Article
Publication date: 26 March 2024

Yuanwen Han, Jiang Shen, Xuwei Zhu, Bang An and Xueying Bao

This study aims to develop an interface management risk interaction modeling and analysis methodology applicable to complex systems in high-speed rail construction projects…

Abstract

Purpose

This study aims to develop an interface management risk interaction modeling and analysis methodology applicable to complex systems in high-speed rail construction projects, reveal the interaction mechanism of interface management risk and provide theoretical support for project managers to develop appropriate interface management risk response strategies.

Design/methodology/approach

This paper introduces the association rule mining technique to improve the complex network modeling method. Taking China as an example, based on the stakeholder perspective, the risk factors and significant accident types of interface management of high-speed rail construction projects are systematically identified, and a database is established. Then, the Apriori algorithm is used to mine and analyze the strong association rules among the factors in the database, construct the complex network, and analyze its topological characteristics to reveal the interaction mechanism of the interface management risk of high-speed rail construction projects.

Findings

The results show that the network is both scale-free and small-world, implying that construction accidents are not random events but rather the result of strong interactions between numerous interface management risks. Contractors, technical interfaces, mechanical equipment, and environmental factors are the primary direct causal factors of accidents, while owners and designers are essential indirect causal factors. The global importance of stakeholders such as owners, designers, and supervisors rises significantly after considering the indirect correlations between factors. This theoretically explains the need to consider the interactions between interface management risks.

Originality/value

The interaction mechanism between interface management risks is unclear, which is an essential factor influencing the decision of risk response measures. This study proposes a new methodology for analyzing interface management risk response strategies that incorporate quantitative analysis methods and considers the interaction of interface management risks.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 22 March 2024

Ramgy Pararajasingam, Anuradha Samarajeewa Waidyasekara and Hasith Chathuranga Victar

Construction material management plays a significant role in achieving successful project delivery of a construction project. However, ineffective material management is a…

Abstract

Purpose

Construction material management plays a significant role in achieving successful project delivery of a construction project. However, ineffective material management is a critical issue in the construction industry, especially in developing economies, of which Sri Lanka is not an exception. Therefore, this study aims to focus on exploring the causes of ineffective material management practices in civil engineering construction projects in Sri Lanka and their impact on successful project delivery.

Design/methodology/approach

Furthermore, the literature findings were validated through the preliminary survey. Subsequently, a quantitative research approach was adopted to pursue the research aim. Questionnaire responses were obtained from 215 construction professionals in civil engineering projects who were selected using the judgemental and snowball sampling techniques. Collected data were analysed through Statistical Package for the Social Sciences (SPSS) V26 and Microsoft Excel 2016.

Findings

Moreover, the study revealed that material price fluctuation, shortage of material in the market, delay in material procurement, inadequate planning and delays in material delivery are the most frequent causes of ineffective material management in civil engineering projects. In addition, it was evidenced that most ineffective material management practices cause both time and cost overruns in civil engineering construction projects. Most respondents emphasized inadequate planning, inadequate qualified and experienced staff, lack of supervision and lack of leadership as the causes for both time and cost overruns.

Originality/value

The study was concluded by proposing strategies for effective material management. Education/training/enlightenment of staff in charge of materials management, use of software like Microsoft Project, Primavera and similar software to eliminate manual errors in material management, and providing clear specifications to suppliers were the most agreed strategies for effective material management in civil engineering construction projects.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 5 February 2024

Sara S. Badran and Ayman Bahjat Abdallah

The present research aims to investigate how lean project management (LPM) and agile project management (APM) affect project performance outcomes in the construction sector in…

Abstract

Purpose

The present research aims to investigate how lean project management (LPM) and agile project management (APM) affect project performance outcomes in the construction sector in Jordan. This study focuses on six key project performance outcomes, namely cost, time, quality, client satisfaction, innovation and responsiveness.

Design/methodology/approach

The present study employed a quantitative approach to achieve the research objectives. Accordingly, a multi-item survey questionnaire was prepared to gather data from 392 project managers from construction companies in Jordan. The study’s model showed acceptable levels regarding reliability, validity, fit indices and discriminant validity. In order to test the hypotheses of this study, path analysis was employed using Amos 24.0 software.

Findings

LPM demonstrated a remarkably high positive impact on cost performance. It also positively affected quality performance and client satisfaction. However, LPM insignificantly affected time, innovation and responsiveness performance measures. On the other hand, APM showed a notably high positive impact on innovation and responsiveness. The findings also revealed that APM positively impacted quality performance and client satisfaction. In addition, APM negatively impacted cost performance and insignificantly impacted time performance.

