Search results

1 – 10 of 185
Open Access
Article
Publication date: 21 July 2022

Anna-Therése Järvenpää, Johan Larsson and Per Erik Eriksson

This paper aims to identify how a public client’s use of control systems (process, output and social control) affect innovation possibilities in construction projects.

Abstract

Purpose

This paper aims to identify how a public client’s use of control systems (process, output and social control) affect innovation possibilities in construction projects.

Design/methodology/approach

Semi-structured interviews about six infrastructure projects were conducted to identify respondents’ views on innovation possibilities. These possibilities were then analyzed from an organizational control perspective within principal–agent relationships between the Swedish Transport Administration (STA) and their contractors.

Findings

How the client uses control systems affects innovation possibilities. Relying on process control could negatively affect innovation opportunities, whereas output control could have a positive influence. In addition, social control seems to have a weak effect, as the STA appears not to use social control to facilitate joint innovation. Public clients must comply with the Public Procurement Act and, therefore, retain the requirements specified in the tendering documents. Much of the steering of the execution is connected to the ex ante phase (before signing the contract), which affects innovation possibilities in the design and execution phases for the contractor.

Research limitations/implications

This study was conducted with only one client, thus limiting its generalizability. However, the findings provide an important stepping stone to further investigation into balancing control systems and creating innovation possibilities in a principal–agent relationship.

Originality/value

Although public procurement has increasingly been emphasized as a major potential source of innovation, studying how a public client’s use of organizational control systems affects innovation possibilities in the construction sector has received scant attention.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 25 April 2024

Johanna Maria Liljeroos-Cork and Kaisu Laitinen

Infrastructure forms a basis for the operations and sustainability of the modern society. This paper aims to recognize value creation from the infrastructure procurement ecosystem…

Abstract

Purpose

Infrastructure forms a basis for the operations and sustainability of the modern society. This paper aims to recognize value creation from the infrastructure procurement ecosystem perspective to achieve those goals. The pursuit of enhancing value creation involves an examination of infrastructure procurement challenges, boundaries as well as boundary spanners that facilitate effective knowledge transfer and interaction.

Design/methodology/approach

The qualitative study is based on content analysis of 25 thematic interviews. Data was transcribed and coded via Atlas.ti software.

Findings

Infrastructure procurement value creation challenges appear complex and related to boundaries that hamper collaboration, coordination and knowledge sharing. Our results show that these boundaries locate within and between different levels of procurement ecosystem. Therefore, value creation in infrastructure procurement requires boundary spanners for leveraging knowledge sharing and interaction. Artifacts, discussion, processes and brokers as identified boundary spanners are strongly nested and interrelated in the industry. Special attention should be given to supporting individuals to act as brokers, since they play the key roles in trust building, culture steering and usage of other boundary spanners.

Social implications

Promoting value creation in infrastructure procurement helps to achieve socio-economic development goals.

Originality/value

This study offers a unique perspective on value creation in the context of infrastructure by adopting an ecosystem lens and examining boundary crossing mechanisms. The results support future development of collaboration and knowledge sharing practices fostering procurement productivity.

Details

Journal of Public Procurement, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1535-0118

Keywords

Open Access
Article
Publication date: 9 November 2023

Abdulmohsen S. Almohsen, Naif M. Alsanabani, Abdullah M. Alsugair and Khalid S. Al-Gahtani

The variance between the winning bid and the owner's estimated cost (OEC) is one of the construction management risks in the pre-tendering phase. The study aims to enhance the…

Abstract

Purpose

The variance between the winning bid and the owner's estimated cost (OEC) is one of the construction management risks in the pre-tendering phase. The study aims to enhance the quality of the owner's estimation for predicting precisely the contract cost at the pre-tendering phase and avoiding future issues that arise through the construction phase.

Design/methodology/approach

This paper integrated artificial neural networks (ANN), deep neural networks (DNN) and time series (TS) techniques to estimate the ratio of a low bid to the OEC (R) for different size contracts and three types of contracts (building, electric and mechanic) accurately based on 94 contracts from King Saud University. The ANN and DNN models were evaluated using mean absolute percentage error (MAPE), mean sum square error (MSSE) and root mean sums square error (RMSSE).

Findings

The main finding is that the ANN provides high accuracy with MAPE, MSSE and RMSSE a 2.94%, 0.0015 and 0.039, respectively. The DNN's precision was high, with an RMSSE of 0.15 on average.

Practical implications

The owner and consultant are expected to use the study's findings to create more accuracy of the owner's estimate and decrease the difference between the owner's estimate and the lowest submitted offer for better decision-making.

Originality/value

This study fills the knowledge gap by developing an ANN model to handle missing TS data and forecasting the difference between a low bid and an OEC at the pre-tendering phase.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 30 January 2024

Justice Mensah, Kwesi Amponsah-Tawiah and Nana Kojo Ayimadu Baafi

This study aims to extend the literature on psychological contracts, employee mental health, self-control and equity sensitivity among employees in Ghana.

Abstract

Purpose

This study aims to extend the literature on psychological contracts, employee mental health, self-control and equity sensitivity among employees in Ghana.

Design/methodology/approach

Data for this study came from a sample of 484 employees from an organisation in the telecommunication sector of Ghana. The details of the study were discussed with employees after which they were given the choice to participate in the study.

Findings

The present study found that psychological contract breach is directly associated with mental health and indirectly related to mental health through equity sensitivity and self-control.

Originality/value

The findings suggest that psychological contracts are important aspects of the employment relationship that could be used to enhance employee mental health. Furthermore, enhancing employees’ self-control and resolving issues of individuals high on equity sensitivity are effective ways that organisations can deploy to sustain mental health in the face of psychological contract breaches.

Details

Organization Management Journal, vol. 21 no. 2
Type: Research Article
ISSN: 2753-8567

Keywords

Open Access
Article
Publication date: 1 May 2024

Subhanjan Sengupta, Sonal Choudhary, Raymond Obayi and Rakesh Nayak

This study aims to explore how sustainable business models (SBM) can be developed within agri-innovation systems (AIS) and emphasize an integration of the two with a systemic…

Abstract

Purpose

This study aims to explore how sustainable business models (SBM) can be developed within agri-innovation systems (AIS) and emphasize an integration of the two with a systemic understanding for reducing food loss and value loss in postharvest agri-food supply chain.

Design/methodology/approach

This study conducted longitudinal qualitative research in a developing country with food loss challenges in the postharvest supply chain. This study collected data through multiple rounds of fieldwork, interviews and focus groups over four years. Thematic analysis and “sensemaking” were used for inductive data analysis to generate rich contextual knowledge by drawing upon the lived realities of the agri-food supply chain actors.

Findings

First, this study finds that the value losses are varied in the supply chain, encompassing production value, intrinsic value, extrinsic value, market value, institutional value and future food value. This happens through two cumulative effects including multiplier losses, where losses in one model cascade into others, amplifying their impact and stacking losses, where the absence of data stacks or infrastructure pools hampers the realisation of food value. Thereafter, this study proposes four strategies for moving from the loss-incurring current business model to a networked SBM for mitigating losses. This emphasises the need to redefine ownership as stewardship, enable formal and informal beneficiary identification, strengthen value addition and build capacities for empowering communities to benefit from networked SBM with AIS initiatives. Finally, this study puts forth ten propositions for future research in aligning AIS with networked SBM.

Originality/value

This study contributes to understanding the interplay between AIS and SBM; emphasising the integration of the two to effectively address food loss challenges in the early stages of agri-food supply chains. The identified strategies and research propositions provide implications for researchers and practitioners seeking to accelerate sustainable practices for reducing food loss and waste in agri-food supply chains.

Details

Supply Chain Management: An International Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1359-8546

Keywords

Open Access
Article
Publication date: 15 May 2023

Kai Hänninen, Jouni Juntunen and Harri Haapasalo

The purpose of this study is to describe latent classes explaining the innovation logic in the Finnish construction companies. Innovativeness is a driver of competitive…

16150

Abstract

Purpose

The purpose of this study is to describe latent classes explaining the innovation logic in the Finnish construction companies. Innovativeness is a driver of competitive performance and vital to the long-term success of any organisation and company.

Design/methodology/approach

Using finite mixture structural equation modelling (FMSEM), the authors have classified innovation logic into latent classes. The method analyses and recognises classes for companies that have similar logic in innovation activities based on the collected data.

Findings

Through FMSEM analysis, the authors have identified three latent classes that explain the innovation logic in the Finnish construction companies – LC1: the internal innovators; LC2: the non-innovation-oriented introverts; and LC3: the innovation-oriented extroverts. These three latent classes clearly capture the perceptions within the industry as well as the different characteristics and variables.

Research limitations/implications

The presented latent classes explain innovation logic but is limited to analysing Finnish companies. Also, the research is quantitative by nature and does not increase the understanding in the same manner as qualitative research might capture on more specific aspects.

Practical implications

This paper presents starting points for construction industry companies to intensify innovation activities. It may also indicate more fundamental changes for the structure of construction industry organisations, especially by enabling innovation friendly culture.

Originality/value

This study describes innovation logic in Finnish construction companies through three models (LC1–LC3) by using quantitative data analysed with the FMSEM method. The fundamental innovation challenges in the Finnish construction companies are clarified via the identified latent classes.

Open Access
Article
Publication date: 1 March 2024

Anja Wittmers, Kai N. Klasmeier, Birgit Thomson and Günter W. Maier

Drawing on COR theory and based on a person-centered approach, this study aims to explore profiles of both leadership behavior (transformational leadership, abusive supervision…

Abstract

Purpose

Drawing on COR theory and based on a person-centered approach, this study aims to explore profiles of both leadership behavior (transformational leadership, abusive supervision) and well-being indicators (cognitive irritation, emotional exhaustion). Additionally, we consider whether certain resource-draining (work intensification) and resource-creating factors (leader autonomy, psychological contract fulfillment) from the leaders' work context are related to profile membership.

Design/methodology/approach

The profiles are built using LPA on data from 153 leaders and their 1,077 followers. The relationship between profile membership and correlates from the leaders' work context is examined using multinomial logistic regression analyses.

Findings

LPA results in an interpretable four-profile solution with the profiles named (1) Good health – constructive leading, (2) Average health – inconsistent leading, (3) Impaired health – constructive leading and (4) Impaired health – destructive leading. The two groups with the highest sample share – Profiles 1 and 3 – both show highly constructive leadership behavior but differ significantly in their well-being indicators. The regression analyses show that work intensification and psychological contract fulfillment are significantly related to profile membership.

Originality/value

The person-centered approach provides a more nuanced view of the leadership behavior – leader well-being relationship, which can address inconsistencies in previous research. In terms of practical relevance, the person-centered approach allows for the identification of risk groups among leaders for whom organizations can provide additional resources and health-promoting interventions.

Details

Journal of Managerial Psychology, vol. 39 no. 4
Type: Research Article
ISSN: 0268-3946

Keywords

Open Access
Article
Publication date: 31 May 2022

Kari-Pekka Tampio and Harri Haapasalo

The purpose of this paper is to identify the areas and logic of integration of different stakeholders using different methods and to analyse their applicability and challenges in…

1081

Abstract

Purpose

The purpose of this paper is to identify the areas and logic of integration of different stakeholders using different methods and to analyse their applicability and challenges in practical projects. The main aim is to describe how these different methods impact value creation.

Design/methodology/approach

Action design research was carried out in a large hospital construction project where the first author acted as an “involved researcher” and the second author acted as an “outside researcher”. Two workshops were organised to evaluate the direct and indirect challenges and benefits of the applied four methods and to explain how different methods enable value creation.

Findings

All the studied methods provide good results in terms of usability and commitment to the aims of the project, thus delivering the direct benefits expected. Process, people and tools logic works well in this case project when applying the methods properly. Significant evidence was provided on secondary deliverables of the methods, and all analysed methods had a significant impact in the area of leading people, clarifying what “focus on people” means and how it is enabled.

Practical implications

Focus on people can be achieved through different operative methods if applied in the right way. It is necessary to select the most suitable methods based on all the direct and indirect deliverables.

Originality/value

This case project offered a platform to analyse integration methods in a real-life project using the collaborative contract method. The authors were able to participate in the analysis by taking action from the very beginning of the project in terms of training, learning, continuous development and coaching of these methods and evaluating the applicability.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 13 September 2022

Oliver Disney, Mattias Roupé, Mikael Johansson and Alessio Domenico Leto

Building information modeling (BIM) is mostly limited to the design phase where two parallel processes exist, i.e. creating 2D-drawings and BIM. Towards the end of the design…

4315

Abstract

Purpose

Building information modeling (BIM) is mostly limited to the design phase where two parallel processes exist, i.e. creating 2D-drawings and BIM. Towards the end of the design process, BIM becomes obsolete as focus shifts to producing static 2D-drawings, which leads to a lack of trust in BIM. In Scandinavia, a concept known as Total BIM has emerged, which is a novel “all-in” approach where BIM is the single source of information throughout the project. This paper's purpose is to investigate the overall concept and holistic approach of a Total BIM project to support implementation and strategy work connected to BIM.

Design/methodology/approach

Qualitative data were collected through eight semi-structured interviews with digitalization leaders from the case study project. Findings were analyzed using a holistic framework to BIM implementation.

Findings

The Total BIM concept was contingent on the strong interdependences between commonly found isolated BIM uses. Four main success factors were identified, production-oriented BIM as the main contractual and legally binding construction document, cloud-based model management, user-friendly on-site mobile BIM software and strong leadership.

Originality/value

A unique case is studied where BIM is used throughout all project phases as a single source of information and communication platform. No 2D paper drawings were used on-site and the Total BIM case study highlights the importance of a new digitalized construction process.

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Open Access
Article
Publication date: 30 August 2022

Petteri Annunen, Juho Tella, Sini Pekki and Harri Haapasalo

This study describes how maintenance capability should be created during the design and construction phases of construction projects. Purpose of the abstract to define the…

1862

Abstract

Purpose

This study describes how maintenance capability should be created during the design and construction phases of construction projects. Purpose of the abstract to define the elements for creating the maintenance capability and the process to be used in construction life cycle projects for buildings.

Design/methodology/approach

An inductive and qualitative research method was used to construct the proposed process based on the literature and 18 interviews in two large construction companies.

Findings

The results indicate that the maintenance phase is usually overlooked during the design and construction phases, and capabilities are not systematically built. In particular, processes are lacking in data management, causing severe problems in maintenance.

Originality/value

This study presents a process including key requirements and activities for creating maintenance capability in conjunction with the design and construction phases, which is novel to the literature. The validated process can be adapted based on the needs of the construction company.

Details

Journal of Facilities Management , vol. 22 no. 3
Type: Research Article
ISSN: 1472-5967

Keywords

Access

Only content I have access to

Year

Last month (185)

Content type

1 – 10 of 185