1 – 10 of over 1000The future construction site will be pervasive, context aware and embedded with intelligence. The purpose of this paper is to explore and define the concept of the digital skin of…
Abstract
Purpose
The future construction site will be pervasive, context aware and embedded with intelligence. The purpose of this paper is to explore and define the concept of the digital skin of the future smart construction site.
Design/methodology/approach
The paper provides a systematic and hierarchical classification of 114 articles from both industry and academia on the digital skin concept and evaluates them. The hierarchical classification is based on application areas relevant to construction, such as augmented reality, building information model-based visualisation, labour tracking, supply chain tracking, safety management, mobile equipment tracking and schedule and progress monitoring. Evaluations of the research papers were conducted based on three pillars: validation of technological feasibility, onsite application and user acceptance testing.
Findings
Technologies learned about in the literature review enabled the envisaging of the pervasive construction site of the future. The paper presents scenarios for the future context-aware construction site, including the construction worker, construction procurement management and future real-time safety management systems.
Originality/value
Based on the gaps identified by the review in the body of knowledge and on a broader analysis of technology diffusion, the paper highlights the research challenges to be overcome in the advent of digital skin. The paper recommends that researchers follow a coherent process for smart technology design, development and implementation in order to achieve this vision for the construction industry.
Details
Keywords
Kesavan Manoharan, Pujitha Dissanayake, Chintha Pathirana, Dharsana Deegahawature and Renuka Silva
Sources highlight that insufficient skills of site supervisors considerably influence the progress of many construction projects in numerous countries. This study intends to…
Abstract
Purpose
Sources highlight that insufficient skills of site supervisors considerably influence the progress of many construction projects in numerous countries. This study intends to identify the crucial supervisory competencies that influence the effectiveness of building project operations in the context of developing countries.
Design/methodology/approach
The crucial construction site supervisory competencies were qualitatively identified through a comprehensive literature survey and a series of expert interviews with the use of thematic analysis approaches. A questionnaire survey was then carried out among 154 building project firms to quantify the impacts of the competencies on the effectiveness of project tasks with the use of the relative importance index approach. Additionally, industry-consultative meetings were held using problem-focused communication strategies to scrutinise the necessary actions.
Findings
Overall, 22 cognitive elements and 24 skills/abilities of supervisors were determined as being critical according to their impact values, where the site supervisors cognitive domains in construction planning and construction materials were determined as the top-ranking competencies in the list, with their manual skills/abilities in labour management and labour performance evaluation. Accordingly, a group of key competency outcomes were produced for the considerations in developing new site supervisory training components. Relevant statistical analysis results and the industry consultative outcomes substantiated the validity and dependability of the overall results.
Research limitations/implications
Although the study's focus was to site supervision procedures used in Sri Lankan building construction projects, the overall findings/outcomes might be put to the test in related situations in other emerging industries in other countries.
Originality/value
The study has constructed a base that shows how the significant site supervisory competencies influence the effectiveness of building construction operations, contributing to making a big difference in the methods of reskilling/upskilling in the industry associated with construction labour, supervision, efficiency management and productivity enhancement.
Details
Keywords
Olivia McDermott, Kevin ODwyer, John Noonan, Anna Trubetskaya and Angelo Rosa
This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to…
Abstract
Purpose
This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to design, modularise and manufacture various building elements in a controlled factory environment off-site.
Design/methodology/approach
A case study in a construction company utilised lean six sigma (LSS) methodology and BIM to identify non-value add waste in the construction process and improve sustainability.
Findings
An Irish-based construction company manufacturing modular pipe racks for the pharmaceutical industry utilised LSS to optimise and standardise their off-site manufacturing (OSM) partners process and leverage BIM to design skids which could be manufactured offsite and transported easily with minimal on-site installation and rework required. Productivity was improved, waste was reduced, less energy was consumed, defects were reduced and the project schedule for completion was reduced.
Research limitations/implications
The case study was carried out on one construction company and one construction product type. Further case studies would ensure more generalisability. However, the implementation was tested on a modular construction company, and the methods used indicate that the generic framework could be applied and customized to any offsite company.
Originality/value
This is one of the few studies on implementing offsite manufacturing (OSM) utilising LSS and BIM in an Irish construction company. The detailed quantitative benefits and cost savings calculations presented as well as the use of the LSM methods and BIM in designing an OSM process can be leveraged by other construction organisations to understand the benefits of OSM. This study can help demonstrate how LSS and BIM can aid the construction industry to be more environmentally friendly.
Mats Janné and Anna Fredriksson
The construction industry is reluctant to utilize construction logistics centres (CLC). To understand why, the purpose of the study is to increase the understanding of drivers and…
Abstract
Purpose
The construction industry is reluctant to utilize construction logistics centres (CLC). To understand why, the purpose of the study is to increase the understanding of drivers and challenges of CLC utilization.