Originality/value

This study is one of the first comprehensive studies to empirically examine the impact of both LPM and APM on various project performance outcomes in the construction industry in the context of a developing country. It reveals some similarities and differences between LPM and APM with regard to their impacts on project management outcomes. The findings are expected to guide managers in selecting the appropriate project management approach based on the desired performance outcomes. Accordingly, it offers important implications for project managers in construction companies.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 19 June 2023

Abdelrahman M. Farouk and Rahimi A. Rahman

Implementing building information modeling (BIM) in construction projects offers many benefits. However, the use of BIM in project cost management is still limited. This study…

Abstract

Purpose

Implementing building information modeling (BIM) in construction projects offers many benefits. However, the use of BIM in project cost management is still limited. This study aims to review the current trends in the application of BIM in project cost management.

Design/methodology/approach

This study systematically reviews the literature on the application of BIM in project cost management. A total of 46 related articles were identified and analyzed using the Preferred Reporting Items for Systematic Reviews and Meta-Analyses method.

Findings

Eighteen approaches to applying BIM in project cost management were identified. The approaches can be grouped into cost control and cost estimation. Also, BIM can be applied independently or integrated with other techniques. The integrated approaches for cost control include integration with genetic algorithms, Monte Carlo simulation, lean construction, integrated project delivery, neural network and value engineering. On the contrary, integrated approaches for cost estimation include integration with cost-plus pricing, discrepancy analysis, construction progress curves, estimation standards, algorithms, declarative mappings, life cycle sustainability assessment, ontology, Web-based frameworks and structured query language.

Originality/value

To the best of the authors’ knowledge, this study is the first to systematically review prior literature on the application of BIM in project cost management. As a result, the study provides a comprehensive understanding of the current state of the art and fills the literature gap. Researchers and industry professionals can use the study findings to increase the benefits of implementing BIM in construction projects.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 3 November 2022

Debby Willar, Bambang Trigunarsyah, Anak Agung Diah Parami Dewi and Febriane Makalew

There are various methods to assess the failure of a road construction project that does not meet quality and performance standards. This study aims to evaluate the factors…

1087

Abstract

Purpose

There are various methods to assess the failure of a road construction project that does not meet quality and performance standards. This study aims to evaluate the factors affecting the quality management of road construction projects in Indonesia by identifying the critical challenges in implementing quality management processes and examining the countermeasures to address these problems.

Design/methodology/approach

In this research, the quality management processes in Indonesian road construction projects are evaluated using a mixed quantitative and qualitative approach. Quantitative data obtained from two rounds of Delphi questionnaire surveys as the primary data source, and focus group interviews as the qualitative data are used to achieve the aims of this study.

Findings

It is found that from as early as in the preconstruction stage of a project, the availability of quality standards and documentation is problematic when implementing quality management processes. The critical factor of the quality control activities of a project and the quality management roles and responsibilities of the stakeholders during road construction is the project team. This constraint deals with the interaction of the competency, commitment, and mutual cooperation among the main stakeholders to ensure that quality management processes are implemented. This implementation is a part of controlling the road pavement materials, supervising the project activities according to a specified standard, and reporting the project performance. The findings of this study add parameters relating to quality management and quality processes in a road construction project area.

Originality/value

This study is the first to evaluate the quality management processes in the construction of Indonesian road projects. The investigation identifies and evaluates the causes of the persistence of poor road quality. All revealed constraints are substantial factors that hinder the implementation of quality management processes when delivering quality road products. This study addresses the key influencing factors and scenarios related to quality management during road construction projects in Indonesia and other developing countries as practical examples and provides case-based insights for construction practitioners and civil engineering academics in developed countries.

Details

The TQM Journal, vol. 35 no. 7
Type: Research Article
ISSN: 1754-2731

Keywords

Article
Publication date: 14 March 2023

Titus Ebenezer Kwofie, Florence Akyaa Ellis, Michael Nii Addy, Samuel Amos-Abanyie, Clinton Aigbavboa and Samuel Owusu Afram

The link between relationship typologies and effectiveness of conflict resolution approaches remains to be tested despite its significance in conflict management in construction…

Abstract

Purpose

The link between relationship typologies and effectiveness of conflict resolution approaches remains to be tested despite its significance in conflict management in construction project delivery. By using the four relationships attributes based on the group attachment theory, the purpose of the study was to explore the cluster of relationships among project teams and organisations and the performance of conflict management strategies across these clusters in the Ghanaian construction industry.

