, rather than value and goodwill, are the main inspiration for SP practices.
Research limitations/implications
The study’s limitation is the fact that it was conducted in the context of Botswana and only used the interview technique as the solo data collection method. The other limitation is the lack of empirical literature on SP concerning the lack of SP policy in Botswana.
Originality/value
This study raises awareness of the concept of SP among contractors in Botswana and eases its implementation within the industry.
Details
Keywords
Emmanuel Dele Omopariola, Abimbola Olukemi Windapo, David John Edwards, Clinton Ohis Aigbavboa, Sunday Ukwe-Nya Yakubu and Onimisi Obari
Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective…
Abstract
Purpose
Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective project cash flow process. However, scant research has been undertaken to empirically establish the cash flow performance and domino effect of APS on project and organisational performance.
Design/methodology/approach
The epistemological design adopted a positivist philosophical stance augmented by deductive reasoning to explore the phenomena under investigation. Primary quantitative data were collected from 504 Construction Industry Development Board (CIDB) registered contractors (within the grade bandings 1–9) in South Africa. A five-point Likert scale was utilised, and subsequent data accrued were analysed using structural equation modelling (SEM).
Findings
Emergent findings reveal that the mandatory use of an APS does not guarantee a positive project cash flow, an improvement in organisational performance or an improvement in project performance.
Practical implications
The ensuing discussion reveals the contributory influence of APS on positive cash flow and organisational performance, although APS implementation alone will not achieve these objectives. Practically, the research accentuates the need for various measures to be concurrently adopted (including APS) towards ensuring a positive project cash flow and improved organisational and project performance.
Originality/value
There is limited empirical research on cash flow performance and the domino effect of APS on project and organisational performance in South Africa, nor indeed, the wider geographical location of Africa as a continent. This study addresses this gap in the prevailing body of knowledge.
Details
Keywords
Rouzbeh Shabani, Tobias Onshuus Malvik, Agnar Johansen and Olav Torp
Uncertainty management (UM) in projects has been a point of attention for researchers for many years. Research on UM has mainly been aimed at uncertainty analyses in the front-end…
Abstract
Purpose
Uncertainty management (UM) in projects has been a point of attention for researchers for many years. Research on UM has mainly been aimed at uncertainty analyses in the front-end and managing uncertainty in the construction phase. In contrast, UM components in the design phase have received less attention. This research aims to improve knowledge about the key components of UM in the design phase of large road projects.
Design/methodology/approach
This study adopted a literature review and case study. The literature review was used to identify relevant criteria for UM. These criteria helped to design the interview guide. Multiple case study research was conducted, and data were collected through document study and interviews with project stakeholders in two road projects. Each case's owners, contractors and consultants were interviewed individually.
Findings
The data analysis obtained helpful information on the involved parties, process and exploit tools and techniques during the design phase. Johansen's (2015) framework [(a) human and organisation, (b) process and (c) tools and techniques)] was completed and developed by identifying relevant criteria (such as risk averse or risk-taker, culture and documentation level) for each component. These criteria help to measure UM performance. The authors found that owners and contractors are major formal UM actors, not consultants. Empirical data showed the effectiveness of Web-based tools in UM.
Research limitations/implications
The studied cases were Norwegian, and this study focussed on uncertainties in the project's design phase. Relevant criteria did not cover all the criteria for evaluating the performance of UM. Qualitative evaluation of criteria allows further quantitative analysis in the future.
Practical implications
This paper gave project owners and managers a better understanding of relevant criteria for measuring UM in the owners and managers' projects. The paper provides policy-makers with a deeper understanding of creating rigorous project criteria for UM during the design phase. This paper also provides a guideline for UM in road projects.
Originality/value
This research gives a holistic evaluation of UM by noticing relevant criteria and criteria's interconnection in the design phase.
Details
Keywords
This research studies the behavior choice of key actors in the construction supply chain and constructs a model which includes the benefit function of the government, contractors…
Abstract
Purpose
This research studies the behavior choice of key actors in the construction supply chain and constructs a model which includes the benefit function of the government, contractors and owners, aiming at improving the coverage of green buildings.
Design/methodology/approach
In this paper, tripartite dynamic game is studied and simulated based on duplicate dynamic equation. The tripartite game under government intervention is rarely considered, and government punishment measures are seldom introduced into the research.
Findings
According to the simulation results, the practical insights in line with the development of green supply chain are put forward. Rewards and punishments affect the development of the supply chain. New technologies and new materials accelerate the development of green supply chain and then improve the coverage of green buildings.
Research limitations/implications
This paper constructs a dynamic model based on complete information rationality, which is difficult to realize in practice, for information is incomplete and human rationality is limited.
Originality/value
In fact, the government has not issued a punishment document to introduce a new variable adjustment model.
Details
Keywords
A key factor adversely affecting contractor social networking performance is the improper handling and information management of contractor’s services delivery on websites…
Abstract
Purpose
A key factor adversely affecting contractor social networking performance is the improper handling and information management of contractor’s services delivery on websites. Contractor social networking is particularly problematic on industrialised building system (IBS) infrastructure maintenance projects where contractor’s certified quality product and firms are not matched with maintenance specialisation services. The paper aims to discuss this issue.
Design/methodology/approach
This paper reports on the early stages of research which is developing a new information and communications technology (ICT)-based approach to managing contractor social networking on IBS infrastructure maintenance schemes. As a precursor to this work, the paper reviews current contractor social networking websites practices on IBS infrastructure maintenance projects and explores the ICT tools and techniques currently being employed on such projects.
Findings
The findings reveal the need for more sophisticated contractor social networking websites solutions which accord with the needs of IBS infrastructure maintenance schemes.
Originality/value
The paper concludes by presenting a research framework for developing such a system in the future.
Details
Keywords
Sinikka Lepistö, Justyna Dobroszek, Lauri Lepistö and Ewelina Zarzycka
This paper aims to explore controls within an inter-organisational relationship involving outsourced management accounting services from the contractor’s perspective.
Abstract
Purpose
This paper aims to explore controls within an inter-organisational relationship involving outsourced management accounting services from the contractor’s perspective.
Design/methodology/approach
Qualitative data from within the relationship are analysed in a legitimacy-theory framework, illustrating how controls within the relationship are intended to build the contractor’s legitimacy and what kinds of implications the controls have in relation to conflicts between interests inherent in the relationship.
Findings
The legitimacy perspective clarifies that while controls are aimed at ensuring efficiency for the client, they may also provide symbolic displays of the appropriateness of the contractor’s actions both at an inter-organisational level for the client and at an individual level for the contractor’s employees. While the contractor intends to build legitimacy with the client by demonstrating utility in the form of efficiency, the process also gives the client influence and allows the disposition in terms of shared values to be demonstrated. However, this process has some negative consequences for the contractor’s employees as it is insufficient for serving the boundary-spanning employees’ interests connected with the nature of their work. Hence, the same controls need to yield benefits and fair outcomes for employees. The controls simultaneously foster interconnections that contribute to permanence and formalise the outsourcing of complex services, thereby rendering such processes comprehensible and transferable to other settings, which can be seen to serve the contractor’s continuity interests.
Originality/value
The paper contributes to academic research by illustrating how controls within inter-organisational relationships not only steer boundary-spanners’ work to conform to a client’s needs but may also help to build legitimacy via symbolic properties in the presence of conflicting interests at both an inter-organisational and individual level. It specifically highlights the important role of boundary-spanners lower in the organisational structure, who both affect and are influenced by the intentions to build legitimacy with the client.
Details
Keywords
Anna-Therése Järvenpää, Johan Larsson and Per Erik Eriksson
This paper aims to identify how a public client’s use of control systems (process, output and social control) affect innovation possibilities in construction projects.
Abstract
Purpose
This paper aims to identify how a public client’s use of control systems (process, output and social control) affect innovation possibilities in construction projects.
Design/methodology/approach
Semi-structured interviews about six infrastructure projects were conducted to identify respondents’ views on innovation possibilities. These possibilities were then analyzed from an organizational control perspective within principal–agent relationships between the Swedish Transport Administration (STA) and their contractors.
Findings
How the client uses control systems affects innovation possibilities. Relying on process control could negatively affect innovation opportunities, whereas output control could have a positive influence. In addition, social control seems to have a weak effect, as the STA appears not to use social control to facilitate joint innovation. Public clients must comply with the Public Procurement Act and, therefore, retain the requirements specified in the tendering documents. Much of the steering of the execution is connected to the ex ante phase (before signing the contract), which affects innovation possibilities in the design and execution phases for the contractor.
Research limitations/implications
This study was conducted with only one client, thus limiting its generalizability. However, the findings provide an important stepping stone to further investigation into balancing control systems and creating innovation possibilities in a principal–agent relationship.
Originality/value
Although public procurement has increasingly been emphasized as a major potential source of innovation, studying how a public client’s use of organizational control systems affects innovation possibilities in the construction sector has received scant attention.
Details
Keywords
Paulos A. Wondimu, Ole Jonny Klakegg and Ola Lædre
Early contractor involvement (ECI) faces many barriers because it differs from traditional business practices. Public owners, especially, face a major challenge because they must…
Abstract
Purpose
Early contractor involvement (ECI) faces many barriers because it differs from traditional business practices. Public owners, especially, face a major challenge because they must comply with international and national legislation. The purpose of this paper is to develop a framework that illustrates the various approaches that public project owners can take to implement ECI.
Design/methodology/approach
In addition to a literature review, three groups of case studies were carried out. The case studies were based on 54 semi-structured in-depth interviews with key personnel from 21 Norwegian public projects and document study.
Findings
In all, 25 approaches to ECI were identified during the research. Twelve of these were used in the cases studied.
Social implications
There are several approaches to ECI that are suitable for public owners. However, the contractor’s contribution depends on which approach is implemented and how it is implemented.
Originality/value
As original contribution, this study presents a novel framework that defines options for implementing ECI in public projects. Furthermore, this paper provides insights on how ECI can be implemented in public projects based on Norwegian experiences. Although the empirical data of the study is limited to Norwegian public projects, this study contributes to knowledge about how to implement ECI internationally.
Details