Design/methodology/approach
Adopting an activity-based cost methodology, nine construction projects' CLC utilization in a Swedish urban development project is analyzed for a time period of three years (2013–2016).
Findings
There is a difference between drivers and challenges for implementing and utilizing CLCs, which are often implemented to reduce third-party disturbances. The drivers to utilize a CLC, however, stem from achieving efficient logistics. The authors identify two different utilization strategies; the CLC is used either for just-in-time (JIT) deliveries or as a consolidation point.
Research limitations/implications
The study shows that construction logistics is to some extent repeating some mistakes of its big brother, city logistics. The study hypothesizes that there are differences between CLC implementation and utilization drivers and challenges that are often overlooked, which can explain the lack of CLC utilization.
Practical implications
The study shows that it is crucial for construction projects to develop and formulate a logistics strategy for how to utilize the setup, i.e. deciding whether to use the setup as a consolidation point leading to fewer deliveries and more materials on-site, or as JIT, leading to more deliveries but fewer materials on-site.
Social implications
CLCs can reduce environmental impact and third-party disturbances. However, to make this come true, acceptance among the users is needed. The study provides understanding of drivers and barriers for CLC implementation and utilization that can increase acceptance among users (i.e. construction projects).
Originality/value
The current study is one of the first studies to analyze CLC utilization.
Details
Keywords
AbdulLateef Olanrewaju, Jack Son Khor and Christopher Nigel Preece
Statistics show that the construction sector has the second-highest number of accident cases in Malaysia. A total of 100, 000 construction workers suffer from work-related bad…
Abstract
Purpose
Statistics show that the construction sector has the second-highest number of accident cases in Malaysia. A total of 100, 000 construction workers suffer from work-related bad health each year. Scaffolding accidents are the second cause of accidents on construction sites. Therefore, this present research provided answers to the following questions: (1) what are the causes of scaffolding accidents and (2) what are the possible measures to reduce scaffolding accidents?
Design/methodology/approach
The research developed a questionnaire instrument that included 24 causes of scaffolding accidents and 21 remedial actions. The research was based on a cross-sectional survey questionnaire administered to 129 members of construction organizations.
Findings
Data revealed that scaffolding-related cases caused a total of 70% of the deaths/injuries on sites. Furthermore, scaffolding accidents were mainly caused by a lack of guard rails on scaffoldings, poor inspections, improper assembly, a poor safety culture, poor attitudes towards safety, poor footing of scaffoldings and unsecured planking. To reduce scaffolding accidents, there must be a lifeline on scaffolding, proper guardrails and proper assembling of scaffoldings, and preventing access to incomplete or defective scaffoldings. The 24 causes are structured into six factors through factor analysis and the 21 remedial actions into six factors.
Originality/value
This research serves as the first attempt to conduct broad research on the causes and remedial actions concerning scaffolding accidents on construction sites in Malaysia. Theoretically, the research has provided fresh insights into the impact of scaffolding accidents.
Details
Keywords
Oliver Disney, Mattias Roupé, Mikael Johansson and Alessio Domenico Leto
Building information modeling (BIM) is mostly limited to the design phase where two parallel processes exist, i.e. creating 2D-drawings and BIM. Towards the end of the design…
Abstract
Purpose
Building information modeling (BIM) is mostly limited to the design phase where two parallel processes exist, i.e. creating 2D-drawings and BIM. Towards the end of the design process, BIM becomes obsolete as focus shifts to producing static 2D-drawings, which leads to a lack of trust in BIM. In Scandinavia, a concept known as Total BIM has emerged, which is a novel “all-in” approach where BIM is the single source of information throughout the project. This paper's purpose is to investigate the overall concept and holistic approach of a Total BIM project to support implementation and strategy work connected to BIM.
Design/methodology/approach
Qualitative data were collected through eight semi-structured interviews with digitalization leaders from the case study project. Findings were analyzed using a holistic framework to BIM implementation.
Findings
The Total BIM concept was contingent on the strong interdependences between commonly found isolated BIM uses. Four main success factors were identified, production-oriented BIM as the main contractual and legally binding construction document, cloud-based model management, user-friendly on-site mobile BIM software and strong leadership.
Originality/value
A unique case is studied where BIM is used throughout all project phases as a single source of information and communication platform. No 2D paper drawings were used on-site and the Total BIM case study highlights the importance of a new digitalized construction process.
Details
Keywords
Niklas Rönnberg, Rasmus Ringdahl and Anna Fredriksson
The noise and dust particles caused by the construction transport are by most stakeholders experienced as disturbing. The purpose of this study is to explore how sonification can…
Abstract
Purpose
The noise and dust particles caused by the construction transport are by most stakeholders experienced as disturbing. The purpose of this study is to explore how sonification can support visualization in construction planning to decrease construction transport disturbances.
Design/methodology/approach
This paper presents an interdisciplinary research project, combining research on construction logistics, internet of things and sonification. First, a data recording device, including sound, particle, temperature and humidity sensors, was implemented and deployed in a development project. Second, the collected data were used in a sonification design, which was, third, evaluated with potential users.