Design/methodology/approach

Using a deductive questionnaire survey in the Ghanaian construction industry, a total of 137 responses were gathered and analyzed using cluster analysis, mean scores and ANOVA to reveal the relationship clusters and performance of conflict management strategies across these clusters.

Findings

The results revealed eight relationship clusters that exist among project teams and organisations with distinct influence of roles & tasks function, cognition, emotions and behavior attributes across the relationship clusters. In the aspect of the effectiveness of conflict management strategies, it was noted that the performance of these strategies were significantly different across the groups. For instance, integrating as a conflict management strategy was deemed to be effective in resolving conflict in unitary, adversarial, pluralist, mutuality, collaborative and partnering relationship clusters. In the case of coopetitive and coercive relationships, the performance of integrating as a conflict management strategy was less effective. This study thus has empirically proved that, different relationship clusters of teams and organizations exist within the Ghanaian construction industry, and that they perform different roles & tasks functions, cognition, emotions and behavioural attributes in their formation. Additionally, the performance effectiveness of conflict management strategies differed across the relationship clusters.

Originality/value

By aligning the relationship attributes to the dynamics of relationship clusters experienced in project teams and organisations, relationship quality, suitability and effectiveness of conflict management strategies can be optimized. The findings can inform project teams and stakeholders to develop fit-for-purpose relationship attributes among teams and organisations to enhance team effectiveness, relationship quality and conflict management in the industry.

Details

International Journal of Productivity and Performance Management, vol. 73 no. 3
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 8 April 2022

Yumin Qiu and Hongquan Chen

The large scale of construction projects and the coexistence of multiple logics in the construction field are sparking interest in applying an institutional perspective to…

Abstract

Purpose

The large scale of construction projects and the coexistence of multiple logics in the construction field are sparking interest in applying an institutional perspective to investigate managerial issues in construction projects. However, only a few conceptual papers have been published thus far, and a literature review is needed to identify how that knowledge domain has developed. Based on the results of bibliometric analysis and content analysis, this study proposes potential future avenues for institutional theory in construction project management (ITCPM) studies.

Design/methodology/approach

This paper reports a bibliographic coupling analysis and a co-citation analysis conducted to identify existing research trajectories and determine the primary features of the current ITCPM literature. In addition, this paper employed a content analysis, identified the evolutionary stages of ITCPM knowledge over time and built a framework of existing research.

Findings

This paper first identified that the existing ITCPM studies evolve through three stages, and that the intellectual core of ITCPM studies can be categorized into five clusters. In addition, this paper proposes that future research can be extended from two existing streams: the institutional responses of project actors and the institutional outcomes of construction projects. This paper proposes several major questions that should be addressed by project management scholars working in both streams in order to develop an understanding of construction projects from an institutional perspective.

Originality/value

This is the first literature review of the existing body of knowledge based on a joining of institutional theory and construction project management literature. It uncovers knowledge gaps in contemporary research, notably a lack of broader consideration of how project actors respond to institutional environments and of the institutional outcomes of project management.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 11 July 2022

Yi Wang, Xiaopeng Deng and Hongtao Mao

This paper aims to explore the key risk factors affecting the Personnel Localization Management of international construction projects under the major public emergencies…

Abstract

Purpose

This paper aims to explore the key risk factors affecting the Personnel Localization Management of international construction projects under the major public emergencies represented by the novel coronavirus pneumonia pandemic (hereinafter COVID-19) and how the public emergency affected the Personnel Localization Management from three levels: staff turnover rate, the number of different personnel, the salary and performance of workers. The paper also helps to enhance the construction enterprises' response capacity of major public emergencies and provides a comprehensive framework of optimization strategies for the Personnel Localization Management of international construction projects (hereinafter projects).

Design/methodology/approach

The main research method of this paper is the case study, and ten representative international construction projects are selected for case study in China construction enterprises (hereinafter CCE). And this study used the failure mode and effects analysis (FMEA) and comparative analysis to find out all potential risk factors under the COVID-19 and analyze how the epidemic affects the Personnel Localization Management of projects which based on the primary data from 10 projects obtained through in-depth interviews and the secondary data from China First Metallurgical Group and Central South Construction Group's Overseas Enterprise.

Findings

The findings show that the outbreak of the major public emergencies not only greatly increased eight risk factors but also directly led to an increase in staff turnover rate. Meanwhile, the numbers of Chinese and local managers and workers are all affected, and an increase in the number and the salary performance of local workers can be reduced, to a certain extent, to the cost-to-output ratio of the projects. The findings would help construction enterprises better cope with Personnel Localization Management and enhance the response capacity of major public emergencies.

Research limitations/implications

This study will broaden researchers' horizons regarding “Personnel Localization Management under major public emergencies” and “risk factors of Personnel Localization Management in an international context.” Furthermore, construction enterprises looking for a better mechanism of Personnel Localization Management can benefit from research findings and lessons learned from the authors' case study during or before an outbreak of major public emergency. Lastly, the framework of optimization strategies for Personnel Localization Management can be used both for research purposes and practice issues in international construction projects.

Practical implications

The findings from the authors' case study offer the direction for international construction enterprises in China and other countries to formulate effective measures, strengthen overseas business and establish a crisis management mechanism for Personnel Localization Management under major public emergencies, and the findings provide emergency plans for projects to improve the public crisis handling capacity and respond to major public emergencies such as the COVID-19.

Social implications

This study analyzes the impact of the COVID-19 on the Personnel Localization Management of international construction projects from the perspective of personnel. This study provides a theoretical reference for the international construction industry to actively respond to major public emergencies. Besides, the research is conducive to improving the emergency response mechanism in the construction industry, and further promoting the high-quality and globalized development of international construction.

Originality/value

This study provides other researchers with a comprehensive understanding of the risk factors affecting the Personnel Localization Management of projects under the COVID-19 and insight for further research on localization management, risk management, and project management.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 6 June 2022

Solmaz Ahmadzadeh Amid, Esmatullah Noorzai and Mahmood Golabchi

Because the construction industry is one of the largest waste producers, understanding the primary reasons for waste production is essential. The goal of this study is to identify…

Abstract

Purpose

Because the construction industry is one of the largest waste producers, understanding the primary reasons for waste production is essential. The goal of this study is to identify the major causes of waste production over the project life cycle in Iran's construction industry and to propose effective solutions based on modern technologies like BIM.

Design/methodology/approach

After identifying the primary causes of construction and demolition waste production through interviews and literature analysis, solutions based on building information modeling (BIM) were provided. Then, using questionnaires and exploratory factor analysis (EFA), the areas impacting waste reduction were found.

Findings

The findings suggest that “prefabrication” is the best approach for improving time and quality, while “detection and prediction of errors in the design and construction phases” is the most cost-effective technique for addressing cost and environmental issues.

Originality/value

Cost, time, quality and environmental concerns may all be influenced by effective waste management throughout the project life cycle. Furthermore, utilizing state-of-the-art technologies has far-reaching implications for reducing material waste, resulting in more environmental-friendly construction.

Details

The TQM Journal, vol. 35 no. 6
Type: Research Article
ISSN: 1754-2731

Keywords

Article
Publication date: 1 April 2024

Zoubeir Lafhaj, Slim Rebai, Olfa Hamdi, Rateb Jabbar, Hamdi Ayech and Pascal Yim

This study aims to introduce and evaluate the COPULA framework, a construction project monitoring solution based on blockchain designed to address the inherent challenges of…

Abstract

Purpose

This study aims to introduce and evaluate the COPULA framework, a construction project monitoring solution based on blockchain designed to address the inherent challenges of construction project monitoring and management. This research aims to enhance efficiency, transparency and trust within the dynamic and collaborative environment of the construction industry by leveraging the decentralized, secure and immutable nature of blockchain technology.

Design/methodology/approach

This paper employs a comprehensive approach encompassing the formulation of the COPULA model, the development of a digital solution using the ethereum blockchain and extensive testing to assess performance in terms of execution cost, time, integrity, immutability and security. A case analysis is conducted to demonstrate the practical application and benefits of blockchain technology in real-world construction project monitoring scenarios.

Findings

The findings reveal that the COPULA framework effectively addresses critical issues such as centralization, privacy and security vulnerabilities in construction project management. It facilitates seamless data exchange among stakeholders, ensuring real-time transparency and the creation of a tamper-proof communication channel. The framework demonstrates the potential to significantly enhance project efficiency and foster trust among all parties involved.

Research limitations/implications

While the study provides promising insights into the application of blockchain technology in construction project monitoring, future research could explore the integration of COPULA with existing project management methodologies to broaden its applicability and impact. Further investigations into the solution’s scalability and adaptation to various construction project types and sizes are also suggested.

Originality/value

This research offers a comprehensive blockchain solution specifically tailored for the construction industry. Unlike prior studies focusing on theoretical aspects, this paper presents a practical, end-to-end solution encompassing model formulation, digital implementation, proof-of-concept testing and validation analysis. The COPULA framework marks a significant advancement in the digital transformation of construction project monitoring, providing a novel approach to overcoming longstanding industry challenges.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords