Article
Publication date: 14 February 2022

Salma Husna Zamani, Rahimi A. Rahman, Muhammad Ashraf Fauzi and Liyana Mohamed Yusof

Policymakers are developing government-level pandemic response strategies (GPRS) to assist architecture, engineering and construction (AEC) enterprises. However, the effectiveness…

Abstract

Purpose

Policymakers are developing government-level pandemic response strategies (GPRS) to assist architecture, engineering and construction (AEC) enterprises. However, the effectiveness of the GPRS has not been assessed. Therefore, this study aims to investigate the interrelationships between GPRS and AEC enterprises. To achieve that aim, the study objectives are to compare GPRS effectiveness between small-medium and large AEC enterprises, develop groupings to categorize interrelated GPRS and evaluate the effectiveness of the GPRS and interrelated constructs.

Design/methodology/approach

A systematic literature review and semi-structured interviews with 40 AEC industry professionals were carried out, generating 22 GPRS. Then, questionnaire survey data was collected among AEC professionals. In total, 114 valid survey answers were received and analyzed using the Kruskal–Wallis H test, normalized mean analysis, factor analysis and fuzzy synthetic evaluation.

Findings

Small-medium enterprises have four distinct critical GPRS: “form a special task force to provide support in maneuvering COVID-19,” “provide infrastructure investment budgets to local governments,” “develop employee assistance programs that fit all types of working groups” and “diversify existing supply chain.” Large enterprises have two distinct critical GPRS: “provide help in digitalizing existing construction projects” and “mandate COVID-19 as force majeure.” Eighteen GPRS can be categorized into the following five constructs: “market stability and financial aid,” “enterprise capability management,” “supply chain improvement,” “law and policy resources” and “information and workforce management.” The former two constructs are more effective than other GPRS constructs.

Originality/value

This is the first paper that evaluates the effectiveness of GPRS for AEC enterprises, providing new evidence to policymakers for well-informed decision-making in developing pandemic response strategies.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Open Access
Article
Publication date: 16 October 2023

Emmanuel Dele Omopariola, Abimbola Olukemi Windapo, David John Edwards, Clinton Ohis Aigbavboa, Sunday Ukwe-Nya Yakubu and Onimisi Obari

Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective…

Abstract

Purpose

Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective project cash flow process. However, scant research has been undertaken to empirically establish the cash flow performance and domino effect of APS on project and organisational performance.

Design/methodology/approach

The epistemological design adopted a positivist philosophical stance augmented by deductive reasoning to explore the phenomena under investigation. Primary quantitative data were collected from 504 Construction Industry Development Board (CIDB) registered contractors (within the grade bandings 1–9) in South Africa. A five-point Likert scale was utilised, and subsequent data accrued were analysed using structural equation modelling (SEM).

Findings

Emergent findings reveal that the mandatory use of an APS does not guarantee a positive project cash flow, an improvement in organisational performance or an improvement in project performance.

Practical implications

The ensuing discussion reveals the contributory influence of APS on positive cash flow and organisational performance, although APS implementation alone will not achieve these objectives. Practically, the research accentuates the need for various measures to be concurrently adopted (including APS) towards ensuring a positive project cash flow and improved organisational and project performance.

Originality/value

There is limited empirical research on cash flow performance and the domino effect of APS on project and organisational performance in South Africa, nor indeed, the wider geographical location of Africa as a continent. This study addresses this gap in the prevailing body of knowledge.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 19 May 2022

Douglas Aghimien, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala, Nicholas Chileshe and Bhekinkosi Jabulani Dlamini

This paper presents the findings of assessing the strategies required for improved work-life balance (WLB) of construction workers in Eswatini. This was done to improve the…

2276

Abstract

Purpose

This paper presents the findings of assessing the strategies required for improved work-life balance (WLB) of construction workers in Eswatini. This was done to improve the work-life relationship of construction workers and, in turn, improve the service delivery of the construction industry in the country.

Design/methodology/approach

The study adopted a quantitative research approach using a questionnaire administered to construction professionals in the country. The data gathered were analysed using frequency, percentage, Mann–Whitney U test, exploratory and confirmatory factor analysis (CFA).