Findings
The results showed that the low-cost sensors used could capture “good enough” data, and that the use of sonification for representing these data is interesting and a possible useful tool in urban and construction transport planning.
Research limitations/implications
There is a need to further evolve the sonification design and better communicate the aim of the sounds used to potential users. Further testing is also needed.
Practical implications
This study introduces new ideas of how to support visualization with sonification planning the construction work and its impact on the vicinity of the site. Currently, urban planning and construction planning focus on visualizing the final result, with little focus on how to handle disturbances during the construction process.
Originality/value
Showing the potentials of using low-cost sensor data in sonification, and using sonification together with visualization, is the result of a novel interdisciplinary research area combination.
Details
Keywords
Lars Stehn and Alexander Jimenez
The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels…
Abstract
Purpose
The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels. The take is that fragmentation of construction is one explanation for the lack of productivity growth, and that IHB could be an integrating method of overcoming horizontal and vertical fragmentation.
Design/methodology/approach
Singe-factor productivity measures are calculated based on data reported by IHB companies and compared to official produced and published research data. The survey covers the years 2013–2020 for IHB companies building multi-storey houses in timber. Generalization is sought through descriptive statistics by contrasting the data samples to the used means to control vertical and horizontal fragmentation formulated as three theoretical propositions.
Findings
According to the results, IHB in timber is on average more productive than conventional housebuilding at the company level, project level, in absolute and in growth terms over the eight-year period. On the company level, the labour productivity was on average 10% higher for IHB compared to general construction and positioned between general construction and general manufacturing. On the project level, IHB displayed an average cost productivity growth of 19% for an employed prefabrication degree of about 45%.
Originality/value
Empirical evidence is presented quantifying so far perceived advantages of IHB. By providing analysis of actual cost and project data derived from IHB companies, the article quantifies previous research that IHB is not only about prefabrication. The observed positive productivity growth in relation to the employed prefabrication degree indicates that off-site production is not a sufficient mean for reaching high productivity and productivity growth. Instead, the capabilities to integrate the operative logic of conventional housebuilding together with logic of IHB platform development and use is a probable explanation of the observed positive productivity growth.
Details
Keywords
Olatoyese Zaccheus Oni, AbdulLateef Olanrewaju, Soo Cheen Khor and Bolatito Folasade Akinbile
Because of the sort of working environment and the nature of construction jobs, a high rate of poor mental health has been recorded in the construction industry. The aim of this…
Abstract
Purpose
Because of the sort of working environment and the nature of construction jobs, a high rate of poor mental health has been recorded in the construction industry. The aim of this study is to compare construction workers' mental health before and during the COVID-19 pandemic in Nigeria.
Design/methodology/approach
A survey questionnaire was developed and administered online to building environment professionals working on construction sites. Data were analysed using descriptive statistics such as mean and standard deviation. An independent sample t-test was also conducted to determine whether there was a significant difference in the mean before and during the COVID-19 infection.
Findings
The results show that mental health challenges were more prevalent during the COVID-19 pandemic compared to before the pandemic. The result of the independent sample t-test revealed that there exists a significant difference in all the mean before and during COVID-19 except sleeping too much or too little; having low or no energy and lack of emotion that shows no significant difference.
Originality/value
This study is the first to compare the mental health of construction workers before and during COVID-19 in Nigeria. The significance of this study was that it would provide an insight for construction managers and other decision-makers on the most critical mental health challenges on construction sites, which will help in an attempt to improve the mental well-being of construction workers.
Anna Fredriksson, Mats Janné and Martin Rudberg
The use of third-party logistics (TPL) setups in construction has increased but is still a new phenomenon. The purpose was to increase understanding of how structural and…
Abstract
Purpose
The use of third-party logistics (TPL) setups in construction has increased but is still a new phenomenon. The purpose was to increase understanding of how structural and management dimensions are related in CLSs by describing how CTPL setups are used.
Design/methodology/approach
Ten dimensions to describe and structure CLSs were identified from the literature and used to structure a cross-case analysis of 13 Swedish CLSs.
Findings
The main findings are: (1) there are three typical initiators of CLSs: municipalities, developers and contractors; (2) CLSs are drivers for service differentiation and modularization among TPL providers as construction specific services are required; (3) CLSs play a new role in construction by coordinating logistics activities between the construction project and the vicinity of the site.
Research limitations/implications
The study is based on 13 cases in the Swedish construction context. Additional studies of CLSs in other countries are needed.
Practical implications
The ten dimensions can be used as a guide in designing a CLS and in determining the order of design decisions. The identification and structuring of CTPL services also exemplify the variety of service offerings.
Originality/value
This is one of the first cross-case analyses of CLSs enabling the characterization of CTPL setups. This study identifies how different services included in the setup relate to the roles of SCM and logistics in construction.
Details