Findings

The findings revealed that the level of implementation of WLB initiatives in the Eswatini construction industry is still low. Following the attaining of several model fitness, the study found that the key strategies needed for effective WLB can be classified into four significant components, namely: (1) leave, (2) health and wellness, (3) work flexibility, and; (4) days off/shared work.

Practical implications

The findings offer valuable benefits to construction participants as the adoption of the identified critical strategies can lead to the fulfilment of WLB of the construction workforce and by extension, the construction industry can benefit from better job performance.

Originality/value

This study is the first to assess the strategies needed for improved WLB of construction workers in Eswatini. Furthermore, the study offers a theoretical platform for future discourse on WLB in Eswatini, a country that has not gained significant attention in past WLB literature.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 5 December 2023

Ernest Kissi, Matthew Osivue Ikuabe, Clinton Ohis Aigbavboa, Eugene Danquah Smith and Prosper Babon-Ayeng

While existing research has explored the association between supervisor support and turnover intention among construction workers, there is a notable gap in the literature…

1843

Abstract

Purpose

While existing research has explored the association between supervisor support and turnover intention among construction workers, there is a notable gap in the literature concerning the potential mediating role of work engagement in elucidating this relationship, warranting further investigation. The paper, hence, aims to examine the mediating role of work engagement in the relationship between supervisor support and turnover intention among construction workers.

Design/methodology/approach

Based on the quantitative research method, the hypothesis was tested. The data were collected from 144 construction professionals using a structured questionnaire. Observed variables were tested using confirmatory factor analysis, and the mediating role relationship was validated using hierarchical regression.

Findings

The outcome of this study shows a significant positive impact of work engagement and supervisor support on employee turnover intention. The study further showed that work engagement plays a mediating role in the connection between supervisory support and the intention to turnover and improve project and business performance. Turnover intention, on the other hand, negatively affects project and organizational performance.

Practical implications

By enhancing employee work engagement and perceptions of supervisor support, the findings of this study may aid construction organizations in making better judgments regarding the likelihood of employee turnover. The effectiveness of the project and the organization will likely be greatly impacted.

Originality/value

The results of this study provide supporting evidence and advance efforts at reducing employee turnover intention through work engagement and supervisor support in improving project and organizational performance.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 7 November 2022

Buddhini Ginigaddara, Srinath Perera, Yingbin Feng, Payam Rahnamayiezekavat and Mike Kagioglou

Industry 4.0 is exacerbating the need for offsite construction (OSC) adoption, and this rapid transformation is pushing the boundaries of construction skills towards extensive…

Abstract

Purpose

Industry 4.0 is exacerbating the need for offsite construction (OSC) adoption, and this rapid transformation is pushing the boundaries of construction skills towards extensive modernisation. The adoption of this modern production strategy by the construction industry would redefine the position of OSC. This study aims to examine whether the existing skills are capable of satisfying the needs of different OSC types.

Design/methodology/approach

A critical literature review evaluated the impact of transformative technology on OSC skills. An existing industry standard OSC skill classification was used as the basis to develop a master list that recognises emerging and diminishing OSC skills. The master list recognises 67 OSC skills under six skill categories: managers, professionals, technicians and trade workers, clerical and administrative workers, machinery operators and drivers and labourers. The skills data was extracted from a series of 13 case studies using document reviews and semi-structured interviews with project stakeholders.

Findings

The multiple case study evaluation recognised 13 redundant skills and 16 emerging OSC skills such as architects with building information modelling and design for manufacture and assembly knowledge, architects specialised in design and logistics integration, advanced OSC technical skills, factory operators, OSC estimators, technicians for three dimensional visualisation and computer numeric control operators. Interview findings assessed the current state and future directions for OSC skills development. Findings indicate that the prevailing skills are not adequate to readily relocate construction activities from onsite to offsite.

Originality/value

To the best of the authors’ knowledge, this research is one of the first studies that recognises the major differences in skill requirements for non-volumetric and volumetric OSC types.

Details

Construction Innovation , vol. 24 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 27 April 2022

Ewald Kuoribo, Peter Amoah, Ernest Kissi, David John Edwards, Jacob Anim Gyampo and Wellington Didibhuku Thwala

Prodigious teamwork is the basis for augmenting the level of productivity on construction projects. Globalisation of the construction market has meant that many practitioners work…

Abstract

Purpose

Prodigious teamwork is the basis for augmenting the level of productivity on construction projects. Globalisation of the construction market has meant that many practitioners work outside of their geographical spectrum; however, the multicultural dissimilarities of construction workforces within the project management team (and how these may impact upon project productivity performance) have been given scant academic attention. To bridge this knowledge gap, this paper aims to analyse the effects of a multicultural workforce on construction productivity.

Design/methodology/approach

The epistemological positioning of the research adopted mixed philosophies (consisting of both interpretivism and postpositivism) to undertake a deductive and cross-sectional survey to collate primary quantitative data collected via a closed-ended structured questionnaire. Census sampling and convenience sampling techniques were adopted to target Ghana’s construction workforce and their opinions of the phenomenon under investigation. Out of 96 questionnaires administered, 61 were retrieved. The data obtained were analysed by using mean score ranking, relative important index, one sample t-test and multiple regression. The reliability of the scale was checked by using Cronbach’s alpha coefficient.

Findings

From the t-test analysis, 11 variables sourced from extant literature, and the null hypothesis for the study was not rejected and all factors (except high cost of training and improper gender diversity management) were affirmed as negative effects of the multicultural workforce on construction productivity. Using multiple regression analysis, six of the independent variables were shown to impact upon productivity. The goodness of fit was verified by collinearity and residual analysis. The model’s validation revealed a relatively high predictive accuracy (R2 = 0. 589), implying that the results could be generalized. In culmination, these findings suggest that the predictors can be used to accurately predict the effects of multicultural workforce on construction productivity performance.

Practical implications

The findings indicate that multicultural workforce/teams have a substantial effect on overall construction productivity in the construction sector; consequently, stakeholders must address this issue to enhance productivity across the sector.

Originality/value

The current study significantly contributes to our understanding of how multicultural workers/teams affect construction productivity in the construction business perspective and how to respond to the negative menace.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Open Access
Article
Publication date: 17 March 2023

Charlotta Winkler

This paper aims to explore the process of implementing solar photovoltaic (PV) systems in construction to contribute to the understanding of systemic innovation in construction.

1088

Abstract

Purpose

This paper aims to explore the process of implementing solar photovoltaic (PV) systems in construction to contribute to the understanding of systemic innovation in construction.

Design/methodology/approach

The exploratory research presented is based on qualitative data collected in workshops and interviews with 76 construction- and solar-industry actors experienced in solar PV projects. Actor-specific barriers were identified and analysed using an abductive approach.

Findings

In light of established definitions of systemic innovation, the process of implementing solar PV systems in construction involves challenges regarding technical and material issues, competencies, and informal and formal institutions. The specificities of this case highlight the necessity of paying attention to details in the process and to develop knowledge of systemic innovation in construction since the industry’s involvement in addressing societal challenges related to the energy transition will require implementing such innovations much more in the future.

Practical implications

New knowledge of solar PV systems as an innovation in professional construction is collected, enabling the adaptation of management strategies for its implementation. This knowledge can also be applied generally to other challenges encountered in highly systemic innovation implementation. Solar industry actors can gain an understanding of solar-specific challenges for the construction industry, challenges for which they must adapt their activities.

Originality/value

The exploration of actor-specific experiences of solar PV projects has resulted in a novel understanding of this specific innovation and its implementation. The findings illustrate a case of a high level of systemic innovation and the need to use a finer-grained scale for classification when studying innovation in construction.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 24 November 2023

Nurol Huda Dahalan, Rahimi A. Rahman, Siti Hafizan Hassan and Saffuan Wan Ahmad

Evaluating the implementation of environmental management plans (EMPs) in highway construction projects is essential to avoid climate change. Public evaluations can help ensure…

Abstract

Purpose

Evaluating the implementation of environmental management plans (EMPs) in highway construction projects is essential to avoid climate change. Public evaluations can help ensure that the EMP is implemented correctly and efficiently. To allow public evaluation of EMP implementations, this study aims to investigate performance indicators (PIs) for assessing EMP implementation in highway construction projects. To that end, the study objectives are to compare the critical PIs between environment auditors (EAs) and environment officers (EOs) and among the main project stakeholders (i.e. clients, contractors and consultants), create components for the critical PIs and assess the efficiency of the components.

Design/methodology/approach

The paper identified 39 PIs from interviews with environmental professionals and a systematic literature review. Then a questionnaire survey was developed based on the PIs and sent to EAs and EOs. The data were analyzed via mean score ranking, normalization, agreement analysis, factor analysis and fuzzy synthetic evaluation (FSE).

Findings

The analyses revealed 21 critical PIs for assessing EMP implementation in highway construction projects. Also, the critical PIs can be grouped into four components: ecological, pollution, public safety and ecological. Finally, the overall importance of the critical PIs from the FSE is between important and very important.

Originality/value

To the best of the authors’ knowledge, this paper is the first-of-its-kind study on the critical PIs for assessing EMP implementation in highway construction projects.

Details

International Journal of Disaster Resilience in the Built Environment, vol. 15 no. 3
Type: Research Article
ISSN: 1759-5908

Keywords

Article
Publication date: 16 June 2023

Deniz Avci Hosanli

Despite the quantity of collaborations, the vocational network of the housing production in Ankara during its first five years (1923–1928) remains dispersed. The aim of this study…

Abstract

Purpose

Despite the quantity of collaborations, the vocational network of the housing production in Ankara during its first five years (1923–1928) remains dispersed. The aim of this study is to identify all the actors of housing production and their collaborations which shaped Ankara's urban development as the new capital city.

Design/methodology/approach

The study engages with the literature and archival documents to identify the actors of the housing production, i.e. architects, master-builders, public institutions, private companies, contractors and entrepreneurs, and their resultant vocational network in the housing production in Ankara during 1923–1928.

Findings

Due to different agendas, such as speculation, financial interests or patriotism, the construction industry in Ankara had become an arena where many paths intersected, forming an intertwined vocational network. The profession of contractor became popular, and local architects, engineers and even individuals of various other professions began to work as mediators for foreign companies and public institutions, which required support especially in large-scale projects.

Originality/value

The dispersed information revealed that the actors of the housing production remained mostly anonymous, or only the famous architects were commemorated; however, others could be found within the lines of the established literature on Ankara and/or in archival documents. This research not only focuses on “salient” actors but also highlights the “silent” actors of the housing production and prepares charts to clarify the vocational network in Ankara during its first five years to contribute to the future studies on Ankara and its housing.

Details

Open House International, vol. 49 no. 2
Type: Research Article
ISSN: 0168-2601

Keywords

Article
Publication date: 26 January 2023

Afiqah R. Radzi, Nur Farhana Azmi, Syahrul Nizam Kamaruzzaman, Rahimi A. Rahman and Eleni Papadonikolaki

Digital twin (DT) and building information modeling (BIM) are interconnected in some ways. However, there has been some misconception about how DT differs from BIM. As a result…

Abstract

Purpose

Digital twin (DT) and building information modeling (BIM) are interconnected in some ways. However, there has been some misconception about how DT differs from BIM. As a result, industry professionals reject DT even in BIM-based construction projects due to reluctance to innovate. Furthermore, researchers have repeatedly developed tools and techniques with the same goals using DT and BIM to assist practitioners in construction projects. Therefore, this study aims to assist industry professionals and researchers in understanding the relationship between DT and BIM and synthesize existing works on DT and BIM.

Design/methodology/approach

A systematic review was conducted on published articles related to DT and BIM. A total record of 54 journal articles were identified and analyzed.

Findings

The analysis of the selected journal articles revealed four types of relationships between DT and BIM: BIM is a subset of DT, DT is a subset of BIM, BIM is DT, and no relationship between BIM and DT. The existing research on DT and BIM in construction projects targets improvements in five areas: planning, design, construction, operations and maintenance, and decommissioning. In addition, several areas have emerged, such as developing geo-referencing approaches for infrastructure projects, applying the proposed methodology to other construction geometries and creating 3D visualization using color schemes.

Originality/value

This study contributed to the existing body of knowledge by overviewing existing research related to DT and BIM in construction projects. Also, it reveals research gaps in the body of knowledge to point out directions for future research.

Details

Construction Innovation , vol. 24 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords